SHORT FILM PRODUCTION RISK ASSESSMENT




HAZARD                IN WHICH SCENE   PERSON WHO MAY    PROPERTY THAT          RISK CONTROLS          RISK ASSESSMENT   FURTHER ACTION
                      IS THIS HAZARD   BE HARMED         COULD BE               ALREADY IN PLACE       *See chart        TO BE TAKEN
                      PRESENT?                           DAMAGED
   Rocky Terrain              All         Cast or Crew      Production                  None                 HIGH        Cast and Crew must
                                                            equipment                                                      wear appropriate
                                                                                                                             footwear at all
                                                                                                                                  times
 Weather Changes            All           Crew or Cast   Electrical Equipment   Umbrellas available.             High       Weather reports
                                                                                   No electrical                           must be checked
                                                                                 equipment to be                         the morning prior to
                                                                                   used in wet                                the shoot. No
                                                                                    conditions                            filming in rain/wet
                                                                                                                                conditions
Cliffs/Drops               All         Cast or Crew      All production         Barriers by side of    Extreme           Cast & Crew must
                                                         equipments             cliff/drop                               remain safe
                                                                                                                         distance from
                                                                                                                         edges.
    Water/Lake                 5          Crew or Cast   Electrical Equipment           None                     High      Crew & Cast must
                                                                 Props                                                         remain safe
                                                               Costumes                                                       distance from
                                                                                                                           water, excluding
                                                                                                                         cast in water scene.
Sharp Rocks in Cave        1           Cast or Crew      None ( Crew / Cast )   None                   Extreme           Cast & Crew must
                                                                                                                         move slowly &
                                                                                                                         safely through small
                                                                                                                         cave, being very
                                                                                                                         cautious

More Related Content

What's hot

Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
cembitmead
 
Risk assessment sheet
 Risk assessment sheet  Risk assessment sheet
Risk assessment sheet
Jordan
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
laura.thornborrow
 
Fall off-crane-safety-presentation
Fall off-crane-safety-presentationFall off-crane-safety-presentation
Fall off-crane-safety-presentation
مصطفى حافظ الجندى
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
sixthform96
 
Risk assessment for ben's house
Risk assessment for ben's houseRisk assessment for ben's house
Risk assessment for ben's house
Joe Hayes
 
Lightning Protection
Lightning ProtectionLightning Protection
Lightning Protection
Debojyoti Mukherjee
 
Camrade desertsuits
Camrade desertsuitsCamrade desertsuits
Camrade desertsuits
AVNed
 

What's hot (8)

Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment sheet
 Risk assessment sheet  Risk assessment sheet
Risk assessment sheet
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Fall off-crane-safety-presentation
Fall off-crane-safety-presentationFall off-crane-safety-presentation
Fall off-crane-safety-presentation
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment for ben's house
Risk assessment for ben's houseRisk assessment for ben's house
Risk assessment for ben's house
 
Lightning Protection
Lightning ProtectionLightning Protection
Lightning Protection
 
Camrade desertsuits
Camrade desertsuitsCamrade desertsuits
Camrade desertsuits
 

Viewers also liked

Short film proposal
Short film proposalShort film proposal
Short film proposal
chris10005
 
Short film editing process
Short film editing processShort film editing process
Short film editing process
chris10005
 
Final project pitch
Final project pitchFinal project pitch
Final project pitchchris10005
 
Script
ScriptScript
Script
chris10005
 
Location
LocationLocation
Location
chris10005
 
IMD153 Proposal Sample
IMD153 Proposal SampleIMD153 Proposal Sample
IMD153 Proposal Sample
UiTM
 

Viewers also liked (6)

Short film proposal
Short film proposalShort film proposal
Short film proposal
 
Short film editing process
Short film editing processShort film editing process
Short film editing process
 
Final project pitch
Final project pitchFinal project pitch
Final project pitch
 
Script
ScriptScript
Script
 
Location
LocationLocation
Location
 
IMD153 Proposal Sample
IMD153 Proposal SampleIMD153 Proposal Sample
IMD153 Proposal Sample
 

Similar to Film production Risk Assesment

The book risk assessment josh whipday
The book risk assessment josh whipdayThe book risk assessment josh whipday
The book risk assessment josh whipday
Taikusproductions
 
The book risk assessment josh whipday
The book risk assessment josh whipdayThe book risk assessment josh whipday
The book risk assessment josh whipday
SamHill129
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
pgp23
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
FirstClassProductions
 
Jenny Strand and Mark Smith Film Production Risk Assesment
Jenny Strand and Mark Smith Film Production Risk AssesmentJenny Strand and Mark Smith Film Production Risk Assesment
Jenny Strand and Mark Smith Film Production Risk Assesment
Mystifyingproductions
 
Film production risk_assessment_ig5_
Film production risk_assessment_ig5_Film production risk_assessment_ig5_
Film production risk_assessment_ig5_
DannyBradley1
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
elleryanx
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
thiswaynorthproductions
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
Tooney1994
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
jakedargo
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
k_ishii_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
reuben95
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
johanna-asmedia
 

Similar to Film production Risk Assesment (13)

The book risk assessment josh whipday
The book risk assessment josh whipdayThe book risk assessment josh whipday
The book risk assessment josh whipday
 
The book risk assessment josh whipday
The book risk assessment josh whipdayThe book risk assessment josh whipday
The book risk assessment josh whipday
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Jenny Strand and Mark Smith Film Production Risk Assesment
Jenny Strand and Mark Smith Film Production Risk AssesmentJenny Strand and Mark Smith Film Production Risk Assesment
Jenny Strand and Mark Smith Film Production Risk Assesment
 
Film production risk_assessment_ig5_
Film production risk_assessment_ig5_Film production risk_assessment_ig5_
Film production risk_assessment_ig5_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 

More from chris10005

How do we analyse film22
How do we analyse film22How do we analyse film22
How do we analyse film22
chris10005
 
Call sheet
Call sheetCall sheet
Call sheet
chris10005
 
Captain america
Captain americaCaptain america
Captain america
chris10005
 
Weapons
WeaponsWeapons
Weapons
chris10005
 
IG5 Assignment Brief
IG5 Assignment BriefIG5 Assignment Brief
IG5 Assignment Brief
chris10005
 
IN SALFORD assignment Brief
IN SALFORD assignment BriefIN SALFORD assignment Brief
IN SALFORD assignment Brief
chris10005
 

More from chris10005 (6)

How do we analyse film22
How do we analyse film22How do we analyse film22
How do we analyse film22
 
Call sheet
Call sheetCall sheet
Call sheet
 
Captain america
Captain americaCaptain america
Captain america
 
Weapons
WeaponsWeapons
Weapons
 
IG5 Assignment Brief
IG5 Assignment BriefIG5 Assignment Brief
IG5 Assignment Brief
 
IN SALFORD assignment Brief
IN SALFORD assignment BriefIN SALFORD assignment Brief
IN SALFORD assignment Brief
 

Film production Risk Assesment

  • 1. SHORT FILM PRODUCTION RISK ASSESSMENT HAZARD IN WHICH SCENE PERSON WHO MAY PROPERTY THAT RISK CONTROLS RISK ASSESSMENT FURTHER ACTION IS THIS HAZARD BE HARMED COULD BE ALREADY IN PLACE *See chart TO BE TAKEN PRESENT? DAMAGED Rocky Terrain All Cast or Crew Production None HIGH Cast and Crew must equipment wear appropriate footwear at all times Weather Changes All Crew or Cast Electrical Equipment Umbrellas available. High Weather reports No electrical must be checked equipment to be the morning prior to used in wet the shoot. No conditions filming in rain/wet conditions Cliffs/Drops All Cast or Crew All production Barriers by side of Extreme Cast & Crew must equipments cliff/drop remain safe distance from edges. Water/Lake 5 Crew or Cast Electrical Equipment None High Crew & Cast must Props remain safe Costumes distance from water, excluding cast in water scene. Sharp Rocks in Cave 1 Cast or Crew None ( Crew / Cast ) None Extreme Cast & Crew must move slowly & safely through small cave, being very cautious