The Financial Benefits of
             All Wet Photoresist Removal
                      for 200mm


              China IC Manufacture Annual Summit
                         Wuxi, China
                      November 29, 2007
                                                                               1/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                             always thinking // better ®
Outline
              • Ion Implantation and PR Stripping Challenge
              • FSI ZETA® System ViPR™ process capability
              • Financial Benefit of All-Wet PR stripping
                       – Process / Production Cycle Time Reduction
                       – Improved Clean Space Productivity
                       – Reduced Capital Investment
              • FSI ZETA® System Installed Base Update
              • Summary



                                                                                         2/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                       always thinking // better ®
CMOS – Si Doping by Ion Implantation




                                         15 layers on 90nm and up CMOS process



                                                                                                   3/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                 always thinking // better ®
Key Factor on Implanted PR removal:
                                                        Dopant / Dose / Energy



                                                             ⊗
                                                                                 dehydrogenated,
                                                                                    amorphous
                                                                                   carbon layer




                                                                                                            4/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                          always thinking // better ®
Multiple Process Flexibility for IC fabrication
      FSI ZETA® System = Batch Spray Technology
                                                             Closed Chamber
          •       FEOL
                   – All-Wet Photoresist Strip (ViPR™)
                   – Metal Strip for Salicide Formation
                     (PlatNiStrip™ )
                   – Contact Clean

          •       BEOL
                   – Cu/low-k Post-Ash Clean
                   – Al/Cu Post Ash Clean (DSP)

          •       Back End Process
          •       Wafer Bumping
                   – Photoresist Strip
                   – Flux / Oxide Removal

          •       General                                                             x8 Chemical
                   – Wafer Reclaim                                                     In one tool
                                                                   Fresh chemical
                                                                   by POU mixing                      5/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                    always thinking // better ®
ZETA® System ViPR™ Process
                                     Eliminates Most Ash Steps
                                                              Asher




    Etch or
    ion
    implant

                              Patterned Photoresist


                                                                        Asher Residue
     Anneal
     and/or
     photo

                                              Clean Wafer
                                                             ZETA® G3                       6/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                          always thinking // better ®
Comparison: ZETA® System vs. Wet Bench
                                                       55keV, 1E15 As Implant
                              Immersion                               ZETA® System
                           170°C for 30 min                       ViPR™ Process 13.5 min




                     • Residue remains                               • All PR removed
                     • Process is not                                • Direct comparison
                       feasible in a wet                               shows ViPR™ process
                       bench                                           is more effective
                                                                                                       7/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                     always thinking // better ®
ZETA® System with ViPR™ Capability

                                      1.0E+17
                                                     UHD           DPG
                                                                     Gate                          Requires Ashing
                                      1.0E+16
                                                             B-Gap Eng.
                   Dose (atoms/cm2)




                                                                             S/D
                                      1.0E+15                                Contact
                                                                              Plug
                                                     SDE Engineering                                  FSI’s ViPR™
                                      1.0E+14
                                                                                 Isolation
                                                                                                      Technology
                                                                                                       Capability
                                                                      HALO Pocket
                                      1.0E+13                                                             D/Well
                                                                     Wt / Channel Eng. Twin Well
                                      1.0E+12
                                                    Traditional Wet                                        CCD
                                                   Process Capability
                                      1.0E+11
                                             0.1               1            10               100          1000       10000

                                                                            Energy (keV)                                               8/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                                                     always thinking // better ®
Reduce Production Cycle Time Significantly

                      Traditional Ash + Wet PR Stripping
                     Photoresist Ashing                         Batch Queue    Post Ash Clean

                          gate          damage
                                          layer       gate
                                                                      +       gate        gate
      Capital Cost




                     FSI’s ViPR™ Process All-Wet PR Stripping
                      All Wet Strip & Clean

                     gate                        gate


                                                             25mins                                     105mins
                                                                Process Cycle Time                                 9/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                                 always thinking // better ®
Reduce Production Cycle Time Significantly
                                                                                             Ash+Bench
                                             PR Stripping Process Cycle Time                 FSI Zeta 200 ViPR
                                     30.00


                                     25.00
           Process Cycle Time (hr)




                                     20.00
                Accumiliated




                                                                                                                         Cycle time
                                     15.00                                                                                Saving


                                     10.00


                                      5.00


                                      0.00
                                             1   2   3       4   5   6    7   8   9    10   11   12   13   14   15

                                                                         Mask Layers

                                                                                                                                       10/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                                                     always thinking // better ®
Improve Clean Room Space Efficiency
                                                             200mm Wafers
                     ZETA® System                                      Ash + Wet Bench
                        All-Wet

                                                                                  Asher       Asher
                                                                                  (6M2)       (6M2)
                                                                  Wet Bench     > 90WPH      >90WPH
                                                                    (19M2)
                                                                  >250 WPH        Asher
                              FSI Zeta 200                                        (6M2)
                                  ViPR
                                (6.3 M2)                                         >90WPH
                              > 250 WPH




                                        > 250 WPH rate efficiency for Photoresist stripping process


                                                                                                                 11/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                               always thinking // better ®
Improve Clean Room Space Efficiency
                          200mm Wafers
                                                                                  Asher+Bench
                                                                                  FSI Zeta 200 ViPR
                                350

                                300
            Clean Space ( m )
          2




                                250
                                                                                                           Clean room
                                200
                                                                                                             Space
                                150                                                                          Saving

                                100

                                50

                                 0
                                      10.8     21.6          32.4   43.2   54.0   64.8   75.6   86.4
                                                     Fab Capacity (1000's Wafers/ Month)

                                                                                                                         12/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                                       always thinking // better ®
Reduce Capital Investment
                                                                                                          Asher + Bench
                                                                                                          FSI Zeta 200 ViPR
                                                     35,000

                                                     30,000
                    Deposited Capital (1000's USD)




                                                     25,000

                                                                                                                                    Overall Capital
                                                     20,000
                                                                                                                                       Saving
                                                     15,000

                                                     10,000

    Better       5,000
Capital turnover
  efficiency         0
                                                              10.8   21.6    32.4     43.2      54.0      64.8    75.6   86.4
                                                                            Fab Capacity (1000's Wafers/ Month)



                                                                                                                                                  13/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                                                                always thinking // better ®
ZETA® System Installation Base
                                                  > 120 Systems in Production Worldwide




                                                20 Systems Currently with ViPR™ Capability
                                                                                                               14/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                                             always thinking // better ®
Zeta ViPR Summary
        • ZETA® system's ViPR™ technology for all wet
          photoresist removal has been proven in a
          manufacturing environment.
        • Financial Benefits:
                  – Reduce resist stripping process time from
                    1.5–3hrs to 0.5hrs.
                  – Improve overall fab production cycle time per
                    mask layer by 3 to 5%
                  – Lower capital investment by 15 to 33%

                                                                                    15/15
Copyright © 2007 | FSI International | All Rights Reserved
                                                                  always thinking // better ®

More Related Content

Viewers also liked

Why Motivation Sucks and How to Succeed Without it
Why Motivation Sucks and How to Succeed Without itWhy Motivation Sucks and How to Succeed Without it
Why Motivation Sucks and How to Succeed Without it
Cody McLain
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003
Sidewinder2011
 
Women Leadership Statistics
Women Leadership StatisticsWomen Leadership Statistics
Women Leadership Statistics
The Hatchery
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
Sidewinder2011
 
Kss 2010- processes for film stripping
Kss 2010- processes for film strippingKss 2010- processes for film stripping
Kss 2010- processes for film stripping
Sidewinder2011
 
Schottky Barrier Heigh oriented process integration 2012
Schottky Barrier Heigh oriented process integration 2012Schottky Barrier Heigh oriented process integration 2012
Schottky Barrier Heigh oriented process integration 2012
Sidewinder2011
 

Viewers also liked (6)

Why Motivation Sucks and How to Succeed Without it
Why Motivation Sucks and How to Succeed Without itWhy Motivation Sucks and How to Succeed Without it
Why Motivation Sucks and How to Succeed Without it
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003
 
Women Leadership Statistics
Women Leadership StatisticsWomen Leadership Statistics
Women Leadership Statistics
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
 
Kss 2010- processes for film stripping
Kss 2010- processes for film strippingKss 2010- processes for film stripping
Kss 2010- processes for film stripping
 
Schottky Barrier Heigh oriented process integration 2012
Schottky Barrier Heigh oriented process integration 2012Schottky Barrier Heigh oriented process integration 2012
Schottky Barrier Heigh oriented process integration 2012
 

FSI China IC Manufacture Annual Summit 2007 Final

  • 1. The Financial Benefits of All Wet Photoresist Removal for 200mm China IC Manufacture Annual Summit Wuxi, China November 29, 2007 1/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 2. Outline • Ion Implantation and PR Stripping Challenge • FSI ZETA® System ViPR™ process capability • Financial Benefit of All-Wet PR stripping – Process / Production Cycle Time Reduction – Improved Clean Space Productivity – Reduced Capital Investment • FSI ZETA® System Installed Base Update • Summary 2/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 3. CMOS – Si Doping by Ion Implantation 15 layers on 90nm and up CMOS process 3/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 4. Key Factor on Implanted PR removal: Dopant / Dose / Energy ⊗ dehydrogenated, amorphous carbon layer 4/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 5. Multiple Process Flexibility for IC fabrication FSI ZETA® System = Batch Spray Technology Closed Chamber • FEOL – All-Wet Photoresist Strip (ViPR™) – Metal Strip for Salicide Formation (PlatNiStrip™ ) – Contact Clean • BEOL – Cu/low-k Post-Ash Clean – Al/Cu Post Ash Clean (DSP) • Back End Process • Wafer Bumping – Photoresist Strip – Flux / Oxide Removal • General x8 Chemical – Wafer Reclaim In one tool Fresh chemical by POU mixing 5/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 6. ZETA® System ViPR™ Process Eliminates Most Ash Steps Asher Etch or ion implant Patterned Photoresist Asher Residue Anneal and/or photo Clean Wafer ZETA® G3 6/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 7. Comparison: ZETA® System vs. Wet Bench 55keV, 1E15 As Implant Immersion ZETA® System 170°C for 30 min ViPR™ Process 13.5 min • Residue remains • All PR removed • Process is not • Direct comparison feasible in a wet shows ViPR™ process bench is more effective 7/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 8. ZETA® System with ViPR™ Capability 1.0E+17 UHD DPG Gate Requires Ashing 1.0E+16 B-Gap Eng. Dose (atoms/cm2) S/D 1.0E+15 Contact Plug SDE Engineering FSI’s ViPR™ 1.0E+14 Isolation Technology Capability HALO Pocket 1.0E+13 D/Well Wt / Channel Eng. Twin Well 1.0E+12 Traditional Wet CCD Process Capability 1.0E+11 0.1 1 10 100 1000 10000 Energy (keV) 8/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 9. Reduce Production Cycle Time Significantly Traditional Ash + Wet PR Stripping Photoresist Ashing Batch Queue Post Ash Clean gate damage layer gate + gate gate Capital Cost FSI’s ViPR™ Process All-Wet PR Stripping All Wet Strip & Clean gate gate 25mins 105mins Process Cycle Time 9/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 10. Reduce Production Cycle Time Significantly Ash+Bench PR Stripping Process Cycle Time FSI Zeta 200 ViPR 30.00 25.00 Process Cycle Time (hr) 20.00 Accumiliated Cycle time 15.00 Saving 10.00 5.00 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Mask Layers 10/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 11. Improve Clean Room Space Efficiency 200mm Wafers ZETA® System Ash + Wet Bench All-Wet Asher Asher (6M2) (6M2) Wet Bench > 90WPH >90WPH (19M2) >250 WPH Asher FSI Zeta 200 (6M2) ViPR (6.3 M2) >90WPH > 250 WPH > 250 WPH rate efficiency for Photoresist stripping process 11/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 12. Improve Clean Room Space Efficiency 200mm Wafers Asher+Bench FSI Zeta 200 ViPR 350 300 Clean Space ( m ) 2 250 Clean room 200 Space 150 Saving 100 50 0 10.8 21.6 32.4 43.2 54.0 64.8 75.6 86.4 Fab Capacity (1000's Wafers/ Month) 12/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 13. Reduce Capital Investment Asher + Bench FSI Zeta 200 ViPR 35,000 30,000 Deposited Capital (1000's USD) 25,000 Overall Capital 20,000 Saving 15,000 10,000 Better 5,000 Capital turnover efficiency 0 10.8 21.6 32.4 43.2 54.0 64.8 75.6 86.4 Fab Capacity (1000's Wafers/ Month) 13/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 14. ZETA® System Installation Base > 120 Systems in Production Worldwide 20 Systems Currently with ViPR™ Capability 14/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®
  • 15. Zeta ViPR Summary • ZETA® system's ViPR™ technology for all wet photoresist removal has been proven in a manufacturing environment. • Financial Benefits: – Reduce resist stripping process time from 1.5–3hrs to 0.5hrs. – Improve overall fab production cycle time per mask layer by 3 to 5% – Lower capital investment by 15 to 33% 15/15 Copyright © 2007 | FSI International | All Rights Reserved always thinking // better ®