Inova Fairfax Hospital
South Patient Tower
Falls Church, VA
Penn State Senior Capstone Project
Jianhong Qiu| Construction Management
Advisor: James Faust
Inova Fairfax Hospital
South Patient Tower
Falls Church, VA
Penn State Senior Capstone Project
Jianhong Qiu| Construction Management
Advisor: James Faust
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
BREADTH TOPICS
• DYNAMIC GLASS/ELETRICAL BREADTH
• MECHANICAL BREADTH
LOCATION: 3300 GALLOWS ROAD, FALLS CHURCH, VA
FUNCTION: HEALTHCARE
174 PRIVATE ROOMS
INTENSIVE CARE UNITS
SIZE: 236,000 SQ. FT.
147.55 FT
COST: 76MILLION $
DATE OF CONSTRUCTION : JULY 2010-AUGUST 2012
EDLIVERY METHOD: DESIGN-BID-BUILD
PROJECT OVERVIEW
ORINIGAL SITE
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
PROJECT PARTICIPANTS
•OWNER: INOVA HEALTHCARE SYSTEM
•GERNAL CONTRACTOR: TURNER CONSTRUCION COMPANY
•ARCHITECT: WILMOT SANZ, INC.
•MEP: RMF ENGINEERING, INC.
•CIVIL: DEWBERRY & DAVIS LLC
•STRUCTURE: CAGLEY & ASSOCIATES
•ELECTRICAL: TURLAND SERVICE CORPORATION
4
PROJECT OVERVIEW
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
STRCTURE:
CONCRETE STRUCTURE
TWO-WAY FLAT SLAB
TYPICAL 24IN. X 24IN. COLUMNS
12FLOORS ABOVE GRADE /1FLOOR BELOW GRADE
MECHANICAL SYSTEM:
5TH FLOOR WITH 4X 5,000 CFM AIR HANDLING UNITS
2 AIR HANDER FOR CAFETERIA AND KITCHEN ON WEST ROOF OF 2ND FLOOR
10,000CFM AND 13,000 CFM
3 HEAT EXCHANGER IN BASEMENT (715 GALLONS/MINS )
ELECTRICAL SYSTEM:
TWO 2,000KVA TRASFORMERS
2,000KW EMERGENCY GENERATOR 5
PROJECT OVERVIEW
FAÇADE:
45,000 SF. ARCHITECTURAL PRECAST (INCLUDING
22,000SF. THIN BRICK-CLAD )
282 METAL PANELS GLAZED INTO ALUINUM
CURTAIN WALL
SUSTAINABILITY:
LEED SILVER CERTIFICATION
GREEN ROOF, RAIN GARDEN
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
6
Problem Identification:
•BIM NOT STRICTLY REQUIRED BY OWNER
•NOT USED TO FULL TENSION
•EXISTING BIM USES
Ěľ 3D COORDINATION OF MEP SYSTEM
Ěľ PREFIBRACATE MEP COMPONENTS
AYALYSIS #1 IMPLEMENTATION OF BIM
PROTENTIAL SOLUTIONS
•INVESTIGATION OF BIM TOOLS
•BIM ROI
•BIM SCORE CARD
•EXPLORE ADDITIONAL BIM USAGE
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
BIM RETURN ON INVESTMENT (ROI)
ROI= EARNING/COST
A: Cost of hardware and software($)
B: Monthly labor cost($)
C: Training time (Months)
D: Productivity lost during training(%)
E: Productivity gain after training(%)
7
AYALYSIS #1 IMPLEMENTATION OF BIM
(B-(B/(1+E))) X(12-C) =1st YearROI
A+(B xCxD)
A 6000
B 4200
C 3
D 50
E 25
(4200-(4200/(1+25%))) X (12-3) = 61.46%
6000+ ( 4200 x 3 x 50%)
SCHEDULE COMPRESSION BY 10%
REVIT ARCHITECTURE SOFTWARE SURVEY
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
BIM SCORECARD-DETERMINE HOW MANY BIM
CAPABILITIES ARE USED IN OPERATION
7 CATEGORIES:
1.PORTFOLIO AND PROJECT MANAGEMENT
2.COST PLANNING
3.COST CONTROL
4.SCHEDULE PLANNING
5.PRODUCTION CONTROL
6.DESIGN COORDINATION
7.DESIGN TEAM ENGAGEMENT
8
AYALYSIS #1 IMPLEMENTATION OF BIM
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
BIM SCORECARD
1.PORTFOLIO AND PROJECT MANAGEMENT
2.COST PLANNING
3.COST CONTROL
4.SCHEDULE PLANNING
5.PRODUCTION CONTROL
6.DESIGN COORDINATION
7.DESIGN TEAM ENGAGEMENT
9
AYALYSIS #1 IMPLEMENTATION OF BIM
REVIEW AREAS FOR IMPROVEMENT OPPORTUNITIES
• COST PLANNING
• SCHEDULE PLANNING
• DESIGN TEAM ENGAGEMENT
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
INVESTIGATION OF BIM TOOLS
VICO 5D MODEL SOFTWARE:
•2D DRAWING
•3D CONSTRUCTABILITY AND COORDINATION
•4D SCHEDULING AND PRODUCTION CONTROL
•5D ESTIMATION AND COST PLANNING
10
AYALYSIS #1 IMPLEMENTATION OF BIM
HOW DATA FLOW WORK
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
CASE STUDY
•MIDDLE TENNESSEE MEDICAL CENTER
•555,000 SF.
•$3MILLIONS BUDGET SAVING
•ADDITIONAL $1MILLION SAVING DUE TO BIM ENABLED
PREFABRICATION
•COMPLETED TWO MONTHS AHEAD OF SCHEDULE
11
AYALYSIS #1 IMPLEMENTATION OF BIM
FURTHER BENEFITS
•INOVA FAIRFAX 2015 CAMPUS IMPROVEMENT PLAN
•EXPENSION OF 600,000SF. WOMEN HOSPITAL
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
12
PROBLEM IDENTIFICATION
• SIMILAR AND REPETITIVE FLOOR PLANS
• PATIENT ROOMS ALONG WITH WORKING SESSION
• IDENTIFY ROOM NUMBERS AND DIMENSIONS
POTENTIAL SOLUTION
• IDENTIFY AREAS FOR NEW SIPS SCHEDULE
• PREDESIGNED SMART ROOM
• CREATE NEW SCHEDULE
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
FLOOR PLAN
ANALYSIS#2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
13
ORIGINAL CONSTRUCION FLOW
ANALYSIS#2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
IDENTIFY AREA FOR SIPS:
•RED AREA
•FLOW: FROM EAST TO SOUTH
•3,4,6,7,8 FLOOR MEDICAL/SURGERY ROOM
•9-11FLOOR ICU BEDS
14
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
15
SCHEDULE ACCERLATOIN-SMART ROOM
•PREDESIGNED MEDICAL CARE/SURGERY ROOM BY HILL-ROM
•FINALIZEINTERIOR ROOM LAYOUT
•2D, 3D REDERINGS FOR CLIENTS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS)
16
SCHEDULE ACCELERATION
•SUPERSTRUCTURE
•ABOVE CEILING MEP
•FAÇADE
•INTERIOR
•SAVING ONE MONTH
•AUGUST2011-JULY2011
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
17
Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
PROBLEM IDENTIFICATION
•OPERATE 24/7 HIGH COOLING,ELECTRICITY HOT WATER DEMANDS
•EMERGENCY BACKUP, OPERATIONAL DURING NATURAL AND OTHER
DISASTER
•TIGHT CONTROL OF TEMPERATURE, HUMIDITY, VENTILATION. VARY
AMONG DIFFERENT SPACE TYPES
•DAY-TO-DAY OPERATION EQUIPMENT INTENSIVE, NO EFFICIENCY
RATING SYSTEMS FOR MEDICAL EQUIPMENTS
SPT GOAL: ENERGY REDUCTION 24.5 %
BASED ON DATABASE OF SIMILAR BUILDINGS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
18
Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
NET ZERO ENERGY BUILDING CERTIFICATION REQUIREMENT:
•CONSTRUCTION AND RENEWABLE ENERGY SYSTEM CURB THE PROJECT’S
CONTRIBUTION TO THE EFFECTS OF SPRAWLED DEVELOPMENT
•THE BUILDING OPERATES AT NET ZERO ENERGY
•NOT PRECLUDE ANOTHER BUILDING
•ATTRACTIVE AND INSPIRING
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
NATIONAL RENEWABLE ENERGY LABORATORY(NREL)
DEFINITION SUGGESTED BELOW TO DEFINE NET ZERO ENERGY:
• NET ZERO SITE ENERGY
• NET ZERO SOURCE ENERGY
• NET ZERO ENERGY COSTS
• NET ZERO ENERGY EMISSIONS
19
Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
• CHILLED BEAM
 PASSIVE/ACTIVE/MULTI-SERVICE
• COMBINED HEAT AND POWER(CHP)
• SOLAR ELECTRIC
 ROOF/GROUND/MOUNTED FACING SOUTH
 NO SHADE 9:00AM-3:00OM DECEMBER
 2-4% NET COST
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
UTILITY BILL:
PRODUCED VS. USED
ADD UP MONTYLY READINGS OF ONE YEAR
EXTRA ENERGY:
SELL BACK TO UTILITY COMPANIES
FIXED PRICE
20
Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
PRESENTATION OUTLINE:
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. ENERGY REDUCTION STUDIES
II. SYSTEM LAYOUT AND DESIGN
III. STRUCTURAL IMPACT
IV. ENERGY IMPACT
V. FINANCIAL FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. CASE STUDIES
II. INITIAL PREFABRICATION PLANNING
III. SCHEDULE AND COST REDUCTION
IV. SCHEDULE COMPRESSION
V. MODULAR DESIGN
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. BIM EXECUTION GUIDE
II. CASE STUDIES
III. OPTIMAL DETERMINED USES
IV. VIRTUAL MOCK-UPS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
BREADTH TOPIC: DYNAMIC GLASS
THE FAÇADE DESIGN TOOL
4A MIXED HUMID CLIMATE
DESIGN PARAMETERS:
WINDOW AREA/DAYLIGHTS CONTROLS /
SHADING/GLASS&FRAME TYPE
21
BREADTH TOPIC: DYNAMIC GLASS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
WEST FACADE
SOUTH FACADE
EAST FACADE
22
DYNAMIC GLASS
•REDUCE VISUAL GLARE
•REDUCING COOLING HEATING USAGE BY 20%
•REDUCING PEAK LOAD BY 30%
•COST:20$ / SF.
BREADTH TOPIC: DYNAMIC GLASS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
23
BREADTH TOPIC: DYNAMIC GLASS
TOTAL ENERGY SAVING= 31,789,200kBTU x 25%= 7,947,300kBTU
TOTAL COST SAVINGS=7.9473 x 1000 x 35.16= $ 279,427
SOLADIGM INC. $20 /SF
TOTAL COST= $20/ ft2 x 22450 ft2 = $449,000
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
24
PROBLEM IDENTIFICATION
COMPLEXITY OF MEP SYSTEM:
MORE THAN ONE YEAR BIM COORDINATION
NO EARLIER CONTRIBUTION TO DESIGN PHASE
AND COORDINATION PROCESS
EAST ELEVATION EXTERIOR WALL:
•LIGHT GAGE METAL FRAIMING
•REDESIGN TO COORDINATE
BETTER WITH WOMEN’S HOSPITAL
•REVISED ENGINEERING DRAWINGS
PREPARED BY FRAMING
SUBCONTRACTOR.
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
25
PROBLEM IDENTIFICATION
SOUTH ELEVATION :
1ST AND 2ND FLOOR CURVED WALL
CURVES NOT MATCH
ARCHITECTURE AND ENGINEERING DRAWING MISTAKES
SCHEDULE DELAYED
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
STUDY ON INTEGRATED PROJECT DELIVERY A Guide(AIA)
26
Items Traditional Project Delivery Integrated Project Delivery
Team Fragmented, “minimum-
necessary” basis, strongly
hierarchical
Mutual Respect and Trust
Compensation/re
ward
Individually pursued Mutual Benefit and
Reward
Risk Individually managed,
transferred to the greatest extent
possible
Collaborative Innovation
and Decision
Process linear, segregated,information
hoarded.
Early Involvement of Key
Participants, goal
Definition, Intensified
Planning
Communication Paper based,2 dimensional Digital based, BIM, Open
Communication
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
• ABILITY TO CHANGE DECREASE
• COST OF CHANGES INCREASE
• IPD PUT MORE EFFORT IN
PREDESIGN/SCHEMATIC DESIGN PHASE
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
27
RISKS:
•TRYING SOMETHING NEW AND UNTESTED
•BUILDING WITHOUT A GMP
•OWNER TAKING RISKS BACK
•DIFFICULT TO MEASURE THE BENEFIT
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
MOST IDEAL WAY TO ACHIEVE IPD
• COMBINE ALL NEW TECHNOLOGIES
• BIM LEAN SUSTAINABILITY
ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD)
28
MULTI PRIME CONTRACTS
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
DIVISION OF CAPITAL ASSET MANAGEMENT OF
COMMONWEALTH OF MASSACHUSETTS
• FREQUENT MEETINGS
• SHARING SENSITIVE, PROPRIETARY OR CONFIDENTIAL
INFORMATION
• SELECT AND BUILD STRONG IPD PROJECT TEAMS
• MASTER KEY COMPONENTS OF CONTRACTS AND RISK
MANAGEMENT
• UNDERSTAND ECONOMIC AND MARKET FACTORS THAT ARE
DRIVING IPD ADOPTION
SUMMARY AND CONCLUSION
ANALYSIS#1INCREASE IMPLEMENTATION OF BIM
SCHEDULE/COST PLANNING
ANALYSIS#2 SIPS ACCELERATE SCHEDULE
PREDESIGNED SMART ROOM
29
I. PROJECT OVERVIEW
II. ANALYSIS #1: IMPLEMENTATION OF BIM
I. PROBLEM IDENTIFICATION
II. BIM SCORECARD
III. BIM ROI
IV. INVESTIGATION OF BIM TOOLS
V. CASE STUDY AND FEASIBILITY
III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
I. PROBLEM IDENTIFICATION
II. IDENTIFY AREA FOR SIPS
III. SMART ROOM
IV. SCHEDULE ACCELERATION
IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
I. PROBLEM IDENTIFICATION
II. NZE BUILDING CERTIFICATION
III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
IV. ELECTRICALBREADTH –DYNAMIC GLASS
V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
I. PROBLEM IDENTIFICATION
II. STUDY ON IPD GUIDE
III. MULTI PRIME CONTRACTS
VI. SUMMARY AND CONCLUSION
VII. ACKNOWLEDGEMENTS
ANALYSIS#3 NET ZERO ENERGY INCREASE
BUILDING ENERGY EFFICIENCY
ANALYSIS#4 INTEGREATED PROJECT DELIVERY
ELIMINATE BARRIERS INCREASE
PRODUCTIVITY
ACKNOWLEGEMENTS
PENN STATE AE FACULTY
ADVISOR:
JAMES FAUST
CRAIG DUBLER
TURNER CONSTRUCTION:
TESSA R. TEODORO
JOHNNY F. WEAVER
DREW KELLEHER
30
VICO SOFTWARE INTEGRATING CONSTRUCTION:
HOLLY ALLISON
PACE INDUSTRY MEMBERS
MY FAMILY AND FRIENDS

More Related Content

Similar to FINAL_PRESENTATION[1].ppt

The future of cloud computing
The future of cloud computingThe future of cloud computing
The future of cloud computing
threesixty
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
Angela Lopez
 
Kenneth Burnham (IES - UK)
Kenneth Burnham (IES - UK)Kenneth Burnham (IES - UK)
Kenneth Burnham (IES - UK)
I4MS_eu
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
pranay kumar
 
BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
Gaurav Kumar
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
Clive Walsh
 

Similar to FINAL_PRESENTATION[1].ppt (20)

The future of cloud computing
The future of cloud computingThe future of cloud computing
The future of cloud computing
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part III
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
CV (1)man
CV (1)manCV (1)man
CV (1)man
 
Making the Invisible Visible for Roofs: Quality Assurance, Risk Mitigation an...
Making the Invisible Visible for Roofs: Quality Assurance, Risk Mitigation an...Making the Invisible Visible for Roofs: Quality Assurance, Risk Mitigation an...
Making the Invisible Visible for Roofs: Quality Assurance, Risk Mitigation an...
 
Kenneth Burnham (IES - UK)
Kenneth Burnham (IES - UK)Kenneth Burnham (IES - UK)
Kenneth Burnham (IES - UK)
 
Portal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIPortal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part II
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Exploring-the-Mini-Sky-City-Project.pptx
Exploring-the-Mini-Sky-City-Project.pptxExploring-the-Mini-Sky-City-Project.pptx
Exploring-the-Mini-Sky-City-Project.pptx
 
Training Report 2014
Training Report 2014Training Report 2014
Training Report 2014
 
Smart Energy Management of Photovoltaic and battery storage
Smart Energy Management of Photovoltaic and battery storageSmart Energy Management of Photovoltaic and battery storage
Smart Energy Management of Photovoltaic and battery storage
 
BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
 
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIOMEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
 
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_JianzhongGIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
#FiaComit ibeacons
#FiaComit ibeacons#FiaComit ibeacons
#FiaComit ibeacons
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
 

More from BurkaDinka

Present.pptx Site analysissZDVgdfb bvf bfb
Present.pptx Site analysissZDVgdfb bvf bfbPresent.pptx Site analysissZDVgdfb bvf bfb
Present.pptx Site analysissZDVgdfb bvf bfb
BurkaDinka
 
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
BurkaDinka
 
spaceframes-160206033433 (2).docxtj5ujkl
spaceframes-160206033433 (2).docxtj5ujklspaceframes-160206033433 (2).docxtj5ujkl
spaceframes-160206033433 (2).docxtj5ujkl
BurkaDinka
 
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
BurkaDinka
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
BurkaDinka
 
Lecture 8 a.pptx
Lecture 8 a.pptxLecture 8 a.pptx
Lecture 8 a.pptx
BurkaDinka
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
BurkaDinka
 
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdfសៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
BurkaDinka
 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdf
BurkaDinka
 
Pop_Art[1].pptx
Pop_Art[1].pptxPop_Art[1].pptx
Pop_Art[1].pptx
BurkaDinka
 

More from BurkaDinka (11)

Present.pptx Site analysissZDVgdfb bvf bfb
Present.pptx Site analysissZDVgdfb bvf bfbPresent.pptx Site analysissZDVgdfb bvf bfb
Present.pptx Site analysissZDVgdfb bvf bfb
 
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
07chapter7.pdfFranklin county courthouse square power point by Old Depot Muse...
 
spaceframes-160206033433 (2).docxtj5ujkl
spaceframes-160206033433 (2).docxtj5ujklspaceframes-160206033433 (2).docxtj5ujkl
spaceframes-160206033433 (2).docxtj5ujkl
 
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
2. Post Modernism.pptxModernis. Post Modernism.pptxm.pptx
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
Lecture 1-1.ppt
Lecture 1-1.pptLecture 1-1.ppt
Lecture 1-1.ppt
 
Lecture 8 a.pptx
Lecture 8 a.pptxLecture 8 a.pptx
Lecture 8 a.pptx
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdfសៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
សៀវភៅសម្រាប់រៀនគូរ_និងរៀនឆ្លាក់ខ្នាតព្រះសម្មាសម្ពុទ្ធបុរាណខ្មែរ.pdf
 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdf
 
Pop_Art[1].pptx
Pop_Art[1].pptxPop_Art[1].pptx
Pop_Art[1].pptx
 

Recently uploaded

FULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
FULL NIGHT — 9999894380 Call Girls In Wazirabad | DelhiFULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
FULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
SaketCallGirlsCallUs
 
Completed Event Presentation for Huma 1305
Completed Event Presentation for Huma 1305Completed Event Presentation for Huma 1305
Completed Event Presentation for Huma 1305
jazlynjacobs51
 
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | DelhiFULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
SaketCallGirlsCallUs
 
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
Sheetaleventcompany
 
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | DelhiFULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
SaketCallGirlsCallUs
 
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
Nitya salvi
 
Call Girls in Sakinaka 9892124323, Vashi CAll Girls Call girls Services, Che...
Call Girls in Sakinaka  9892124323, Vashi CAll Girls Call girls Services, Che...Call Girls in Sakinaka  9892124323, Vashi CAll Girls Call girls Services, Che...
Call Girls in Sakinaka 9892124323, Vashi CAll Girls Call girls Services, Che...
Pooja Nehwal
 
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
delhimunirka444
 
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| DelhiDELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
delhimunirka444
 
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
Bobbie goods coloring book 81 pag_240127_163802.pdf
Bobbie goods coloring book 81 pag_240127_163802.pdfBobbie goods coloring book 81 pag_240127_163802.pdf
Bobbie goods coloring book 81 pag_240127_163802.pdf
MARIBEL442158
 
Van Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson todayVan Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson today
lucygibson17
 
FULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
FULL NIGHT — 9999894380 Call Girls In Indirapuram | DelhiFULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
FULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
SaketCallGirlsCallUs
 
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call GirlsMassage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Recently uploaded (20)

FULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
FULL NIGHT — 9999894380 Call Girls In Wazirabad | DelhiFULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
FULL NIGHT — 9999894380 Call Girls In Wazirabad | Delhi
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Completed Event Presentation for Huma 1305
Completed Event Presentation for Huma 1305Completed Event Presentation for Huma 1305
Completed Event Presentation for Huma 1305
 
AaliyahBell_themist_v01.pdf .
AaliyahBell_themist_v01.pdf             .AaliyahBell_themist_v01.pdf             .
AaliyahBell_themist_v01.pdf .
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | DelhiFULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
FULL NIGHT — 9999894380 Call Girls In Patel Nagar | Delhi
 
VIP Ramnagar Call Girls, Ramnagar escorts Girls 📞 8617697112
VIP Ramnagar Call Girls, Ramnagar escorts Girls 📞 8617697112VIP Ramnagar Call Girls, Ramnagar escorts Girls 📞 8617697112
VIP Ramnagar Call Girls, Ramnagar escorts Girls 📞 8617697112
 
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
Call Girl In Chandigarh ☎ 08868886958✅ Just Genuine Call Call Girls Chandigar...
 
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | DelhiFULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
FULL NIGHT — 9999894380 Call Girls In Mahipalpur | Delhi
 
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
Haridwar Call Girls 8617697112 Short 4000 Night 10000 Best call girls Service...
 
Call Girls in Sakinaka 9892124323, Vashi CAll Girls Call girls Services, Che...
Call Girls in Sakinaka  9892124323, Vashi CAll Girls Call girls Services, Che...Call Girls in Sakinaka  9892124323, Vashi CAll Girls Call girls Services, Che...
Call Girls in Sakinaka 9892124323, Vashi CAll Girls Call girls Services, Che...
 
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
(9711106444 )🫦#Sexy Desi Call Girls Noida Sector 4 Escorts Service Delhi 🫶
 
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| DelhiDELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
DELHI NCR —@9711106444 Call Girls In Majnu Ka Tilla (MT)| Delhi
 
Moradabad Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Moradabad Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service AvailableMoradabad Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
Moradabad Call Girls - 📞 8617697112 🔝 Top Class Call Girls Service Available
 
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
❤ Sexy Call Girls in Chandigarh 👀📞 90,539,00,678📞 Chandigarh Call Girls Servi...
 
Bobbie goods coloring book 81 pag_240127_163802.pdf
Bobbie goods coloring book 81 pag_240127_163802.pdfBobbie goods coloring book 81 pag_240127_163802.pdf
Bobbie goods coloring book 81 pag_240127_163802.pdf
 
Van Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson todayVan Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson today
 
Barasat call girls 📞 8617697112 At Low Cost Cash Payment Booking
Barasat call girls 📞 8617697112 At Low Cost Cash Payment BookingBarasat call girls 📞 8617697112 At Low Cost Cash Payment Booking
Barasat call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
FULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
FULL NIGHT — 9999894380 Call Girls In Indirapuram | DelhiFULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
FULL NIGHT — 9999894380 Call Girls In Indirapuram | Delhi
 
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call GirlsMassage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
Massage And Sex Call Girls In Chandigarh 9053900678 Chandigarh Call Girls
 

FINAL_PRESENTATION[1].ppt

  • 1. Inova Fairfax Hospital South Patient Tower Falls Church, VA Penn State Senior Capstone Project Jianhong Qiu| Construction Management Advisor: James Faust
  • 2. Inova Fairfax Hospital South Patient Tower Falls Church, VA Penn State Senior Capstone Project Jianhong Qiu| Construction Management Advisor: James Faust I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS BREADTH TOPICS • DYNAMIC GLASS/ELETRICAL BREADTH • MECHANICAL BREADTH
  • 3. LOCATION: 3300 GALLOWS ROAD, FALLS CHURCH, VA FUNCTION: HEALTHCARE 174 PRIVATE ROOMS INTENSIVE CARE UNITS SIZE: 236,000 SQ. FT. 147.55 FT COST: 76MILLION $ DATE OF CONSTRUCTION : JULY 2010-AUGUST 2012 EDLIVERY METHOD: DESIGN-BID-BUILD PROJECT OVERVIEW ORINIGAL SITE I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 4. PROJECT PARTICIPANTS •OWNER: INOVA HEALTHCARE SYSTEM •GERNAL CONTRACTOR: TURNER CONSTRUCION COMPANY •ARCHITECT: WILMOT SANZ, INC. •MEP: RMF ENGINEERING, INC. •CIVIL: DEWBERRY & DAVIS LLC •STRUCTURE: CAGLEY & ASSOCIATES •ELECTRICAL: TURLAND SERVICE CORPORATION 4 PROJECT OVERVIEW I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 5. STRCTURE: CONCRETE STRUCTURE TWO-WAY FLAT SLAB TYPICAL 24IN. X 24IN. COLUMNS 12FLOORS ABOVE GRADE /1FLOOR BELOW GRADE MECHANICAL SYSTEM: 5TH FLOOR WITH 4X 5,000 CFM AIR HANDLING UNITS 2 AIR HANDER FOR CAFETERIA AND KITCHEN ON WEST ROOF OF 2ND FLOOR 10,000CFM AND 13,000 CFM 3 HEAT EXCHANGER IN BASEMENT (715 GALLONS/MINS ) ELECTRICAL SYSTEM: TWO 2,000KVA TRASFORMERS 2,000KW EMERGENCY GENERATOR 5 PROJECT OVERVIEW FAÇADE: 45,000 SF. ARCHITECTURAL PRECAST (INCLUDING 22,000SF. THIN BRICK-CLAD ) 282 METAL PANELS GLAZED INTO ALUINUM CURTAIN WALL SUSTAINABILITY: LEED SILVER CERTIFICATION GREEN ROOF, RAIN GARDEN I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 6. 6 Problem Identification: •BIM NOT STRICTLY REQUIRED BY OWNER •NOT USED TO FULL TENSION •EXISTING BIM USES Ěľ 3D COORDINATION OF MEP SYSTEM Ěľ PREFIBRACATE MEP COMPONENTS AYALYSIS #1 IMPLEMENTATION OF BIM PROTENTIAL SOLUTIONS •INVESTIGATION OF BIM TOOLS •BIM ROI •BIM SCORE CARD •EXPLORE ADDITIONAL BIM USAGE I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 7. BIM RETURN ON INVESTMENT (ROI) ROI= EARNING/COST A: Cost of hardware and software($) B: Monthly labor cost($) C: Training time (Months) D: Productivity lost during training(%) E: Productivity gain after training(%) 7 AYALYSIS #1 IMPLEMENTATION OF BIM (B-(B/(1+E))) X(12-C) =1st YearROI A+(B xCxD) A 6000 B 4200 C 3 D 50 E 25 (4200-(4200/(1+25%))) X (12-3) = 61.46% 6000+ ( 4200 x 3 x 50%) SCHEDULE COMPRESSION BY 10% REVIT ARCHITECTURE SOFTWARE SURVEY I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 8. BIM SCORECARD-DETERMINE HOW MANY BIM CAPABILITIES ARE USED IN OPERATION 7 CATEGORIES: 1.PORTFOLIO AND PROJECT MANAGEMENT 2.COST PLANNING 3.COST CONTROL 4.SCHEDULE PLANNING 5.PRODUCTION CONTROL 6.DESIGN COORDINATION 7.DESIGN TEAM ENGAGEMENT 8 AYALYSIS #1 IMPLEMENTATION OF BIM I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 9. BIM SCORECARD 1.PORTFOLIO AND PROJECT MANAGEMENT 2.COST PLANNING 3.COST CONTROL 4.SCHEDULE PLANNING 5.PRODUCTION CONTROL 6.DESIGN COORDINATION 7.DESIGN TEAM ENGAGEMENT 9 AYALYSIS #1 IMPLEMENTATION OF BIM REVIEW AREAS FOR IMPROVEMENT OPPORTUNITIES • COST PLANNING • SCHEDULE PLANNING • DESIGN TEAM ENGAGEMENT I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 10. INVESTIGATION OF BIM TOOLS VICO 5D MODEL SOFTWARE: •2D DRAWING •3D CONSTRUCTABILITY AND COORDINATION •4D SCHEDULING AND PRODUCTION CONTROL •5D ESTIMATION AND COST PLANNING 10 AYALYSIS #1 IMPLEMENTATION OF BIM HOW DATA FLOW WORK I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 11. CASE STUDY •MIDDLE TENNESSEE MEDICAL CENTER •555,000 SF. •$3MILLIONS BUDGET SAVING •ADDITIONAL $1MILLION SAVING DUE TO BIM ENABLED PREFABRICATION •COMPLETED TWO MONTHS AHEAD OF SCHEDULE 11 AYALYSIS #1 IMPLEMENTATION OF BIM FURTHER BENEFITS •INOVA FAIRFAX 2015 CAMPUS IMPROVEMENT PLAN •EXPENSION OF 600,000SF. WOMEN HOSPITAL I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 12. ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS) 12 PROBLEM IDENTIFICATION • SIMILAR AND REPETITIVE FLOOR PLANS • PATIENT ROOMS ALONG WITH WORKING SESSION • IDENTIFY ROOM NUMBERS AND DIMENSIONS POTENTIAL SOLUTION • IDENTIFY AREAS FOR NEW SIPS SCHEDULE • PREDESIGNED SMART ROOM • CREATE NEW SCHEDULE I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS FLOOR PLAN
  • 13. ANALYSIS#2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS) 13 ORIGINAL CONSTRUCION FLOW
  • 14. ANALYSIS#2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS) IDENTIFY AREA FOR SIPS: •RED AREA •FLOW: FROM EAST TO SOUTH •3,4,6,7,8 FLOOR MEDICAL/SURGERY ROOM •9-11FLOOR ICU BEDS 14 I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 15. ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS) 15 SCHEDULE ACCERLATOIN-SMART ROOM •PREDESIGNED MEDICAL CARE/SURGERY ROOM BY HILL-ROM •FINALIZEINTERIOR ROOM LAYOUT •2D, 3D REDERINGS FOR CLIENTS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 16. ANALYSIS #2 SHORT INTERVAL PRODUCTION SCHEDULE(SIPS) 16 SCHEDULE ACCELERATION •SUPERSTRUCTURE •ABOVE CEILING MEP •FAÇADE •INTERIOR •SAVING ONE MONTH •AUGUST2011-JULY2011 I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 17. 17 Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY PROBLEM IDENTIFICATION •OPERATE 24/7 HIGH COOLING,ELECTRICITY HOT WATER DEMANDS •EMERGENCY BACKUP, OPERATIONAL DURING NATURAL AND OTHER DISASTER •TIGHT CONTROL OF TEMPERATURE, HUMIDITY, VENTILATION. VARY AMONG DIFFERENT SPACE TYPES •DAY-TO-DAY OPERATION EQUIPMENT INTENSIVE, NO EFFICIENCY RATING SYSTEMS FOR MEDICAL EQUIPMENTS SPT GOAL: ENERGY REDUCTION 24.5 % BASED ON DATABASE OF SIMILAR BUILDINGS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 18. 18 Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY NET ZERO ENERGY BUILDING CERTIFICATION REQUIREMENT: •CONSTRUCTION AND RENEWABLE ENERGY SYSTEM CURB THE PROJECT’S CONTRIBUTION TO THE EFFECTS OF SPRAWLED DEVELOPMENT •THE BUILDING OPERATES AT NET ZERO ENERGY •NOT PRECLUDE ANOTHER BUILDING •ATTRACTIVE AND INSPIRING I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS NATIONAL RENEWABLE ENERGY LABORATORY(NREL) DEFINITION SUGGESTED BELOW TO DEFINE NET ZERO ENERGY: • NET ZERO SITE ENERGY • NET ZERO SOURCE ENERGY • NET ZERO ENERGY COSTS • NET ZERO ENERGY EMISSIONS
  • 19. 19 Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL • CHILLED BEAM  PASSIVE/ACTIVE/MULTI-SERVICE • COMBINED HEAT AND POWER(CHP) • SOLAR ELECTRIC  ROOF/GROUND/MOUNTED FACING SOUTH  NO SHADE 9:00AM-3:00OM DECEMBER  2-4% NET COST I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS UTILITY BILL: PRODUCED VS. USED ADD UP MONTYLY READINGS OF ONE YEAR EXTRA ENERGY: SELL BACK TO UTILITY COMPANIES FIXED PRICE
  • 20. 20 Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY PRESENTATION OUTLINE: I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. ENERGY REDUCTION STUDIES II. SYSTEM LAYOUT AND DESIGN III. STRUCTURAL IMPACT IV. ENERGY IMPACT V. FINANCIAL FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. CASE STUDIES II. INITIAL PREFABRICATION PLANNING III. SCHEDULE AND COST REDUCTION IV. SCHEDULE COMPRESSION V. MODULAR DESIGN IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. BIM EXECUTION GUIDE II. CASE STUDIES III. OPTIMAL DETERMINED USES IV. VIRTUAL MOCK-UPS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS BREADTH TOPIC: DYNAMIC GLASS THE FAÇADE DESIGN TOOL 4A MIXED HUMID CLIMATE DESIGN PARAMETERS: WINDOW AREA/DAYLIGHTS CONTROLS / SHADING/GLASS&FRAME TYPE
  • 21. 21 BREADTH TOPIC: DYNAMIC GLASS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS WEST FACADE SOUTH FACADE EAST FACADE
  • 22. 22 DYNAMIC GLASS •REDUCE VISUAL GLARE •REDUCING COOLING HEATING USAGE BY 20% •REDUCING PEAK LOAD BY 30% •COST:20$ / SF. BREADTH TOPIC: DYNAMIC GLASS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS Analysis #3 NET ZERO ENERGY BUILDING SUSTAINABILITY
  • 23. 23 BREADTH TOPIC: DYNAMIC GLASS TOTAL ENERGY SAVING= 31,789,200kBTU x 25%= 7,947,300kBTU TOTAL COST SAVINGS=7.9473 x 1000 x 35.16= $ 279,427 SOLADIGM INC. $20 /SF TOTAL COST= $20/ ft2 x 22450 ft2 = $449,000 I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 24. ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) 24 PROBLEM IDENTIFICATION COMPLEXITY OF MEP SYSTEM: MORE THAN ONE YEAR BIM COORDINATION NO EARLIER CONTRIBUTION TO DESIGN PHASE AND COORDINATION PROCESS EAST ELEVATION EXTERIOR WALL: •LIGHT GAGE METAL FRAIMING •REDESIGN TO COORDINATE BETTER WITH WOMEN’S HOSPITAL •REVISED ENGINEERING DRAWINGS PREPARED BY FRAMING SUBCONTRACTOR. I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 25. ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) 25 PROBLEM IDENTIFICATION SOUTH ELEVATION : 1ST AND 2ND FLOOR CURVED WALL CURVES NOT MATCH ARCHITECTURE AND ENGINEERING DRAWING MISTAKES SCHEDULE DELAYED I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS
  • 26. ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) STUDY ON INTEGRATED PROJECT DELIVERY A Guide(AIA) 26 Items Traditional Project Delivery Integrated Project Delivery Team Fragmented, “minimum- necessary” basis, strongly hierarchical Mutual Respect and Trust Compensation/re ward Individually pursued Mutual Benefit and Reward Risk Individually managed, transferred to the greatest extent possible Collaborative Innovation and Decision Process linear, segregated,information hoarded. Early Involvement of Key Participants, goal Definition, Intensified Planning Communication Paper based,2 dimensional Digital based, BIM, Open Communication I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS • ABILITY TO CHANGE DECREASE • COST OF CHANGES INCREASE • IPD PUT MORE EFFORT IN PREDESIGN/SCHEMATIC DESIGN PHASE
  • 27. ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) 27 RISKS: •TRYING SOMETHING NEW AND UNTESTED •BUILDING WITHOUT A GMP •OWNER TAKING RISKS BACK •DIFFICULT TO MEASURE THE BENEFIT I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS MOST IDEAL WAY TO ACHIEVE IPD • COMBINE ALL NEW TECHNOLOGIES • BIM LEAN SUSTAINABILITY
  • 28. ANALYSIS #4 INTEGRATED PROJECT DELIVERY (IPD) 28 MULTI PRIME CONTRACTS I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS DIVISION OF CAPITAL ASSET MANAGEMENT OF COMMONWEALTH OF MASSACHUSETTS • FREQUENT MEETINGS • SHARING SENSITIVE, PROPRIETARY OR CONFIDENTIAL INFORMATION • SELECT AND BUILD STRONG IPD PROJECT TEAMS • MASTER KEY COMPONENTS OF CONTRACTS AND RISK MANAGEMENT • UNDERSTAND ECONOMIC AND MARKET FACTORS THAT ARE DRIVING IPD ADOPTION
  • 29. SUMMARY AND CONCLUSION ANALYSIS#1INCREASE IMPLEMENTATION OF BIM SCHEDULE/COST PLANNING ANALYSIS#2 SIPS ACCELERATE SCHEDULE PREDESIGNED SMART ROOM 29 I. PROJECT OVERVIEW II. ANALYSIS #1: IMPLEMENTATION OF BIM I. PROBLEM IDENTIFICATION II. BIM SCORECARD III. BIM ROI IV. INVESTIGATION OF BIM TOOLS V. CASE STUDY AND FEASIBILITY III. ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS) I. PROBLEM IDENTIFICATION II. IDENTIFY AREA FOR SIPS III. SMART ROOM IV. SCHEDULE ACCELERATION IV. ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY I. PROBLEM IDENTIFICATION II. NZE BUILDING CERTIFICATION III. TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL IV. ELECTRICALBREADTH –DYNAMIC GLASS V. ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD) I. PROBLEM IDENTIFICATION II. STUDY ON IPD GUIDE III. MULTI PRIME CONTRACTS VI. SUMMARY AND CONCLUSION VII. ACKNOWLEDGEMENTS ANALYSIS#3 NET ZERO ENERGY INCREASE BUILDING ENERGY EFFICIENCY ANALYSIS#4 INTEGREATED PROJECT DELIVERY ELIMINATE BARRIERS INCREASE PRODUCTIVITY
  • 30. ACKNOWLEGEMENTS PENN STATE AE FACULTY ADVISOR: JAMES FAUST CRAIG DUBLER TURNER CONSTRUCTION: TESSA R. TEODORO JOHNNY F. WEAVER DREW KELLEHER 30 VICO SOFTWARE INTEGRATING CONSTRUCTION: HOLLY ALLISON PACE INDUSTRY MEMBERS MY FAMILY AND FRIENDS