MT实习情况总结 

— 最终总结 



Schneider-Electric Management Training Program 

Weekly Report
—- Final
邓慕阳
软件中⼼心
施耐德电⽓气
Leo Deng
Software Center
Schneider Electric China
Work Summarize
● Translation Documents
● Ampla Training
● SSRS Training
● SUZHOU Baxter Projects
Translation Documents
4 files
Ampla Training
• Task: Learn how to use
Ampla
• Achieve: Virtual
machine in MAC
• Gains :
1. Basic idea about how
to do the original plant
setting
2. Basic idea about
production, metric and
other modules
● What is Ampla
● Production
● View
● Downtime
● Quality
● Matrix
● * Inventory
● Knowledge
● * Database to Integration
● * Search in SQL
SSRS Training
• Task: Learn how to use
SSRS
• Achieve: Virtual
machine in MAC and
the server
• Gains :
1. Basic idea about how
to build up a report.
2. Basic idea about how
the system works with
the database.
Baxter Project
SUZHOU Baxter Information Collect
• Task: Match the
equipment with 193
meters.
• Achieve: Real project
work
• Gains :
1. Getting to know real
project process.
2. Learn how to
communicate with a
client and push the
project.
● Match the equipment with meters.
• Task: Confirm the
equipment with 117
meters.
• Achieve: Real project
work
• Gains :
1. Getting to know real
project process.
2. Keep communicate
with the client and
push the project.
● Confirm the equipment with meters.
SUZHOU Baxter Information Collect
SUZHOU Baxter electric single line map
● Build up the electric single line map for Baxter..
• Task: Build up the
electric single line map
for Baxter..
• Achieve: Pdf version of
documents
• Gains :
1. Technical format of 2D
electric single line map
for Baxter.
2. Basic idea about how
project works in the
beginning.
3. Basic idea about work
flow.
SUZHOU Baxter Ampla
• Task: Model the whole
enterprise with 2 plants
• Achieve: Real project
work
• Gains :
1. Getting to know better
about the idea ‘from
big to small’.
2. Building up the whole
plant mode by myself
and getting to know
about Ampla and
naming rules.
● Building up the reporting points
SUZHOU Baxter Ampla
● Reconfigure all the KPI points according to the clients needs.
• Task: Refine the KPI for
the old plant
• Achieve: Real project
work
• Gains :
1. Communicate with
clients and know what
they want.
2. Learn what is
important for this kind
of plant and why.
SUZHOU Baxter SSRS
● Whole plant important KPI ● Whole plant ALL power meters
SUZHOU Baxter SSRS
● Whole plant important KPI category by different type.
SUZHOU Baxter SSRS
● Old plant power KPI and whole plant water KPI
SUZHOU Baxter SSRS
● Whole plant temperature and humidity/ One to four KPI compare map.
Related Files
●See attachment

Final report

  • 1.
    MT实习情况总结 
 — 最终总结
 
 Schneider-Electric Management Training Program 
 Weekly Report —- Final 邓慕阳 软件中⼼心 施耐德电⽓气 Leo Deng Software Center Schneider Electric China
  • 2.
    Work Summarize ● TranslationDocuments ● Ampla Training ● SSRS Training ● SUZHOU Baxter Projects
  • 3.
  • 4.
    Ampla Training • Task:Learn how to use Ampla • Achieve: Virtual machine in MAC • Gains : 1. Basic idea about how to do the original plant setting 2. Basic idea about production, metric and other modules ● What is Ampla ● Production ● View ● Downtime ● Quality ● Matrix ● * Inventory ● Knowledge ● * Database to Integration ● * Search in SQL
  • 5.
    SSRS Training • Task:Learn how to use SSRS • Achieve: Virtual machine in MAC and the server • Gains : 1. Basic idea about how to build up a report. 2. Basic idea about how the system works with the database.
  • 6.
  • 7.
    SUZHOU Baxter InformationCollect • Task: Match the equipment with 193 meters. • Achieve: Real project work • Gains : 1. Getting to know real project process. 2. Learn how to communicate with a client and push the project. ● Match the equipment with meters.
  • 8.
    • Task: Confirmthe equipment with 117 meters. • Achieve: Real project work • Gains : 1. Getting to know real project process. 2. Keep communicate with the client and push the project. ● Confirm the equipment with meters. SUZHOU Baxter Information Collect
  • 9.
    SUZHOU Baxter electricsingle line map ● Build up the electric single line map for Baxter.. • Task: Build up the electric single line map for Baxter.. • Achieve: Pdf version of documents • Gains : 1. Technical format of 2D electric single line map for Baxter. 2. Basic idea about how project works in the beginning. 3. Basic idea about work flow.
  • 10.
    SUZHOU Baxter Ampla •Task: Model the whole enterprise with 2 plants • Achieve: Real project work • Gains : 1. Getting to know better about the idea ‘from big to small’. 2. Building up the whole plant mode by myself and getting to know about Ampla and naming rules. ● Building up the reporting points
  • 11.
    SUZHOU Baxter Ampla ●Reconfigure all the KPI points according to the clients needs. • Task: Refine the KPI for the old plant • Achieve: Real project work • Gains : 1. Communicate with clients and know what they want. 2. Learn what is important for this kind of plant and why.
  • 12.
    SUZHOU Baxter SSRS ●Whole plant important KPI ● Whole plant ALL power meters
  • 13.
    SUZHOU Baxter SSRS ●Whole plant important KPI category by different type.
  • 14.
    SUZHOU Baxter SSRS ●Old plant power KPI and whole plant water KPI
  • 15.
    SUZHOU Baxter SSRS ●Whole plant temperature and humidity/ One to four KPI compare map.
  • 16.