Dear AIESEC in Poland, 
With huge pleasure, we would like to inform you about results of one of the biggest recruitment in AIESEC in Poland in this year – our second Future Leaders Recruitment in October 2014. As members of AIESEC we spent a lot of time in preparation to this process, we were promoting FL for long hours, preparing a lot of assessement sheets, providing knowledge about this process to LCs, but now we should be proud that we gave an opportunity to so many young people who want to be part of our amazing organization. We want to thank all LCVP TMs and LCVP Communications for your work, engagement and effort during these intense months of preparation and work. We are really proud of you ! Yours, Karolina & Ola MCVP TxP AIESEC in Poland & National Recruitment Coordinator
This Report containS Information About* : 
Recruitment process 
Result of FL campaign 
Internal recruitment 
*One LC didn’t fill in this report – LC Nowy Sącz
OVERALL RESULTS 
We achieved 110 % plans nationally of recruitment new members Further information on next pages
OVERALL RESULTS 
We had 1826 applications 
We allocated 783 new members, including 31 returnees 
We allocated 125 TMP-TMPs 
General we allocated 908 people
PROMOTION
We achieved 103 % plans nationally of number of applications
Realization plans of number of applications 
44 
110 
102 
48 
246 
122 
72 
19 
52 
158 
60 
44 
66 
156 
128 
124 
126 
28 
46 
161 
83 
27 
304 
111 
86 
13 
20 
135 
45 
49 
75 
264 
185 
152 
67 
3 
0 
50 
100 
150 
200 
250 
300 
350 
Plan 
Realization
Realization plans of number of applications 
0 
50 
100 
150 
200 
250 
300 
350 
BS 
Mkt 
SE
Number of applications per Future Leaders sub-program 
542 
337 
947 
0 
100 
200 
300 
400 
500 
600 
700 
800 
900 
1000 
Business Sales 
Marketing 
Social Entre.
Results per Future Leaders sub-program (applications stage) 
136% 
68% 
104% 
0% 
20% 
40% 
60% 
80% 
100% 
120% 
140% 
160% 
Social Entre.. 
Marketing 
Business Sales 
We didn’t achieve 100% of plans only in Marketing program (337 people in whole Poland applied for Marketing).
Campaign duration 
19 
14 
14 
28 
17 
14 
17 
15 
15 
21 
28 
26 
14 
18 
25 
10 
25 
0 
5 
10 
15 
20 
25 
30 
How many days did the campaign last? 
Average duration was 20 days.
Campaign duration 
• The longest campaign has 2 LCs : LC Szczecin – 28 days 1,75 applications per day LC Kielce – 28 days 0,96 applications per day 
• The shortes campaign has one LC: LC Wrocław UT – 10 days 6,7 applications per day
Campaign budget 
1282 
1448 
1000 
100 
1000 
200 
0 
60 
1050 
300 
200 
1612 
500 
0 
600 
300 
100 
Białystok 
Gdańsk 
Katowice UE 
Kielce 
Kraków 
Lublin 
Łódź 
Olsztyn 
Poznań 
Rzeszów 
Szczecin 
Toruń UMK 
Warsaw SGH 
Warsaw UW 
Wrocław UE 
Wrocław UT 
IG Bielsko-Biała 
Only 2 LCs didn’t have budget for Future Leaders Campaign - they used materials from last campaign 
LCs used the following materials: posters, leaflets, FL graphics, gadgets, stickers. 
Average budget per LC was 634 PLN
Efficiency of our campaign 
The most effective channel was FRIENDS – more than 450 apps 
The second effective channel was FACEBOOK 
8 LCs organized outdoor promotion
What channels did we use during our campaign? 
0 
5 
10 
15 
20 
25 
Stands 
Events 
Classshouts 
Media release 
LC Warsaw UW didn’t use direct promotion and didn’t have media releases
Efficiency of our campaign 
LC Lublin organized the most number of classshouts 
The most number of stands were organized in LC Kielce 
LC Białystok and LC Gdańsk had the most number of media releases 
Only in Białystok, Katowice, Szczecin, Toruń UMK , Warsaw UW didn’t organize outdoors events
Campaign sum up 
233 people was engaged in Future Leaders promotion 
Avarage 29 people was engaged in each LC 
One people provided 8 applications 
9 LCs had event on facebook to promote FL 
The biggest potential we had still in students of Management and Economy faculties 
11 of 18 LCs had at least 1 parallel campaign
RECRUITMENT
We achieved 110% of recruitment plans and 11 LCs achieved more than 100% (Gdańsk, Kielce, Kraków, Nowy Sącz, Poznań, Rzeszów, Szczecin, Toruń UMK, Warsaw SGH, Warsaw UW, Wrocław UE). Situation in LC Szczecin was result of wrong planned Talent Plan and plan of promotion. 
IG Bielsko-Biała achieved only 30% 
77% 
116% 
95% 
129% 
119% 
93% 
88% 
150% 
84% 
104% 
119% 
480% 
167% 
103% 
103% 
122% 
79% 
30% 
% of recruitment plans achieved
ALLocation Plans vs Realization 
0 
10 
20 
30 
40 
50 
60 
70 
80 
90 
100 
LC Białystok 
LC Gdańsk 
LC Katowice 
LC Kielce 
LC Kraków 
LC Lublin 
LC Łódź 
LC Nowy Sącz 
LC Olsztyn 
LC Poznań 
LC Rzeszów 
LC Szczecin 
LC Toruń 
LC Warsaw SGH 
LC Warsaw UW 
LC Wrocław UE 
LC Wrocław UT 
IG Bielsko-Biała 
Plan 
Realization
Allocation Results per Future Leaders sub-program 
121% 
85% 
80% 
0% 
20% 
40% 
60% 
80% 
100% 
120% 
140% 
Social Enter… 
Marketing 
Business Sales 
Still we had the worst results in Business Sales sub-program, but they were better than during last recruitment
We allocated in AIESEC 908 members. 65% female 35% male. Warsaw UW allocated less than 20% of women 3 LCs allocated almost equally of women and men: : Warsaw SGH, Wrocław UE, Wrocław UT 
65% 
67% 
63% 
70% 
80% 
77% 
83% 
80% 
77% 
79% 
71% 
70% 
59% 
19% 
57% 
57% 
25% 
35% 
33% 
37% 
30% 
20% 
23% 
17% 
20% 
23% 
21% 
29% 
30% 
41% 
81% 
43% 
43% 
75% 
Women 
Men
Recruitment and allocation 
To recruit 783 people (new members + returnees) we needed 346 members. 
Most of the members was allocated to Social Enterprenuer program (page 22)
Only 6 LCs haven’t had skip yet ( 33%) Rest LCs noted 1-5 skips
How Many people We Reallocate 
5 
22 
14 
0 
20 
0 
5 
2 
13 
8 
0 
9 
4 
0 
13 
5 
1 
5 
18 
10 
0 
15 
0 
4 
3 
12 
6 
8 
7 
2 
0 
12 
5 
1 
Applicants 
Allocated members 
Only 4 LCs provided more than 10 TMP-TMP Experiences. In LCs members didn’t leave for other team experience.
Relation of new members to reallocation in recruitment 
17 
64 
43 
22 
87 
58 
32 
16 
71 
25 
48 
47 
79 
57 
61 
42 
3 
4 
18 
12 
5 
15 
0 
4 
1 
9 
6 
10 
7 
2 
0 
13 
10 
1 
New Members 
Reallocation 
We can notice that we based most on new members during recruitment
How Many returnees we recruited 
0 
4 
6 
0 
8 
3 
1 
2 
2 
0 
1 
1 
11 
7 
1 
1 
0 
0 
2 
1 
0 
8 
3 
1 
1 
2 
0 
1 
1 
9 
4 
1 
1 
0 
Applicants 
Allocated returnees 
Only 2 LCs provided more Integrated Experience than 5 per recruitment.
12% 
88% 
When did you allocate people? 
Pre- allocation on each step of the process 
After interview 
Nobody in AIESEC in Poland allocated people on LCC ! It means that OCPs went to LCC prepared to their structure 
33% 
39% 
22% 
6% 
How did you allocate people? 
Final decision of VP TM and LCP 
Final decision of VP TM 
Final decision of EB 
With engagement of OCPs 
Only Warsaw SGH engaged OCP to allocation. It means that in most LCs TM had final decidion about allocation
35% 
65% 
How long was Group Exercise? 
30 min 
30 min-60 min 
23% 
71% 
6% 
How long was average interview? 
Less than 45 min 
45 min- 1h 
1h -1,5h 
In every LC Group Exercise lastsed less than one hour 
Most of LCs conducted interviews less than one hour ! (In 94% of LCs RBs lasted less than 45min and 45 min-1 hour) 
It means that whole recruitment process was well-planned and materials created by MC helped LCs running recruitment.
Preparation to Recruitment 
17 
10 
1 
Training for assessors 
Simulation of recruitment 
Other 
How did you prepare people to recruitment process? 
Number of LC which use each materials 
14 
11 
15 
10 
13 
5 
What materials did you use during recruitment process? 
No of LCs which use each materials 
Every LCs organized training for assessors and 10 LCs tried to prepare them in practice way. During recruitment in most of cases used materials prepared by MC
How many people RESignED AFTER EACH ELEMENTS OF RECRiUTMENT PROCESS 
0 
5 
10 
15 
20 
25 
30 
Białystok 
Gdańsk 
Katowice UE 
Kielce 
Kraków 
Lublin 
Łódź 
Olsztyn 
Poznań 
Rzeszów 
Szczecin 
Toruń UMK 
Warsaw SGH 
Warsaw UW 
Wrocław UE 
Wrocław UT 
IG Bielsko-Biała 
After application 
After Group Exercise 
After RB 
After LCC
15% 
1% 
25% 
22% 
11% 
20% 
3% 
0% 
13% 
22% 
0% 
28% 
5% 
12% 
18% 
7% 
0% 
% of people who resigned 
% of people who resigned 
What was the relations between people who resigned and numer of applications
OUR CHALLENGES during creating report 
Not all of data sent by LCs was used in the report. In some cases it is impossible to create statistics. 
 Mistakes in providing data for campaigns results, sub-programs results - different answers in different questions 
Not filling in full report 
Some misunderstandings happened related to names 
A few of LCs missed DDLs, that’s why we have to postpone date of published report
Future leaders recruitment report   final version

More Related Content

Similar to Future leaders recruitment report final version

Future Leaders Implementation Report
Future Leaders Implementation ReportFuture Leaders Implementation Report
Future Leaders Implementation ReportJustyna Borucka
 
October recruitment report 2013
October recruitment report 2013October recruitment report 2013
October recruitment report 2013Karolina Mlenko
 
Q1 2014 national performance review
Q1 2014 national performance reviewQ1 2014 national performance review
Q1 2014 national performance reviewDanh Nguyen
 
[MC- 1516] Application booklet
[MC- 1516] Application booklet[MC- 1516] Application booklet
[MC- 1516] Application bookletKarolina Mlenko
 
AIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application BookletAIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application Bookletaiesec_poland
 
Future leaders recruitment report rekrutacja
Future leaders recruitment report   rekrutacjaFuture leaders recruitment report   rekrutacja
Future leaders recruitment report rekrutacjaAleksandra Wolny
 
AIESEC HCMC][National RnR 1314] Best oGCDP Award
AIESEC HCMC][National RnR 1314] Best oGCDP AwardAIESEC HCMC][National RnR 1314] Best oGCDP Award
AIESEC HCMC][National RnR 1314] Best oGCDP AwardNguyễn Minh
 
National Driver Update: GCDPo
National Driver Update: GCDPoNational Driver Update: GCDPo
National Driver Update: GCDPonur_farzana
 
AIESEC SJTU MarComm Awarding Materials
AIESEC SJTU MarComm Awarding MaterialsAIESEC SJTU MarComm Awarding Materials
AIESEC SJTU MarComm Awarding Materialslenaliu327
 
MC 1617 booklet fourth round
MC 1617 booklet fourth roundMC 1617 booklet fourth round
MC 1617 booklet fourth roundaiesec_poland
 
AIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application BookletAIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application Bookletaiesec_poland
 
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014Aiesec ftu hcm_ogcdp_r&r application_ignite 2014
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014Vân Đào
 
Mo c mc vp 1415 candidate booklet
Mo c mc vp 1415 candidate bookletMo c mc vp 1415 candidate booklet
Mo c mc vp 1415 candidate bookletMowen Li
 

Similar to Future leaders recruitment report final version (20)

TMP Oct 2014
TMP Oct 2014TMP Oct 2014
TMP Oct 2014
 
TMP May/June 2014
TMP May/June 2014TMP May/June 2014
TMP May/June 2014
 
Future Leaders Implementation Report
Future Leaders Implementation ReportFuture Leaders Implementation Report
Future Leaders Implementation Report
 
TMP Oct 2013
TMP Oct 2013TMP Oct 2013
TMP Oct 2013
 
TMP Feb/March 2014
TMP Feb/March 2014TMP Feb/March 2014
TMP Feb/March 2014
 
TMP Sept-Oct 2015
TMP Sept-Oct 2015TMP Sept-Oct 2015
TMP Sept-Oct 2015
 
October recruitment report 2013
October recruitment report 2013October recruitment report 2013
October recruitment report 2013
 
Q1 2014 national performance review
Q1 2014 national performance reviewQ1 2014 national performance review
Q1 2014 national performance review
 
[MC- 1516] Application booklet
[MC- 1516] Application booklet[MC- 1516] Application booklet
[MC- 1516] Application booklet
 
AIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application BookletAIESEC in Poland MC 16/17 Second Round Application Booklet
AIESEC in Poland MC 16/17 Second Round Application Booklet
 
10306136 why o_gip
10306136 why o_gip10306136 why o_gip
10306136 why o_gip
 
TMP March 2015
TMP March 2015TMP March 2015
TMP March 2015
 
Future leaders recruitment report rekrutacja
Future leaders recruitment report   rekrutacjaFuture leaders recruitment report   rekrutacja
Future leaders recruitment report rekrutacja
 
AIESEC HCMC][National RnR 1314] Best oGCDP Award
AIESEC HCMC][National RnR 1314] Best oGCDP AwardAIESEC HCMC][National RnR 1314] Best oGCDP Award
AIESEC HCMC][National RnR 1314] Best oGCDP Award
 
National Driver Update: GCDPo
National Driver Update: GCDPoNational Driver Update: GCDPo
National Driver Update: GCDPo
 
AIESEC SJTU MarComm Awarding Materials
AIESEC SJTU MarComm Awarding MaterialsAIESEC SJTU MarComm Awarding Materials
AIESEC SJTU MarComm Awarding Materials
 
MC 1617 booklet fourth round
MC 1617 booklet fourth roundMC 1617 booklet fourth round
MC 1617 booklet fourth round
 
AIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application BookletAIESEC in Poland MC 16/17 Third Round Application Booklet
AIESEC in Poland MC 16/17 Third Round Application Booklet
 
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014Aiesec ftu hcm_ogcdp_r&r application_ignite 2014
Aiesec ftu hcm_ogcdp_r&r application_ignite 2014
 
Mo c mc vp 1415 candidate booklet
Mo c mc vp 1415 candidate bookletMo c mc vp 1415 candidate booklet
Mo c mc vp 1415 candidate booklet
 

Future leaders recruitment report final version

  • 1. Future leaders Recruitment report October 2014 * In this report you can find information about results of October recruitment of AIESEC in Poland
  • 2. Dear AIESEC in Poland, With huge pleasure, we would like to inform you about results of one of the biggest recruitment in AIESEC in Poland in this year – our second Future Leaders Recruitment in October 2014. As members of AIESEC we spent a lot of time in preparation to this process, we were promoting FL for long hours, preparing a lot of assessement sheets, providing knowledge about this process to LCs, but now we should be proud that we gave an opportunity to so many young people who want to be part of our amazing organization. We want to thank all LCVP TMs and LCVP Communications for your work, engagement and effort during these intense months of preparation and work. We are really proud of you ! Yours, Karolina & Ola MCVP TxP AIESEC in Poland & National Recruitment Coordinator
  • 3. This Report containS Information About* : Recruitment process Result of FL campaign Internal recruitment *One LC didn’t fill in this report – LC Nowy Sącz
  • 4. OVERALL RESULTS We achieved 110 % plans nationally of recruitment new members Further information on next pages
  • 5. OVERALL RESULTS We had 1826 applications We allocated 783 new members, including 31 returnees We allocated 125 TMP-TMPs General we allocated 908 people
  • 7. We achieved 103 % plans nationally of number of applications
  • 8. Realization plans of number of applications 44 110 102 48 246 122 72 19 52 158 60 44 66 156 128 124 126 28 46 161 83 27 304 111 86 13 20 135 45 49 75 264 185 152 67 3 0 50 100 150 200 250 300 350 Plan Realization
  • 9. Realization plans of number of applications 0 50 100 150 200 250 300 350 BS Mkt SE
  • 10. Number of applications per Future Leaders sub-program 542 337 947 0 100 200 300 400 500 600 700 800 900 1000 Business Sales Marketing Social Entre.
  • 11. Results per Future Leaders sub-program (applications stage) 136% 68% 104% 0% 20% 40% 60% 80% 100% 120% 140% 160% Social Entre.. Marketing Business Sales We didn’t achieve 100% of plans only in Marketing program (337 people in whole Poland applied for Marketing).
  • 12. Campaign duration 19 14 14 28 17 14 17 15 15 21 28 26 14 18 25 10 25 0 5 10 15 20 25 30 How many days did the campaign last? Average duration was 20 days.
  • 13. Campaign duration • The longest campaign has 2 LCs : LC Szczecin – 28 days 1,75 applications per day LC Kielce – 28 days 0,96 applications per day • The shortes campaign has one LC: LC Wrocław UT – 10 days 6,7 applications per day
  • 14. Campaign budget 1282 1448 1000 100 1000 200 0 60 1050 300 200 1612 500 0 600 300 100 Białystok Gdańsk Katowice UE Kielce Kraków Lublin Łódź Olsztyn Poznań Rzeszów Szczecin Toruń UMK Warsaw SGH Warsaw UW Wrocław UE Wrocław UT IG Bielsko-Biała Only 2 LCs didn’t have budget for Future Leaders Campaign - they used materials from last campaign LCs used the following materials: posters, leaflets, FL graphics, gadgets, stickers. Average budget per LC was 634 PLN
  • 15. Efficiency of our campaign The most effective channel was FRIENDS – more than 450 apps The second effective channel was FACEBOOK 8 LCs organized outdoor promotion
  • 16. What channels did we use during our campaign? 0 5 10 15 20 25 Stands Events Classshouts Media release LC Warsaw UW didn’t use direct promotion and didn’t have media releases
  • 17. Efficiency of our campaign LC Lublin organized the most number of classshouts The most number of stands were organized in LC Kielce LC Białystok and LC Gdańsk had the most number of media releases Only in Białystok, Katowice, Szczecin, Toruń UMK , Warsaw UW didn’t organize outdoors events
  • 18. Campaign sum up 233 people was engaged in Future Leaders promotion Avarage 29 people was engaged in each LC One people provided 8 applications 9 LCs had event on facebook to promote FL The biggest potential we had still in students of Management and Economy faculties 11 of 18 LCs had at least 1 parallel campaign
  • 20. We achieved 110% of recruitment plans and 11 LCs achieved more than 100% (Gdańsk, Kielce, Kraków, Nowy Sącz, Poznań, Rzeszów, Szczecin, Toruń UMK, Warsaw SGH, Warsaw UW, Wrocław UE). Situation in LC Szczecin was result of wrong planned Talent Plan and plan of promotion. IG Bielsko-Biała achieved only 30% 77% 116% 95% 129% 119% 93% 88% 150% 84% 104% 119% 480% 167% 103% 103% 122% 79% 30% % of recruitment plans achieved
  • 21. ALLocation Plans vs Realization 0 10 20 30 40 50 60 70 80 90 100 LC Białystok LC Gdańsk LC Katowice LC Kielce LC Kraków LC Lublin LC Łódź LC Nowy Sącz LC Olsztyn LC Poznań LC Rzeszów LC Szczecin LC Toruń LC Warsaw SGH LC Warsaw UW LC Wrocław UE LC Wrocław UT IG Bielsko-Biała Plan Realization
  • 22. Allocation Results per Future Leaders sub-program 121% 85% 80% 0% 20% 40% 60% 80% 100% 120% 140% Social Enter… Marketing Business Sales Still we had the worst results in Business Sales sub-program, but they were better than during last recruitment
  • 23. We allocated in AIESEC 908 members. 65% female 35% male. Warsaw UW allocated less than 20% of women 3 LCs allocated almost equally of women and men: : Warsaw SGH, Wrocław UE, Wrocław UT 65% 67% 63% 70% 80% 77% 83% 80% 77% 79% 71% 70% 59% 19% 57% 57% 25% 35% 33% 37% 30% 20% 23% 17% 20% 23% 21% 29% 30% 41% 81% 43% 43% 75% Women Men
  • 24. Recruitment and allocation To recruit 783 people (new members + returnees) we needed 346 members. Most of the members was allocated to Social Enterprenuer program (page 22)
  • 25. Only 6 LCs haven’t had skip yet ( 33%) Rest LCs noted 1-5 skips
  • 26. How Many people We Reallocate 5 22 14 0 20 0 5 2 13 8 0 9 4 0 13 5 1 5 18 10 0 15 0 4 3 12 6 8 7 2 0 12 5 1 Applicants Allocated members Only 4 LCs provided more than 10 TMP-TMP Experiences. In LCs members didn’t leave for other team experience.
  • 27. Relation of new members to reallocation in recruitment 17 64 43 22 87 58 32 16 71 25 48 47 79 57 61 42 3 4 18 12 5 15 0 4 1 9 6 10 7 2 0 13 10 1 New Members Reallocation We can notice that we based most on new members during recruitment
  • 28. How Many returnees we recruited 0 4 6 0 8 3 1 2 2 0 1 1 11 7 1 1 0 0 2 1 0 8 3 1 1 2 0 1 1 9 4 1 1 0 Applicants Allocated returnees Only 2 LCs provided more Integrated Experience than 5 per recruitment.
  • 29. 12% 88% When did you allocate people? Pre- allocation on each step of the process After interview Nobody in AIESEC in Poland allocated people on LCC ! It means that OCPs went to LCC prepared to their structure 33% 39% 22% 6% How did you allocate people? Final decision of VP TM and LCP Final decision of VP TM Final decision of EB With engagement of OCPs Only Warsaw SGH engaged OCP to allocation. It means that in most LCs TM had final decidion about allocation
  • 30. 35% 65% How long was Group Exercise? 30 min 30 min-60 min 23% 71% 6% How long was average interview? Less than 45 min 45 min- 1h 1h -1,5h In every LC Group Exercise lastsed less than one hour Most of LCs conducted interviews less than one hour ! (In 94% of LCs RBs lasted less than 45min and 45 min-1 hour) It means that whole recruitment process was well-planned and materials created by MC helped LCs running recruitment.
  • 31. Preparation to Recruitment 17 10 1 Training for assessors Simulation of recruitment Other How did you prepare people to recruitment process? Number of LC which use each materials 14 11 15 10 13 5 What materials did you use during recruitment process? No of LCs which use each materials Every LCs organized training for assessors and 10 LCs tried to prepare them in practice way. During recruitment in most of cases used materials prepared by MC
  • 32. How many people RESignED AFTER EACH ELEMENTS OF RECRiUTMENT PROCESS 0 5 10 15 20 25 30 Białystok Gdańsk Katowice UE Kielce Kraków Lublin Łódź Olsztyn Poznań Rzeszów Szczecin Toruń UMK Warsaw SGH Warsaw UW Wrocław UE Wrocław UT IG Bielsko-Biała After application After Group Exercise After RB After LCC
  • 33. 15% 1% 25% 22% 11% 20% 3% 0% 13% 22% 0% 28% 5% 12% 18% 7% 0% % of people who resigned % of people who resigned What was the relations between people who resigned and numer of applications
  • 34. OUR CHALLENGES during creating report Not all of data sent by LCs was used in the report. In some cases it is impossible to create statistics.  Mistakes in providing data for campaigns results, sub-programs results - different answers in different questions Not filling in full report Some misunderstandings happened related to names A few of LCs missed DDLs, that’s why we have to postpone date of published report