COMPONENT IDENTIFICATION
    AND INSTALLATION
      GUIDELINES
 FLOODBREAK, AUTOGATE

        FloodBreak, L.L.C.
  2800 Post Oak Blvd., Suite 5850
          Houston, Texas
              77056
COMPONENT IDENTIFICATION
GATE:
The term “gate” refers to the buoyant composite beam itself.
Identified here in red.
GATE PAN:
The gate pan is a recessed pan that the gate to and fits into.
Identified in green.
INSTALLATION BRACKET:
The installation bracket is welded to the gate pan and is used for
leveling the gate unit, as well as anchoring the gate unit to the
structural footing. Identified in blue.
GATE UNIT:
The entire structure, including the gate, gate pan, installation
bracket, and wiper walls (not shown here).
INSTALLATION

PLEASE NOTE THAT THE PHOTOS USED IN THIS PRESENTATION
 MAY REFLECT VARYING SITE CONDITIONS AND ARE INTENDED
           FOR ILLUSTRATION PURPOSES ONLY
5/8” AND 9/16”
MASONRY BITS
                              Installation Kit
                                                                         PAINT, FILLER
                                                                         PUTTY AND
                                GATE ANCHOR BOLTS                        HARDENER
                                WASHERS AND NUTS
                   LEVELING
                    BOLTS




                 VINYLESTER
                  CAPSULES           STAINLESS SHACKLES
                                     AND LIFTING CABLE




                                                          WIPER WALL
                                                          ANCHOR BOLTS




                               GRATING LIFTING HANDLES
STEP 1
    Identify the size of the of the rough opening required to accommodate
    placement of the gate unit.

EXAMPLE: Proposed gate size 3„X 25‟
The additions to the gate dimension are constant regardless of the gate size.
For a 3‟ gate the equation to identify the rough opening (r.o.) would read as
  follows.
3‟ (gate) + 1‟-3” (gate pan) + 1‟ (installation bracket) + 2‟ (construction
    tolerance) = 7‟-3” r.o.
EXAMPLE: Proposed gate size 5‟-6” X 25‟
For a 3‟-6” gate the equation to identify the rough opening (r.o.) would read as
  follows.
5‟-6”(gate) + 1‟-3” (gate pan) + 1” (installation bracket) + 2‟ (construction
    tolerance) = 9‟-9” r.o.
THE ROUGH OPENING DEPTH IS THE “UNIT DEPTH” + 3”
•     STANDARD = 12”
•     ROADWAY = 16”
STEP 2
Make two parallel saw cuts the correct distance apart as is determined
by the rough opening dimension
STEP 3
Break out, and haul off site the existing concrete.
STEP 4
Excavate, and haul off site, the existing base to the required depth to
accommodate the structural footing
STRUCTURAL FOOTING

The structural footing is a concrete footing placed 16”
below finished grade to a depth determined by others.
Varying geotechnical conditions and temperatures
typically determine the required depth. Consultation with
an engineer or local contractor is highly recommended.
Load specifications are to be equal to or greater than the
existing or proposed driveway design.
STEP 5
Place the 4” drain to storm sewer or exit point, centered both directions
in the rough opening, leaving the “stub up “ high (above finished grade)
to be cut off at the time of placing the gate unit.
STEP 6
Place re-bar and concrete for structural footing (first lift)
STEP 7
Remove all crating material from the gate unit. Including the wiper wall
support angles and square tubing shims.
STEP 8
Using a spreader-bar of adequate length to make a two point lift, lift the
gate unit from the trailer and swing it into position over the rough
opening.
Spreader Bar
STEP 9
Leaving the gate unit suspended over the rough opening, screw the leveling
bolts (provided) into the installation bracket approximately 1 ½” – 2”. When
the gate unit is placed it should be very close to finished grade.




         Leveling Bolt
STEP 10
Cut off the 4” drain to allow the leveling bolts to sit firmly on the structural footing
when the gate is placed.
NOTE: Using a site level, make a mark on the 4” pipe at finished grade. Measure
down from finished grade 4 ½” and cut off the pipe. This will leave some pipe in
the pan to be finished later.
STEP 11
Place the gate unit in the rough opening making sure to keep the gate unit
square with the existing structure before anchoring
STEP 12
Level the gate unit to match existing grade.
NOTE: Using a site level, shoot several points on the existing concrete (both
sides) to determine an “average” finished grade. Placing the mast on the finish
angles of the gate unit, take shot at every leveling bolt location and use the
leveling bolts to bring the gate unit to “average” finished grade.
STEP 13
           Anchor the gate unit to the structural footing.
Using a rotor hammer and a 9/16” masonry bit (provided) drill a minimum of 6”
into the structural footing by placing the into the anchor holes located adjacent
to the leveling bolts. Once the holes are all drilled, it is vey important to remove
all dust from the holes by using a vacuum or compressed air. After the holes are
thoroughly cleaned you can then drop the epoxy capsules (provided) into the
holes. Place the ½” stainless all-thread bolts into the holes and strike with a
hammer to ensure that the capsule is broken and the epoxy is released. Allow
the anchor bolts to “set” for about an hour to an hour and half, depending on
the ambient temperature, or until secure. Once set you can then bolt down the
unit. Using a grinder with a cut-off wheel, remove the excess all-thread
protruding above finished grade. Open the gate and put the prop-rods (located
in the pan) into place making sure to use the safety pin to prevent the gate from
falling. Repeat the anchoring process using the holes located on the retention
arm brackets. The all-thread bolts used on the inside of the pan must be ground
off flush with the top of the nuts to ensure proper closing of the gate. Return
the gate to the closed position.
Attach lifting cable
with stainless
shackles
Retention Arms
Prop-rod
Rotate prop-rod upward
Slide prop-rod
into position
Place prop-rod end into
the receiver
Install safety pin
Lower Retention Arm Bracket
STEP 14
Anchor the wiper walls to the existing structure.


 Using a rotor hammer and ½” masonry bit (provided) drill into
 the existing structure far enough to receive the wedge
 anchors and bolts (provided) by placing the bit into the pre-
 drilled holes in the wiper walls. Place the wedge anchors and
 bolts into the holes and tighten while ensuring the wiper walls
 are plumb and square to the gate surface. Sand the area
 around the bolt heads to remove the paint. Apply the two
 part putty (provided) to the sanded areas using the applicator
 provided. Allow the putty to harden and sand smooth.
STEP 15
Protect the entire gate unit using duct tape and plastic to keep any concrete
from getting on the gate unit.
STEP 16
Place the second lift of concrete to finished grade.
NOTE: It is critical to pour the concrete from the front side or “wet side” and
vibrate to the back to avoid any air pockets.
Dry Side




Wet Side
Vibrating Concrete from “Wet Side” to
“Dry Side”
STEP 17
Using non-shrink grout, grout the area between the wiper walls and existing
structure.




                  Wiper wall condition
                  before grout
Wiper Wall condition
after grout
STEP 18
Remove the tape and plastic, open the gate and put the prop-rods into
place. Using a grinder with a cut-off wheel, cut the 4” drain off flush with
the gate pan. Do not install a strainer. Re-paint the puttied areas of the
wiper walls using the paint and roller provided.
ESTIMATED INSTALLATION TIME
A typical retrofit installation, as we have illustrated here,
under normal conditions usually takes four (4) men, three (3)
days. The actual placement of the gate unit, i.e. leveling,
anchoring, and placement of the second lift normally takes
four (4) men, one and one half (1 ½) days.

For assistance please contact FloodBreak technical services.
                     FloodBreak, L.L.C.
              2800 Post Oak, Blvd. Suite 5850
                   Houston, Texas 77056
                       (713) 980-6610
                   info@floodbreak.com

More Related Content

What's hot

Quarrix Roofing Ventilation Product Guide
Quarrix Roofing Ventilation Product GuideQuarrix Roofing Ventilation Product Guide
Quarrix Roofing Ventilation Product Guide
Quarrix
 
Ceramic tiles for worktops
Ceramic tiles for worktopsCeramic tiles for worktops
Ceramic tiles for worktopsPraveen Sudarsan
 
Ridge Vent Installation Instructions for Hip Roofs
Ridge Vent Installation Instructions for Hip RoofsRidge Vent Installation Instructions for Hip Roofs
Ridge Vent Installation Instructions for Hip Roofs
Quarrix
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
Mot panels
 
Slx whisper faq (03 2011)-en
Slx whisper faq (03 2011)-enSlx whisper faq (03 2011)-en
Slx whisper faq (03 2011)-en
amicof
 
STORAGE: Key factors in bin usage
STORAGE: Key factors in bin usageSTORAGE: Key factors in bin usage
STORAGE: Key factors in bin usage
Milling and Grain magazine
 
Combo | Garden Sell Sheet
Combo | Garden Sell SheetCombo | Garden Sell Sheet
Combo | Garden Sell Sheet
Lynden Door | Alliance Door
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 
visual dictionary- cornerbead
visual dictionary- cornerbeadvisual dictionary- cornerbead
visual dictionary- cornerbeadcornerbead
 
How to Fit Hardwood Flooring
How to Fit Hardwood FlooringHow to Fit Hardwood Flooring
How to Fit Hardwood Flooring
British Hardwoods
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pondPraveen Sudarsan
 
Urethane Mortar Flooring
Urethane Mortar FlooringUrethane Mortar Flooring
Urethane Mortar Flooring
David Ryan
 
Visual Dictionary-CMU1
Visual Dictionary-CMU1Visual Dictionary-CMU1
Visual Dictionary-CMU1CMU1
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Trevain Bechan
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
jaydeedee
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
kaustav mukherjee
 
Effective Use of Tack Coats
Effective Use of Tack CoatsEffective Use of Tack Coats
Effective Use of Tack Coats
California Asphalt Pavement Association
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualGiller Doit
 

What's hot (20)

Quarrix Roofing Ventilation Product Guide
Quarrix Roofing Ventilation Product GuideQuarrix Roofing Ventilation Product Guide
Quarrix Roofing Ventilation Product Guide
 
Ceramic tiles for worktops
Ceramic tiles for worktopsCeramic tiles for worktops
Ceramic tiles for worktops
 
Ridge Vent Installation Instructions for Hip Roofs
Ridge Vent Installation Instructions for Hip RoofsRidge Vent Installation Instructions for Hip Roofs
Ridge Vent Installation Instructions for Hip Roofs
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
2004 0824 Mt
2004 0824 Mt2004 0824 Mt
2004 0824 Mt
 
Slx whisper faq (03 2011)-en
Slx whisper faq (03 2011)-enSlx whisper faq (03 2011)-en
Slx whisper faq (03 2011)-en
 
STORAGE: Key factors in bin usage
STORAGE: Key factors in bin usageSTORAGE: Key factors in bin usage
STORAGE: Key factors in bin usage
 
Combo | Garden Sell Sheet
Combo | Garden Sell SheetCombo | Garden Sell Sheet
Combo | Garden Sell Sheet
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
visual dictionary- cornerbead
visual dictionary- cornerbeadvisual dictionary- cornerbead
visual dictionary- cornerbead
 
How to Fit Hardwood Flooring
How to Fit Hardwood FlooringHow to Fit Hardwood Flooring
How to Fit Hardwood Flooring
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
Urethane Mortar Flooring
Urethane Mortar FlooringUrethane Mortar Flooring
Urethane Mortar Flooring
 
Visual Dictionary-CMU1
Visual Dictionary-CMU1Visual Dictionary-CMU1
Visual Dictionary-CMU1
 
Go For Broke Arch A-2
Go For Broke Arch A-2Go For Broke Arch A-2
Go For Broke Arch A-2
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
 
Effective Use of Tack Coats
Effective Use of Tack CoatsEffective Use of Tack Coats
Effective Use of Tack Coats
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly Manual
 

Similar to FloodBreak Installation Guide

thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
Trần Khánh
 
How to install guttering
How to install gutteringHow to install guttering
How to install guttering
HSS Hire
 
Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installationRoofers World
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
Schiedel UK
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
Installation Manuals - Southwest Solutions Group
 
Grande Palazzo Pool Water Fountain
Grande Palazzo Pool Water FountainGrande Palazzo Pool Water Fountain
Grande Palazzo Pool Water FountainBrook Kavanugh
 
How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
AbdallahTayea99
 
Sluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch TechnologiesSluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch Technologies
Watch Technologies
 
Build a shower cubicle
Build a shower cubicleBuild a shower cubicle
Build a shower cubicleZulaiha Amaria
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
LingWei11
 
Dish4You Cable Routing
Dish4You Cable RoutingDish4You Cable Routing
Dish4You Cable Routingspicherheidi
 
orion installation illuminated
orion installation illuminatedorion installation illuminated
orion installation illuminatedPeter Hoban
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidetZulaiha Amaria
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideWestern-Building-Center
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
dteich
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
ssuser480182
 
Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2
Dien Ha The
 
Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2
Dien Ha The
 

Similar to FloodBreak Installation Guide (20)

thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 
How to install guttering
How to install gutteringHow to install guttering
How to install guttering
 
Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installation
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
Grande Palazzo Pool Water Fountain
Grande Palazzo Pool Water FountainGrande Palazzo Pool Water Fountain
Grande Palazzo Pool Water Fountain
 
Fit a bath and wash basin
Fit a bath and wash basinFit a bath and wash basin
Fit a bath and wash basin
 
How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
 
Sluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch TechnologiesSluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch Technologies
 
Build a shower cubicle
Build a shower cubicleBuild a shower cubicle
Build a shower cubicle
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
Dish4You Cable Routing
Dish4You Cable RoutingDish4You Cable Routing
Dish4You Cable Routing
 
orion installation illuminated
orion installation illuminatedorion installation illuminated
orion installation illuminated
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2
 
Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2Catalog busbar ls 09. busduct installation&maintenance rev2
Catalog busbar ls 09. busduct installation&maintenance rev2
 

Recently uploaded

How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
BelgiumManagement
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
Lead Generation Media
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
aashiyanastardevelop
 
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
JagadishKR1
 
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BrickAndBolt
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
Lixin Azarmehr
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
ticktoktips
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop AG
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
Listing Turkey
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Joseph Lewis Aguirre
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
VickyAulakh1
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
SVN International Corp.
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Volition Properties
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
JagadishKR1
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
omaxesportscitydwark
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
kishor21012022
 

Recently uploaded (20)

How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
 
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
 
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
 
One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.One20 North Vancouver Floor Plans by Three Shores Development.
One20 North Vancouver Floor Plans by Three Shores Development.
 
SVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property BroadcastSVN Live 6.3.24 Weekly Property Broadcast
SVN Live 6.3.24 Weekly Property Broadcast
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
One FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG by Group 108 Sector 142 Noida Construction Update
One FNG by Group 108 Sector 142 Noida Construction Update
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
 

FloodBreak Installation Guide

  • 1. COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C. 2800 Post Oak Blvd., Suite 5850 Houston, Texas 77056
  • 3. GATE: The term “gate” refers to the buoyant composite beam itself. Identified here in red.
  • 4. GATE PAN: The gate pan is a recessed pan that the gate to and fits into. Identified in green.
  • 5. INSTALLATION BRACKET: The installation bracket is welded to the gate pan and is used for leveling the gate unit, as well as anchoring the gate unit to the structural footing. Identified in blue.
  • 6. GATE UNIT: The entire structure, including the gate, gate pan, installation bracket, and wiper walls (not shown here).
  • 7. INSTALLATION PLEASE NOTE THAT THE PHOTOS USED IN THIS PRESENTATION MAY REFLECT VARYING SITE CONDITIONS AND ARE INTENDED FOR ILLUSTRATION PURPOSES ONLY
  • 8. 5/8” AND 9/16” MASONRY BITS Installation Kit PAINT, FILLER PUTTY AND GATE ANCHOR BOLTS HARDENER WASHERS AND NUTS LEVELING BOLTS VINYLESTER CAPSULES STAINLESS SHACKLES AND LIFTING CABLE WIPER WALL ANCHOR BOLTS GRATING LIFTING HANDLES
  • 9. STEP 1 Identify the size of the of the rough opening required to accommodate placement of the gate unit. EXAMPLE: Proposed gate size 3„X 25‟ The additions to the gate dimension are constant regardless of the gate size. For a 3‟ gate the equation to identify the rough opening (r.o.) would read as follows. 3‟ (gate) + 1‟-3” (gate pan) + 1‟ (installation bracket) + 2‟ (construction tolerance) = 7‟-3” r.o. EXAMPLE: Proposed gate size 5‟-6” X 25‟ For a 3‟-6” gate the equation to identify the rough opening (r.o.) would read as follows. 5‟-6”(gate) + 1‟-3” (gate pan) + 1” (installation bracket) + 2‟ (construction tolerance) = 9‟-9” r.o. THE ROUGH OPENING DEPTH IS THE “UNIT DEPTH” + 3” • STANDARD = 12” • ROADWAY = 16”
  • 10. STEP 2 Make two parallel saw cuts the correct distance apart as is determined by the rough opening dimension
  • 11. STEP 3 Break out, and haul off site the existing concrete.
  • 12. STEP 4 Excavate, and haul off site, the existing base to the required depth to accommodate the structural footing
  • 13. STRUCTURAL FOOTING The structural footing is a concrete footing placed 16” below finished grade to a depth determined by others. Varying geotechnical conditions and temperatures typically determine the required depth. Consultation with an engineer or local contractor is highly recommended. Load specifications are to be equal to or greater than the existing or proposed driveway design.
  • 14. STEP 5 Place the 4” drain to storm sewer or exit point, centered both directions in the rough opening, leaving the “stub up “ high (above finished grade) to be cut off at the time of placing the gate unit.
  • 15. STEP 6 Place re-bar and concrete for structural footing (first lift)
  • 16. STEP 7 Remove all crating material from the gate unit. Including the wiper wall support angles and square tubing shims.
  • 17. STEP 8 Using a spreader-bar of adequate length to make a two point lift, lift the gate unit from the trailer and swing it into position over the rough opening.
  • 19.
  • 20.
  • 21. STEP 9 Leaving the gate unit suspended over the rough opening, screw the leveling bolts (provided) into the installation bracket approximately 1 ½” – 2”. When the gate unit is placed it should be very close to finished grade. Leveling Bolt
  • 22.
  • 23. STEP 10 Cut off the 4” drain to allow the leveling bolts to sit firmly on the structural footing when the gate is placed. NOTE: Using a site level, make a mark on the 4” pipe at finished grade. Measure down from finished grade 4 ½” and cut off the pipe. This will leave some pipe in the pan to be finished later.
  • 24.
  • 25.
  • 26. STEP 11 Place the gate unit in the rough opening making sure to keep the gate unit square with the existing structure before anchoring
  • 27. STEP 12 Level the gate unit to match existing grade. NOTE: Using a site level, shoot several points on the existing concrete (both sides) to determine an “average” finished grade. Placing the mast on the finish angles of the gate unit, take shot at every leveling bolt location and use the leveling bolts to bring the gate unit to “average” finished grade.
  • 28.
  • 29. STEP 13 Anchor the gate unit to the structural footing. Using a rotor hammer and a 9/16” masonry bit (provided) drill a minimum of 6” into the structural footing by placing the into the anchor holes located adjacent to the leveling bolts. Once the holes are all drilled, it is vey important to remove all dust from the holes by using a vacuum or compressed air. After the holes are thoroughly cleaned you can then drop the epoxy capsules (provided) into the holes. Place the ½” stainless all-thread bolts into the holes and strike with a hammer to ensure that the capsule is broken and the epoxy is released. Allow the anchor bolts to “set” for about an hour to an hour and half, depending on the ambient temperature, or until secure. Once set you can then bolt down the unit. Using a grinder with a cut-off wheel, remove the excess all-thread protruding above finished grade. Open the gate and put the prop-rods (located in the pan) into place making sure to use the safety pin to prevent the gate from falling. Repeat the anchoring process using the holes located on the retention arm brackets. The all-thread bolts used on the inside of the pan must be ground off flush with the top of the nuts to ensure proper closing of the gate. Return the gate to the closed position.
  • 30.
  • 31.
  • 32.
  • 33. Attach lifting cable with stainless shackles
  • 34.
  • 39. Place prop-rod end into the receiver
  • 42.
  • 43. STEP 14 Anchor the wiper walls to the existing structure. Using a rotor hammer and ½” masonry bit (provided) drill into the existing structure far enough to receive the wedge anchors and bolts (provided) by placing the bit into the pre- drilled holes in the wiper walls. Place the wedge anchors and bolts into the holes and tighten while ensuring the wiper walls are plumb and square to the gate surface. Sand the area around the bolt heads to remove the paint. Apply the two part putty (provided) to the sanded areas using the applicator provided. Allow the putty to harden and sand smooth.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48. STEP 15 Protect the entire gate unit using duct tape and plastic to keep any concrete from getting on the gate unit.
  • 49. STEP 16 Place the second lift of concrete to finished grade. NOTE: It is critical to pour the concrete from the front side or “wet side” and vibrate to the back to avoid any air pockets.
  • 50.
  • 51.
  • 53.
  • 54. Vibrating Concrete from “Wet Side” to “Dry Side”
  • 55.
  • 56. STEP 17 Using non-shrink grout, grout the area between the wiper walls and existing structure. Wiper wall condition before grout
  • 58. STEP 18 Remove the tape and plastic, open the gate and put the prop-rods into place. Using a grinder with a cut-off wheel, cut the 4” drain off flush with the gate pan. Do not install a strainer. Re-paint the puttied areas of the wiper walls using the paint and roller provided.
  • 59.
  • 60. ESTIMATED INSTALLATION TIME A typical retrofit installation, as we have illustrated here, under normal conditions usually takes four (4) men, three (3) days. The actual placement of the gate unit, i.e. leveling, anchoring, and placement of the second lift normally takes four (4) men, one and one half (1 ½) days. For assistance please contact FloodBreak technical services. FloodBreak, L.L.C. 2800 Post Oak, Blvd. Suite 5850 Houston, Texas 77056 (713) 980-6610 info@floodbreak.com