This document provides installation instructions for injection hose systems used to seal structural joints in underground concrete structures and tunnels. It describes how to place the hose in the middle of a cold joint and secure it with hose clamps every 15 cm. It also explains that the injection ends should be placed outside the formwork and that ventilation hoses must be fixed to prevent movement during concrete pouring. Finally, it provides specifications for the PREDIMAX and CEM injection hose systems, including dimensions, materials that can be injected, maximum lengths, and characteristics.