SlideShare a Scribd company logo
1 of 46
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Delivery Methods for Optimizing in situDelivery Methods for Optimizing in situ
Remediation with TreatmentRemediation with Treatment
AmendmentsAmendments
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
OutlineOutline
 The trend towardsThe trend towards in situin situ RemediationRemediation
 New approaches: Many OptionsNew approaches: Many Options
 Delivery Methods: Injection vs. FracturingDelivery Methods: Injection vs. Fracturing
 Verification techniquesVerification techniques
 ApplicationsApplications
 BenefitsBenefits
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Traditional ApproachTraditional Approach
 Excavation and Disposal (soils)Excavation and Disposal (soils)
 Monitored Natural Attenuation (Risk Management)Monitored Natural Attenuation (Risk Management)
 Ex situ treatmentEx situ treatment
 Physical extraction systemsPhysical extraction systems
BUT,BUT,
Excavation is expedient, but costly; retained liability is prorated toExcavation is expedient, but costly; retained liability is prorated to
waste generatorswaste generators
Risk Management is only a tool, not a remedial solutionRisk Management is only a tool, not a remedial solution
Ex situ options not always feasible due to site constraintsEx situ options not always feasible due to site constraints
(operations and facilities) and associated expense(operations and facilities) and associated expense
Physical extraction systems (P&T) not effective in low permeabilityPhysical extraction systems (P&T) not effective in low permeability
sedimentssediments
Transferring contamination or deferring the problem by riskTransferring contamination or deferring the problem by risk
management is NOT REMEDIATIONmanagement is NOT REMEDIATION
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
TraditionalTraditional
“Remediation”“Remediation”
3D Contaminant3D Contaminant
Plume ProfilePlume Profile
Free PhaseFree Phase ZoneZone Dissolved ZoneDissolved Zone
Alberta Reality –Alberta Reality –
Who wants to beWho wants to be
a millionaire?a millionaire?
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
““The New Remediation”The New Remediation”
Focus on DestructionFocus on Destruction of Contaminantsof Contaminants InIn
SituSitu to harmless end products :to harmless end products :
 ChemicallyChemically
 BiologicallyBiologically
using treatment amendments andusing treatment amendments and
enabling technologies (e.g. fracturing,enabling technologies (e.g. fracturing,
directional drilling, subsurface mapping)directional drilling, subsurface mapping)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Growing trend to RemedialGrowing trend to Remedial
Technologies that are …Technologies that are …
 CHEAPER (lower life-cycle cost)CHEAPER (lower life-cycle cost)
 Effective (meet criteria)Effective (meet criteria)
 Passive (simple infrastructure)Passive (simple infrastructure)
 Sustainable (natural processes)Sustainable (natural processes)
 Non-disruptive (minimal site disturbance)Non-disruptive (minimal site disturbance)
 Versatile (in soil and bedrock)Versatile (in soil and bedrock)
““Conventional Remediation that involvesConventional Remediation that involves
excavation is like amputating a patient’s armexcavation is like amputating a patient’s arm
when all she might need is a tetanus shot”when all she might need is a tetanus shot”
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Examples of In SituExamples of In Situ
ApplicationsApplications
 Refineries and Tank FarmsRefineries and Tank Farms
 Gas Plants and Battery SitesGas Plants and Battery Sites
 Pipeline ROWsPipeline ROWs
 Bulk Fuel PlantsBulk Fuel Plants
 Former Flare Pit sitesFormer Flare Pit sites
 Retail Gasoline StationsRetail Gasoline Stations
 Dry cleaner sitesDry cleaner sites
 Grain TerminalsGrain Terminals
 LandfillsLandfills
 Industrial Manufacturing SitesIndustrial Manufacturing Sites
 Brownfield redevelopmentBrownfield redevelopment
propertiesproperties
 Military SitesMilitary Sites
 Geotechnical dewatering &Geotechnical dewatering &
slope stability applicationsslope stability applications
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
In Situ Remediation usingIn Situ Remediation using
Treatment AmendmentsTreatment Amendments
DELIVERY TREATMENT
GEOLOGY
EMPLACE
TECHNIQUE
DRILL
EQUIPMENT
TREATMENT
AMENDMENT
CONTAMINANT
TYPE
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Treatment AmendmentsTreatment Amendments
AMENDMENAMENDMEN
TT
EXAMPLEEXAMPLE
SS
PROCESSPROCESS CONTAM.CONTAM.
Peroxygen
Chemicals
(powder slurry)
Calcium &
Magnesium
Peroxide
Oxidation and
Aerobic Bio-
degradation
Residual
Phase and
Dissolved
PHCs
Zero Valent Iron
(solids slurry)
CGI, MSI, NSI
Abiotic
Reductive
Dehalogenation
Chlorinated
solvents
Zeolites/Humates
(solids slurry)
Clinoptilolite/
Leonardite
Cation
Exchange/
Adsorp &
Chelatn
Salts,
metals,
hydrocarbons
Surfactants
(solution)
Non-ionic,
alcohol based
Reduced IFT;
enhanced Bio-
availability
Residual or
Free Phase
PHCs
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Low Density SolidLow Density Solid
Bioamendment (Chitin)Bioamendment (Chitin)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
High density SolidHigh density Solid
Amendment (ZVI)Amendment (ZVI)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Zeolite Column TestingZeolite Column Testing
To test for:To test for:
 Hydraulic ConductivityHydraulic Conductivity
propertiesproperties
 Use as a fractureUse as a fracture
proppantproppant
 Efficacy as an in situEfficacy as an in situ
treatment amendmenttreatment amendment
for sodium reductionfor sodium reduction
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Amendment DeliveryAmendment Delivery
MethodsMethods
 FRACTUREFRACTURE
EMPLACEMENTEMPLACEMENT::
Slurry containingSlurry containing
amendment isamendment is
pumped downholepumped downhole
at a pressureat a pressure
sufficient to fail soilsufficient to fail soil
and create discreteand create discrete
fractures of radialfractures of radial
distributiondistribution
 PERMEATIONPERMEATION
INJECTION:INJECTION:
Amendment solutionAmendment solution
or slurry is injected ator slurry is injected at
sub-fracturingsub-fracturing
pressure to permeatepressure to permeate
pore space radiallypore space radially
outwards from pointoutwards from point
of injection.of injection.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Permeation InjectionPermeation Injection
 Only works if amendment can pass throughOnly works if amendment can pass through
the mean pore throat diameter of a soil, i.e.the mean pore throat diameter of a soil, i.e.
when:when:
Amendment Particle size,Amendment Particle size,
Ps <Ps < √ K/7√ K/7
Ps in microns and K in md (Haris and Odum, 1982)Ps in microns and K in md (Haris and Odum, 1982)
Otherwise, you are fracturing!!!Otherwise, you are fracturing!!!
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Simplified Direct PushSimplified Direct Push
InjectionInjection
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Oxidant Injection at Dry CleanerOxidant Injection at Dry Cleaner
SiteSite
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
What is Fracturing?What is Fracturing?
 Fracturing is a process in which a fluid isFracturing is a process in which a fluid is
applied to a soil or rock mass until failure ofapplied to a soil or rock mass until failure of
the soil or rock occurs, which results in athe soil or rock occurs, which results in a
tensile parting (i.e. fracture).tensile parting (i.e. fracture).
 Adapted for environmental use from theAdapted for environmental use from the
Petroleum Industry where it has been usedPetroleum Industry where it has been used
for increasing well production since 1949.for increasing well production since 1949.
 Fractures create high permeable pathwaysFractures create high permeable pathways
which increase subsurface fluid flow.which increase subsurface fluid flow.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracture EmplacementFracture Emplacement
 Low permeability soils: <10Low permeability soils: <10-6-6
m/s Hydraulicm/s Hydraulic
Conductivity (clays, silts, silty/clayey fineConductivity (clays, silts, silty/clayey fine
grained sands)grained sands)
 Provides permeability enhancement andProvides permeability enhancement and
simultaneous delivery of treatmentsimultaneous delivery of treatment
amendments (solid, liquid, or slurry)amendments (solid, liquid, or slurry)
 Fracture pathways can be used forFracture pathways can be used for
subsequent injections of treatmentsubsequent injections of treatment
amendment for multiple dosing.amendment for multiple dosing.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Typical Fracture PlanTypical Fracture Plan
1.1. Soil Fracturing to increase permeabilitySoil Fracturing to increase permeability
2.2. Injection of chemical oxidants or biologicalInjection of chemical oxidants or biological
reagents into fractures and surrounding soils.reagents into fractures and surrounding soils.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracture EmplacementFracture Emplacement
of Amendmentsof Amendments
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Base Gel (Guar) carrierBase Gel (Guar) carrier
fluidfluid
 Water based,Water based,
natural or hydroxylnatural or hydroxyl
propyl guar polymerspropyl guar polymers
 pH buffer & claypH buffer & clay
stabilizerstabilizer
 CrosslinkerCrosslinker
 BreakerBreaker
 Sand proppantSand proppant
 AmendmentsAmendments
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Equipment Required forEquipment Required for
Amendment PlacementAmendment Placement
 Mobile mixing tankMobile mixing tank
and pumpsand pumps
 Drilling equipmentDrilling equipment
 Downhole FracturingDownhole Fracturing
and Injection toolsand Injection tools
 Pressure, Flow vs.Pressure, Flow vs.
Time InstrumentationTime Instrumentation
 Fracture mappingFracture mapping
equipmentequipment
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
INDUCED SANDINDUCED SAND
FRACTURESFRACTURES
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Which Delivery System ?Which Delivery System ?
 Depends on physical properties ofDepends on physical properties of
Treatment Amendment and propertiesTreatment Amendment and properties
of receiving geologyof receiving geology
 Generally low permeability soils andGenerally low permeability soils and
coarse-grained solid amendmentscoarse-grained solid amendments
require Fracture Emplacementrequire Fracture Emplacement
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Verifying Fractures andVerifying Fractures and
AmendmentAmendment DistributionDistribution
 Visually: Excavation, soil coringVisually: Excavation, soil coring
 Geophysics: Tiltmeters, GPR, ECGeophysics: Tiltmeters, GPR, EC
 Indirect methods: TracersIndirect methods: Tracers
 Effects on GW geochemistryEffects on GW geochemistry
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Visual verification of fracturesVisual verification of fractures
in excavationin excavation
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Verification of amendmentVerification of amendment
delivery by soil coringdelivery by soil coring
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Verification usingVerification using
Tiltmeter GeophysicsTiltmeter Geophysics
 Tiltmeters areTiltmeters are
ground surfaceground surface
sensors that detectsensors that detect
tilt angle and tilttilt angle and tilt
direction indirection in
response to aresponse to a
fracturing orfracturing or
injection event ininjection event in
the subsurfacethe subsurface
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Geochemical verification for AnaerobicGeochemical verification for Anaerobic
Reductive Dehalogenation of TCE byReductive Dehalogenation of TCE by
Poly-n-acetyl glucosamine (Chitin)Poly-n-acetyl glucosamine (Chitin)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Case Study 1:Case Study 1:
Condensate RecoveryCondensate Recovery
 Former gas plantFormer gas plant
leaked 400 mleaked 400 m33
ofof
liquid condensateliquid condensate
 Condensate underCondensate under
highway moving tohighway moving to
lake & water wellslake & water wells
 Low permeabilityLow permeability
clay soils do notclay soils do not
allow efficientallow efficient
recoveryrecovery
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracturing ProgramFracturing Program
 18 Fracture Boreholes containing 96 fractures18 Fracture Boreholes containing 96 fractures
created in hydrocarbon plumecreated in hydrocarbon plume
 Fractures initiated between 8 to 12 metresFractures initiated between 8 to 12 metres
depth in contaminated silts and claysdepth in contaminated silts and clays
 High vacuum extraction and pneumaticHigh vacuum extraction and pneumatic
pumping system constructed to recoverpumping system constructed to recover
hydrocarbons.hydrocarbons.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Condensate Plume prior toCondensate Plume prior to
Fracture RemediationFracture Remediation
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Condensate Plume after 5Condensate Plume after 5
years of MPE operationyears of MPE operation
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracture PerformanceFracture Performance
ParameteParamete
rr
BaselineBaseline
Recovery WellsRecovery Wells
FracturedFractured
Recovery WellsRecovery Wells
KK
(m/s)(m/s)
3x103x10-8-8
4x104x10-6-6
QQ
(L/day)(L/day)
160160
(17% HC)(17% HC)
490490
(77% HC)(77% HC)
RR
(m)(m)
44 > 10> 10
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracturing in ResidualFracturing in Residual
Condensate PlumesCondensate Plumes
(2006)(2006)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Results of FractureResults of Fracture
Enhanced RemediationEnhanced Remediation
 Subsurface condensate plume was reduced toSubsurface condensate plume was reduced to
residual levels and immobilized in 5 years.residual levels and immobilized in 5 years.
 Value of condensate recovered from fracturedValue of condensate recovered from fractured
recovery wells was $135,000 which almost paidrecovery wells was $135,000 which almost paid
for cost of fracturing ($152,000).for cost of fracturing ($152,000).
 Remediation cost: $1.4 millionRemediation cost: $1.4 million
 Best convenitional in situ alternative: $2.5Best convenitional in situ alternative: $2.5
millionmillion
 Estimated cost of excavation exclusive ofEstimated cost of excavation exclusive of
replacement cost of highway: > $4 millionreplacement cost of highway: > $4 million
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Case Study 2:Case Study 2:
Fracture enhanced saltFracture enhanced salt
leachingleaching
•Former Oilfield facility with
extensive salt impacts: 1.6ha
•Farmer does not want
disturbance to land
•Remedy: salt leach drains
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Fracturing ProgramFracturing Program
 Drainage field of 221 horizontal drainageDrainage field of 221 horizontal drainage
fractures in 65 boreholes over 1.6 ha sitefractures in 65 boreholes over 1.6 ha site
 Drainage fractures: 2 to 5 metres depthDrainage fractures: 2 to 5 metres depth
 Hydraulically connected to collection sumpHydraulically connected to collection sump
 Salt water treatment (flash distillation) andSalt water treatment (flash distillation) and
recirculation to fractured injection wellsrecirculation to fractured injection wells
 Landowner acceptanceLandowner acceptance
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
ResultsResults
 Permeability enhancement of 2 to 3Permeability enhancement of 2 to 3
orders of magnitudeorders of magnitude
 Hydraulic control over entire plume areaHydraulic control over entire plume area
 Very little above ground infrastructureVery little above ground infrastructure
 Negligible disturbance to landNegligible disturbance to land
 Less than half the $3.0 M cost ofLess than half the $3.0 M cost of
excavation (Wiebe Env.- RemTech ’06)excavation (Wiebe Env.- RemTech ’06)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
#3 - PCE Remediation at a#3 - PCE Remediation at a
Mall ComplexMall Complex
 Former dry cleaning operation at an urbanFormer dry cleaning operation at an urban
shopping mall leaked “PERC” (component inshopping mall leaked “PERC” (component in
dry cleaner fluid) into clay soils anddry cleaner fluid) into clay soils and
groundwater over 1,000 mgroundwater over 1,000 m22
areaarea
 Mall was redeveloped without addressingMall was redeveloped without addressing
contaminants residing to 8 m in subsurfacecontaminants residing to 8 m in subsurface
 New stores built over contamination andNew stores built over contamination and
remediation now required as part of real-remediation now required as part of real-
estate transaction.estate transaction.
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Former Dry Cleaner SiteFormer Dry Cleaner Site
Challenges:Challenges:
 Clay soils (K = 10Clay soils (K = 10-8-8
m/s)m/s)
required permeabilityrequired permeability
enhancementenhancement
 Site constraints: traffic,Site constraints: traffic,
deliveries, shoppers,deliveries, shoppers,
impact on businesses,impact on businesses,
buried utilities,buried utilities,
contamination undercontamination under
liquor storeliquor store
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Field ProgramField Program
 13 Fracture Boreholes13 Fracture Boreholes
 10 boreholes completed as10 boreholes completed as
injection wellsinjection wells
 Total of 42 sand fracturesTotal of 42 sand fractures
emplaced in clays (30 t)emplaced in clays (30 t)
 Fractures directed intoFractures directed into
contaminated soils undercontaminated soils under
liquor storeliquor store
 Subsequent injections ofSubsequent injections of
Oxytek MFR and KMnOOxytek MFR and KMnO44 intointo
fracture networkfracture network
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
Project SummaryProject Summary
 Fracture network facilitated injection of oxidizing solutionsFracture network facilitated injection of oxidizing solutions
modified Fentons Reagent, KMnOmodified Fentons Reagent, KMnO44 ) into contaminated clays) into contaminated clays
 Negligible disturbance to mall commerce – 6 day fracturingNegligible disturbance to mall commerce – 6 day fracturing
programprogram
 50% reduction in PCE in GW after 2 months (Oxytek)50% reduction in PCE in GW after 2 months (Oxytek)
 95% reduction (perimeter wells) & 11% reduction (core wells)95% reduction (perimeter wells) & 11% reduction (core wells)
 85% reduction in PCE GW plume & 30% reduction of soil plume85% reduction in PCE GW plume & 30% reduction of soil plume
 Ongoing oxidant injections to treat PCE rebound from claysOngoing oxidant injections to treat PCE rebound from clays
Cost analysis:Cost analysis:
Excavation and rebuilding: $ 2.5 M + loss of revenuesExcavation and rebuilding: $ 2.5 M + loss of revenues
Fracture Remediation : $ 0.5 M (est. 3 years)Fracture Remediation : $ 0.5 M (est. 3 years)
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
BenefitsBenefits
 Cost savings: 30% to 70%Cost savings: 30% to 70%
 Eco-friendly – small footprintEco-friendly – small footprint
 Best Available TechnologiesBest Available Technologies
 Dovetails with “Sustainability” conceptDovetails with “Sustainability” concept
 ““Stakeholder friendly” = acceptanceStakeholder friendly” = acceptance
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
CLOSURECLOSURE
 Innovative and cost-advantagedInnovative and cost-advantaged
technologies are increasingly in demandtechnologies are increasingly in demand
 These technologies are being leveragedThese technologies are being leveraged
for competitive advantage, includingfor competitive advantage, including
Master Service AgreementsMaster Service Agreements
 In situ vendors and technologies arrivingIn situ vendors and technologies arriving
in Canadain Canada
 The status quo is being left behindThe status quo is being left behind
FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD.
THANK YOU !!THANK YOU !!
Additional case histories, technicalAdditional case histories, technical
papers & SITE DATA CHECKLIST arepapers & SITE DATA CHECKLIST are
available at:available at:
www.fracrite.cawww.fracrite.ca

More Related Content

Similar to Frac Pp09

High speed technology is a boon in fpd /orthodontic courses by Indian dental ...
High speed technology is a boon in fpd /orthodontic courses by Indian dental ...High speed technology is a boon in fpd /orthodontic courses by Indian dental ...
High speed technology is a boon in fpd /orthodontic courses by Indian dental ...Indian dental academy
 
Radon migration study of the single layer coverage of the uranium enrichment ...
Radon migration study of the single layer coverage of the uranium enrichment ...Radon migration study of the single layer coverage of the uranium enrichment ...
Radon migration study of the single layer coverage of the uranium enrichment ...Leishman Associates
 
Kraken Stormwater Filter Is NJCAT Verified
Kraken Stormwater Filter Is NJCAT VerifiedKraken Stormwater Filter Is NJCAT Verified
Kraken Stormwater Filter Is NJCAT VerifiedZachary Crear
 
Water treatment i (1)
Water treatment i (1)Water treatment i (1)
Water treatment i (1)JEEVANRAJ S
 
Water treatment i
Water treatment iWater treatment i
Water treatment imemon5
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniquesAHMED NADIM JILANI
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsInfocengrs63
 
Sustainable landscape presentation final
Sustainable landscape presentation finalSustainable landscape presentation final
Sustainable landscape presentation finalGreen Jay Landscaping
 
Root canal irrigants /endodontic courses
Root canal irrigants /endodontic coursesRoot canal irrigants /endodontic courses
Root canal irrigants /endodontic coursesIndian dental academy
 
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALS
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALSCTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALS
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALSShankar Ramasamy
 
Greenbuild June 2011
Greenbuild June 2011Greenbuild June 2011
Greenbuild June 2011brianstannett
 
Flyash in geotechnical engineering
Flyash in geotechnical engineeringFlyash in geotechnical engineering
Flyash in geotechnical engineeringNiranjan Reddy
 
Portfolio Presentation 20090817
Portfolio Presentation 20090817Portfolio Presentation 20090817
Portfolio Presentation 20090817Pacificmp
 
L&t waste water-treatment by Ohm-Srinivas
L&t waste water-treatment by Ohm-SrinivasL&t waste water-treatment by Ohm-Srinivas
L&t waste water-treatment by Ohm-SrinivasSrinivas Kalasapati
 
Bio-engineering power point Presentation
Bio-engineering power point PresentationBio-engineering power point Presentation
Bio-engineering power point PresentationKalyan Thapa
 
Rationale for scaling and root planing
Rationale for scaling and root planingRationale for scaling and root planing
Rationale for scaling and root planingswati sharma
 

Similar to Frac Pp09 (20)

High speed technology is a boon in fpd /orthodontic courses by Indian dental ...
High speed technology is a boon in fpd /orthodontic courses by Indian dental ...High speed technology is a boon in fpd /orthodontic courses by Indian dental ...
High speed technology is a boon in fpd /orthodontic courses by Indian dental ...
 
Radon migration study of the single layer coverage of the uranium enrichment ...
Radon migration study of the single layer coverage of the uranium enrichment ...Radon migration study of the single layer coverage of the uranium enrichment ...
Radon migration study of the single layer coverage of the uranium enrichment ...
 
Kraken Stormwater Filter Is NJCAT Verified
Kraken Stormwater Filter Is NJCAT VerifiedKraken Stormwater Filter Is NJCAT Verified
Kraken Stormwater Filter Is NJCAT Verified
 
acid treatments
acid treatmentsacid treatments
acid treatments
 
cpt-soundings.pdf
cpt-soundings.pdfcpt-soundings.pdf
cpt-soundings.pdf
 
Water treatment i (1)
Water treatment i (1)Water treatment i (1)
Water treatment i (1)
 
Water treatment i
Water treatment iWater treatment i
Water treatment i
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniques
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigations
 
Sustainable landscape presentation final
Sustainable landscape presentation finalSustainable landscape presentation final
Sustainable landscape presentation final
 
Root canal irrigants /endodontic courses
Root canal irrigants /endodontic coursesRoot canal irrigants /endodontic courses
Root canal irrigants /endodontic courses
 
MBBR PRESENTATION
MBBR PRESENTATIONMBBR PRESENTATION
MBBR PRESENTATION
 
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALS
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALSCTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALS
CTEP - UNIT - I - ADMIXTURES & CONSTRUCTION CHEMICALS
 
Greenbuild June 2011
Greenbuild June 2011Greenbuild June 2011
Greenbuild June 2011
 
Flyash in geotechnical engineering
Flyash in geotechnical engineeringFlyash in geotechnical engineering
Flyash in geotechnical engineering
 
Portfolio Presentation 20090817
Portfolio Presentation 20090817Portfolio Presentation 20090817
Portfolio Presentation 20090817
 
Sergey Neckludov
Sergey NeckludovSergey Neckludov
Sergey Neckludov
 
L&t waste water-treatment by Ohm-Srinivas
L&t waste water-treatment by Ohm-SrinivasL&t waste water-treatment by Ohm-Srinivas
L&t waste water-treatment by Ohm-Srinivas
 
Bio-engineering power point Presentation
Bio-engineering power point PresentationBio-engineering power point Presentation
Bio-engineering power point Presentation
 
Rationale for scaling and root planing
Rationale for scaling and root planingRationale for scaling and root planing
Rationale for scaling and root planing
 

Recently uploaded

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Recently uploaded (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Frac Pp09

  • 1. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Delivery Methods for Optimizing in situDelivery Methods for Optimizing in situ Remediation with TreatmentRemediation with Treatment AmendmentsAmendments
  • 2. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. OutlineOutline  The trend towardsThe trend towards in situin situ RemediationRemediation  New approaches: Many OptionsNew approaches: Many Options  Delivery Methods: Injection vs. FracturingDelivery Methods: Injection vs. Fracturing  Verification techniquesVerification techniques  ApplicationsApplications  BenefitsBenefits
  • 3. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Traditional ApproachTraditional Approach  Excavation and Disposal (soils)Excavation and Disposal (soils)  Monitored Natural Attenuation (Risk Management)Monitored Natural Attenuation (Risk Management)  Ex situ treatmentEx situ treatment  Physical extraction systemsPhysical extraction systems BUT,BUT, Excavation is expedient, but costly; retained liability is prorated toExcavation is expedient, but costly; retained liability is prorated to waste generatorswaste generators Risk Management is only a tool, not a remedial solutionRisk Management is only a tool, not a remedial solution Ex situ options not always feasible due to site constraintsEx situ options not always feasible due to site constraints (operations and facilities) and associated expense(operations and facilities) and associated expense Physical extraction systems (P&T) not effective in low permeabilityPhysical extraction systems (P&T) not effective in low permeability sedimentssediments Transferring contamination or deferring the problem by riskTransferring contamination or deferring the problem by risk management is NOT REMEDIATIONmanagement is NOT REMEDIATION
  • 4. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. TraditionalTraditional “Remediation”“Remediation” 3D Contaminant3D Contaminant Plume ProfilePlume Profile Free PhaseFree Phase ZoneZone Dissolved ZoneDissolved Zone Alberta Reality –Alberta Reality – Who wants to beWho wants to be a millionaire?a millionaire?
  • 5. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. ““The New Remediation”The New Remediation” Focus on DestructionFocus on Destruction of Contaminantsof Contaminants InIn SituSitu to harmless end products :to harmless end products :  ChemicallyChemically  BiologicallyBiologically using treatment amendments andusing treatment amendments and enabling technologies (e.g. fracturing,enabling technologies (e.g. fracturing, directional drilling, subsurface mapping)directional drilling, subsurface mapping)
  • 6. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Growing trend to RemedialGrowing trend to Remedial Technologies that are …Technologies that are …  CHEAPER (lower life-cycle cost)CHEAPER (lower life-cycle cost)  Effective (meet criteria)Effective (meet criteria)  Passive (simple infrastructure)Passive (simple infrastructure)  Sustainable (natural processes)Sustainable (natural processes)  Non-disruptive (minimal site disturbance)Non-disruptive (minimal site disturbance)  Versatile (in soil and bedrock)Versatile (in soil and bedrock) ““Conventional Remediation that involvesConventional Remediation that involves excavation is like amputating a patient’s armexcavation is like amputating a patient’s arm when all she might need is a tetanus shot”when all she might need is a tetanus shot”
  • 7. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Examples of In SituExamples of In Situ ApplicationsApplications  Refineries and Tank FarmsRefineries and Tank Farms  Gas Plants and Battery SitesGas Plants and Battery Sites  Pipeline ROWsPipeline ROWs  Bulk Fuel PlantsBulk Fuel Plants  Former Flare Pit sitesFormer Flare Pit sites  Retail Gasoline StationsRetail Gasoline Stations  Dry cleaner sitesDry cleaner sites  Grain TerminalsGrain Terminals  LandfillsLandfills  Industrial Manufacturing SitesIndustrial Manufacturing Sites  Brownfield redevelopmentBrownfield redevelopment propertiesproperties  Military SitesMilitary Sites  Geotechnical dewatering &Geotechnical dewatering & slope stability applicationsslope stability applications
  • 8. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. In Situ Remediation usingIn Situ Remediation using Treatment AmendmentsTreatment Amendments DELIVERY TREATMENT GEOLOGY EMPLACE TECHNIQUE DRILL EQUIPMENT TREATMENT AMENDMENT CONTAMINANT TYPE
  • 9. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Treatment AmendmentsTreatment Amendments AMENDMENAMENDMEN TT EXAMPLEEXAMPLE SS PROCESSPROCESS CONTAM.CONTAM. Peroxygen Chemicals (powder slurry) Calcium & Magnesium Peroxide Oxidation and Aerobic Bio- degradation Residual Phase and Dissolved PHCs Zero Valent Iron (solids slurry) CGI, MSI, NSI Abiotic Reductive Dehalogenation Chlorinated solvents Zeolites/Humates (solids slurry) Clinoptilolite/ Leonardite Cation Exchange/ Adsorp & Chelatn Salts, metals, hydrocarbons Surfactants (solution) Non-ionic, alcohol based Reduced IFT; enhanced Bio- availability Residual or Free Phase PHCs
  • 10. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Low Density SolidLow Density Solid Bioamendment (Chitin)Bioamendment (Chitin)
  • 11. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. High density SolidHigh density Solid Amendment (ZVI)Amendment (ZVI)
  • 12. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Zeolite Column TestingZeolite Column Testing To test for:To test for:  Hydraulic ConductivityHydraulic Conductivity propertiesproperties  Use as a fractureUse as a fracture proppantproppant  Efficacy as an in situEfficacy as an in situ treatment amendmenttreatment amendment for sodium reductionfor sodium reduction
  • 13. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Amendment DeliveryAmendment Delivery MethodsMethods  FRACTUREFRACTURE EMPLACEMENTEMPLACEMENT:: Slurry containingSlurry containing amendment isamendment is pumped downholepumped downhole at a pressureat a pressure sufficient to fail soilsufficient to fail soil and create discreteand create discrete fractures of radialfractures of radial distributiondistribution  PERMEATIONPERMEATION INJECTION:INJECTION: Amendment solutionAmendment solution or slurry is injected ator slurry is injected at sub-fracturingsub-fracturing pressure to permeatepressure to permeate pore space radiallypore space radially outwards from pointoutwards from point of injection.of injection.
  • 14. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Permeation InjectionPermeation Injection  Only works if amendment can pass throughOnly works if amendment can pass through the mean pore throat diameter of a soil, i.e.the mean pore throat diameter of a soil, i.e. when:when: Amendment Particle size,Amendment Particle size, Ps <Ps < √ K/7√ K/7 Ps in microns and K in md (Haris and Odum, 1982)Ps in microns and K in md (Haris and Odum, 1982) Otherwise, you are fracturing!!!Otherwise, you are fracturing!!!
  • 15. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Simplified Direct PushSimplified Direct Push InjectionInjection
  • 16. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Oxidant Injection at Dry CleanerOxidant Injection at Dry Cleaner SiteSite
  • 17. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. What is Fracturing?What is Fracturing?  Fracturing is a process in which a fluid isFracturing is a process in which a fluid is applied to a soil or rock mass until failure ofapplied to a soil or rock mass until failure of the soil or rock occurs, which results in athe soil or rock occurs, which results in a tensile parting (i.e. fracture).tensile parting (i.e. fracture).  Adapted for environmental use from theAdapted for environmental use from the Petroleum Industry where it has been usedPetroleum Industry where it has been used for increasing well production since 1949.for increasing well production since 1949.  Fractures create high permeable pathwaysFractures create high permeable pathways which increase subsurface fluid flow.which increase subsurface fluid flow.
  • 18. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracture EmplacementFracture Emplacement  Low permeability soils: <10Low permeability soils: <10-6-6 m/s Hydraulicm/s Hydraulic Conductivity (clays, silts, silty/clayey fineConductivity (clays, silts, silty/clayey fine grained sands)grained sands)  Provides permeability enhancement andProvides permeability enhancement and simultaneous delivery of treatmentsimultaneous delivery of treatment amendments (solid, liquid, or slurry)amendments (solid, liquid, or slurry)  Fracture pathways can be used forFracture pathways can be used for subsequent injections of treatmentsubsequent injections of treatment amendment for multiple dosing.amendment for multiple dosing.
  • 19. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Typical Fracture PlanTypical Fracture Plan 1.1. Soil Fracturing to increase permeabilitySoil Fracturing to increase permeability 2.2. Injection of chemical oxidants or biologicalInjection of chemical oxidants or biological reagents into fractures and surrounding soils.reagents into fractures and surrounding soils.
  • 20. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracture EmplacementFracture Emplacement of Amendmentsof Amendments
  • 21. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Base Gel (Guar) carrierBase Gel (Guar) carrier fluidfluid  Water based,Water based, natural or hydroxylnatural or hydroxyl propyl guar polymerspropyl guar polymers  pH buffer & claypH buffer & clay stabilizerstabilizer  CrosslinkerCrosslinker  BreakerBreaker  Sand proppantSand proppant  AmendmentsAmendments
  • 22. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Equipment Required forEquipment Required for Amendment PlacementAmendment Placement  Mobile mixing tankMobile mixing tank and pumpsand pumps  Drilling equipmentDrilling equipment  Downhole FracturingDownhole Fracturing and Injection toolsand Injection tools  Pressure, Flow vs.Pressure, Flow vs. Time InstrumentationTime Instrumentation  Fracture mappingFracture mapping equipmentequipment
  • 23. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. INDUCED SANDINDUCED SAND FRACTURESFRACTURES
  • 24. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Which Delivery System ?Which Delivery System ?  Depends on physical properties ofDepends on physical properties of Treatment Amendment and propertiesTreatment Amendment and properties of receiving geologyof receiving geology  Generally low permeability soils andGenerally low permeability soils and coarse-grained solid amendmentscoarse-grained solid amendments require Fracture Emplacementrequire Fracture Emplacement
  • 25. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Verifying Fractures andVerifying Fractures and AmendmentAmendment DistributionDistribution  Visually: Excavation, soil coringVisually: Excavation, soil coring  Geophysics: Tiltmeters, GPR, ECGeophysics: Tiltmeters, GPR, EC  Indirect methods: TracersIndirect methods: Tracers  Effects on GW geochemistryEffects on GW geochemistry
  • 26. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Visual verification of fracturesVisual verification of fractures in excavationin excavation
  • 27. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Verification of amendmentVerification of amendment delivery by soil coringdelivery by soil coring
  • 28. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Verification usingVerification using Tiltmeter GeophysicsTiltmeter Geophysics  Tiltmeters areTiltmeters are ground surfaceground surface sensors that detectsensors that detect tilt angle and tilttilt angle and tilt direction indirection in response to aresponse to a fracturing orfracturing or injection event ininjection event in the subsurfacethe subsurface
  • 29. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Geochemical verification for AnaerobicGeochemical verification for Anaerobic Reductive Dehalogenation of TCE byReductive Dehalogenation of TCE by Poly-n-acetyl glucosamine (Chitin)Poly-n-acetyl glucosamine (Chitin)
  • 30. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Case Study 1:Case Study 1: Condensate RecoveryCondensate Recovery  Former gas plantFormer gas plant leaked 400 mleaked 400 m33 ofof liquid condensateliquid condensate  Condensate underCondensate under highway moving tohighway moving to lake & water wellslake & water wells  Low permeabilityLow permeability clay soils do notclay soils do not allow efficientallow efficient recoveryrecovery
  • 31. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracturing ProgramFracturing Program  18 Fracture Boreholes containing 96 fractures18 Fracture Boreholes containing 96 fractures created in hydrocarbon plumecreated in hydrocarbon plume  Fractures initiated between 8 to 12 metresFractures initiated between 8 to 12 metres depth in contaminated silts and claysdepth in contaminated silts and clays  High vacuum extraction and pneumaticHigh vacuum extraction and pneumatic pumping system constructed to recoverpumping system constructed to recover hydrocarbons.hydrocarbons.
  • 32. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Condensate Plume prior toCondensate Plume prior to Fracture RemediationFracture Remediation
  • 33. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Condensate Plume after 5Condensate Plume after 5 years of MPE operationyears of MPE operation
  • 34. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracture PerformanceFracture Performance ParameteParamete rr BaselineBaseline Recovery WellsRecovery Wells FracturedFractured Recovery WellsRecovery Wells KK (m/s)(m/s) 3x103x10-8-8 4x104x10-6-6 QQ (L/day)(L/day) 160160 (17% HC)(17% HC) 490490 (77% HC)(77% HC) RR (m)(m) 44 > 10> 10
  • 35. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracturing in ResidualFracturing in Residual Condensate PlumesCondensate Plumes (2006)(2006)
  • 36. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Results of FractureResults of Fracture Enhanced RemediationEnhanced Remediation  Subsurface condensate plume was reduced toSubsurface condensate plume was reduced to residual levels and immobilized in 5 years.residual levels and immobilized in 5 years.  Value of condensate recovered from fracturedValue of condensate recovered from fractured recovery wells was $135,000 which almost paidrecovery wells was $135,000 which almost paid for cost of fracturing ($152,000).for cost of fracturing ($152,000).  Remediation cost: $1.4 millionRemediation cost: $1.4 million  Best convenitional in situ alternative: $2.5Best convenitional in situ alternative: $2.5 millionmillion  Estimated cost of excavation exclusive ofEstimated cost of excavation exclusive of replacement cost of highway: > $4 millionreplacement cost of highway: > $4 million
  • 37. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Case Study 2:Case Study 2: Fracture enhanced saltFracture enhanced salt leachingleaching •Former Oilfield facility with extensive salt impacts: 1.6ha •Farmer does not want disturbance to land •Remedy: salt leach drains
  • 38. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Fracturing ProgramFracturing Program  Drainage field of 221 horizontal drainageDrainage field of 221 horizontal drainage fractures in 65 boreholes over 1.6 ha sitefractures in 65 boreholes over 1.6 ha site  Drainage fractures: 2 to 5 metres depthDrainage fractures: 2 to 5 metres depth  Hydraulically connected to collection sumpHydraulically connected to collection sump  Salt water treatment (flash distillation) andSalt water treatment (flash distillation) and recirculation to fractured injection wellsrecirculation to fractured injection wells  Landowner acceptanceLandowner acceptance
  • 39. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. ResultsResults  Permeability enhancement of 2 to 3Permeability enhancement of 2 to 3 orders of magnitudeorders of magnitude  Hydraulic control over entire plume areaHydraulic control over entire plume area  Very little above ground infrastructureVery little above ground infrastructure  Negligible disturbance to landNegligible disturbance to land  Less than half the $3.0 M cost ofLess than half the $3.0 M cost of excavation (Wiebe Env.- RemTech ’06)excavation (Wiebe Env.- RemTech ’06)
  • 40. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. #3 - PCE Remediation at a#3 - PCE Remediation at a Mall ComplexMall Complex  Former dry cleaning operation at an urbanFormer dry cleaning operation at an urban shopping mall leaked “PERC” (component inshopping mall leaked “PERC” (component in dry cleaner fluid) into clay soils anddry cleaner fluid) into clay soils and groundwater over 1,000 mgroundwater over 1,000 m22 areaarea  Mall was redeveloped without addressingMall was redeveloped without addressing contaminants residing to 8 m in subsurfacecontaminants residing to 8 m in subsurface  New stores built over contamination andNew stores built over contamination and remediation now required as part of real-remediation now required as part of real- estate transaction.estate transaction.
  • 41. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Former Dry Cleaner SiteFormer Dry Cleaner Site Challenges:Challenges:  Clay soils (K = 10Clay soils (K = 10-8-8 m/s)m/s) required permeabilityrequired permeability enhancementenhancement  Site constraints: traffic,Site constraints: traffic, deliveries, shoppers,deliveries, shoppers, impact on businesses,impact on businesses, buried utilities,buried utilities, contamination undercontamination under liquor storeliquor store
  • 42. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Field ProgramField Program  13 Fracture Boreholes13 Fracture Boreholes  10 boreholes completed as10 boreholes completed as injection wellsinjection wells  Total of 42 sand fracturesTotal of 42 sand fractures emplaced in clays (30 t)emplaced in clays (30 t)  Fractures directed intoFractures directed into contaminated soils undercontaminated soils under liquor storeliquor store  Subsequent injections ofSubsequent injections of Oxytek MFR and KMnOOxytek MFR and KMnO44 intointo fracture networkfracture network
  • 43. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. Project SummaryProject Summary  Fracture network facilitated injection of oxidizing solutionsFracture network facilitated injection of oxidizing solutions modified Fentons Reagent, KMnOmodified Fentons Reagent, KMnO44 ) into contaminated clays) into contaminated clays  Negligible disturbance to mall commerce – 6 day fracturingNegligible disturbance to mall commerce – 6 day fracturing programprogram  50% reduction in PCE in GW after 2 months (Oxytek)50% reduction in PCE in GW after 2 months (Oxytek)  95% reduction (perimeter wells) & 11% reduction (core wells)95% reduction (perimeter wells) & 11% reduction (core wells)  85% reduction in PCE GW plume & 30% reduction of soil plume85% reduction in PCE GW plume & 30% reduction of soil plume  Ongoing oxidant injections to treat PCE rebound from claysOngoing oxidant injections to treat PCE rebound from clays Cost analysis:Cost analysis: Excavation and rebuilding: $ 2.5 M + loss of revenuesExcavation and rebuilding: $ 2.5 M + loss of revenues Fracture Remediation : $ 0.5 M (est. 3 years)Fracture Remediation : $ 0.5 M (est. 3 years)
  • 44. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. BenefitsBenefits  Cost savings: 30% to 70%Cost savings: 30% to 70%  Eco-friendly – small footprintEco-friendly – small footprint  Best Available TechnologiesBest Available Technologies  Dovetails with “Sustainability” conceptDovetails with “Sustainability” concept  ““Stakeholder friendly” = acceptanceStakeholder friendly” = acceptance
  • 45. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. CLOSURECLOSURE  Innovative and cost-advantagedInnovative and cost-advantaged technologies are increasingly in demandtechnologies are increasingly in demand  These technologies are being leveragedThese technologies are being leveraged for competitive advantage, includingfor competitive advantage, including Master Service AgreementsMaster Service Agreements  In situ vendors and technologies arrivingIn situ vendors and technologies arriving in Canadain Canada  The status quo is being left behindThe status quo is being left behind
  • 46. FRAC RITE ENVIRONMENTAL LTD.FRAC RITE ENVIRONMENTAL LTD. THANK YOU !!THANK YOU !! Additional case histories, technicalAdditional case histories, technical papers & SITE DATA CHECKLIST arepapers & SITE DATA CHECKLIST are available at:available at: www.fracrite.cawww.fracrite.ca

Editor's Notes

  1. City of Calgary landfill rate increase, EU LF directive 2004 – no more codisposal
  2. Best Practices – mandated in corporate bylaws
  3. Simplified recipe for successful in situ remediation using a treatment amendment – critical elements Geology is of paramount importance!! It dictates delivery and influences treatment decisions.
  4. Zeolite has the potential to simultaneously provide high inherent permeability and cation exchange potential when emplaced into subsoils by fracturing .
  5. Two ways to overcome limitations of difficult soils - Fracturing to enhance K, and injection of treatment amendments into subsurface to inoculate soil and groundwater
  6. Direct injection works great in permeable soils (like in California) where there is sufficient groundwater flux to transport treatment amendments throughout the aquifer. However, this approach is not effective for clays – amendments can only be emplaced by fracturing because microscopic pore throats do not readily permit the injection of solids or liquids.
  7. Two ways to overcome limitations of difficult soils - Fracturing to enhance K, and injection of treatment amendments into subsurface to inoculate soil and groundwater
  8. Can emplace solid, slurry, or liquid phase amendments
  9. Bench to field scale
  10. Horizontal sheets of sand layered like pancakes – permeability contrast between clay and sand fractures is 5 orders of magnitude.
  11. Options: Excavation – need to dig up highway, condensate very deep – 15 m bgs Conventional recovery wells – low flow rates, too many required (&amp;gt;55), time frame to remediation estimated at 18 years by consultant.
  12. Based on assessment of 3 baseline wells to 3 fractured wells.
  13. Verification drilling in 2004 – missed smaller plumes from initial investigation – drilled conventional recovery wells in an attempt to recover condensate – unsuccessful. Therefore fractured in smaller plumes to enhance condensate recovery.
  14. 5 year time frame is impressive if you consider that the site had been leaking over 25 years. Threat to domestic WW users removed Production in first two years
  15. Best Practices – mandated in corporate bylaws