Anyone who does not include “profit” in their definition of a brand has never run a brand before. To me, a product is a basic commodity you sell. A brand creates a bond that leads to a power and profit beyond what the product alone can achieve.
If you want to succeed in brand management, you have to understand brand finance. After all, you are running a business. If you only like the activity of marketing, then you should become a subject matter expert, because if you cannot work the finances of your brand, you will not get promoted beyond brand manager.
There are eight ways you can drive brand profits
1️⃣ Premium pricing
2️⃣ Trade loyal consumers up to a higher price
3️⃣ Lower cost of goods
4️⃣ Lower marketing and selling costs
5️⃣ Steal competitive users
6️⃣ Get loyal users to use more
7️⃣ Enter into new markets
8️⃣ Find new uses for the brand
This type of thinking is in my Beloved Brands book, which I wrote as the playbook to help brand leaders build a brand that consumers love. You will learn how to think, define, plan, execute and analyze. We have a specific chapter on a Finance 101 for Marketers. To order Beloved Brands on Amazon https://lnkd.in/eF-mYPe or on Apple Books: https://lnkd.in/ekQ-n9X or on Kobo: https://lnkd.in/g7SzEh4
Anyone who does not include “profit” in their definition of brand likely has never run a brand before. To me, a product is the basic commodity you sell but a brand creates a bond, with the intention of achieving a power and profit beyond what the product alone could achieve. The only reason you would ever add more investment to create a brand is because you believe you can get more back from that investment than just selling the product. If you wish to succeed in Brand Management, you have to understand brand finance. After all, you are running a business. If you started your brand to fulfill a personal passion or promise, I will tell you that a profitable brand will allow you to fulfill a lot more promises. If you just like the activity of Marketing, then you should become a subject matter expert, not in charge of a branded business.
The step-by-step process for how to define your B2B brand.
This type of thinking is in my second book, B2B Brands, which I wrote as the playbook for how to create a B2B brand that your customers will love.
https://beloved-brands.com/brand-positioning/
B2B Brands is an actionable “make it happen” playbook, not just some theory or opinion book.
To reach your full potential as a B2B brand leader, you will learn to think, define, plan, inspire and analyze:
How to think strategically
Write a brand positioning statement
Come up with a brand idea
Write a brand plan everyone can follow
Write an inspiring creative brief
Make decisions on marketing execution
Conduct a deep-dive business review
Learn finance 101 for marketers
My goal in writing this book is to make you a smarter B2B brand leader so your brand can win in the market.
To order B2B Brands on Amazon https://lnkd.in/ecesjkq on Rakuten Kobo: https://lnkd.in/eqrf-sU or on Apple Books: https://lnkd.in/eVD63iK
The more beloved the brand, the more valuable the brand.
For more on Beloved Brands, here are a few of our most popular articles
1. Beloved Brands Marketing Training programs.
https://beloved-brands.com/brand-management-training/
2. Our Beloved Brands Mini MBA is an online marketing course to help your marketing career.
https://beloved-brands.com/mini-mba/
3. Simple process to build your Brand Positioning Statement
https://beloved-brands.com/brand-positioning/
4. How to write a Marketing Plan
https://beloved-brands.com/marketing-plans/
5. Our one-page strategic plan
https://beloved-brands.com/brand-strategy-roadmap/
6. The best and worst of a Creative Brief
https://beloved-brands.com/creative-brief-line-by-line/
7. Marketing Plan Template
https://beloved-brands.com/product/marketing-plan-template/
8. Our one-page Brand Plan
https://beloved-brands.com/brand-plans
9. How to understand Brand Architecture
https://beloved-brands.com/brand-architecture
10. How to use Marketing Funnels to analyze your brand
https://beloved-brands.com/marketing-funnels/
Too many people think that brand management matters most to a consumer brand, and they underestimate the value of marketing for B2B brands. And many of these people are running B2B brands. They treat marketing as a support function, hiring low-cost marketing coordinators to support their sales team, and do basic packaging for new launches and run a few basic trade magazines.
How to write your annual Brand Plan so that everyone in your organization can...Beloved Brands Inc.
Have you ever noticed that people who say, “We need to get everyone on the same page” rarely have anything written down on ONE page? People use the term “fewer bigger bets” all the time, yet these same people seem to be fans of those small little projects that deplete resources. People say they are good decision-makers, yet struggle when facing strategic choices, so they try to justify doing both options. A well-written Brand Plan should force your hand in how to allocate your brand’s limited resources to drive the highest return. We believe that a Brand Plan should be on one page!
Here are the 5 marketing processes that every brand leader must know to be successful in your job.
✅ How to define your brand positioning
✅ How to write a marketing plan
✅ How to inspire marketing execution
✅ How to analyze your brand's performance
✅ How to think strategically
Every marketer has a natural space they excel and a blind spot they need help in. If you have a gap, it will likely show to those deciding on your next move. Challenge yourself to fill in your skills gaps using experience, coaching, and training to become a well-rounded marketer.
Explore our Beyond the MBA training program which is a virtual brand management training designed for the real world. This is your opportunity to gain access to world-class brand management training.
Our virtual training includes 35 engaging video training sessions as Graham shares the best brand management thinking that covers strategic thinking, brand positioning, brand plans, marketing execution, and marketing analytics.
Upon completing our program, you will earn a certificate in brand management that you can proudly display on your resume and LinkedIn profile.
For more information on Beyond the MBA, go to:
https://lnkd.in/e8f_dKn
Here are some of our best Beloved Brands stories on brand management:
Read how to write a brand positioning statement:
https://beloved-brands.com/2012/05/06/brand-positioning-statement/
Read how to write a brand plan:
https://beloved-brands.com/2012/06/24/brand-plan/
Read how to write a brand strategy roadmap:
https://beloved-brands.com/2013/04/14/brand-strategy-roadmap/
Read how to write brand concept:
https://beloved-brands.com/2013/10/12/brand-concept/
Workshop for Brand Leaders to help define your brand positioning statement, brand concept and organizing big idea.
https://beloved-brands.com/brand-positioning/
Anyone who does not include “profit” in their definition of brand likely has never run a brand before. To me, a product is the basic commodity you sell but a brand creates a bond, with the intention of achieving a power and profit beyond what the product alone could achieve. The only reason you would ever add more investment to create a brand is because you believe you can get more back from that investment than just selling the product. If you wish to succeed in Brand Management, you have to understand brand finance. After all, you are running a business. If you started your brand to fulfill a personal passion or promise, I will tell you that a profitable brand will allow you to fulfill a lot more promises. If you just like the activity of Marketing, then you should become a subject matter expert, not in charge of a branded business.
The step-by-step process for how to define your B2B brand.
This type of thinking is in my second book, B2B Brands, which I wrote as the playbook for how to create a B2B brand that your customers will love.
https://beloved-brands.com/brand-positioning/
B2B Brands is an actionable “make it happen” playbook, not just some theory or opinion book.
To reach your full potential as a B2B brand leader, you will learn to think, define, plan, inspire and analyze:
How to think strategically
Write a brand positioning statement
Come up with a brand idea
Write a brand plan everyone can follow
Write an inspiring creative brief
Make decisions on marketing execution
Conduct a deep-dive business review
Learn finance 101 for marketers
My goal in writing this book is to make you a smarter B2B brand leader so your brand can win in the market.
To order B2B Brands on Amazon https://lnkd.in/ecesjkq on Rakuten Kobo: https://lnkd.in/eqrf-sU or on Apple Books: https://lnkd.in/eVD63iK
The more beloved the brand, the more valuable the brand.
For more on Beloved Brands, here are a few of our most popular articles
1. Beloved Brands Marketing Training programs.
https://beloved-brands.com/brand-management-training/
2. Our Beloved Brands Mini MBA is an online marketing course to help your marketing career.
https://beloved-brands.com/mini-mba/
3. Simple process to build your Brand Positioning Statement
https://beloved-brands.com/brand-positioning/
4. How to write a Marketing Plan
https://beloved-brands.com/marketing-plans/
5. Our one-page strategic plan
https://beloved-brands.com/brand-strategy-roadmap/
6. The best and worst of a Creative Brief
https://beloved-brands.com/creative-brief-line-by-line/
7. Marketing Plan Template
https://beloved-brands.com/product/marketing-plan-template/
8. Our one-page Brand Plan
https://beloved-brands.com/brand-plans
9. How to understand Brand Architecture
https://beloved-brands.com/brand-architecture
10. How to use Marketing Funnels to analyze your brand
https://beloved-brands.com/marketing-funnels/
Too many people think that brand management matters most to a consumer brand, and they underestimate the value of marketing for B2B brands. And many of these people are running B2B brands. They treat marketing as a support function, hiring low-cost marketing coordinators to support their sales team, and do basic packaging for new launches and run a few basic trade magazines.
How to write your annual Brand Plan so that everyone in your organization can...Beloved Brands Inc.
Have you ever noticed that people who say, “We need to get everyone on the same page” rarely have anything written down on ONE page? People use the term “fewer bigger bets” all the time, yet these same people seem to be fans of those small little projects that deplete resources. People say they are good decision-makers, yet struggle when facing strategic choices, so they try to justify doing both options. A well-written Brand Plan should force your hand in how to allocate your brand’s limited resources to drive the highest return. We believe that a Brand Plan should be on one page!
Here are the 5 marketing processes that every brand leader must know to be successful in your job.
✅ How to define your brand positioning
✅ How to write a marketing plan
✅ How to inspire marketing execution
✅ How to analyze your brand's performance
✅ How to think strategically
Every marketer has a natural space they excel and a blind spot they need help in. If you have a gap, it will likely show to those deciding on your next move. Challenge yourself to fill in your skills gaps using experience, coaching, and training to become a well-rounded marketer.
Explore our Beyond the MBA training program which is a virtual brand management training designed for the real world. This is your opportunity to gain access to world-class brand management training.
Our virtual training includes 35 engaging video training sessions as Graham shares the best brand management thinking that covers strategic thinking, brand positioning, brand plans, marketing execution, and marketing analytics.
Upon completing our program, you will earn a certificate in brand management that you can proudly display on your resume and LinkedIn profile.
For more information on Beyond the MBA, go to:
https://lnkd.in/e8f_dKn
Here are some of our best Beloved Brands stories on brand management:
Read how to write a brand positioning statement:
https://beloved-brands.com/2012/05/06/brand-positioning-statement/
Read how to write a brand plan:
https://beloved-brands.com/2012/06/24/brand-plan/
Read how to write a brand strategy roadmap:
https://beloved-brands.com/2013/04/14/brand-strategy-roadmap/
Read how to write brand concept:
https://beloved-brands.com/2013/10/12/brand-concept/
Workshop for Brand Leaders to help define your brand positioning statement, brand concept and organizing big idea.
https://beloved-brands.com/brand-positioning/
Free Download on How to stop writing Ugly Creative Briefs
The Creative Brief should help Brand Leaders to control the strategy, yet give freedom on execution. Brand leaders have this backwards, giving freedom on the strategy with various options in the brief, and yet control the execution with a long list of mandatories and direction on style of advertising. But really, you want “creative” options, not strategic options. You should write a very tight brief, based on the strategy you decided on, before you even wrote the brief. Slow down and let your strategic thinking prevail. Brand leaders try to control the outcome of the creative process so they write a long list of mandatories in the brief, they try to steer the type of advertising they want to see, or don’t want to see. You should allow the creative process to unfold, as you always hold the power of decision. Go faster with your instincts to not over-think great ideas.
• Brands sit somewhere on the hypothetical Brand Love curve
• There are 5 connections needed to create love for your brand
• The Brand Connectivity and love generates power for your brand.
• Having Power for your brand helps generates profit in 8 ways
Get our ideal Brand Plan template in a downloadable PowerPoint file.
Link: https://beloved-brands.com/product/brand-plan-template/
Includes ideal slides for vision, purpose, analysis, key issues, strategies, brand positioning statement, and execution plans.
Our brand plan template provides formatted blank slides with key marketing definitions where you can insert your own brand plan.
Gain access to our one-page brand plan and our one-page Brand Strategy Roadmap.
For more on Beloved Brands, here are a few of our most popular articles
1. Beloved Brands Marketing Training programs.
https://beloved-brands.com/brand-management-training/
2. Our Beloved Brands Mini MBA is an online marketing course to help your marketing career.
https://beloved-brands.com/mini-mba/ for online marketing course
3. Simple process to build your Brand Positioning Statement
https://beloved-brands.com/brand-positioning/ for brand positioning
4. How to write a Marketing Plan
https://beloved-brands.com/marketing-plans/
5. Our one-page strategic plan
https://beloved-brands.com/brand-strategy-roadmap/
6. The best and worst of a Creative Brief
https://beloved-brands.com/creative-brief-line-by-line/
7. Marketing Plan Template
https://beloved-brands.com/product/marketing-plan-template/
8. Our one-page Brand Plan
https://beloved-brands.com/brand-plans
9. How to understand Brand Architecture
https://beloved-brands.com/brand-architecture
10. How to use Marketing Funnels to analyze your brand
https://beloved-brands.com/marketing-funnels/
This will provide you with an ideal format for how to lay out a Long Range Strategic Plan with the vision, purpose, values, big idea, strategies, and tactics.
Feel free to download. Brands need to stand out to win. Marketers face limited resources that they apply to an unlimited choices. The role of the Brand Positioning Statement is to take everything you know about your brand and begin making focused decisions on who you will serve, what you will say that is unique, own-able and motivating to get consumers to think, feel and act differently to create a bond that is stronger than what the product alone could do. A good positioning statement should balance the rational and emotional benefits for the consumer. Your positioning has to reflect your internal brand soul and help shape your external brand reputation.
The Creative Brief frames the strategy and positioning so your Agency can creatively express the brand promise through communication.
1, Marketing Execution must impact the brand’s consumers in a way that puts your brand in a stronger business position. The Creative Brief is the bridge between the brand strategy and the execution.
2. Through our Brand Positioning workshop, you will have all the homework on the brand needed to set up the transformation into a succinct 1-page Creative Brief that will focus, inspire and challenge a creative team to make great work.
3. The hands-on Creative Brief workshop explores best in class methods for writing the brief’s objective, target market, consumer insights, main message stimulus and the desired consumer response.
4. Brand Leaders walk away from the session with a ready-to-execute Creative Brief.
Do you know your consumer better than your competition knows your consumer?
Think of consumer insights like you do intellectual property. Your knowledge of your consumer is a competitive advantage. Consumer Insights are little secrets hidden beneath the surface, that explain the underlying behaviors, motivations, pain points and emotions of your consumers. Insights provide a connection point to show consumers that your brand is meant for them.
What are you doing to drive brand love with your consumers? The deeper the love a brand can build with your most cherished consumers, the more powerful and profitable that brand will be, going far beyond what the product alone could ever deliver.
There is only one source of revenue. Not the products you sell, but the consumers who buy them.
This is our brand management training workshop on brand positioning. Your brand positioning statement defines the target market, consumer benefits, both functional and emotional, as well as support points.
Workshop to help turn consumer insights into a brand strategy that will help the brand win in the market
Workshop Agenda
1. How to use consumer insights to bring the consumer to life
2. How to use consumer insights to define your brand
3, How to use consumer insights to develop brand strategy
Use your 7-second pitch to manage your brand reputation.
How do you define yourself, by where in the marketplace you see yourself having the biggest impact?
What is the primary benefit you provide your target, whether they are potential prospects?
What is the secondary benefit you provide your target, whether they are potential prospects?
What is the expected result you deliver, that matches up to your target’s potential goals?
Read our story on how to write a brand plan:
https://beloved-brands.com/2012/06/24/brand-plan/
Help for the Brand Manager with tips on how to write a brand plan, including vision, mission, strategies, tactics, execution, and the overall writing and flow of the plan.
We look at the role of the Brand Leader, how to develop marketing execution strategy, tools to make marketing decisions and how to give direction to an agency.
While different people will have different approaches to developing and managing brands, we believe there are some fundamental constructs and truths about brand strategy that need to be considered in any brand strategy process. We\'ve developed a short presentation on some of the fundamentals of brand strategy.
The marketing skills you need to be a successful Brand LeaderBeloved Brands Inc.
Our Brand Leader white paper on marketing skills
At Beloved Brands, we use a 360-degree approach to marketing, which can highlight the skills you need to be successful in running your brand. You must know how to analyze the performance of your brand through a deep-dive business review. Brand Leaders have to be able to think strategically to sort through issues and make decisions on direction. You must know how to define your brand with a positioning statement and a brand idea. Marketers need to understand how to write a brand plan that everyone can follow.
Feel free to download the White Paper that explains how the more love for a brand creates brand power and profitability. Takes you through the 4 stages of a brand.
2019 The annual report on the world's most valuable and strongest apparel brands.
Nike continues to dominate as the world’s most valuable apparel brand, with a brand value of US$32.4billion
+ Zara and Adidas move up the ranks as H&M’s brand value decrease pushes it down to 4th place
+ Uniqlo is the fastest-growing apparel brand in the top 10, up a whopping 48% year on year
+ Rolex is the strongest brand in the sector, posting an elite AAA+ brand strength rating
+ Luxury brands account for 7 out of the top 10 strongest apparel brands, showing importance of brand strength in the segment
Free Download on How to stop writing Ugly Creative Briefs
The Creative Brief should help Brand Leaders to control the strategy, yet give freedom on execution. Brand leaders have this backwards, giving freedom on the strategy with various options in the brief, and yet control the execution with a long list of mandatories and direction on style of advertising. But really, you want “creative” options, not strategic options. You should write a very tight brief, based on the strategy you decided on, before you even wrote the brief. Slow down and let your strategic thinking prevail. Brand leaders try to control the outcome of the creative process so they write a long list of mandatories in the brief, they try to steer the type of advertising they want to see, or don’t want to see. You should allow the creative process to unfold, as you always hold the power of decision. Go faster with your instincts to not over-think great ideas.
• Brands sit somewhere on the hypothetical Brand Love curve
• There are 5 connections needed to create love for your brand
• The Brand Connectivity and love generates power for your brand.
• Having Power for your brand helps generates profit in 8 ways
Get our ideal Brand Plan template in a downloadable PowerPoint file.
Link: https://beloved-brands.com/product/brand-plan-template/
Includes ideal slides for vision, purpose, analysis, key issues, strategies, brand positioning statement, and execution plans.
Our brand plan template provides formatted blank slides with key marketing definitions where you can insert your own brand plan.
Gain access to our one-page brand plan and our one-page Brand Strategy Roadmap.
For more on Beloved Brands, here are a few of our most popular articles
1. Beloved Brands Marketing Training programs.
https://beloved-brands.com/brand-management-training/
2. Our Beloved Brands Mini MBA is an online marketing course to help your marketing career.
https://beloved-brands.com/mini-mba/ for online marketing course
3. Simple process to build your Brand Positioning Statement
https://beloved-brands.com/brand-positioning/ for brand positioning
4. How to write a Marketing Plan
https://beloved-brands.com/marketing-plans/
5. Our one-page strategic plan
https://beloved-brands.com/brand-strategy-roadmap/
6. The best and worst of a Creative Brief
https://beloved-brands.com/creative-brief-line-by-line/
7. Marketing Plan Template
https://beloved-brands.com/product/marketing-plan-template/
8. Our one-page Brand Plan
https://beloved-brands.com/brand-plans
9. How to understand Brand Architecture
https://beloved-brands.com/brand-architecture
10. How to use Marketing Funnels to analyze your brand
https://beloved-brands.com/marketing-funnels/
This will provide you with an ideal format for how to lay out a Long Range Strategic Plan with the vision, purpose, values, big idea, strategies, and tactics.
Feel free to download. Brands need to stand out to win. Marketers face limited resources that they apply to an unlimited choices. The role of the Brand Positioning Statement is to take everything you know about your brand and begin making focused decisions on who you will serve, what you will say that is unique, own-able and motivating to get consumers to think, feel and act differently to create a bond that is stronger than what the product alone could do. A good positioning statement should balance the rational and emotional benefits for the consumer. Your positioning has to reflect your internal brand soul and help shape your external brand reputation.
The Creative Brief frames the strategy and positioning so your Agency can creatively express the brand promise through communication.
1, Marketing Execution must impact the brand’s consumers in a way that puts your brand in a stronger business position. The Creative Brief is the bridge between the brand strategy and the execution.
2. Through our Brand Positioning workshop, you will have all the homework on the brand needed to set up the transformation into a succinct 1-page Creative Brief that will focus, inspire and challenge a creative team to make great work.
3. The hands-on Creative Brief workshop explores best in class methods for writing the brief’s objective, target market, consumer insights, main message stimulus and the desired consumer response.
4. Brand Leaders walk away from the session with a ready-to-execute Creative Brief.
Do you know your consumer better than your competition knows your consumer?
Think of consumer insights like you do intellectual property. Your knowledge of your consumer is a competitive advantage. Consumer Insights are little secrets hidden beneath the surface, that explain the underlying behaviors, motivations, pain points and emotions of your consumers. Insights provide a connection point to show consumers that your brand is meant for them.
What are you doing to drive brand love with your consumers? The deeper the love a brand can build with your most cherished consumers, the more powerful and profitable that brand will be, going far beyond what the product alone could ever deliver.
There is only one source of revenue. Not the products you sell, but the consumers who buy them.
This is our brand management training workshop on brand positioning. Your brand positioning statement defines the target market, consumer benefits, both functional and emotional, as well as support points.
Workshop to help turn consumer insights into a brand strategy that will help the brand win in the market
Workshop Agenda
1. How to use consumer insights to bring the consumer to life
2. How to use consumer insights to define your brand
3, How to use consumer insights to develop brand strategy
Use your 7-second pitch to manage your brand reputation.
How do you define yourself, by where in the marketplace you see yourself having the biggest impact?
What is the primary benefit you provide your target, whether they are potential prospects?
What is the secondary benefit you provide your target, whether they are potential prospects?
What is the expected result you deliver, that matches up to your target’s potential goals?
Read our story on how to write a brand plan:
https://beloved-brands.com/2012/06/24/brand-plan/
Help for the Brand Manager with tips on how to write a brand plan, including vision, mission, strategies, tactics, execution, and the overall writing and flow of the plan.
We look at the role of the Brand Leader, how to develop marketing execution strategy, tools to make marketing decisions and how to give direction to an agency.
While different people will have different approaches to developing and managing brands, we believe there are some fundamental constructs and truths about brand strategy that need to be considered in any brand strategy process. We\'ve developed a short presentation on some of the fundamentals of brand strategy.
The marketing skills you need to be a successful Brand LeaderBeloved Brands Inc.
Our Brand Leader white paper on marketing skills
At Beloved Brands, we use a 360-degree approach to marketing, which can highlight the skills you need to be successful in running your brand. You must know how to analyze the performance of your brand through a deep-dive business review. Brand Leaders have to be able to think strategically to sort through issues and make decisions on direction. You must know how to define your brand with a positioning statement and a brand idea. Marketers need to understand how to write a brand plan that everyone can follow.
Feel free to download the White Paper that explains how the more love for a brand creates brand power and profitability. Takes you through the 4 stages of a brand.
2019 The annual report on the world's most valuable and strongest apparel brands.
Nike continues to dominate as the world’s most valuable apparel brand, with a brand value of US$32.4billion
+ Zara and Adidas move up the ranks as H&M’s brand value decrease pushes it down to 4th place
+ Uniqlo is the fastest-growing apparel brand in the top 10, up a whopping 48% year on year
+ Rolex is the strongest brand in the sector, posting an elite AAA+ brand strength rating
+ Luxury brands account for 7 out of the top 10 strongest apparel brands, showing importance of brand strength in the segment
Social Media should be treated as part of an overall marketing and
communication plan and, as such, should be measured and monitored along
with all other marketing and communication activities.
How Vendors Allocate Their Marketing Dollars - A CMA White PaperSteve Arens
Most brand marketers and most retail category managers are focused on spending the funds allocated to them. This paper helps them understand the C-suite spending rationale determining what resources ultimately trickle down to the brand and then out to the retailer.
A distinguishing symbol, mark, logo, name, word, sentence or a combination of these items that companies use to distinguish their product from others in the market. Once a brand has created positive sentiment among its target audience, the firm is said to have built brand equity. Some examples of firms with brand equity - possessing very recognizable brands of products - are Microsoft, Coca-Cola, Ferrari, Sony, The Gap and Nokia.
Fighting for your Economic Development Marketing BudgetHeather @ Rain
Despite fierce competition among communities for the same “hot” sectors and a shrinking pool of skilled workers, it seems that winning support for marketing activities is getting tougher instead of easier.
Marketing can be tough to conceptualize, difficult to measure, and is usually the first on the chopping block when it’s time to reduce spending. This white paper will examine these challenges and provide concrete responses and strategies for addressing them.
Welcome to our annual B2B Content Marketing Benchmarks, Budgets, and Trends—North America report. We’re excited to present you with the findings from our latest content marketing survey.
Content marketing has changed a lot since we launched this research nearly a decade ago. We marketers are still focused on content creation, but our thinking about the audiences for whom we create that content has evolved. So, too, have the ways we distribute, measure, and improve upon our content marketing. Technology has played a big role, along with the knowledge we’ve gained through our content marketing experiences.
As you’ll see in this report, some organizations are more developed than others with their content marketing. But you’ll also recognize your own practices reflected in many of the findings. Where does your company stand? What do you need to get to where you want to be? If you need help, let us know!
How to make decisions on advertising that drives brand linkBeloved Brands Inc.
Brand leaders who are good at advertising can get great ads on the air and keep bad ads off the air.
You need to make decisions to find the sweet spot where your brand’s advertising is both different and smart.
To be different, you need to achieve a branded breakthrough, using creativity to capture consumers. Gain their attention amid the market clutter and link your brand closer to the story.
To be smart, you need a motivating message to communicate the main message memorable to connect with consumers, and make the ad stick enough to move them to see, think, feel, or act differently than before they saw the ad.
In our Beloved Brands book, I outline principles for achieving attention, brand link, communication, and stickiness—the model I call the ABC’s. I show examples of some of the best ads in the history of branding to support those principles. I hope to challenge your thinking about your brand’s advertising.
Brand link is not just about more of your brand, but rather the right engagement of your brand, and the placement of your brand. Sometimes less is more, when you tell stories.
This type of thinking is in my Beloved Brands book, can be found on Amazon https://lnkd.in/eF-mYPe or on Apple Books: https://lnkd.in/ekQ-n9X
These slides are from our brand management training program. With our Brand Plan training, we will show you how to come up with the vision, purpose, goals, analysis, key issues, strategies, execution plans and measurements.
At Beloved Brands, we help brands find growth and we make brand leaders smarter.
Here is the ideal Brand plan format that includes the vision, purpose, goals, analysis, key issues, strategies, execution plans and measurements. We use both a 20 page PPT slide deck and a plan on a page format
This is one of the chapters of my new book: Beloved Brands. If you like this chapter, you can find the book on Amazon at https://lnkd.in/eF-mYPe
With Beloved Brands, you will learn everything you need to know so you can build a brand that your consumers will love. You will learn how to think strategically, define your brand with a positioning statement and a brand idea, write a brand plan everyone can follow, inspire smart and creative marketing execution, and be able to analyze the performance of your brand through a deep-dive business review.
Marketing pros and entrepreneurs, this book is for you. Whether you are a VP, CMO, director, brand manager or just starting your marketing career, I promise you will learn how to realize your full potential. You could be in brand management working for an organization or an owner-operator managing a branded business.
Beloved Brands provides a toolbox intended to help you every day in your job. Keep it on your desk and refer to it whenever you need to write a brand plan, create a brand idea, develop a creative brief, make advertising decisions or lead a deep-dive business review.
We outline the 20 core skills and 20 behaviors that are needed for successful Marketing team.
As the leader of a marketing team, you have to realize you are only as good as your people on the team. The only way your team will get better is if you identify the gaps on your team, then give your people the feedback on the gaps they need to close, and then build personal development plans for how to close those gaps. We look at people development in three different ways: skills, behaviors and experiences. We will showcase five major skill areas that includes the ability to: 1) analyze brand performance 2) think strategically 3) define the brand positioning 4) create brand plans and 5) how to inspire, challenge and make decisions on creative brand execution. We will then outline five major leader behaviors that includes: 1) accountable to results 2) team leadership 3) broad influence 4) authentic style and 5) inspiring leadership on execution. To help with the development of your people, you can use the Skills and Leadership Assessment tools to determine where your team sits today.
On a daily basis I hear Marketing buzz words bantered about and it becomes obvious people say them and don’t really even know what they mean. I think people use the sacred marketing words like relevant, equity or insights, because they figure no one will challenge them. Of course, everyone puts “strategic thinker” on their Linked In profile. The problem I see is that a generation of Brand Leaders have not been properly trained and it’s starting to show. For the past 20 years, companies have said “on the job” training is good enough. But now the lack of training is starting to show up. The mis-use of these words can be linked to the lack of understanding of the fundamentals of marketing.
We have mapped out the 7 elements of smart strategic thinking, as a way to guide and challenge you to think strategically. Challenge yourself to take your brand strategy and see how it lines up to our 7 elements of smart strategic thinking. Do you have a vision, are you focused enough, are you taking advantage of some opportunity? You can have this on the brand overall, or any project that you are working on. We will show you how the model works, then provide examples drawn out using Apple, Starbucks and Special K.
In the new economy, Brand Love is the new currency, with marketing shifting to building big ideas, leveraging purpose-driven stories that are in the moment, creating consumer experiences that people talk about, managing ubiquitous purchase moments all helping to steer the brand’s reputation. Marketing has to focus on creating a brand reputation with consumers, and equally creating an organizational culture that reflects the brand’s soul. Instead of shouting your message at every consumers, the best brands confidently whisper to those most motivated by what they do, who then scream with influence to their friends. In the new world, the best brands now fight for a place in the minds and hearts of consumers.
How to use brand analytics to lead a business review on your Brand
You owe your brand a deep-dive business review at least once a year. It should be the start of your brand planning process. Otherwise, you are being negligent to your brand and will operate on the surface level, missing what’s going on beneath the surface. To go deep, you need to look at everything–including the category, consumers, channels, competitors and then your own brand.
We will look at four levels of Marketing which are Assistant Brand Manager, Brand Manager, Marketing Director and VP/CMO. While we present in a linear way, I think learning is rather random. We gain confidence through our success but we learn from our failures. You must boldly look to make an impact and take chances. Put all your passion into your work. At every level you have to adjust to the new role. Brand Managers fail when they keep acting like ABMs who are looking for a to-do list. Directors fail when they keep acting like Brand Managers by micro-managing and making every decision. And, VPs fail when they don’t know what to do. We all say we want to advance, but don’t think of it as just a title: think of it as a challenge to step back.
Workshop to provoke you to think differently and see how a brand’s BIG IDEA reflects the brand’s SOUL and transforms the experience and bond into a REPUTATION
Workshop to help brand leaders write brand plans that everyone in the organization can follow. Case Study, using fictional “Gray’s Cookies” brand to complete a Brand Plan, which is the final stage of our overall Beloved Brands planning process.
Case Study, using fictional “Gray’s Cookies” brand to complete a business review, which is the first stage of our overall Beloved Brands planning process.
Workshop for Brand Leaders to provide an overall planning process including business review, key issues, positioning and creating the annual Brand Plan
Everyone knows the power of stories, but when asked to come up with them, we struggle. Either we second guess ourselves as to the story's relevance, or we just come up blank and can't think of any. Unlocking Everyday Narratives: The Power of Storytelling in Marketing will teach you how to recognize stories in the moment and to recall forgotten moments that your audience needs to hear.
Key Takeaways:
Understand Why Personal Stories Connect Better
How To Remember Forgotten Stories
How To Use Customer Experiences As Stories For Your Brand
Most small businesses struggle to see marketing results. In this session, we will eliminate any confusion about what to do next, solving your marketing problems so your business can thrive. You’ll learn how to create a foundational marketing OS (operating system) based on neuroscience and backed by real-world results. You’ll be taught how to develop deep customer connections, and how to have your CRM dynamically segment and sell at any stage in the customer’s journey. By the end of the session, you’ll remove confusion and chaos and replace it with clarity and confidence for long-term marketing success.
Key Takeaways:
• Uncover the power of a foundational marketing system that dynamically communicates with prospects and customers on autopilot.
• Harness neuroscience and Tribal Alignment to transform your communication strategies, turning potential clients into fans and those fans into loyal customers.
• Discover the art of automated segmentation, pinpointing your most lucrative customers and identifying the optimal moments for successful conversions.
• Streamline your business with a content production plan that eliminates guesswork, wasted time, and money.
In the digital age, businesses are inundated with tools promising to streamline operations, enhance creativity, and boost productivity. Yet, the true key to digital transformation lies not in the accumulation of tools but in strategically integrating the right AI solutions to revolutionize workflows. Join Jordache, an experienced entrepreneur, tech strategist and AI consultant, as he explores essential AI tools across three critical categories—Ideation, Creation, and Operations—that can reshape the way your business creates, operates, and scales.This talk will guide you through the practicalities of selecting and effectively using AI tools that go beyond the basics of today’s popular tools like ChatGPT, Claude, Gemini, Midjourney, or Dall-E. For each category of tools, Jordache will address three crucial questions: What is each tool? Why is each one valuable to you as a business leader? How can you start using it in your workflow? This approach will not only clarify the role of these tools but also highlight their strategic value, making it perfect for business leaders ready to make informed decisions about integrating AI into their workflows.
Key Takeaways:
>> Strategic Selection and Integration: Understand how to select AI tools that align with your business goals and how to conceptually integrate them into your workflows to enhance efficiency and innovation.
>> Understanding AI Tool Categories: Gain a deeper understanding of how AI tools can be leveraged in the areas of ideation, creation, and operation—transforming each aspect of your business.
>> Practical Starting Points: Learn how you can start using these tools in your business with practical tips on initial steps and integration ideas.
>> Future-Proofing Your Business: Discover how staying informed about and utilizing the latest AI tools and strategies can keep your business competitive in a rapidly evolving digital landscape.
Come learn how YOU can Animate and Illuminate the World with Generative AI's Explosive Power. Come sit in the driver's seat and learn to harness this great technology.
The What, Why & How of 3D and AR in Digital CommercePushON Ltd
Vladimir Mulhem has over 20 years of experience in commercialising cutting edge creative technology across construction, marketing and retail.
Previously the founder and Tech and Innovation Director of Creative Content Works working with the likes of Next, John Lewis and JD Sport, he now helps retailers, brands and agencies solve challenges of applying the emerging technologies 3D, AR, VR and Gen AI to real-world problems.
In this webinar, Vladimir will be covering the following topics:
Applications of 3D and AR in Digital Commerce,
Benefits of 3D and AR,
Tools to create, manage and publish 3D and AR in Digital Commerce.
The Forgotten Secret Weapon of Digital Marketing: Email
Digital marketing is a rapidly changing, ever evolving industry--Influencers, Threads, X, AI, etc. But one of the most effective digital marketing tools is also one of the oldest: Email. Find out from two Houston-based digital experts how to maximize your results from email.
Key Takeaways:
Email has the best ROI of any digital tactic
It can be used at any stage of the customer journey
It is increasingly important as the cookie-less future gets closer and closer
Mastering Local SEO for Service Businesses in the AI Era is tailored specifically for local service providers like plumbers, dentists, and others seeking to dominate their local search landscape. This session delves into leveraging AI advancements to enhance your online visibility and search rankings through the Content Factory model, designed for creating high-impact, SEO-driven content. Discover the Dollar-a-Day advertising strategy, a cost-effective approach to boost your local SEO efforts and attract more customers with minimal investment. Gain practical insights on optimizing your online presence to meet the specific needs of local service seekers, ensuring your business not only appears but stands out in local searches. This concise, action-oriented workshop is your roadmap to navigating the complexities of digital marketing in the AI age, driving more leads, conversions, and ultimately, success for your local service business.
Key Takeaways:
Embrace AI for Local SEO: Learn to harness the power of AI technologies to optimize your website and content for local search. Understand the pivotal role AI plays in analyzing search trends and consumer behavior, enabling you to tailor your SEO strategies to meet the specific demands of your target local audience. Leverage the Content Factory Model: Discover the step-by-step process of creating SEO-optimized content at scale. This approach ensures a steady stream of high-quality content that engages local customers and boosts your search rankings. Get an action guide on implementing this model, complete with templates and scheduling strategies to maintain a consistent online presence. Maximize ROI with Dollar-a-Day Advertising: Dive into the cost-effective Dollar-a-Day advertising strategy that amplifies your visibility in local searches without breaking the bank. Learn how to strategically allocate your budget across platforms to target potential local customers effectively. The session includes an action guide on setting up, monitoring, and optimizing your ad campaigns to ensure maximum impact with minimal investment.
Videos are more engaging, more memorable, and more popular than any other type of content out there. That’s why it’s estimated that 82% of consumer traffic will come from videos by 2025.
And with videos evolving from landscape to portrait and experts promoting shorter clips, one thing remains constant – our brains LOVE videos.
So is there science behind what makes people absolutely irresistible on camera?
The answer: definitely yes.
In this jam-packed session with Stephanie Garcia, you’ll get your hands on a steal-worthy guide that uncovers the art and science to being irresistible on camera. From body language to words that convert, she’ll show you how to captivate on command so that viewers are excited and ready to take action.
How to Use AI to Write a High-Quality Article that Ranksminatamang0021
In the world of content creation, many AI bloggers have drifted away from their original vision, resulting in low-quality articles that search engines overlook. Don't let that happen to you! Join us to discover how to leverage AI tools effectively to craft high-quality content that not only captures your audience's attention but also ranks well on search engines.
Disclaimer: Some of the prompts mentioned here are the examples of Matt Diggity. Please use it as reference and make your own custom prompts.
Gokila digital marketing| consultant| Coimbatoredmgokila
Myself Gokila digital marketing consultant located in Coimbatore other various types of digital marketing services such as SEM
SEO SMO SMM CAMPAIGNS content writing web design for all your business needs with affordable cost
Digital Marketing Services | Techvolt Software :
Digital Marketing is a latest method of Marketing techniques widely used across the Globe. Digital Marketing is an online marketing technique and methods used for all products and services through Search Engine and Social media advertisements. Previously the marketing techniques were used without using the internet via direct and indirect marketing strategies such as advertising through Telemarketing,Newspapers,Televisions,Posters etc.
List of Services offered in Digital Marketing |Techvolt Software :
Techvolt Software offers best Digital Marketing services for promoting your products and services through online platform on the below methods of Digital marketing
1. Search Engine Optimization (SEO)
2. Search Engine Marketing (SEM)
3. Social Media Optimization (SMO)
4. Social Media Marketing (SMM)
5. Campaigns
Importance | Need of Digital Marketing (Online Promotions) :
1. Quick Promotions through Online
2. Generation of More leads and Business Enquiries via Search Engine and Social Media Platform
3. Latest Technology development vs Business promotions
4. Creation of Social Branding
5. Promotion with less investment
Benefits Digital Marketing Services at Techvolt software :
1. Services offered with Affordable cost
2. Free Content writing
3. Free Dynamic Website design*
4. Best combo offers on website Hosting,design along with digital marketing services
5. Assured Lead Generation through Search Engine and Social Media
6. Online Maintenance Support
Free Website + Digital Marketing Services
Techvolt Software offers Free website design for all customer and clients who is availing the digital marketing services for a minimum period of 6 months.
With Regards
Gokila digital marketer
Coimbatore
Enhancing a Luxury Furniture E-commerce Store with Expert Shopify ManagementSunTec India
SunTec India's expertise in Shopify store management has been a game-changer for a luxury furniture e-commerce business. Through meticulous optimization of product listings, strategic SEO practices, and an enhanced user experience, this case study details the successful outcomes of their collaboration, including increased traffic, higher conversion rates, and stronger brand presence.
Read more- https://shorturl.at/yl3MU
Mastering Dynamic Web Designing A Comprehensive Guide.pdfIbrandizer
Dynamic Web Designing involves creating interactive and adaptable web pages that respond to user input and change dynamically, enhancing user experience with real-time data, animations, and personalized content tailored to individual preferences.
[Google March 2024 Update] How To Thrive: Content, Link Building & SEOSearch Engine Journal
March 2024 disrupted the SEO industry. Websites were deindexed, and manual penalties were delivered—all to produce more helpful, more trustworthy search results.
How did your website fare?
Watch us as we delve into the seismic shifts brought about by Google's March 2024 updates and explore strategies to not just survive, but thrive in this dynamic digital landscape.
You’ll learn:
- How to create content that is valuable to users (not just search engines) using E-E-A-T.
- How to build links that can boost rankings and withstand algorithm updates.
- Best practices for content creation and link building so you can thrive during algorithm updates.
With Vince Ramos, we'll examine the implications of the latest algorithm changes on content creation, link building, and SEO practices, and offer actionable insights from businesses like yours that have remained steadfast amidst the volatility.
Using real-life case studies, we’ll also show you the effectiveness of manual link building techniques and person-first content strategies.
Whether you're a seasoned SEO professional, a budding content creator, or anyone in between, this webinar will help you weather the changes in Google's algorithms and capitalize on them for sustained success.
Check out this webinar and unlock the secrets to thriving in the new Google era.
[Google March 2024 Update] How To Thrive: Content, Link Building & SEO
Finance 101 for Marketers
1. Brand
Finance
101 to help
manage
your
brand’s
profitability
Anyone who does not include “profit” in their definition of a brand has never run a
brand before. To me, a product is a basic commodity you sell. A brand creates a
bond that leads to a power and profit beyond what the product alone can achieve.
If you want to succeed in brand management, you have to understand brand finance. After all, you are running
a business. If you only like the activity of marketing, then you should become a subject matter expert, because
if you cannot work the finances of your brand, you will not get promoted beyond brand manager.
I will go through everything you need to know so you can manage the profitability of your brands. In our book, I
include all the essential formulas you need to know with examples to help follow along. Even if you are not a
natural at finance, my hope is this chapter will help make you smarter at brand finance.
2. A quick dissection of the brand’s financial statement
For many of us, we became marketers
because we were attracted to the strategic,
creative, and the psychological aspects of
business. So if finance is not a natural skill,
when your finance manager hands you the
brand’s profit and loss (P&L) statement, it
can be intimidating. I come at this as a
fellow marketer, not a finance expert.
To assess the performance of your brand,
and begin knowing where to dig deeper, I
recommend you break it down by looking at
four key numbers.
1. As a leader of the brand, I start by
trying to understand the growth rate.
Most brand leaders have brand growth
as their number one objective. You can
do a quick calculation to figure out the
average growth rate but, as you dig in,
you should try to find out what
happened each year to give you a better
feel of the brand performance. There are
two calculations you can use, either
average growth rate or compound
annual growth rate (CAGR).
In this example, the average growth rate is 7%, and CAGR % is 9.1%, both very high compared to the
overall economic growth of 2-3%. My first instinct would be to look at the category growth to see if the brand
is gaining or losing market share. Next, the year-by-year growth shows the growth rate has shot up to 12%
over the past two years. I would make a mental note to expect to see this as an investment brand and
determine whether the profit is paying off yet.
2. My eye is drawn immediately to figuring out the gross margin percentage, as a first signal of brand health
or to try to understand the strategy behind the brand. Divide the absolute gross margin by the sales. You can
assess the brand’s health by comparing the margin percent over time to see the trend line, with other brands
in your portfolio to evaluate the opportunity cost, or with other competitive brands in the category.
In this example, the gross margin percentage has fallen from 43% in 2018 down to 37% in 2020, which
should prompt you to go a layer deeper to look at price and cost of goods. Regarding price, dig around to
see if there has been an average price decrease, then look to see if it is due to an increase in trade spend, a
shift in the sales mix to lower-priced items, or even a shift to lower margin items.
The starting point is the P&
2019 2020 2021
$ g% $ g% $ g%
Net Sales 21,978 44% 27,354 24% 30,385 11%
Cost of Goods Sold 10,333 40% 12,606 22% 13,237 5%
Gross Margin 11,645 49% 14,748 27% 17,148 16%
GM % 53% 54% 56%
R&D 346 3% 352 2% 360 2%
Marketing Budget 5,528 22% 7,962 44% 8,850 11%
Advertising 4,015 22% 5,062 51% 5,550 -1%
Research 200 55% 300 50% 500 67%
Packaging 133 66% 100 -25% 50 -50%
Trade Expense 1,180 44% 2,500 202% 2,750 8%
Other SG&A 2,000 22% 289 -86% 989 242%
Contribution Margin 3,771 22% 6,145 63% 6,949 13%
CM % 17% 22% 23%
Brand Financial Statement
3. 3. Next, look at the contribution margin
percentage, dividing the bottom line
contribution income by the overall sales.
Some cost factors are outside the brand’s
control, such as foreign exchange, raw
material cost increases, duties, and
transportation costs. However, look out for
factors within the brand’s control. Was there
a strategic decision to change to a higher
cost of raw material? Was there increased
quality control at the manufacturing site? Did
you switch to a more expensive supplier or
change the location of your production?
In the example, an alarm bell goes off when
I see the contribution margin percentage has
fallen from 26% to 17% in three years. My
first observation is the sales are up
dramatically, yet both the gross margin
percentages and contribution margin
percentages are down. While the gross
margin percentage is down, the gross margin
dollars increased. However, in this case, the
contribution margin dollars have gone down
from $5,763 to $4,772. After two years of
investment, the brand is not responding fast
enough to cover that spend level.
4. Look at the comparison between the sales
growth rate and the spending growth rate.
While sales are growing at 12% over the past
two years, spending is up 22%. The brand is
not covering the spending increase. Dig in to
understand if the payback was expected to
be slower. If not, I would dig in to explain
why it is not paying back: not the right
message, competitive activity, or market
dynamics.
With each of these four questions, view it as a
starting point to dig in deeper and ask questions
of the experts around you. From my experience,
every P&L is as unique as a fingerprint. As the
business leader, you run your brand’s P&L.
!3
2016 2017 2018 2019 2020
Net Sales 19,483 20,383 21,978 24,616 27,569
Growth Rate 5% 8% 12% 12%
1
Start with the overall sales line, and explain
year-by-year growth rates
Explain growth rates of each year. We see a healthy average
growth rate is 7%, and a strong compound growth rate is 9%.
2018 2019 2020
Sales 21,978 24,616 27,569
Gross Margin 9,482 9,862 10,225
Gross Margin % 43% 40% 37%
2 Look at the Gross Margin %, by dividing the
gross margin by Sales
Over the 3 years, the gross margin % is down from 43% to
37%. Either overall pricing has been cut or the costs are up.
3
Look at Contribution Margin %, dividing
contribution margin by sales
Over the 3 years, the CM% fell from 26% to 17%. There a
problem with the top-line margin, and gross margin is not
covering off the increase in spend.
2017 2018 2019 2020
Sales Growth 5% 8% 12% 12%
Spend Growth 5% 22% 44% 11%
4
Compare the sales growth rate with the
marketing spend growth rate
There was a significant spend increase, yet sales growth
not keeping pace. Is it strategies, message, competitive
activity or changing market dynamics?
2018 2019 2020
Sales 21,978 24,616 27,569
Contribution Margin 5,763 5,244 4,772
Contribution Margin % 26% 21% 17%
Financial Statement Review
4. Brand love generates brand power
The tighter the bond a brand creates with its consumers, the more powerful the brand will become with all
stakeholders. Think of brand love as stored energy a brand can unleash in the form of power into the
marketplace. You can use that power with consumers, competitors, new entries, employees, influencers, media,
suppliers, and channel partners.
These beloved brands command power over the very consumers who love them, as consumers feel more and
think less. These consumers pay
price premiums, line up in the
rain, follow the brand as soon
as it enters new categories,
and relentlessly defend the
brand to any attackers. They
cannot live without the brand.
Beloved brands have power
over channel customers, who
know their consumers would
switch stores before they
switch brands. Stores cannot
stand up to the beloved brand;
instead, they give the brand
everything in negotiations. The
beloved brand ends up with
stronger store placement,
better trade terms, and better
promotions from retail
partners.
The competitors, whether
current competitors or new
entries, cannot match the
emotional bond the beloved
brand has created with their brand fans. The beloved brand has a monopoly on emotions, making the consumer
decisions less about the actual product and more about how the experience makes consumers feel. Unless a
new brand has an overwhelming technological advantage, it will be impossible to break the emotional bond the
consumer has established with the beloved brand.
The beloved brand also has power over the media whether paid, earned, social, or search media. With paid
media, the beloved brand gets better placement, cheaper rates and they are one of the first calls for possible
brand integrations. The beloved brand is considered newsworthy, so they earn more free media via mainstream
media, expert reviews, and bloggers.
The playbook for how to create
brand your consumers will lo
The tighter the bond the brand creates with their consumers,
the more powerful that brand will be with all stakeholders
Brand fans think
less and feel more
Get them to cut
costs or terms.
Reduce their impact
and create a failure
Gain a positional per
and change momentum
Engaged, motivated,
outspoken culture.
Get outspoken brand
fans to influence others
Leverage paid, earned,
search, social or home
Channels Competitors
New EntriesSuppliers
Media
Influencers
Employees
Consumers
Use retailers to gain a
competitive advantage
Brand
Power
5. Being a famous, beloved brand helps bypass the need for search engine optimization (SEO). The beloved
brands become part of the conversation, whether it is through social media or at the lunch table at work.
Beloved brands can use their homepage website to engage their most loyal users, inform the market of
upcoming changes, allow consumers to design their version of the brand and then sell the product directly to
brand lovers.
Suppliers serve at the mercy of the beloved brand. The high volumes drive efficiencies of scale that drive down
production costs, backing the supplier into a corner before they offer up most of those savings. Plus, the
supplier becomes willing to give in, so that they can use the beloved brand as a selling tool for their supplier
services to other potential brands.
Beloved brands even have power over employees, who want to be part of the brand. They are brand fans, who
are proud to work on the brand. They embody the culture on day 1 and want to help the brand achieve success.
The beloved brands have power over key influencers, whether they are doctors recommending a drug,
restaurant critics giving a positive review or salespeople at electronics shops pushing the beloved brands. These
influencers become fans of the beloved brand and build their own emotions into their recommendations.
Beloved brands can use higher prices and lower costs to drive higher margins
With all the love and power the beloved brand generates, it becomes easy to translate that stored power into
sales growth, profit, and market valuation.
Most beloved brands can use their loyal brand lovers to command a premium price, creating a relatively inelastic
price. The weakened channel customers cave in during negotiations to give the brand richer margins. Satisfied
and loyal consumers are willing to trade up to the next best model. A well-run beloved brand can use their high
volume to drive efficiency, helping to achieve a lower cost of goods structure.
Not only can they use their growth to drive economies of scale, but suppliers will cut their cost to be on the
roster of the beloved brand. The beloved brand will operate with much more efficient marketing spend, using
their power with the media to generate lower rates with plenty of free media. Plus, the higher sales volumes
make the beloved brand’s spend ratios much more efficient. The consumer response to the marketing execution
is much more efficient, giving the brand a higher return on investment.
Beloved brands can use higher prices and lower costs to
drive higher margins
Most beloved brands can use their loyal brand lovers to command a premium price, creating a relatively inelastic
price. The weakened channel customers cave in during negotiations to give the brand richer margins. Satisfied
and loyal consumers are willing to trade up to the next best model. A well-run beloved brand can use their high
volume to drive efficiency, helping to achieve a lower cost of goods structure.
Not only can they use their growth to drive economies of scale, but suppliers will cut their cost to be on the
roster of the beloved brand. The beloved brand will operate with much more efficient marketing spend, using
their power with the media to generate lower rates with plenty of free media. Plus, the higher sales volumes
!5
6. make the beloved brand’s spend ratios much more efficient. The consumer response to the marketing execution
is much more efficient, giving the brand a higher return on investment.
Beloved brands use higher shares of a bigger market to
drive higher volume
The beloved brands use their momentum to reach a tipping point of support to drive higher market shares. They
can get loyal users to use more, as consumers build the beloved brand into life’s routines and daily rituals.
It is easier for the beloved brands to enter new categories, knowing their loyal consumers will follow. Finally,
there are more opportunities for the beloved brand to find more uses to increase the number of ways the
beloved brand can fit into the consumer's life.
How brand love drives profits
1
Premium
Pricing
2
Trading
up
3
Lower
cost of
goods
4
Efficient
Program
Spending
5
6
Get loyal users
to use more
7
Enter
new
markets
8
Find new
uses
Lower Costs
Bigger Market
Higher Margins
Higher Volume
Steal competitive
users
Higher Share
Higher Prices
How brand love drives profits
1
Premium
Pricing
2
Trading
up
3
Lower
cost of
goods
4
Efficient
Program
Spending
5
6
Get loyal users
to use more
7
Enter
new
markets
8
Find new
uses
Lower Costs
Bigger Market
Higher Margins
Higher Volume
Steal competitive
users
Higher Share
Higher Prices
7. There are eight ways you can drive brand profits
1. Premium pricing
2. Trade loyal consumers up to a higher price
3. Lower cost of goods
4. Lower marketing and selling costs
5. Steal competitive users
6. Get loyal users to use more
7. Enter into new markets
8. Find new uses for the brand
Profit = (Price - Cost) x (Market Share x Market Size)*
!7
8. 1. Premium Pricing
Simply put, brands can execute a price increase when the market or consumers allow the brand to do so. A
beloved brand will have an easier time pushing through a price increase as it can use the power of its brand
versus consumers, competitors, or channels. When pushing a price increase through retail channel partners,
brands usually require proof that the new price will work or that product costs have gone up. Factors that help
the brand story include
the health of the brand
and market. Use this
tactic when battling a
competitor, in reaction to
sluggish economic
conditions or retail
channel pressure. You can
also use an aggressive
price decrease when you
have a cost advantage,
whether that’s
manufacturing, materials
or distribution. When you
have that cost advantage,
it may make sense to
deploy a lower price to deplete the resources of your competitor.
2. Trading consumers up/down on price
To trade consumers up on price, make sure your brand can carve out a meaningful difference to create a
second or third tier, so consumers can see an apparent reason to move up. Many brands will deploy a good/
better/best approach to pricing. When your brand secures trust or a bond with the consumer, it will be easier to
use your brand reputation and product performance to move loyal consumers up to the next level. Use trading
consumers down, your brand sees a potential unserved market, it can trade consumers down when the move
brings minimal damage to the brand image or reputation. In a tough economy, creating a lower-priced set of
products can be a smarter strategy than lowering the overall price of your main brand. Once the economy
bounces back, you can discontinue the lower-priced product option.
3. Efficiency through lower Cost of goods
Decreasing the cost of goods: There are a few ways to drive down cost of goods (COGs). First, you can use
your brand power and higher volumes to negotiate with suppliers. You can choose to use lower-priced raw
materials, drive process efficiencies, or explore offshore manufacturing. Increasing the cost of goods: The
most significant reason to increase cost of goods (COGs) is when upgrading to a premium market or an added
benefit. Watch out for suppliers trying to pass along costs beyond inflationary rates.
The playbook for how to create
brand your consumers will lov
Trade the consumer up or down
• Trading consumers up on price: Make sure your brand can carve out a meaningful difference to create
a second or third tier, so consumers can see an apparent reason for wanting to move up. Many brands
will deploy a good/better/best approach to pricing. When your brand secures trust or a bond with the
consumer, it will be easier to use your brand reputation and product performance to move loyal
consumers up to the next level.
• Trading consumers down: When the brand sees a potential unserved market, it can trade consumers
down when the move will bring minimal damage to the brand image or reputation. In a tough economy,
creating a lower-priced set of products can be a smarter strategy than lowering the overall price of your
main brand. Once the economy bounces back, you can discontinue the lower-priced product option.
Current New
Price $2.50 $2.75
COGs 1.00 1.00
Margin 1.50 1.75
Margin % 60% 64%
Unit Forcast 100,000 90,000
Revenue $250,000 $247,500
Profit $150,000 $157,500
Profit impact of a price increase
((New Price - COGs) x new unit volume)
MINUS ((Old Price - COGs) x old unit volume)
= ((2.75-1.0) x 90,000) - ((2.5-1.0) x 100,000)
= $7,500
With a 10% price increase against a 10% volume
decrease, you will generate $7,500 more profit.
Price Increase Formulas
9. 4. Lower marketing and selling costs
Marketing cost decrease: Many times companies look at cost-cutting to counter short-term changes
happening within other parts the P&L (price, volume or COGs). However, many of the best-run brands keep the
investment strong, aligning
with the longer-term
strategy instead of a short-
term situational need.
Marketing cost increase:
Used when there is an
opportunity to gain share
against a competitor or as
a defensive position trying
to hold share. The brand
should see an opportunity
where significant revenue
gains can cover off the
lower profit ratios.
5. Steal competitive users
Offensive share gains: Look to gain share using a significant competitive advantage against an
opportunity in the marketplace, whether that is a first-mover advantage into new technology, an unmet
consumer need, a changing retail channels, or a chance to steal share, using your brand’s superior
performance against a vulnerable competitor. Defensive share stance: Hold your market share or
minimize the share losses until your brand can catch up on technology. The best way to protect your
brand is to feed your loyal base of consumers who are less likely to switch.
6. Higher usage
A higher share of requirements: In many categories, even loyal consumers will work within a
competitive set of favorite brands. You need to provide a reason, through product superiority claims,
consumer experiences, or emotional benefits to persuade loyal consumers to use your brand for every
occasion. Get current users to use more: Look for opportunities with loyal users to create a potential
routine or ritual around your brand.
7. Enter new categories
When your brand has a strong base of loyal consumers, and you see an opportunity to take those
consumers into a new peripheral category, you can open up new revenue streams for your brand.
Make sure the new category fits with the brand idea, and you can transfer elements of your brand
reputation into the new product.
!9
The playbook for how to cre
brand your consumers wil
• Marketing cost decrease: Many times companies look at cost-cutting to counter short-term changes
happening within other parts the P&L (price, volume or COGs). However, many of the best-run brands
keep the investment strong, aligning with the longer-term strategy instead of a short-term situational
need.
• Marketing cost increase: Used when there is an opportunity to gain share against a competitor or as a
defensive position trying to hold share. The brand should see an opportunity where significant revenue
gains can cover off the lower profit ratios.
Program
Incremental Sales Volume $5,000,000
Cost of Goods Sold (COGS) $3,000,000
Gross Margin $2,000,000
Gross Margin % 40%
Total Investment Spend $1,500,000
Contribution Margin $500,000
Formulas for ROI
Gross Margin = Revenue - Cost of Goods Sold
$5 Million - $3 Million = $2 Million
Contribution Margin = Gross Margin - Spend
$2 Million - $1.5 Million = $0.5 Million
ROI = Contribution Margin divided by spend
$0.5 Million divided by $1.5 Million = 33%
Return on Investment (ROI) for a marketing investment
10. 8. Create new uses
Take the brand and create similar experiences into a new format or new offering. You need to make sure
your current brand is in order before you divert attention, funding, and focus on a potential blue ocean
expansion area.
Using the brand funnel to determine your sales forecast
The playbook for how to create a
brand your consumers will love
Enter new categories
Awareness
Familiar
Consider
Purchase
Repeat
Loyal
Assumptions 10 million people, $5 per item
Awareness
Familiar
Consider
Purchase
Repeat
Loyal
90%
75%
50%
25%
10%
2%
9 million people aware
7.5 familiar
Half of people consider
2.5 million first purchase at $5 per
1.0 million buy a 2nd time at $5 per
200k buy a 3rd time at $5 per
Using the funnel for a forecast
Purchase:
Repeat:
Loyal:
$12.5 Million
$ 5.0 Million
$. 1.0 Million
$18.5 MillionTotal Sales
11. How the
Beloved
Brands
playbook
can work
for you
It takes a fundamentally sound
marketer to figure out how to win
with brand love in this crazy cluttered world of brands. The fundamentals of
brand management matter more now than ever.
Today’s marketers have become so busy, as they run from meeting to meeting, they have become a little
overwhelmed and confused. They have no time to think. Marketing has become about ‘get stuff done,’ never
taking the time to stop and ask if it is the right stuff to do.
To build a relationship, you must genuinely court your consumer. To move your consumer from stranger to
friend and onto the forever stage, you need to think all the time. With the focus on access to big data,
marketers are drowning in so much data they do not even have the time to sort through it all to produce the
analytical stories that help to make decisions. Marketers are so overwhelmed by the breadth of media choices
and the pressure to be everywhere that the quality of the execution has suffered.
If marketers do not love the work they create, how can they ever expect the consumer to love the brand?
My goal in writing this book is to make you a smarter brand leader so your brand can win in the market. I know
your role and the challenges you face. I have been in your shoes. I will share everything I have learned in my
20 years in the trenches of brand management. I want to help you be successful. This book is intended as an
actionable “make it happen” playbook, not a theory or opinion book.
!11
Beloved Brands is available
12. Learn to think, define, plan, inspire and analyze
1. How to think strategically
Too many marketers are so busy that they do not even have time to think. The best brand leaders do the
necessary critical strategic thinking to find ways to win in the market. Strategic thinking is an essential
foundation, forcing marketers to ask big questions that challenge and focus brand decisions.
I will show you four ways to enhance your strategic thinking, using the brand’s core strength finder, consumer
strategy, competitive strategy, and situational strategy. You will learn how to set a vision for your brand, focus
your limited resources on breakthrough points, take advantage of opportunities you see in the market, find early
wins to leverage to give your brand a positional power to drive growth and profits for your brand.
1. Learn new strategic thinking methods, looking at core strength,
competitive landscape, consumer relationship, and situation you face.
2. Brand positioning statements start with a consumer profile, uses our
consumer benefits ladder with functional and emotional benefits. Then,
build out a brand idea that organizes everyone who works on your brand.
3. In teaching brand plans, we go through each element needed for a long-
range brand strategy roadmap and your annual brand plan.
4. Learn to make smart and creative decisions that inspires outstanding
marketing execution with your creative advertising and media choices.
5. Use brand analytics to write a deep-dive business review, looking at the
Strategic
Thinking
Positioning
Statement
2
4
1
Marketing
Execution
What
consumers
want
What your
competitor
does best
What your
brand
does best
Winning
Our marketing training helps realize the
full potential of your marketing team
Brand Plan
5
The playbook for how to create a
brand your consumers will love
✓ How to think strategically
✓ Write a brand positioning statement
✓ Come up with a brand idea
✓ Write a brand plan everyone can follow
✓ Write an inspiring creative brief
✓ Make decisions on marketing execution
✓ Conduct a deep-dive business review
✓ Learn finance 101 for marketers
Beloved Brands
Beloved Brands is available on Amazon and Apple Books
The playbook for how to build a
brand your consumers will love.
Measuring the brand love, to determine the
love, power and profit progress of the brand
• Brand funnels become thicker as the brand
becomes more loved. It’s not just about driving
particular numbers but about moving them from
one stage to the next.
• Awareness is never enough. Anyone can get that.
Consideration is the point you start to see that your
brand idea starts to connect and move the
consumer.
• To drive trial you need to gain consideration first
(the brain) and then you need to move the
consumer towards purchase and through the
experience.
• To drive loyalty (the heart) you need to create
experiences that deliver the promise and use tools
to create an emotional bond with the consumer.
Use the brand funnel to measure health
Awareness
Familiar
Consider
Purchase
Repeat
Loyal
!1
Dad’s wins on innovation and deep price
discounts, but is weak on taste.
• Dad’s brand is the mature brand
in the “good for you” segment
holding on average a 25%
share over the past 10 years.
• Dad’s scores low on taste
quality, but higher on innovation
than Gray’s, launching 2 new
flavors each year.
• Dad’s fought declining share
with a “buy one get one free”
that we decided not to match
Gray’s needs to step up on innovation to use
superior quality to gain share against Dad’s.
0
2
3
5
6
2018 2019 2020 2021
3.19
3.613.773.99
5.495.395.294.97
Business
Review
GRAY’S
Cookies
Exceptional scores among early Adopters (“Proactive
Preventers”) making it highly beloved among the niche.
• Gray’s is very healthy among “Preventers” with strong awareness at 80% and all related Brand
Funnel scores significantly above norm. However, that strength has not carried over to the
overall market, where Gray’s is significantly under-developed in the overall market.
Explore ways to leverage Love from Preventers, as early
adopters, to influence the rest of the market.
Preventers Overall Norm
Brand Funnel Scores Preventers vs. Overall
0
20
40
60
80
Awareness
Gray’s Dad’s Business
Review
GRAY’S
Cookies
Exceptional scores among early Adopters (“Proactive
Preventers”) making it highly beloved among the niche.
• Gray’s is very healthy among “Preventers” with strong awareness at 80% and all related Brand
Funnel scores significantly above norm. However, that strength has not carried over to the
overall market, where Gray’s is significantly under-developed in the overall market.
Explore ways to leverage Love from Preventers, as early
adopters, to influence the rest of the market.
Preventers Overall Norm
Brand Funnel Scores Preventers vs. Overall
0
20
40
60
80
Awareness
Average Price per unit
0
22.5
45
67.5
90
2018 2019 2020 2021
Gray’s
Dad’s
Blind taste test performance
Analyze
Performance
Annual Marketing Plan
Analysis Issues and Strategies Execution Plans
P&L forecast
• Sales $30,385
• Gross Margin $17,148
• GM % 56%
• Marketing Budget $8,850
• Contribution Margin $6,949
• CM% 23%
Drivers
• Taste drives a high conversion of Trial to
Purchase
• Strong Listings in Food Channels
• Exceptional brand health scores among
Early Adopters. Highly Beloved Brand
among niche.
Inhibitors
• Low familiar yet to turn our sales into loyalty
• Awareness held back due to weak
Advertising
• Low distribution at specialty stores. Poor
coverage.
• Low Purchase Frequency among most
loyal.
Risks
• Launch of Mainstream cookie brands
(Pepperidge Farms and Nabisco).
• De-listing 2 weakest skus weakened our in-
store presence
• Legal challenge to taste claims
Opportunities
• R&D has 5 new flavors in development.
• Sales Broker gains at Specialty Stores
• Use social media to convert loyal following.
Key Issues
1.What’s the priority choice for growth: find
new users or drive usage frequency among
loyalists?
2.Where should the investment/resources
focus and deployment be to drive our
awareness and share needs for Gray’s?
3.How will we defend Gray’s against the
proposed Q1 2014 ‘healthy cookie’
launches from Pepperidge Farms and
Nabisco?
Strategies
1.Continue to attract new users to Gray’s
2.Focus investment on driving awareness
and trial with new consumers and building
a presence at retail.
3.Build defence plan against new entrants to
defends with consumers and at store level.
Goals
• Increase penetration from 10% to 12%,
specifically up from 15% to 20% with the
core target. Monitor usage frequency
among the most loyal to ensure it stays
steady.
• Increase awareness from 33% to 42%,
specifically up from 45% to 50% within the
core target. Drive trial from 15% to 20%.
Close distribution from 62% to 72%.
• Hold dollar share during competitive
launches. Grow 11% post launch gaining up
to 1.2% share. Target zero losses at shelf.
Advertising
• Use awareness to drive trial of the new
Grays. Target “Proactive Preventers”.
Suburban working women, 35-40.Main
Message of “great tasting cookie without the
guilt, so you can stay in control of your
health”. Media includes 15 second TV,
specialty health magazines, event signage,
digital and social media
Sampling
• Drive trial with In-store sampling at grocery,
Costco, health food stores and event
sampling at fitness, yoga, women’s
networking, new moms.
Distribution
• Support Q4 retail blitz with message
focused on holding shelf space during the
competitive launches. Q2 specialty blitz to
grow distribution at key specialty stores.
Innovation
• Launch two new flavours in Q4/15 & Q4/16.
Explore diet claims, motivating and own-
able.
Competitive Defence Plan
• Pre Launch sales blitz to shore up all
distribution gaps. At launch, heavy
merchandising, locking up key ad dates,
BOGO. TV, print, coupons, in-store
sampling.
• Use sales story that any new “healthy”
cookies should displace under-performing
and declining unhealthy cookies.
Brand Vision: Be first ‘healthy cookie’ to generate craving, popularity and sales of a mainstream cookie. $100 Million by 2024.
3
Brand
Plans
Brand Plan
13. In our section on strategic thinking, you will learn how to:
✓ Use five elements of smart strategic thinking
✓ Engage our ThinkBox 360-degree strategic thinking model to trigger new questions
✓ Build everything around your brand’s core strength
✓ Think strategically to tighten your brand’s bond with consumers
✓ Think strategically to win the competitive battles you face
✓ Think strategically, within the brand’s current situation
✓ Write strategic objective statements for each of the four strategies
2. How to define your brand positioning
Too many marketers are trying to be everything to anyone. This strategy is the usual recipe for becoming
nothing to everyone. The best brand leaders target a specific motivated consumer audience and then define
their brand around a brand idea that is interesting, simple, unique, motivating, and ownable.
I will show you how to write a winning brand positioning statement with four essential elements: target market,
competitive set, main benefit, and reason to believe (RTB). You will learn how to build a brand idea that leads
every touchpoint of your brand, including the brand promise, brand story, innovation, purchase moment, and
the consumer experience. I will give you the tools for how to write a winning brand concept and brand story.
In our section on defining your brand, you will learn how to:
✓ Write brand positioning statements
✓ Define your target market, with insights, enemies, and need states
✓ Define consumer benefits, both functional and emotional
✓ Come up with brand support points and claims
✓ Understand the relationship between brand soul, brand idea and brand reputation
✓ Come up with your brand idea
✓ Write brand concept statements
✓ Turn your brand concept into a brand story
✓ Use the brand positioning and brand idea to build your internal brand credo
!13
14. 3. How to write Brand Plans
Too many marketers focus on a short-term to-do list, not a long-term plan. The best brand leaders write brand
plans that everyone in the organization can follow with ease, including senior management, sales, R&D,
agencies, and operational teams. I will teach you how to write each element of the brand plan, including the
brand vision, purpose, values, goals, key Issues, strategies, and tactics. Real-life examples will give you a
framework to use on your brand. You will learn to build execution plans including a brand communications plan,
innovation plan, and in-store plan.
In our section on how to write brand plans, you will learn how to:
✓ Use five strategic questions as an outline for your entire plan
✓ Write an inspirational brand vision statement to frame your brand plan
✓ Come up with a brand purpose and brand values
✓ Summarize your brand’s situation analysis
✓ Map out the key issues your brand faces
✓ Write smart, brand strategy objective statements to build around your brand’s core strength
✓ Write smart, consumer brand objective strategy statements
✓ Write smart, competitive brand objective strategy statements
✓ Write smart, situational brand strategy objective statements
✓ Focus tactics to ensure a high return on effort
✓ Write specific execution plans for brand communications, innovation, and in-store
✓ Come up with a profit statement, sales forecast, goals, and marketing budget for your plan
✓ Use an ideal one-page brand formats for the annual brand plan and long-range strategic roadmap
4. How to inspire marketing execution
Too many marketers are becoming task-masters and step over the line into execution. The best brand leaders
need to inspire experts to produce smart and creative execution. I will provide tools and techniques for judging
and making decisions on creative advertising from your agency.
For judging execution, I use the ABC’s tool, believing the best executions must drive Attention (A), Brand link
(B), Communication (C) and Stickiness (S). I will provide a checklist for you to use when judging executions,
then show you how to provide direction to your agency to inspire and challenge great execution.
15. In our section on how to lead the marketing execution, you will learn how to:
✓ Understand the crucial role of the brand leader in getting great creative execution
✓ Be the brand leaders who can successfully manage the 10 stages of the advertising process
✓ Write a brand communications plan
✓ Turn the brand communications plan into a creative brief
✓ Leverage smart and bad examples of the creative brief
✓ Use the ABC’s advertising decision-making tool
✓ Give inspiring feedback on advertising that pushes for great work
✓ Build your media planning with six media questions
✓ Line up media choices to where consumers are most willing to engage with your brand
5. How to analyze your brand’s performance
Too few marketers take the time to dig into data analytics. There is no value in having access to data if you are
not using it to discover meaningful insights. The best brand leaders can tell strategic stories through analytics. I
will show you how to create a deep-dive business review, looking at the marketplace, consumers, competitors,
channels, and brand. I will teach how to turn your analysis into a presentation for management, showing the
ideal presentation slide format. I will also provide a Finance 101 for Marketers, giving you every financial
formula you need to run your brand.
In our section on how to analyze the brand’s performance, you will learn how to:
✓ Analyze the marketplace your brand plays in
✓ Assess your consumers
✓ Assess the retail channels you sell through
✓ Analyze the competitors
✓ Analyze the health of your brand
✓ Use 60 of the best analytical questions to ask
✓ Bring the analysis together into the drivers, inhibitors, threats, and opportunities
✓ Know the financial formulas for compound CAGR, price increases, COGs. and ROI
✓ Prepare a deep-dive business review presentation
!15
16. Who should read the Beloved Brands playbook?
Marketing pros and entrepreneurs, this book is for you. Whether you are a VP, CMO, director, brand
manager, or just starting your
marketing career, I promise you
will learn how to realize your full
potential. You could be in brand
management working for an
organization or an owner-
operator managing a branded
business.
Beloved Brands is a toolbox
intended to help you every day
in your job. Keep it on your
desk and refer to it whenever
you need to write a brand plan,
create a brand idea, develop a
creative brief, make advertising
decisions or lead a deep-dive
business review. You can even
pass on the tools to your team
so they can learn how to deliver
the fundamentals needed for
your brands.
This book is also an excellent
resource for marketing
professors, who can use it as
an in-class textbook to develop
future marketers. It will
challenge communications
agency professionals, who
are looking to get better at
managing brands, including
those who work in advertising,
public relations, in-store
marketing, digital advertising,
or event marketing.
If you are an entrepreneur who
has a great product and wants to turn it into a brand, you can use this book as a playbook. These tips will help
you take full advantage of branding and marketing, and make your brand more powerful and more profitable.
How good is your brand playbook?
Where are the gaps on your team?
Target Name
Description
Needs
Enemy
Insights
They think now?
Buying process
Desired response
The playbook for how to create a
brand your consumers will love
Bring all the work together to create a
winning brand positioning statement
To
(Target)
• Healthy proactive preventers who
want to do more for their health,
working moms, 35-40 years old.
Gray’s is
(Category)
• The healthy cookie option
That is the
(Benefit)
• Guilt-free cookie to help you stay
in control of your health
That’s
because
(Support Points)
• In blind taste tests, Gray’s matched
the leaders on taste, but has only
100 calories and 3g of net carbs.
• In a 12-week study, consumers using
Gray’s once a night as a dessert
were able to lose 5-10 lbs.
1
2
3
4
GRAY’S
Cookies
More Cookie. Less guilt.
Annual Marketing Plan
Analysis Issues and Strategies Execution Plans
P&L forecast
• Sales $30,385
• Gross Margin $17,148
• GM % 56%
• Marketing Budget $8,850
• Contribution Margin $6,949
• CM% 23%
Drivers
• Taste drives a high conversion of Trial to
Purchase
• Strong Listings in Food Channels
• Exceptional brand health scores among
Early Adopters. Highly Beloved Brand
among niche.
Inhibitors
• Low familiar yet to turn our sales into loyalty
• Awareness held back due to weak
Advertising
• Low distribution at specialty stores. Poor
coverage.
• Low Purchase Frequency among most
loyal.
Risks
• Launch of Mainstream cookie brands
(Pepperidge Farms and Nabisco).
• De-listing 2 weakest skus weakened our in-
store presence
• Legal challenge to taste claims
Opportunities
• R&D has 5 new flavors in development.
• Sales Broker gains at Specialty Stores
• Use social media to convert loyal following.
Key Issues
1.What’s the priority choice for growth: find
new users or drive usage frequency among
loyalists?
2.Where should the investment/resources
focus and deployment be to drive our
awareness and share needs for Gray’s?
3.How will we defend Gray’s against the
proposed Q1 2014 ‘healthy cookie’
launches from Pepperidge Farms and
Nabisco?
Strategies
1.Continue to attract new users to Gray’s
2.Focus investment on driving awareness
and trial with new consumers and building
a presence at retail.
3.Build defence plan against new entrants to
defends with consumers and at store level.
Goals
• Increase penetration from 10% to 12%,
specifically up from 15% to 20% with the
core target. Monitor usage frequency
among the most loyal to ensure it stays
steady.
• Increase awareness from 33% to 42%,
specifically up from 45% to 50% within the
core target. Drive trial from 15% to 20%.
Close distribution from 62% to 72%.
• Hold dollar share during competitive
launches. Grow 11% post launch gaining up
to 1.2% share. Target zero losses at shelf.
Advertising
• Use awareness to drive trial of the new
Grays. Target “Proactive Preventers”.
Suburban working women, 35-40.Main
Message of “great tasting cookie without the
guilt, so you can stay in control of your
health”. Media includes 15 second TV,
specialty health magazines, event signage,
digital and social media
Sampling
• Drive trial with In-store sampling at grocery,
Costco, health food stores and event
sampling at fitness, yoga, women’s
networking, new moms.
Distribution
• Support Q4 retail blitz with message
focused on holding shelf space during the
competitive launches. Q2 specialty blitz to
grow distribution at key specialty stores.
Innovation
• Launch two new flavours in Q4/15 & Q4/16.
Explore diet claims, motivating and own-
able.
Competitive Defence Plan
• Pre Launch sales blitz to shore up all
distribution gaps. At launch, heavy
merchandising, locking up key ad dates,
BOGO. TV, print, coupons, in-store
sampling.
• Use sales story that any new “healthy”
cookies should displace under-performing
and declining unhealthy cookies.
Brand Vision: Be first ‘healthy cookie’ to generate craving, popularity and sales of a mainstream cookie. $100 Million by 2024.
Deep-dive review summary GRAY’SCookies
Marketplace Review:
1. Declining cookie sales have created a war among major competitors with lower prices and margins.
2. Category growth and Gray’s growth coming from the West, but facing poor performance in the East.
3. Continuous variations of diet with low calorie, low carb, low fat and gluten free. Consumers remain confused.
As eating habits are changing the cookie category is shrinking, while the good-for-you segment thrives.
Consumer Review
1. Gray’s taste drives a high conversion of trial to purchase (65% versus a norm of 50%).
2. Low purchase frequency (2.2 boxes per year vs. norm of 7.3) even among the most loyal early adopters.
3. Consumers love Gray’s new “guilt free” concept
New consumers attracted to Gray’s “guilt free” positioning, but the great taste drives loyalty
Channel Review
1. Successful listings has driven strong distribution in Food Channels (90%)
2. Low distribution at specialty stores at only 16% due to poor sales coverage.
3. Weak coop/display for Gray’s is directly linked to our lower trade terms being offered.
Gray’s needs to close distribution gaps, but must maintain advertising investment to drive trial.
Competitor Review
1. Re-evaluate strategy and use our power to begin to dominate the “good for you” segment.
2. Dad’s wins on innovation and deep price discounts, but is weak on taste.
3. Major risk if the major cookie brands launch healthy versions that are near-match taste versus current brands.
Gray’s has an opportunity to dominate the “good for you” segment before traditional brands enter segment.
Brand Review
1. Exceptional scores among early Adopters (“Proactive Preventers”), early base of brand lovers.
2. Brand funnel scores show we are still a niche player but yet to turn our sales into strong following
3. Awareness held back due to poor advertising scores with low attention scores and brand link scores.
Gray’s growth due to taste quality, but new “guilt free” positioning will connect deeper and fuel new demand.
Overall Brand Challenge: It is time to transition Gray’s from a product-led brand into an idea-led brand to connect with
consumers by owning the idea of “guilt free” snacking, rather than just selling a great tasting cookie. Gray’s needs to begin to
dominate and lead the “good for you” cookie segment.
Brand
Promise
Consumer
BrandBrand
Idea
Consumer
Experience
Brand
Story
Innovation
Ideas
Purchase
Moment
Packaging
Logo/Slogan
Culture and
Operations
Advertising
and Media Product
Development
Sales
and Retail
Beloved
Like It
Love It
Unknown
We use our Brand Love Curve to chart
how consumers feel about the brand
Get
noticed
Establish
positioning
Influence
friends
Tighten
bond
Trusted
following
Indifferent
Brand PlanDeep Dive Review
Brand PositioningConsumer Profile
Consumer StrategyBrand Idea Map
17. What will you get from the Beloved Brands playbook?
In the past two decades, what makes brands successful has changed, and you must change with it. You will
learn the fundamentals of managing your brand, with brand love at the core. I will show you how to improve
your thinking to unleash your full potential as a brand leader.
You will learn how to think, define, plan, execute, and analyze, and I provide every tool you will ever need
to run your brand. You will find models and examples for each of the four strategic thinking methods, looking at
core strength, competitive, consumer, and situational strategies.
To define the brand, I will provide a tool for writing a brand positioning statement as well as a consumer profile
and a consumer benefits ladder. I have created lists of potential functional and emotional benefits to kickstart
your thinking on brand positioning. We explore the step-by-step process to come up with your brand idea and
bring it all together with a tool for writing the ideal brand concept.
For brand plans, I provide formats for a long-range brand strategy roadmap and the annual brand plan with
definitions for each planning element. From there, I show how to build a brand execution plan that includes the
creative brief, innovation process, and sales plan. I provide tools for how to create a brand calendar, and specific
project plans.
To grow your brand, I show how to make smart decisions on execution around creative advertising and media
choices. When it comes time for the analytics, I provide all the tools you need to write a deep-dive business
review, looking at the marketplace, consumer, channels, competitors and the brand. Write everything so that it
is easy to follow and implement for your brand.
You will learn everything you need to know so you can run your brand. My brand promise is to help make you
smarter so you can realize your full potential.
Graham Robertson
Founder and CMO of Beloved Brands Inc.
!17
18. BELOVED BRANDS
Chapter Summaries
Introduction: How the Beloved Brands playbook can work for you Page 5
• The purpose of the Beloved Brands playbook is to make you a smarter brand leader so your brand can win
in the market. You will learn how to think strategically, define your brand with a positioning statement and
a brand idea, write a brand plan everyone can follow, inspire smart and creative marketing execution, and
be able to analyze the performance of your brand through a deep-dive business review.
1. Why being a beloved brand matters Page 12
• The more loved your brand, the more powerful and profitable your brand will be. While old-school
marketers were yelling their message to every consumer, today’s brand leaders must build relationships
and create a bond with their most cherished consumers. We will explore the concept of a brand idea,
showing how it helps connect with consumers and organize everything you do on your brand. An overview
of the brand love curve will steer your strategic thinking and execution decisions.
2. How to use strategic thinking to help your brand win Page 21
• Strategic thinking is the foundation of brand management. I will take you through the five elements of
smart strategic thinking, including setting a vision, investing in a strategic program that focuses on an
identified opportunity, and how to leverage a breakthrough market impact into a performance result. I will
show how to turn smart thinking into strategic objective statements you can use in your Brand Plans.
Moreover, I will set up the four types of strategy, looking at your brand’s core strength, consumers,
competitors, and looking at the situation.
3. How to build your brand around your core strength Page 32
• Our core strength model forces you to select one of four possible options as your brand’s lead strength: the
product, brand story, experience, or price. Each choice has a distinct strategic focus, brand
communications, and desired reputation. I will show how the model comes to life with numerous brand
examples and a case study on Starbucks as they build a reputation around their commitment to an
exceptional consumer experience.
4. How to build a tight bond with your most cherished consumers Page 42
• Consumer strategy is about building a bond with your target consumer. I use the brand love curve to
demonstrate specific game plans for each stage of the curve, whether your brand is at the unknown,
indifferent, like it, love it or the beloved stage. This model sets up distinct strategies and 20 potential
actions. A case study on Special K shows how they evolved from an indifferent brand to a beloved brand.
19. 5. How to win the competitive battle for your consumer’s heart Page 54
• The competitive strategy leverages the brand’s positioning to win in the market. Brands must evolve their
strategy as they move from a craft brand to a disruptor brand to a challenger brand up to the dominant
power player. Each of the four choices offers a different target focus, unique strategies, and tactics.
6. How to address your brand situation before you make your next move Page 68
• Before initiating your plan, you must understand what is happening internally, within your own company.
You can learn four distinct situations, including fueling the momentum, fix it, re-alignment, or a start-up.
Each situation has different indicators and recommended strategies, as well as advice on the leadership
style to engage.
7. How to define the ideal target market to build your brand around Page 76
• Everything must start with the consumer target you will serve. I will show how to develop a consumer
profile that includes a segmented definition, consumer insights, consumer enemies, need states, and the
desired response that matches your overall strategy.
8. How to define your brand positioning to help your brand win Page 91
• You will learn the four elements of a brand positioning statement including the target you serve, the
category you play in, the space you serve that will help you win, and deal-closing support points—the best
positioning balances functional and emotional benefits. You will access a tool to choose from more than 100
benefits.
9. How to create a brand idea you can build everything around Page 102
• To become a successful and beloved brand, you need a Brand Idea that is interesting, simple, unique,
inspiring, motivating, and own-able. I will introduce a tool to help build your Brand Idea, and how to build a
winning brand concept.
10. How to use your brand idea to organize everything you do Page 113
• Use the brand idea to organize everything you do around five consumer touch-points, including the brand
promise, brand story, innovation, purchase moment and the consumer experience. The brand idea should
organize your brand positioning, advertising, media, product innovation, selling, retailing, and the
consumer experience. Learn how to build a brand credo, and brand story. We use Ritz-Carlton and Apple
case studies to support the learning.
11. How to build a brand plan everyone can follow Page 124
• Use a one-page format to simplify and organize your brand plan so everyone in your organization can
follow it with ease. You will learn how to find your brand vision, purpose, key issues, strategies, execution
tactics, and measurements.
!19
20. 12. How to build your brand’s execution plans Page 142
• Once you draft your brand plan, it is time to build separate execution plans with crystal clear strategies for
those who will execute on your brand's behalf. I will show how to complete a brand communication plan,
execution plan, and sales plan.
13. How to write a creative brief to set up brilliant execution Page 151
• The bridge between your brand plan and marketing execution is the creative brief. I will show how to write
a world-class brief using a recommended format. We will review smart and bad examples of a brief, broken
out on a line-by-line basis. I also introduce a mini-brief for when you are time-pressed.
14. How to run your brand’s advertising process Page 164
• I will take you through the ten steps to inspiring greatness from those experts you engage. I will introduce
a predictive model that measures branded breakthrough and a motivating message to consumers.
15. How to make advertising decisions using our ABC’s model Page 172
• This section outlines principles for achieving Attention, Brand link, Communication, and Stickiness—the
model I call the ABC’s. I will show examples of some of the best ads in the history of branding, to support
those principles. I hope it will challenge your thinking about your brand’s advertising.
16. How to make media decisions to break through the cluttered media world Page 187
• Six questions help you frame your media plan. Consider factors such as your brand's budget size, your
brand's core strength and how tightly connected your brand is with consumers. Then identify which point
on the consumer journey you wish to impact, where your consumers are most willing to engage your
message and what media choices best fit with your creative execution.
17. How to conduct a deep-dive business review to uncover brand issues Page 199
• The deep-dive review forces a 360-degree view of your brand by looking into the marketplace, consumers,
channels, competitors, and the brands. You will learn some of the best analytical tools, including consumer
tracking, customer scorecards, brand funnels, and the leaky bucket. I provide the 50 best analytical
questions to get you started, and a format for how to bring it all together into a business review
presentation.
18. Marketing Finance 101 to help manage your brand’s profitability Page 214
• Learn what you need to know about brand finance, including the eight ways you can drive profit. Learn how
to dissect an income statement and use the essential financial formulas that marketers need to know
including return on investment (ROI), growth, forecasting, cost of goods sold (COGS), and compound
annual growth rate (CAGR).