The Nataraja Foundation
                     www.nataraja.org.in                                      The Indian Primary & Secondary
                                                                              Education Megaproject

27 th March ' 2010

                                                                              This Excel workbook deals mainly with the
                                                                              financial structures, cost estimates and
                                                                              detailed  financials  of   the  Education
                                                                              Megaproject.
Project Concepts and Objectives                                               The actual project, the thinking behind it, it's
                                                                              design criteria etc have been covered in detail in
                                                                              the project concept document which is available
The Indian Primary & Secondary Education Megaproject                          for free download from the Nataraja Foundation's
                                                                              website www.nataraja.org.in

Over the last 30 years India has spent very little money on building new schools . The focus has instead been on getting quick
results through projects that involved the least possible expenditure. So few new schools were built even though India's
population grew from from approx. 846 million in 1991 to almost 1.15 Billion people in 2009. In the schools that were built,
the quality of infrastructure is very poor. Planning commission data clearly shows that 44 % of schools at the primary level do
not have toilets for instance and 15 % do not have drinking water . Planning Commission data also reveals that nearly 45 % of         Creating a lifestyle around the teaching
the SC / ST children drop out of school by class V and by class XIII in excess of 60 % drop out of school. Various studies            profession
conducted by government of India as well as foreign agencies are showing that the percentage               ( % ) of " Out Of School
Children " is falling but no one is talking about the third rate quality of the schools that the children are being enrolled in and   Low cost yet very elegant housing for
the abysymal working conditions of the teachers who teach there.                                                                      teachers under the programme.

As a result of all this, in 6 - 8 years time , over 100 Million children will exit the school going age group without any             This particular house was built at a cost of
employable skills. This is going to create huge social problems in the country.                                                       Rs 750 / Sq Ft in 2007 in the Vernacular
                                                                                                                                      Architectural Style.
Obviously something has gone terribly wrong with our entire approach to education and we need a robust strategy           to solve
the problems in our education system.                                                                                                 Location : Bangalore
                                                                                                                                      Architect : RL Kumar
Therefore ...
                                                                                                                                      www.vernarch.com
Central to the thinking behind this project is the belief that the main reason for the steep decline in the quality of human
resources in India has been the neglect of the teaching profession and teachers over the last several decades.

In India today a crane operator with 5 years of experience makes more money than an MA in Economics or a MSC in
Maths or a teacher with a proper BEd degree and with 10 years of teaching experience at the primary school level. This
has warped the economic choices that a fresh graduate makes and has resulted in the least qualified individuals
handling the most important of all the jobs in this country (The teaching of our children and tomorrows citizens ).

This project takes note of the fact that India reached the height of its glory when the teacher was at the head of our society
and therefore seeks to bring back this long lost Indian tradition through an innovative mechanism on a truly massive
scale. The project is focused on providing a sound basic education as it is more important to have a sound education at the
primary and secondary levels for a majority of our people than to spend billions of dollars on higher education and have most
of those people going abroad.

The whole project therefore is designed around the primary & secondary school teacher ( Project is not centered on the
student ) with a view to creating a simple yet elegant lifestyle around the teaching profession so as to attract the
best minds towards a career in teaching and thereby correcting a macro imbalance in our society. While doing this , the project
also reaches more under privileged children than any other past or currently planned programme of the Govt. Of India.

This Excel workbook concentrates on the financials of the project. For a detailed understanding of the various
issues, readers are requested to go through the Project concept document which describes the project is proper
detail.


Project Scale :

The project seeks to build a total of 30,000 New schools (with 600 students per school ) under the Public Private
Partnership ( PPP ) format during the period 2012 - 2023. Each school under the programme will share teaching
resources ( Teachers , Teaching aids etc ) with 14 other village schools in it's surrounding area so that a total of 420,000
additional schools are covered under the programme .

The main problem then is money and since the government does not have adequate conventional resources , Innovative
financing mechanisms needed to be found to finance this large education project. The project has therefore focused on
bringing in innovative ideas on the finance side and we have been able to find innovative ways to raise approximately US $
131.38 Billion as one time Capital expenditure to build the schools and US $ 42.57 Billion as yearly operational expenditure
to run the 30,000 new school system as well as it's huge teacher sharing programme that will reach an additional 108 Million
children in 420,000 assisted schools. As a result , once fully commissioned in 2023, a total of upto 126 Million children will
receive high quality education totally free of cost .
bringing in innovative ideas on the finance side and we have been able to find innovative ways to raise approximately US $
131.38 Billion as one time Capital expenditure to build the schools and US $ 42.57 Billion as yearly operational expenditure
to run the 30,000 new school system as well as it's huge teacher sharing programme that will reach an additional 108 Million
children in 420,000 assisted schools. As a result , once fully commissioned in 2023, a total of upto 126 Million children will
receive high quality education totally free of cost .




 Phase            Number of Hub Schools             Number Of Assisted Schools          Commissioning Schedule
                                                ( Teacher Sharing Programme )

 Bootstrap I                 -                                    -                            Q1- Q4 2011                               250 New Teacher Training
                                                                                                                                         Institutes to train 300 teachers
                                                                                                                        Phase II         each per year + 60 New Centers of
 Bootstrap II                -                                    -                            Q1- Q4 2012              Repeat Phase I   Vernacular Archiecture to train 300
                                                                                                                                         Master Masons Each every year


 Phase I              6000 Hub Schools                       84,000                         2012 – 2014

 Phase II             9000 Hub Schools                      220,000                        2015 – 2017

 Phase III          15000 Hub Schools                       420,000                        2018 – 2023


 Phase IV       Possible repeat of total project ( another 30,000 schools ) 2023 – 2029
                 to cover 4,20,000 additional schools                                                               Project Schedule To be Extremely
 _____________________________________________________________________________________                              Aggressive

                                   30,000 New Schools to be commissioned by 2023
 _____________________________________________________________________________________
 Notes :

 1. Each Of Bootstrapping stages I & II will consist of 250 Teacher Training Institutes to train 300 teachers
    each per year + 60 Centers of Vernacular Archiecture to train 300 Master Masons each year. Bootstrap II
    will be a repeat of Bootstrap I

 2. It is not possible to execute Phase I of this project faster as India currently does not have enough
    trained teachers who possess the necessary capability / sensitivity to train young minds. This problem
    will be overcome by 2016 after which project execution velocity will pick up.

 3. Phase IV could essentially be a repeat order which will repeat phases I, II and III in half the time. It will
    be possible to dramatically crash commissioning schedules due to retained learning within the
    project enterprise.

 4. Each day school will operate in two shifts to maximize coverage while keeping costs low.




Economic & Environmental Impacts of the Project :

The following are the main economic and environmental features of the project
which seeks to use Traditional yet very elegant Indian Architecture
( where building life is over 100 years ) without any significant maintenance :

 1. This will be the worlds largest , multi-location environmental project as
    it will use 80 % traditional earth based material and very little cement
    and steel in the construction of the 30,000 schools. The C02 / Green
    house gas addition by this project will therefore be virtually zero. It will
    thus allow huge development without adverse environmental impacts.

 2. Project will in addition lead to the planting of around 150 Million trees
    all over India between 2012 and 2023.

 3. While the project will lead to a direct expenditure of US $ 131.38 Billion
    Billion over the period ( 2012 - 2023 ) on the creation of the low
    cost , yet extremely elegant school campuses, It will provide
    huge additional employment opportunities to millions of Indians . The
    total money multiplier effect on the economy will be in the range of
    3 ( conservative ) to yield a total GDP Net delta addition of US $ 300
    Billion from the construction of this project alone. The high quality
    Human Resourses that will be created by building schools
    designed around the teaching profession will be additional.




Prepared By
Ashish Puntambekar
Project Designer , The Nataraja Foundation
(00-91-9867612368)
ashish.puntambekar@gmail.com

 Analyst Note :

This model is provided for the information of Educationists, Indian Government Officials , Corporates , Financial
Institutions and NGO's and must be seen in conjunction with the project / business spreadsheets prepared for both
the stand alone day schools and residential schools as well as the optimised chain that comprimises the
megaproject.

The Project has been designed based on Information published by the Indian Planning Comission ( XIth Plan
Analyst Note :

This model is provided for the information of Educationists, Indian Government Officials , Corporates , Financial
Institutions and NGO's and must be seen in conjunction with the project / business spreadsheets prepared for both
the stand alone day schools and residential schools as well as the optimised chain that comprimises the
megaproject.

The Project has been designed based on Information published by the Indian Planning Comission ( XIth Plan
documents ) as well as other published material on the National Knowledge Commission / Ministry of HRD
websites. Published papers by experts on the Indian Education System have also been studied and means to
overcome the shortcomings pointed out by the experts have been incorporated in the project design.

While these agencies have not been a party to the conception of this project plan, the author would like to thank his
sources for making this plan possible through their data.
Project Design Basis / Education Philosophy
The Nataraja Foundation
www.nataraja.org.in



                                  " Let the watchword be acceptance and not exclusion "




 Sufi Saint Kabir                                                                                                       Guru Nanak Dev
                                 A project of this size and scale will be a dead and soul-less agglomeration of
                                 buildings and computer networks without a sound philosophy which is timeless
                                 and yet extremely advanced and which seeks, as it were , to bind people of
                                 diverse faiths and lead them towards the realization of their potential as human
                                 beings .

                                 The following words of Vivekananda will therefore serve as a Pole Star for future
                                 Indian thinkers on education “ Let the watchword be acceptance and not
                                 exclusion. Not only toleration , for so called toleration is blasphemy. Toleration
  Mother Teresa                  means that I think you are wrong and I am just allowing you to live. Is it not
                                 blasphemy to think that you and I are allowing others to live ? I accept all
                                                                                                                        Rabindranath Tagore & Gandhiji
                                 religions that were in the past and worship them all. I worship God with everyone
                                 of them, in whatever form they worship him”.

                                 Vivekanand Continues …

                                 “ I shall go to the mosque of the Mohammedan ; I shall enter the Christian’s
                                 church and kneel before the crucifix. I shall enter the Buddhist temple where I
                                 shall take refuge in Buddha and in his law. I shall go into the forest and sit down
                                 in meditation with the Hindu, who is trying to see the light which enlightens the
 Dr. APJ Abdul Kalam in Class
                                 heart of everyone.

                                 Not only shall I do all these things but I shall keep my heart open for all that may
                                 come in the future . Is Gods book finished ? Or is it still a continuous revelation
                                 going on. It is a marvelous book – these spiritual revelations of the world . The
                                 Bible , The Vedas , The Koran and all other sacred books are but so many
                                 pages and an infinite number of pages remain to be unfolded ”.




                                              Please Click Here To Access The Full
                                                Copy of the Project Design Basis /
                                 The   Importance Project PhilosophyIn The Indian Tradition
                                                  Of The Teacher Document

                                 Gurur Brahma,
                                 Gurur Vishnu,
                                 Gurur Devo Mahesh Varah.
                                 Guru Shakshat Para Brahma,
                                 Tasmai Shri Guruve Namah.

                                 The teacher is Lord Brahma as he generates knowledge within us. He is like Lord
                                 Vishnu as he sustains us and guides us on the right path. He is like Lord
                                 Mahesha (Shiva) as he destroys ignorance and thereby enlightens us. My
                                 Salutation to such a Guru, who is verily the Supreme God.




                                Note : The Project Design Basis / Education Philosophy can also be downloaded
                                       from the following website :

                                          www.nataraja.org.in
EDUCATION MEGAPROJECT - OVERALL CAPEX / OPEX SNAPSHOT OF PPP SCHEME
Cash Requirements Summary
                                                                                                Bootstrap 1 Bootstrap 2
US $ / Rs Exchange Rate ( 18th march ' 2010 )                         45.49                                               Phase I                          Phase II                             Phase III

Item                                                                                                   2011       2012       2013     2014         2015          2016     2017      2018       2019         2020       2021        2022        2023        2024

Teachers Training Institutes ( Lot @ Rs 8 Crores Capex &                                                250         250
Rs 4 Crores Opex for each per year )

Pilot Projects ( Schools in 28 States + 7 Union Territories) … Assumed that 100                          35          35                Assumed that In Actual Project
85 % day schools and 15 % Residential Schools                  % of Pilot Cost                                                         Construction 60 % Cost is borne
                                                                 borne in the same                                                     in the 1st year and 40 % in the
                                                                 year                                                                  second year
Masons Training Institutes ( Lot & Rs 5 Crore Capex and Rs                                               60          60                                                                          The Nataraja Foundation
2 Crore Opex for each / year )                                                                                                                                                                    www.nataraja.org.in

Day Schools                                                                        Nos Of                           850      2125     2125         2550          2550     2550     3187        3187          3187      3187
Commissioning Sequence ( For Initiating Opex )                                   Institutions                                          850         2125          2125     2550     2550        2550          3187      3187        3187        3189
Cumulative commissioned                                                                                                                850         2975          5100     7650    10200       12750         15937     19124       22311       25500

Residential Schools                                                                                                 150       375      375          450           450      450       563        563          563        563
Commissioning Sequence ( For Initiating Opex )                                                                                         150          375           375      450       450        450          563        563         563         561
Cumulative commissioned                                                                                                                150          525           900     1350      1800       2250         2813       3376        3939        4500

Total Schools Construction Started Each Year                                                                      1000       2500     2500         3000          3000     3000     3750        3750          3750      3750
Commissioning Sequence ( For Initiating Opex )                                                                                        1000         2500          2500     3000     3000        3000          3750      3750        3750        3750
Cumulative commissioned                                                                                                               1000         3500          6000     9000    12000       15000         18750     22500       26250       30000

Costs Of Teacher Sharing Programme

Costs Of Teachers Guest houses ( A total of 4,20,000                                                                                 14000       35000         35000     42000    42000       42000         52500     52500       52500       52500
Guesthouses will be built under the teacher sharing
programme )
Fuel Costs Of teacher sharing programme : Rs 11.56                                                                                    115.6       404.6         693.6    1040.4   1387.2       1734      2167.5        2601      3034.5        3468        3468
Lakhs / School / Year to cover 14 assisted schools                     0.12                            Opex To Be added

IT System for Existing Schools … ( % Complete )                                                        20%         40%       40%                     Capex & Opex to be be added depending on system
Total Cost Of System with alerts @ Rs 500 Crores :                      500                             100         200       200                    needs and the extent to which the teacher sharing
                                                                                                                                                     programme is implemented.
                                                                     Taken as US $ 5 Billion
IT System for Megaproject Schools … ( % Complete )                   over 10 years ( IT Infra )
( Launching of 12 Satellites + Using 4,00,000 Km of Existing                                              0           0         0      758         1895          1895     2275      2275       2275         2843       2843        2843        2843              0
Fibre Optic Across 30,000 Hub School and 420,000 Assisted                     Costs of
Schools Via VSATS )                                                           Essential Items
                                                                              in Crores
                                                 % Completion                                          30%         70%      100%
Forming and Staffing Of the ISIC with Average Salary @ Rs               450                             135         315       450      450          450           450      450       450        450          450        450         450         450         450
20 Lakh / Year = Rs 450 Crores ( Fully Staffed as below )
( 50 Senior Educationists , 300 Finance Professionals, 1200
Project Engineers, 300 IT Professionals, 100 Lawyers, 300
Architects )

Opex Cost of Teacher Training Institutes                                                               1000       2000       2000     2000         2000          2000     2000      2000       2000         2000       2000        2000        2000        2000
Opex Costs of Masons Training Institutes                                                                120        240        240      240          240           240      240       240        240          240        240         240         240         240
Development Of Vernacular Languages + Urdu+ Hindi + Sanskrit                                                                           933         2333          2333     2800      2800       2800         3500       3500        3500        3500

Capital Expenditure            Rs.( Thousands Of Crores )                                              3.00      13.319    32.371    45.273      54.405        57.813    59.153   66.824     71.938      73.949      73.949      35.610      10.051
                                                  ( US $ Billion )                                     0.66        2.93      7.12      9.95       11.96         12.71     13.00    14.69      15.81       16.26       16.26        7.83        2.21
                        Total Capital Expenditure ( Rs Crores )                      597651
                      Total Capital Expenditure ( US $ Billion )                     131.38

Operational Expenditure                       ( Rs. Crores )                                        1476.84     2998.68   3133.68   9565.31 25551.05 41396.80 60458.36 79473.25 98488.14 122327.60 146097.05 169866.51 193632.60 193632.60
                                                 ( US $ Billion )                                      0.32        0.66      0.69      2.10     5.62     9.10    13.29    17.47    21.65     26.89     32.12     37.34     42.57     42.57

 Sanskrit is possibly the worlds oldest language and it is dying in India. The Education Megaproject therefore allocates Rs 8000 Crores over 10 years to the promotion of Sanskrit in schools and for the digitizing of Sanskrit content as Sanskrit serves as
 the basis for several Indian and even international languages. This will reverse the huge neglect it has suffered neglect over the last 100 years . All other Indian Languages ( Tamil, Bengali, Marathi, Telugu, Gujarati, Kannada etc. ) including most
 importantly Urdu and Hindi together will receive an additional Rs 20,000 Crores over 10 years under the Megaproject for the development of digital content and opening of Institutions for scholars. Total Rs 28,000 Crores. Encouragement of local
 languages will allow the poorest citizen to participate fully in the economy. We want every farmer and labourer to have an equal opportunity and language should not be allowed to be a barrier due to lack of Funds. The Education Megaproject has a
 special large budget for Vernacular Language propogation.
2025        2026        2027        2028        2029        2030        2031        2032        2033        2034        2035        2036        2037        2038        2039        2040




    3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468        3468




       0           0           0           0           0           0           0           0           0           0           0           0           0           0           0           0




     450         450         450         450         450         450         450         450         450         450         450         450         450         450         450         450




    2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000        2000
     240         240         240         240         240         240         240         240         240         240         240         240         240         240         240         240




193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60   193632.60
    42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57       42.57
TERM SHEET
Assumptions On Financing / Sources Of Funds :
                                                                                                                              The Nataraja Foundation
US $ / Rs Exchange Rate ( 18th march 2010 )                                         45.49                                      www.nataraja.org.in

Sl. No.   Source Description                                      Estimate of Total            Notional Amount           % Of Source     Amount Available     Cash Available Each
                                                               Possible Corpus               Potentially Available /     Proposed For   Each Year           Year                   (
                                                                      ( US $ Billion )      Year                     (    Education        ( US $ Million )  Thousands of Crores )
                                                                                                 US $ Billion )          Megaproject

YEARLY FUND FLOWS / Annuities

    1     Net Present Value Of Inceremental GDP                           500                          20                    10%               2000                  9098
          Increase after GST implementation starting 1st
          April ' 2010 ( Delta Over Current ) . The Total
          Corpus in the next column is assumed and
          calculated over a 25 year period with a discount
          rate at 3 %. This cash flow will triple by 2025
          when the size of the Indian economy is expected
          to be US $ 4.5 Trillion.




    2     30 % of a proposed new tax on the services                      510                          5.1                   30%               1530                 6959.97
          component in future Infrastructure projects.
          The base case estimate of the delta / net
          additional Infrastructure investment in India over
          the next 10 years is taken at US $ 1.7 Trillion
                   ( Goldman sachs View ). This cash stream
          will triple by 2025 when the size of the Indian
          economy is expected to be US $ 4.5 Trillion.




    3     Graduate Tax Collected From Employers In                       10.11                        2.53                   80%              2022.42                9200
          India. It is assumed here that there are 46
          Million Graduates in India ( 2004 Estimate ). This
          number today is larger. This cash stream will
          double by 2025 when the size of the Indian
          economy is expected to be US $ 4.5 Trillion.




Assumptions On Financing / Sources Of Funds :
US $ / Rs Exchange Rate ( 18th march 2010 )                                           45.49

Sl. No.   Source Description                                        Estimate of Total            Notional Amount           % Of Source     Amount Available Amount Available Each
                                                                 Possible Corpus               Potentially Available /     Proposed For   Each Year           Year                   (
                                                                        ( US $ Billion )      Year                     (    Education        ( US $ Million )  Thousands of Crores )
                                                                                                   US $ Billion )          Megaproject
    4     Quantized Tobin Tax on Forex Transactions. It                     1.1                          1.1                   100%              1095                 4981.16
          has been assumed that the volume of daily
          average forex transactions in India and by
          companies doing business in India is of the order
          of US $ 15 Billion. A Tobin Tax              ( First
          proposed by Nobel laureate James Tobin ) to be
          levied at the rate of 0.02 % on the total volume of
          the transaction which will be quantized as per the
          size of the transaction with higher rates applying
          to larger transactions to prevent speculation on
          the Indian Rupee as it moves towards Capital
          Account Convertability ). This cash stream will
          triple by 2025 when the size of the Indian
          economy is expected to be US $ 4.5 Trillion.


    5     Yearly Rent From Re-developed PSU Land by                         3.00                        3.00                  100%               3000                  13647
          the Indian Social Infrastructure Corporation
          ( ISIC ) Under The Urban Equity Withdrawl
          Programme ( Phase I ) .




    6     Yearly Rent From Redeveloped PSU Land by                         10.00                        10.00                 100%              10000                  45490
          the Indian Social Infrastructure Corporation
          ( ISIC ) Under The Urban Equity Withdrawl
          Programme ( Phase II ) .
Assumptions On Financing / Sources Of Funds :
US $ / Rs Exchange Rate ( 18th march 2010 )                                     45.49


Sl. No.   Source Description                                  Estimate of Total            Notional Amount           % Of Source     Amount Available Amount Available Each
                                                           Possible Corpus               Potentially Available /     Proposed For   Each Year           Year                   (
                                                                  ( US $ Billion )      Year                     (    Education        ( US $ Million )  Thousands of Crores )
                                                                                             US $ Billion )          Megaproject

    7    Teacher / Content Outsourcing Business : The         21.04                               10.52                  40%              4207.52                19140
         Education Megaproject will be employing
         approximately 1.74 Million Teachers across
         India on 5 year Rolling Contracts. It is proposed
         that the terms of the contracts be flexible enough
         to permit teachers to organize themselves into
         teams which could then, in an organized
         manner , produce education content for the world
         market. The revenue earned through this venture
         will be shared by teachers and the ISIC in the
         ratio 60:40 with the larger sum going to the
         participating teachers. They will also participate
         under the Aegis of the ISIC in a Teacher
         Exchange Programme with schools in foreign
         countries. For the purposes of this calculation the
         total teacher strength is assumed as 1.5 Million. It
         is further assumed that just 50 % of the teachers
         will participate in this venture and that each
         teacher's extra earning potential is Rs 5,50,000
         each year.
   8     Students on Fractional Vouchers / NRI Quota           5.10                               5.10                  100%              5103.80              23217.18
         and SAARC / Foreign Students : A majority of
         the students within the Megaproject will be on
         Education Vouchers ( 60 - 70 % ). However some
         37 % + of the students from middle class families
         and well off families will be on fractional
         vouchers with 2 / 3rd subsidy and an additional
         2 - 3 % could be from SAARC countries or NRI /
         Foreign Students who will pay a premium
         ( Double The Voucher value ).
ONE TIME FUND FLOWS - DIRECT FINANCE FOR CONSTRUCTION

    9     Coordinated Equity Withdrawl By the ISIC on                  40                          40                    100              40000                181960.00
          PSU Owned Land in Metros and Large Cities

    10    Un-Utilized Funds with various Ministries and              21.59                        21.59                  100              21590                98212.91
          NGO's



    11    Equity Infusion By Promoter groups for 25,500               6.74                        6.74                   100              6741.48              30666.98
          Day Schools and 4500 Residential Schools


    12    Committed and Un-Utilized Funds Lying with the              15.6                        15.6                   100              15600                70964.40
          World bank and the Asian Development Bank, on
          which the government of India is paying
          Commitment Charges of over Rs 125 Crores
          each year.




Assumptions On Financing / Sources Of Funds :                                                       `


US $ / Rs Exchange Rate ( 18th march 2010 )                                     45.49
Sl. No.   Source Description                                       Estimate of Total         Notional Amount           % Of Source     Amount Available Amount Available Each
                                                                Possible Corpus            Potentially Available /     Proposed For   Each Year           Year                   (
                                                                       ( US $ Billion )   Year                     (    Education        ( US $ Million )  Thousands of Crores )
                                                                                               US $ Billion )          Megaproject

OTHER POTENTIAL SOURCES OF FINANCE

    13    In early March ' 2010 , India's Foreign Exchange                 278                      2.78                   1%                2780                12646.22
          Reserves stood at US $ 278 Billion. This is a
          huge sum and it has earlier been suggested by
          several others that a small part of the RBI's
          reserves should be used to finance Infrastructure
          projects in India. Schools represent essential
          social   Infrastructure   and    the    Education
          megaproject could draw on some of this
          resource.


    14    Dis-investment in Indian Public Sector Entities                   30                        3                    10%               3000                13647.00
          and Banks. This represents a huge potential
          scorce of funds . However successive
          governments have been using dis-investment
          proceeds to help bridge the huge fiscal deficits
          that the government of India runs. In fact this
          money is best used to finance productive capital
          expenditure as in education projects that greatly
          enhance the country's GDP.

          If US $ 1.7 Trillion is to be invested in
          Infrastructure over the next 10 years, the first
          sector that will expand exponentially is
          banking. Government of India will do well to dis-
          invest it's stake in a few large banks to raise
          additional resources while at the same time
          allowing a greater private sector role in the
          banking industry , with strict controls in place of
          course.
Pg 1 0f 4



              Remarks / Critical Assumptions




If net / delta addition to GDP is US $ 20 Billion each year
solely due to GST implementation, then government can
afford to earmark 10 % of that Delta to an Education Mega
Project from the Consolidated Fund Of India through a special
legislation that creates " The Education Megaproject Fund ". It
is being assumed here that the NCAER has taken a 25 year
period for calculating the Net Present value at a 3 % discount
rate. If they have taken a 15 year period instead , then the
yearly sums that will be available will be much larger.



A new tax proposal on the lines of the recently implemented
tax on the services component of housing projects ( 2010
Budget ) will need to be implemented to extend service tax to
the labour and services component of Infrastructure projects.
This will very easily generate a new cash source for creating
the human resources necessary to plan and build large
Infrastructure in India. Right now there is a shortage of 30
million trained people in the construction Industry alone
( Mckinsey 2008 ). So the imposition of a service tax on the
labour / skill component of Infrastructure projects is fully
justified . It is being assumed here that 30 % of an
Infrastructure Projects cost is services and Labour. It is also
being assumed that servoce tax on the Labour and services
component will be @ 10 %.

Employers are being taxed because they are getting access to
qualified graduates free of cost and have not paid a single
paise for their education. This tax will be levied at the rate of 3
% on the Cost to Company ( CTC ) of the employee and will
be paid not by the employee but the employer. Please note
that the current education cess and professional taxes are
separate taxes and are being borne by the employee.
Companies must also pay a tax because they are getting
trained manpower free of cost. We believe that companies will
not be able to pass this tax on to employees as companies will
also be competing with each others in a rapidly growing
economy where skills shortages are acute. Also it has been
realistically assumed that only 25 % of this tax is collectable
from graduates as many work in the un-organized sector.
Many housewifes are graduates too . If independent
professionals such as doctors can be taxed, the collection will
go up dramatically. Also it is assumed that 80 % of this tax will
go for primary education as a person spends 80 % of his time
in school.
Pg 2 Of 4




              Remarks / Critical Assumptions



Given that India is going to be the largest growing market in
the world over the next few years we do not expect business
to move away from India due to the imporition of this tax. The
Imposition of this tax has been considered in the latest
meeting of the G 20 nations in 2009 and It has also been
supported for implementation by none other than our own RBI
governor Dr. D SubbaRao in Dec ' 2009. Since 90 % of the
worlds forex transactions are cleared in just a few financial
centres globally , it will not be difficult to impose this tax which
can provide much needed funds to Education and Healthcare
projects in Rural India.




Subsequent to the sale of 3000 Acres out of a total of 30,000
Acres of prime real estate in Indian Cities, The ISIC will
publish a Global Tender Inviting leading Urban Developers
from around the world to come to India to develop Large Real
Estate Projects. 27,000 Acres of Urban, Government owned
land will be put out on bids under a Public Private Partnership.
Indian companies will participate in the bidding rounds and will
compete with foreign companies. The bids will require project
developers to pay an upfront annuity / yearly instalment of US
$ 3 Billion for the 27,000 acres taken together over the first 10
years and submit plans for the development of Financial
centres where the ISIC will be the owner of 50 % in each
project. Developers will need to come up with ideas whereby
the net earnings to the ISIC will be of the order of US $ 10
Billion each year from the 27,000 Acres of prime real estate
starting from the 7th year after the Bidding. This effective
Urban Equity Withdrawl plan will provide funds for rural
development.




Phase II cashflows will begin to accrue from year 7 onwards
as the PPP projects in Urban Development begin yielding a
return of US $ 10 Billion to the ISIC as explained under V
above.
Pg 3 Of 4



               Remarks / Critical Assumptions




It is being assumed that revenues from the Teaching Content
Development Business and the Overseas Teacher
Exchange Programme will be shared by Teachers / ISIC in
the ratio 60 :40, with 60 % of the revenues going to the
teachers. We have therefore included only the balance 40 %
of revenues as ISIC Income. Further , we do not believe that
this activity will disturb teaching activity in the country as
teachers have considerable amounts of free time and because
the schools have been overstaffed by design not just for
sharing teachers with 420,000 existing and deprived schools
but also with this kind of revenue opportunity clearly in mind.




Fees for Children will be quite affordable to parents as they
well be charged at 1/ 3rd of the value of the voucher. In the
case of Day schools fees will be in the range of Rs 25000 /
child and in the case of fully residential schools, fees will be in
the range of Rs 65,000 - Rs 75,000 which we believe are very
affordable for the Middle Class and above.




The procedure for this is explained in great detail in the project
concept document under construction phase financing.

This financing option has emerged through a study of the
Comptroller & Auditor General's report ( CAG Report ) for
2007 - 08. A special audit committee will be constituted to
trace and recover this money for the Education Megaproject.
This money will come from the Promoters of 30,000 Schools
over a 10 year period ( 2012 - 2022 )


This financing option has emerged through a study of the
Comptroller & Auditor General's report ( CAG Report ) for
2007 - 08. Usually World Bank / ADB Loans are available for
specific projects and cannot usually be re-assigned , We
believe it will be possible to lift the entire corpus for this single
Education Megaproject as the project subsumes within itself
areas as diverse as Women and Child health and education to
rural sanitation and rural roads etc.




                                                         Pg 4 Of 4
Remarks / Critical Assumptions




The Education Megaproject has not included Foreign
Exchange Reserves in its sources in the current Rev 03 of the
project. This represents a potential future source of finance.




The Education Megaproject has not included Dis-investment
proceeds in its sources in the current Rev 03 of the project.
This therefore represents a potential future source of finance.
The Indian Primary & Secondary Education Mega
                                         Project
    The Nataraja Foundation
                                                  Project Legal & Financial Structure
     www.nataraja.org.in
                                                                          Government Of India

                                                           Ministry Of HRD                 Ministry Of Finance
   CONSTRUCTION
   PHASE ( 2012 – 2023 )                                                                                                                                                                                                                Parliament
                                                   Ministry Of
                                                  Disinvestment
                                                 ( FUTURE SOURCE )
                                                                                                Consolidated Fund Of India
   Size Of The Indian Economy
   US $ 1.3 Trillion ( 2010 )

 Exchange Rate ( 18th Mar ‘ 2010 ) :                                                                              Financing Concept is similar to the
 1 US $ = Rs 45.49                                                                                                Golden Quadrangle / Highways
                                                                                                                  Financing.

                                                                                                                  8 different sources of funds are
                                                                                                                  routed to a special " Education
                                                                                                                  Megaproject Fund " … A special
                                                                                                                  Act of Parliament will enable this.
INDIA BASED SOURCES OF FUNDS

1. Yearly Fund Flows
                                                                                                                                                                                         Sovereign
  10 % of New Goods & Services Tax ( GST )                       US $ 2.0 Billion / Year                                                                                                 Guarantee
  Receivables = US $ 2.0 Billion / Year




                                                                                                                                                    US $ 6.64 Billion / Year
                                                                                                                         US $ 6.64 Billion / Year
                                                                                                                 INDIAN & INTERNATIONAL
  30 % of Proposed New Tax on Service                                                                                     BANKS
                                                                 US $ 1.53 Billion / Year
   Component of Infrastructure Projects
   = US $ 1.53 Billion / Year


  Collected From Employers of Graduates                          US $ 2.02 Billion / Year                                                                                      Securitize 10 year annual
  Graduate Tax = US $ 2.02 Billion / Year                                                                                                                                      Receivables at 6 %
                                                                                                                                                                               and Draw US $ 49 Billion

  Quantized Tobin Tax on                                         US $ 1.09 Billion / Year
  Forex Transactions = US $ 1 .09 Billion/Year
2. One Time Fund Flows

                                                                   US $ 3 Billion
                                                                                                                                                                                                                     Education Megaproject
  PSU Owned Metro / Large City Real Estate                                                       US $ 49 Billion For Capex
                                                                                                                                                                                                                            Fund Act
  Equity Withdrawl = US $ 40 Billion
                                                                                                                   Education Megaproject Fund

  Unutilized Funds ( US $ 21.59 Billion ) With
  Various Govt. Ministries and NGO’s                                                             US $ 67.15 Billion for Capex
  as per GAG Report 2007 -08                                                                     + US $ 3 Billion Annual Rent
                                                                     US $ 67.15 Billion                                                                                                                      Special Act Of Parliament to give
                                                                                                                                                                                                             Legal status to SPV and enable
 Sale Of Navratnas, PSU's , Banks = US $ 0.00           Future standby source
                                                                                                                                                                                                             Fast Track Execution based on
                                                         US $ 0.00 Billion
                                                                                                                                        US $ 15.6 Billion                                                    Initial Sovereign Guarantees
                                                    US $ 5.56 Billion                                                                   For Capex
  30,000 Private School Operators                   ( Equity Infusion )




                                                                                      Indian Social Infrastructure                                                                                                   ( ISIC Act )
                                                                                          Corporation ( ISIC )
                                                                                                                                                                US $ 15.6 Billion                          Sovereign Guarantee
   Low cost Loans for Capex to                                                                                                                                  Of Committed But                           For School Capex Loans
   School Concessionaires. This                                                                                                                                 Un-Utilized
   is in addition to the US $ 15.6                                                                                                                              Funds
   Billion that is paid as a bullet
   payment to the ISIC
                                                                                                                                                                                             World                      ADB
                                                                                                                                                                                             Bank




                                                    Capacity To Raise / Spend US $ 134.75 Billion OR Rs 612,977 Crores

                                                    Project Construction Cost = 131.38 Billion
                                                    ( 30,000 Hub Schools + Infrastructure for Teachers Sharing Programme )

                                                    Financial plan therefore raises sufficient funds for construction
The Indian Primary & Secondary Education Mega
                                           Project
                                                    Project Legal & Financial Structure
    The Nataraja Foundation
     www.nataraja.org.in                                                 Government Of India

                                                              Ministry Of HRD                Ministry Of Finance
   BOT OPERATIONS
   PHASE                                                                                                                                                                                                                                                     Parliament
                                                      Ministry Of
                                                     Disinvestment
                                                    ( FUTURE SOURCE )
                                                                                                  Consolidated Fund Of India
   Size Of The Indian Economy
   US $ 4.5 Trillion ( 2025 )

  Exchange Rate ( 18th Mar ‘ 2010 ) :
  1 US $ = Rs 45.49


                                                                                                                                                  Key Point to note is the size of the
INDIA BASED SOURCES OF FUNDS                                                                                                                      Indian Economy in 2025

1. Yearly Fund Flows

  10 % of New General Service Tax Based                           US $ 6.0 Billion / Year
                                                                                                                                                  Students on Fractional
  GST Receivables = US $ 6.00 Billion / Year
                                                                                                                                                  Vouchers




                                                                                                                                                          US $ 4.88 Billion / Year
                                                                                                                                                  and NRI / SAARC Quota




                                                                                                                         US $ 17.86 Billion /
  30 % of Proposed New Tax on Service                             US $ 4.59 Billion / Year
  Component of Infrastructure Projects




                                                                                                                                Year
  = US $ 4.59 Billion / Year                                                                                                                           Teacher
                                                                                                                                                       Outsourcing
                                                                                                                                                       Business




                                                                                                                                                                                       US $ 4.207 Billion /
  Graduate Tax = US $ 4.0 Billion / Year                           US $ 4.0 Billion / Year
  Collected From Employers of Graduates




                                                                                                                                                                                              Year
                                                                                                                                                                                                              US $ 3.55 Billion
                                                                                                                                                                                     Securitization
  Quantized Tobin Tax on Forex Transactions =                      US $ 3.27 Billion / Year                                                                                          Facility Pending Grant




                                                                                                                                                                                                                   / Year
  US $ 3.27 Billion / Year


                                                                   US $ 10 Billion
  Yearly Rent From High FSI Re-Developed
  PSU Properties all over India = US $ 10 Billion                                                                                                                                                                                         Education Megaproject
                                                                                                US $ 17.86 Billion For                                                                                                                           Fund Act
                                                                                                Opex


                                                                                                 US $ 4.5 Billion                                  US $ 12.64 Billion
                                                                                                 Service Tax Feedback                              For Opex

                                                                                                                                                                                                                                  Special Act Of Parliament to give
                                           Service Tax                                             US $ 10.0 Billion Annual Rent Received                                                                                         Legal status to SPV and enable
                                                                                                   From Developer Partnerships                                                                                                    Fast Track Execution based on
                                           @ 10 %                                                                                                                                                                                 Initial Sovereign Guarantees
                                                                                                                                                Education Megaproject Fund



                                                                                                               Capacity To Raise & Spend US $ 45 Billion / Year

                                                                                     Indian Social Infrastructure                                                                                                                         ( ISIC Act )
                                                                                         Corporation ( ISIC )
                           US $ 45 Billion Revenue
                           For Created Ecosystem
                                                                                                      Spend US $ 45 Billion On Primary & Secondary School Operations / year
                                                                                                      +
                                                                                                      PHASE II Expansion ( if Any ) through securitization of specific cashflows



                                                                                                                                                                                            18 Million Students On Education Vouchers
                                                                               30,000 Private School Operators                                    TEACH                                     ( Including 108 Million Students
                                                                                                                                                                                            Under Teacher Sharing Programme )
                                                                                                                                                                                            = 126 Million Children

                                                                                Service Providers Ecosystem
INSTITUTIONAL STRUCTURES , LAND BANKS AND
   URBAN EQUITY WITHDRAWL & MISC ISSUES
                                                                              The Indian Primary & Secondary Education Mega Project




                                                                                                                                 Government Of India
               The Nataraja Foundation                                                                                                              Ministry Of Finance
                www.nataraja.org.in
                                                                                                             Ministry Of HRD


                                                                                                                Ministry Of
                                                                                                               Disinvestment
                                                                                                             ( FUTURE SOURCE )
                                                                                                                                                                                                                                  Parliament



                                                                                                                                                                                   ISIC Act



                                                                                                25 % Equity                                                                                   75 % Equity
                                                                                Central                                 "The Indian Social Infrastructure Corporation "                                                     28 State
                                                                              Government                                                    sets up                                                                       Governments
                                                                                                30,000 Acres              The Primary & Secondary Education Megaproject SPV                    900,000 Acres
                                                                                                                                                                                         Of Land For Setting Up Schools
                                                                                                Of Land all Over
This 9,30,000 Acres , can be visualized approximately as a strip of Land 62                          India
Km by 60 Km. It is not much land for India taken as a whole. Out of this,                                                     with Land Bank of 9,30,000 Acres all over India
30,000 Acres can be easily spared / collected by the central government
from PSU's and government organizations in Metros and B category
Towns . The balance 9,00,000 Acres will be in Villages and towns in 28
States and 7 Union Territories all over India and will be given out on bids
for setting up Schools and Hospitals.                                          Land For Equity Deal
                                                                                                                                                                                        Service Partners
                                                                                                                                                                                         PPP Contracts
                                                                                                                                           The Indian                                                                      Comptroller & Auditor General
     Commercial Land Bank :
     30,000 Acres to be held in Land Bank . Upto 24 % of Cherry Picked land to be sold to Finance 40 %                           Primary & Secondary Education                                                             Of India to Monitor All ISIC Cashflows + All
     Capex of Primary & Secondary Education Project / Healthcare Megaproject . Balance 76 % land to                                       Mega Project                                                                     Sales & Lease Rentals Of ISIC Related Land
     be given on rent in towns and cities to large city developers so as to earn Cash to meet project                                  ( Executive Board )                                                                 Under This Project.
     Operating Cash Requirements so as to subsidize Education and Healthcare provision to Low Income
     Groups.



 Note on PSU Land Based Urban Equity Withdrawl :                                                                   10 % of 30,000 Acres
                                                                                                                   Cherry Picked
 If just 10 % of the land transferred in Metros and Large Towns to the ISIC from PSU's is                          Prime Real Estate in Big                                                                 Issue Of initial capital (2015 - 2016).
 prime real estate it will be approximately 3,000 Acres ( all over India as the SPV in all will                    Cities and Important Towns
                                                                                                                   to be sold to finance 40 %                                                               Stock : India Domestic & International Offering
 have 9,30,000 acres, of which 30,000 acres will be held in the Land Bank while 900,000 will                       of Project Capex. All such
 go for the school project & Healthcare project). This 10 % land will be worth approximately                       sales will be under a
                                                                                                                                                                                                            Of 500 Million Equity Shares or Rs 100 each
 180,000 crores ( Approximate land cost in a Metro per acre has been taken as Rs 60 Crores                         Transperant bidding                                                                      For a premium of @ Rs 400 Per Share to raise
 while actual prices range from Rs 400 Crores / Acre in Mumbai to Rs 2 Crores / Acre in a                          process and SPV land sold                                                                US $ 5.28 Billion as Equity
                                                                                                                   will have an FSI ranging
 small town ).                                                                                                     from 4 - 16 for creation
                                                                                                                   of Financial Centers in
                                                                                                                                                                                                            Bonds : International Bond Offering Sufficient
 The land bank will make the SPV one of the highest net worth companies on the Indian Stock                        major Towns. Thereby                                                                     For 3 Years of Project Construction :
 Exchanges. It will then be possible for the SPV to raise its own resources by selling land                        maximizing development of
                                                                                                                   scarce land as also available                                                            Targeted Debt / Equity Ratio = 3 : 1
 ( Through a competitive and transperant bidding process ) to developers or by issuing long                        funding for the project.
 term tax free bonds on par with RBI bonds. Central and state governments will take land from                                                                                                               Bond Amount = US $ 15.85 Billion
 PSU 's and state government undertakings which are not utilizing the land optimally and                                                                                                                    Coupon rate =
 transfer it to the ISIC which is working towards a National Mission. The Chief Secrateries of                                                                                                              Duration     = 5 Years
 the 28 states will be on the board of the ISIC so each states interests will be fully protected.

 Addressing PSU Concerns
 To fully accomodate the commercial concerns of PSU and their government and private
 shareholders, they will get an enhanced FSI ( either on the same plot or on their other                                                              Balance 90 % land to be
                                                                                                                                                                                                          The US $ 15.85 Billion Bond issue will help finance any
 properties that are not being given away ) . For instance if a PSU is giving away prime real                                                         given on rent by ISIC to large developers
                                                                                                                                                      from around the world ( including Indian            shortfall in Capital Requirements.
 estate in Mumbai city which currently has an FSI of 2.66 , they will get an FSI of 3.50 in                                                           developers ) to
 another property in the same locality ( if they own two properties close to each other and are                                                       Provide Operating Cash
 giving away only one property) or an FSI of 5.0 in a less valuable location, in a manner that                     Project Land                       to Finance Education, Food and Clothing
 their commercial interest is protected. They could also be issued TDR's ( Transfer of                             900,000 Acres in all to be         and Hostel Facilities for needy students from
                                                                                                                   allocated     for   Social         Low Income Families ( This will however be
 Development Rights ) which they could trade on the market or they could receive cash for the                                                         just once source for OPEX ). Money to be
                                                                                                                   Infrastructure Projects in
 enhanced FSI that accrues on the actual sale of their plots. So , If the Plot has been granted                    Education & Healthcare             given directly by ISIC to the school operators
 an additional FSI of 8 , Cash equivalent of 5.5 FSI will go to the Social Infrastructure                                                             without any involvement of local government.
 Megaprojects and a cash equivalent of 2.5 FSI will be paid in cash or issued as TDR's to the                                                         All such payments and their use to be
                                                                                                                                                      monitored by Comptoller & Auditor General
 PSU after the sale of land through a transperant bidding process to Indian or International                                                          Of India.
 consortia , thereby avoiding any litigation from shareholders.

 It must be understood however that increased FSI requires increased Infrastructure support
 in terms of city amenities and better municipal infrastructure. This needs to be incorporated
 into the city's development plan. The land transfers and sales however can proceed
 immediately and need not wait for the city development plans to be changed.                                              Execute US $ 131.38 Billion Primary &
                                                                                                                          Secondary Education Mega Project between
                                                                                                                          2012 - 2023




                 Bootstrap I                               Bootstrap II                                         Phase I                                                           Phase II                                               Phase III
                 Q1 - Q4 2011                              Q1 - Q4 2012                                        2012-2014                                                          2015-2017                                             2018-2023


    School Megaproject Enabling                         School Megaproject Enabling                     Total Schools                  6000                                Total Schools               9000                     Total Schools        15000
           Infrastructure                                        Infrastructure
                                                        Teachers
   Teachers Training                                    Training                                        Day Schools                    5100                                Day Schools                 7650                     Day Schools          12750
                               100                                             100
   Schools                                              Schools
                                                                                                        Residential                    900                                 Residential                 1350                     Residential          2250
   Master Masons *              30                      Master Masons*               30                 Schools                                                            Schools                                              Schools
   Training Schools                                     Training Schools
   * Master Masons to be trained in the                 * Master Masons to be trained in the
   Vernarcular Architecture Style                       Vernarcular Architecture Style


   Once trained , Master Masons and Teachers could organize themselves into Guilds ( Not Cooperatives ). The Masons Guilds could bid for contracts to build the schools / hospitals.



  Note on SPV Executive / Regulatory Powers :

  The BOO / BOT concession for the Primary & Secondary Schools will be given with all necessary clearences and professional affiliations in a single window. If a promoter group / concession awardee fails
  to meet certain transparant criteria ( specified in a 1 page rule book ), the concession will be terminated and offered to a new developer ... there will be no appeal to any court and the 1 page rulebook will
  be very clear on concession termination issues.

  Same structural vehicle / arrangement can be used to finance higher education.



  Governance : Project & Operations Phase

  There are huge cashflows involved in both the project execution and operations phases of the Indian Primary & Secondary Education Megaproject . The execution phase will involve the raising and
  expenditure of approximately US $ 131.38 Billion or Rs 597,651 crores between 2011 and 2023 and the operations phase will involve project revenues and rent allocations ( which will help approx. 126
  million children to receive quality education free of cost ) of approximately US $ 42.57 Billion each year after 2023.

  The scale of cashflows needs to be monitored in a transparent manner and the Megaproject needs to be open to public audit. It is therefore an explicit requirement of the project that it be executed in a
Governance : Project & Operations Phase

There are huge cashflows involved in both the project execution and operations phases of the Indian Primary & Secondary Education Megaproject . The execution phase will involve the raising and
expenditure of approximately US $ 131.38 Billion or Rs 597,651 crores between 2011 and 2023 and the operations phase will involve project revenues and rent allocations ( which will help approx. 126
million children to receive quality education free of cost ) of approximately US $ 42.57 Billion each year after 2023.

The scale of cashflows needs to be monitored in a transparent manner and the Megaproject needs to be open to public audit. It is therefore an explicit requirement of the project that it be executed in a
corporate setup, outside the concerned ministries , under government of India and to implement a context based communications platform for project MIS. In fact , it is better not to execute this
project , than to do it within a ministry or the existing education systems where information in-efficiencies and leakage of funds will undermine the very basis of the projects and lead to huge
cost and time over-runs.

The project needs therefore to be executed and operated in a corporate setup , under a Special Project Vehicle ( SPV ) set up under an act of Parliament ( The ISIC ) in the same manner as
organizations such as IOC, ONGC, NHAI , IIFC and UTI were set up. The chief secretary’s of all states , The Chairman of the National Knowledge Commission, The Secretary , Ministry of HRD, the
Deputy Chairman of the Planning Commission, The Minister of HRD will be members of the board. The responsibility for audit of the organization will vest with the Auditor General of India.

The Masons guilds are a very important part of this project as they will generate huge employment opportunities in rural india. As envisaged however , the guilds will essentially be self governing and
market forces. will decide their profitability. Government or local political control on these cooperatives will kill these guilds and therefore it is essential to protect their interests only through broad , non-
interfering regulation. The guilds must therefore never be turned into cooperatives which breed corruption and in-efficiency.
Stand Alone ( Day School ) Facility With 300 Children X 2 Shifts, Full Time 51                                                                 www.nataraja.org.in
Teachers + 7 Visiting Faculty                                                                             Zero Drop out rate is being assumed
       IMPORTANT NOTE ON OPERATING FINANCIALS OF THE SCHOOLS:                                                                                         Floor Space Required ( Class
                                                                                                          due to superior teaching inputs …           Room + Hostel ) in Sq Ft @
                                                         Fractional Vouchers in Day schools               Project will rely less on pull factors such
                                                         will provide 2/3 subsidy.                                                                    Rs 850 / Sq Ft … This includes
       This project works because the Education SPV provides for the total costs of education      for 18 as Mid Day Meal Schemethe Hub Schools) . Theconstruction & Furniture
                                                                                                           Million Children ( In & More on
       Vouchers also include the cost of the teacher sharing programme which reaches another
                                                         For ease of calculations students         108 Million Children who are attopresent covered byrequired
                                                                                                          Better and Inspiring Teachers keep
                                                                                                          students in school.
       the Sarva Shiksha Abhiyan ( SSA ). A total of 126 Million Children are are added in
                                                         on fractional vouchers therefore covered with the best teaching resources possible.
                                                         the end.
       This spreadsheet Looks exclusively at the financial viability of the schools from the point of view of private developers / Consortia who
       will be investing just Rs 0.88 Crore equity each and raising the balance of their 60 % share as Interest free debt during the construction
       period from the World Bank / Asian Development Bank . Here again Government of India will back this debt with a revolving $ 10 Billion
       sovereign loan guarantee and take on the cost of the debt during the construction period. After the construction is complete, the World Bank /
       Asian Development Bank will be replaced in the financial structure by a commercial bank and the debt will carry a normal market rate of
       interest . The project developer will pay back this loan and any interest that will be due.

       The ISIC raises all the money required through unique and innovative financing. Please read the project concept document for more
       details on financing
Stand Alone Residential Facility With 600 Children ( Residents )+ 200 Children as Day Scholars                                                                 www.nataraja.org.in
, 51 Full Time Teachers + 7 Visiting Faculty                                                Zero Drop out rate is being assumed
             IMPORTANT NOTE ON OPERATING FINANCIALS OF THE SCHOOLS:                         due to superior teaching inputs …                           Floor Space Required ( Class
                                                          System has sufficient inbuilt                 Project will rely less on pull factors such     Room + Hostel ) in Sq Ft @
             This project works because the Education     capacity for de-bottlenecking.
                                                        SPV provides for the total costs   of educationfor Mid Day MealChildren&(More on Hub Schools) . Rs 850 / Sq Ft Furniture
                                                                                                        as 18 Million Scheme             In the         The
                                                                                                                                                        construction &
                                                                                                                                                                       … This includes
             Vouchers also include the cost of the teacher sharing programme which reaches another     108 Million Children who to keep present covered by
                                                                                                        Better and Inspiring Teachers are at
                                                                                                                                                        required
                                                                                                        students in school.
             the Sarva Shiksha Abhiyan ( SSA ). A total of 126 Million Children are therefore covered with the best teaching resources possible.

             This spreadsheet Looks exclusively at the financial viability of the schools from the point of view of private developers / Consortia who
             will be investing just Rs 1.75 Crore equity each and raising the balance of their 60 % share as Interest free debt during the construction
             period from the World Bank / Asian Development Bank . Here again Government of India will back this debt with a revolving $ 10 Billion
             sovereign loan guarantee and take on the cost of the debt during the construction period. After the construction is complete, the World Bank /
             Asian Development Bank will be replaced in the financial structure by a commercial bank and the debt will carry a normal market rate of
             interest . The project developer will pay back this loan and any interest that will be due.

             The ISIC raises all the money required through unique and innovative financing. Please read the project concept document for more
             details on financing
The Nataraja Foundation
                     www.nataraja.org.in


Economics Of The Teacher Sharing Programme :
It is felt that teachers ( many of them women ) will need a place to rest and refresh themselves during their work in the villages. A
guesthouse has therefore been created in the area close to each of the assisted schools. This will allow for further expansion of the
programme. The guesthouses will also allow for overnight stay.

                                                                                       Sample Teacher Guest houses
1. Teacher Guesthouses                                                                 Cost : Rs 850 / Sq Ft

A small teacher guesthouse will be constructed in the environs of each of the 14 assisted village school

Teacher Guesthouse Costing :
                                                                                                         Cost

Cost of 1200 Sq Ft guesthouse @ Rs 850 / Sq Ft                                                           10.2
Land Development Cost @ 15 % of Guesthouse cost                                                          1.53
Guesthouse Furnishing                                                                                       2
Land Cost ( land given by government for free )                                                             0

Total Cost                                                                                             13.73

Total Cost of 30000 X 14 Guesthouses ( 420,000 Guesthouses )                                          57666




2. Vehicle / Fuel Costs For The Teacher Sharing Programme

     Type Of Vehicle         Qty Of        Distance       Mileage Cost of Diesel               Total Running
                             Vehicle       Travelled               ( Rs / Litre )                 Cost / Day
                                           / Day



     Large Buses                       2           50            4                    40             1000.00
     Mini Vans                         2           50            6                    40              666.67
     Jeeps                             4           75           10                    40             1200.00
     Cars                              4           75           12                    40             1000.00

     TOTAL COSTS

     Assumptions
     All assisted schools will be within a 50 Km radius of the hub school
Each Small Vehicle Does 75 Km / Day on Average and Each Bus / Minibus travels 50 Km / Day
Cost of Diesel @ Rs 40 / Litre. Global petroleum markets are volatile and marginal pricing economics constrain upw


Mileage Assumptions
                      Km / Litre
                       Of Diesel
Bus                          4
Mini Bus                     6
Jeep                        10
Car                         12




Notes :

1. Driver & helper costs are included in staff costs
2. Teacher costs are included in the school costs and therefore not priced here.
Architect : RL Kumar   (
                                                                   Bangalore )


during their work in the villages. A
l allow for further expansion of the


Teacher Guest houses
s 850 / Sq Ft

14 assisted village school




                     Lakhs
                     Lakhs
                     Lakhs




              Crores




                  Total Running        Maintenance      Total           Total Operating
              Cost / Year of 250       Cost / Year / Maintenance       Cost of Fleet Per
                           Days              Vehicle    Cost                       Year



                      250000.00             30000         60000              310000.00
                      166666.67             25000         50000              216666.67
                      300000.00             10000         40000              340000.00
                      250000.00             10000         40000              290000.00

                    966666.67                           190000           1156666.67
50 Km / Day
al pricing economics constrain upward price view.
Project is capable of financing the
                                                                                                                                   launch of upto 12 New EDUSAT
                                                                                                                                   Statellites beginning in 2013 and
                                                                                                                                   can also finance the replacement of
                                                                                                                                   these satellites every 7 years.

   The Nataraja Foundation
    www.nataraja.org.in



Network Enabled E Learning




Children exploring the $ 100 Computer         Pres. Kalam inaugurates a Portal         ISRO - GSLV Prepares to Launch EDUSAT               A Village Trainer introducing childr



Internet / Network Enabled Learning
The Education Megaproject is divided into two phases ( Phases I & II ).




                                                                                                                                       PHASE II : The Contextual Commu
PHASE I : Improving The Current System

                                                                                                                                       The Education Mwegaproject has cho
Phase I of the project will be initiated immediately with the objective of                                                             on the performance that such a system
improving the current MIS within the Sarva Shiksha Abhiyaan ( SSA ).                                                                   very large and complex project such
                                                                                                                                       whole system seamlessly into its oper
Phase I will have 3 objectives :
                                                                                                                                       During project planning and execution
1. Improve Fund Flow Predictibility & Velocity
                                                                                                                                       In the Operations phase ... system w
   Reduce the time it takes for funds to flow from the Ministry Of HRD in Delhi                                                        Children.
   to schools in rural india from 3 - 4 months currently ... to just 2 - 3 days.
   This will be achieved by implementing a new internet based information                  If the document below does not open
                                                                                                                                       For a detailed write-up on the contex
   architecture which will send out E mail messages and SMS's to school                    on clicking …pls go to the Abraham          pointed out by the arrow :
   principals informing them about the quantum of funds that have been                     Lincoln's Letter Worksheet. The
   sanctioned for their schools and exactly what the grant can be spent on                 same file is stored there as well.
   ( Furniture, Toilets , Computers etc ). Today even school principals have no                                                        A description if the IT Infrastructure
   idea what the money they receive can be spent on ... this problem will now
   be resolved.
                                                                                                                                       INTERNET / NETWORK ENABLED L
2. Improve Transparency / Visibility within the system
                                                                                                                                       Please note that the plan below wi
   Phase I of the IT implementation will execute a context based                                                                       regional school cluster. The Teach
   communications system which will dramatically improve the visibility of                                                             scale deployment of IT infrastructu
   people and officials within various ministries.
                                                                                                                                       One of the major strengths of the Ed
   Specifically it will do the following :                                                                                             large amount of financial resources
                                                                                                                                       8 different sources of financing.
   1. If someone is holding up decisions for more than 10 days the system
      will generate an E mail alert which will be sent to his / her                                                                    Network enabled learning is one of the
      superiors and to the individual schools which are affected. All schools                                                           have adequate resources.
      and funds will be mapped to certain material codes / budget codes
      to enable this functionality. This will greatly improve accountability.                                                          The 30,000 schools set up under th
                                                                                                                                       constitute the largest E Learming ne
   2. If for any reason money allocated for one purpose is used for another                                                            level backed by sophisticated fiber
      purpose, the system will send out an E mail alert to all concerned.          Special Note :                                      satellites specially launched for the pu

                                                                                   One of the fundamental ideas behind this            However , E Learning needs to be
3. Improve Real Time Response                                                      project is to use Communication technologies        by competent teachers to conv
                                                                                   and the internet to further develop Vernacular      systems to millions of children who w
   Phase I of the project will also put in place new architecture which will       Languages and local cultures of the different
   allow access to the latest information about each school. Today the             states of India.                                 There can be no substitute for a good
   information about schools ( On the SSA website ) is at least 2 years old.                                                        the children inculcate their values. T
                                                                                   Let us use the power of the internet to enable a impression that the internet and c
   This particular part of phase I will extend into the actual Megaproject when    massive exchange of ideas among the many purposes of this project therefore we
   the larger quantum of funds will become available.                              different cultures of India.                     enabled internet based learning as jus

                                                                                   English is the language of International
                                                                                   commerce but a majority of our people do not        STAGE I : Jan 2013 - Dec 201
                                                                                   know English. There is a need therefore to use
                                                                                   technology to empower the Tamilian farmer who       A. Connection To Existing Telecom
                                                                                   knows no other language but his mothertongue
                                                                                   or the Mizo tribal or the Bengali artisan who has   In India we already have close
                                                                                   no use for english in his daily life. Why should    fiber carrying capacity is virtually unlim
                                                                                   the poor be put at a disadvantage just because        amplification , telecom companies
                                                                                   they do not know English ?                          their capacity at a concessional rat
                                                                                                                                       knowledge network that will operate
                                                                                   So while English will have its place in commerce,
                                                                                   the massive E - Learning infrastructure being set B. ISRO EDUSAT enabled VSAT Ter
                                                                                   up by this project needs to be also used ,
allow access to the latest information about each school. Today the            states of India.                                 There can be no substitute for a good
information about schools ( On the SSA website ) is at least 2 years old.                                                       the children inculcate their values. T
                                                                               Let us use the power of the internet to enable a impression that the internet and c
This particular part of phase I will extend into the actual Megaproject when   massive exchange of ideas among the many purposes of this project therefore we
the larger quantum of funds will become available.                             different cultures of India.                     enabled internet based learning as jus

                                                                               English is the language of International
                                                                               commerce but a majority of our people do not        STAGE I : Jan 2013 - Dec 201
                                                                               know English. There is a need therefore to use
                                                                               technology to empower the Tamilian farmer who       A. Connection To Existing Telecom
                                                                               knows no other language but his mothertongue
                                                                               or the Mizo tribal or the Bengali artisan who has   In India we already have close
                                                                               no use for english in his daily life. Why should    fiber carrying capacity is virtually unlim
                                                                               the poor be put at a disadvantage just because        amplification , telecom companies
                                                                               they do not know English ?                          their capacity at a concessional rat
                                                                                                                                   knowledge network that will operate
                                                                               So while English will have its place in commerce,
                                                                               the massive E - Learning infrastructure being set   B. ISRO EDUSAT enabled VSAT Ter
                                                                               up by this project needs to be also used ,
                                                                               through appropriate policy measures to catalyze     However, to reach remote locations o
                                                                               a large local language content industry with         to provide Video, Voice and data se
                                                                               people from every region of India putting their     financed by the project SPV and
                                                                               best works and their practical ideas in every       thousand locations :
                                                                               field, in their own vernacular medium on the
                                                                               internet.                                              1. 384 Kbps VSAT Terminal : Rs 2
                                                                                                                                      2. Projector + Screen        : Rs 2
                                                                                                                                      3. Switch / Router / cabling
                                                                                                                                         and 6 terminals           : Rs 3
                                                                                                                                                                   --------
                                                                                                                                        Total Cost Per School        Rs 7
                                                                                                                                                                   --------

                                                                                                                                   For 30,000 schools built over a period

                                                                                                                                   Normally a 384 Kbps of leased VSA
                                                                                                                                   approx Rs 7000 / Kbps / Year) ... so f
                                                                                                                                   Since the Capex is low and the Oper
                                                                                                                                   for the SPV to own its own satellites.


                                                                                                                                   Satellite Launches To Commence in

                                                                                                                                   With a view to minimizing the opera
                                                                                                                                   ISRO to launch the ISRO EDUSAT's
                                                                                                                                   launch a total of 6 EDUSATs before
                                                                                                                                   would have been commissioned.

                                                                                                                                   Cost of each EDUSAT , including la
                                                                                                                                   involve an expenditure of US $ 1.65 B

                                                                                                                                   A total of 21,000 schools will then ha
                                                                                                                                   21,000 schools , the Project SPV wil
                                                                                                                                   rural schools,thereby bringing a total
                                                                                                                                   January 2016. Given the above, t
                                                                                                                                   15,250 Crores.


                                                                                                                                   STAGE II : Feb 2016 - Dec 201
                                                                                                                                   Stage II will involve the launch of
                                                                                                                                   then, we will have a more advanced
                                                                                                                                   have reached every school in the cou

                                                                                                                                   Telecommunication technologies are
                                                                                                                                   G and other broadband technologies
                                                                                                                                   of schools on the network. Actually th
                                                                                                                                   need for VSAT and Satellite deploym
                                                                                                                                   Screen ) is found to be a cheaper solu


                                                                                                                                   Note :

                                                                                                                                   The current plan is looking at just th
                                                                                                                                   the market and a futuristic plan can
                                                                                                                                   are more qualified to deal with this s
                                                                                                                                   EDUSAT for launch in 2014.

                                                                                                                                   Ideas to improve this E - Learning mo
ect is capable of financing the
 ch of upto 12 New EDUSAT
 ellites beginning in 2013 and
 also finance the replacement of
se satellites every 7 years.




   A Village Trainer introducing children to the Internet




HASE II : The Contextual Communications Platform


he Education Mwegaproject has chosen a contextual communications platform based
n the performance that such a system is capable of delivering , first while executing a
ery large and complex project such as the Megaproject and then while migrating the
hole system seamlessly into its operations phase.

 uring project planning and execution ... system will deliver huge cost savings

  the Operations phase ... system will allow for network enabled learning for upto 126 Million
 hildren.

or a detailed write-up on the contextual communications platform please click on the document
ointed out by the arrow :


 description if the IT Infrastructure that is proposed to be set up now follows :


NTERNET / NETWORK ENABLED LEARNING

lease note that the plan below will need to be changed to accomodate the needs of each
egional school cluster. The Teacher sharing programme may reduce the need for a large
cale deployment of IT infrastructure if recorded content and Laptops are a cleaper option.

 ne of the major strengths of the Education Megaproject and it's financing mechanism is the
 rge amount of financial resources that it is capable of raising to fund its projects based on it's
 different sources of financing.

etwork enabled learning is one of the key projects that will be financed for which the SPV will
have adequate resources.

he 30,000 schools set up under this project and the 420,000 additional assisted schools will
onstitute the largest E Learming network globally at the primary and secondary school
 vel backed by sophisticated fiber optic networks and upto 12 EDUSAT communication
atellites specially launched for the purposes of this project by ISRO.

owever , E Learning needs to be used and understood for what it is - A tool to used
y competent teachers to convey the right knowledge inputs and the right value
ystems to millions of children who will be on the network.

here can be no substitute for a good teacher at the primary and secondary school level where
 e children inculcate their values. This point is made specifically since people have a wrong
mpression that the internet and computers will solve all our national problems. For the
urposes of this project therefore we are looking at E - learning, VSAT broadband and 3 G
nabled internet based learning as just a tool ... to enable learning.


 TAGE I : Jan 2013 - Dec 2015
 . Connection To Existing Telecom & Fiber Optic Networks

    India we already have close to 400,000 Km of Fibre Optic Cables in the ground. Since
ber carrying capacity is virtually unlimited , a fact made possible by multiplexing and optical
amplification , telecom companies operating in India can be required to lease some of
 eir capacity at a concessional rate for the purposes of building the government backed
nowledge network that will operate between high traffic nodes on the school network.

 . ISRO EDUSAT enabled VSAT Terminals
here can be no substitute for a good teacher at the primary and secondary school level where
 e children inculcate their values. This point is made specifically since people have a wrong
mpression that the internet and computers will solve all our national problems. For the
urposes of this project therefore we are looking at E - learning, VSAT broadband and 3 G
nabled internet based learning as just a tool ... to enable learning.


 TAGE I : Jan 2013 - Dec 2015
 . Connection To Existing Telecom & Fiber Optic Networks

     India we already have close to 400,000 Km of Fibre Optic Cables in the ground. Since
 ber carrying capacity is virtually unlimited , a fact made possible by multiplexing and optical
 amplification , telecom companies operating in India can be required to lease some of
  eir capacity at a concessional rate for the purposes of building the government backed
 nowledge network that will operate between high traffic nodes on the school network.

 . ISRO EDUSAT enabled VSAT Terminals

 owever, to reach remote locations on the school network, 384 Kbps VSAT's can be deployed
 o provide Video, Voice and data services to children in remote schools. These VSATs will be
 nanced by the project SPV and the following configuration can be provided at several
  ousand locations :

   1. 384 Kbps VSAT Terminal : Rs 2.0 Lacks
   2. Projector + Screen        : Rs 2.0 Lacks
   3. Switch / Router / cabling
      and 6 terminals           : Rs 3.0 Lacks
                                --------------------
     Total Cost Per School        Rs 7.0 Lacks
                                -------------------

 or 30,000 schools built over a period of 10 years , the total cost will be Rs 2100 Crores.

 ormally a 384 Kbps of leased VSAT bandwidth would cost Rs 26.88 Lakhs / year ( Rate is
 pprox Rs 7000 / Kbps / Year) ... so for 30,000 schools the cost would be Rs 8064 Crores / year .
 ince the Capex is low and the Operating leased line costs are extremely high ... it makes sense
  r the SPV to own its own satellites.


 atellite Launches To Commence in Mid 2013

With a view to minimizing the operating costs of the Network,the SPV will enter into a JV with
SRO to launch the ISRO EDUSAT's in batches of 2 each every year from 2013 itself ... to
 unch a total of 6 EDUSATs before January 2016 by which time almost 14000 New schools
 ould have been commissioned.

 ost of each EDUSAT , including launch cost is estimated at US $ 275 Million. So Phase 1 will
 volve an expenditure of US $ 1.65 Billion on the 6 satellites.

 total of 21,000 schools will then have access to the EDUSAT linkage. In addition to the
1,000 schools , the Project SPV will finance the installation of VSAT terminals at 80,000 more
ural schools,thereby bringing a total of 1,00,000 schools within the EDUSAT's coverage by
anuary 2016. Given the above, the total installed cost of Phase I will be approximately Rs
5,250 Crores.


 TAGE II : Feb 2016 - Dec 2018
 tage II will involve the launch of another 6 EDUSAT satellites if necessary ( Hopefully by
  en, we will have a more advanced satellite from ISRO ) as fiber optic based systems may
 ave reached every school in the country by then.

 elecommunication technologies are continuously evolving and costs keep coming down . 3
  and other broadband technologies can be therefore deployed to get an increasing number
   schools on the network. Actually the teacher sharing programme may considerably reduce the
 eed for VSAT and Satellite deployment if recorded content on laptops ( using a Projector &
 creen ) is found to be a cheaper solution.


 ote :

 he current plan is looking at just the execution of a project to deploy technologies currently in
  e market and a futuristic plan can be incorporated based on advice from technologists who
 re more qualified to deal with this subject. This project is already assuming a higher capacity
 DUSAT for launch in 2014.

 eas to improve this E - Learning module of the project are therefore very welcome.
Project Bootstrapping & Support Required



The Nataraja Foundation                                                         Architect : Laurie Baker ( Cost Ford ) , Kerala
 www.nataraja.org.in

 27 th March ' 2010




                                             Kindergarten , Auroville
                                             Pondicherry


                                             Architect : Auroville Architects




     The Primary & Secondary Education Megaproject needs some help from the Government of India to get off th

     The following support is required from the Govt. Of India :

     1. To enable fast track execution of this project, Government needs to initiate a total of 70 pilot projec
        across 28 states and 7 Union Territories. Each pilot project will include :

            - A school for 600 students ( design capacity of 300 students and operating in 2 Shifts )
            - A large rural teachers training facility to train 300 teachers each year
            - A Masons training facility to train 300 masons in Vernacular / Low cost / sustainable architecture

         Each of the 70 pilot projects will require between 150 – 200 acres of land for the above activities.

     2. A Statutory Organization “The Indian Social Infrastructure Corporation “ will need to be created under
        act of Parliament. The legal status of this organization and It’s financial structure / means of financing a
        made available for free download on (www.nataraja.org.in) with the caption “Legal and Financial Structu

     3. A statutory fund named “The Indian Education Megaproject Fund “ will need to be created under an Act
        Parliament. This fund will be on the lines of the “Central Road Fund “ , which has been created to build t
        Golden Quadrangle Project. Therefore the passage of “The Education Megaproject Fund Act “ is critical
        put this project into execution mode.

     4. A new tax proposal on the lines of the recently implemented tax, on the services component of housi
        projects (2010 Budget) will need to be implemented to extend service tax to the labour and servic
        component of Infrastructure projects. This will very easily generate a new cash source for creating th
        human resources necessary to plan and build large Infrastructure projects in India. At present, there
        a shortage of 30 million trained people in the construction Industry alone. So the imposition of a serv
        tax on the labour / skill component of Infrastructure projects is fully justified.

     5. An initial corpus needs to be set aside, to set up the 70 pilot projects including the model schoo
        teachers training institutes and Masons training institutes. All this initial money that the governme
Golden Quadrangle Project. Therefore the passage of “The Education Megaproject Fund Act “ is critical
   put this project into execution mode.

4. A new tax proposal on the lines of the recently implemented tax, on the services component of housi
   projects (2010 Budget) will need to be implemented to extend service tax to the labour and servic
   component of Infrastructure projects. This will very easily generate a new cash source for creating th
   human resources necessary to plan and build large Infrastructure projects in India. At present, there
   a shortage of 30 million trained people in the construction Industry alone. So the imposition of a serv
   tax on the labour / skill component of Infrastructure projects is fully justified.

5. An initial corpus needs to be set aside, to set up the 70 pilot projects including the model schoo
   teachers training institutes and Masons training institutes. All this initial money that the governme
   spends upfront will be returned by the “ The Indian Social Infrastructure Corporation ” within 2 –
   years with interest calculated at 12 %. The rest of the project (balance 30,000 schools) will be bu
   without any further demands on conventional means of financing .
t Required



 Laurie Baker ( Cost Ford ) , Kerala




                                       Deens Academy
                                       Whitefield, Bangalore Kumar
                                               Architect : RL
                                       Cost : Rs 690 / Sq Ft
                                       Architect : RL Kumar




ernment of India to get off the ground.



te a total of 70 pilot projects


erating in 2 Shifts )

/ sustainable architecture

or the above activities.

 l need to be created under an
cture / means of financing are
“Legal and Financial Structure “..

 to be created under an Act of
h has been created to build the
aproject Fund Act “ is critical to


ervices component of housing
tax to the labour and services
w cash source for creating the
 ts in India. At present, there is
. So the imposition of a service


s including the model schools,
al money that the government
aproject Fund Act “ is critical to


ervices component of housing
tax to the labour and services
w cash source for creating the
 ts in India. At present, there is
. So the imposition of a service


s including the model schools,
 al money that the government
cture Corporation ” within 2 – 3
 e 30,000 schools) will be built
Abraham Lincolns letter to his son’s headmaster.
Written sometime in the late 1850’s … early 1860’s   Project Design Basis Document / Project Ph


Respected Teacher,

He will have to learn,
I know,
that all men are not just,
all men are not true.

But teach him also that
for every scoundrel there is a
hero;
that for every selfish politician,
there is a dedicated leader …

Teach him for every enemy
there is a friend
it will take time , I know;
but teach him if you can,
that a dollar earned is of
far more value than
five found …
teach him to learn to lose …
and also to enjoy winning.

Steer him away from envy,
if you can,
teach him the secret of
quiet laughter.

Let him learn early that
the bullies are the easiest to
lick …

Teach him, if you can,
the wonder of books …
but also give him quiet time
to ponder the eternal mystery
of birds in the sky,
bees in the sun,
and the flowers on a green
hillside.

In the school teach him                                        MEGAPROJECT INFORMATION
if is far more honourable to fail
than to cheat …

Teach him to have faith
in his own ideas,
even if everyone tells him
they are wrong …

Teach him to be gentle
with gentle people,
and tough with the tough,

Try to give my son
the strength not to follow the
crowd when everyone is
getting on the band wagon …
Teach him to have faith
in his own ideas,
even if everyone tells him
they are wrong …

Teach him to be gentle
with gentle people,
and tough with the tough,

Try to give my son
the strength not to follow the
crowd when everyone is
getting on the band wagon …

Teach him to listen to all men …
but teach him also to filter
all he hears on the screen of truth,
and take only the good
that comes through

Teach him if you can
how to laugh when he is sad …
teach him there is no shame in
tears,

Teach him to scoff at cynics
and to beware of too much
sweetness …

Teach him to sell his brawn
and brains to the highest
bidders
but never to put a price-tag
on his heart and soul.

Teach him to close his ears
to a howling mob
and to stand and fight
if he thinks he’s right.


Treat him gently
but do not cuddle him,
because only the test
of fire makes fine steel.

Let him have the courage
to be impatient …
let him have the patience to be
brave.

Teach him always
to have sublime faith in
himself,
because then he will have
sublime faith in mankind.

This is a big order,
but see what you can do …
he is such a fine fellow,
my son !



… Abraham Lincoln

“ With malice towards none … with justice for all … with firmness in the right "
This is a big order,
but see what you can do …
he is such a fine fellow,
my son !



… Abraham Lincoln

“ With malice towards none … with justice for all … with firmness in the right "
esign Basis Document / Project Philosophy




                                            Megaproject Information
                                            Architecture




 MEGAPROJECT INFORMATION ARCHITECTURE
Any Syllabus as prescribed and regulated by Central & State
         Government Statutory Authorities is OK
ated by Central & State
orities is OK
Project Concept Submitted To :

SL. No. Name


  1    Dr. Montek Singh Ahluwalia
  2    Ms.Anshu Vaish
  3    Mr. Arun Ramanathan
  4    Mr. Ashok Chawla
  5    Mr. Govind Mohan

  6    Dr. APJ Abdul Kalam

       National Knowledge Commission

   7   Mr. Sam Pitroda
   8   Dr. Ashok Ganguly
   9   Dr. P. Balaram
  10   Dr. Jayati Ghosh
  11   Dr. Deepak Nayyar
  12   Mr. Nandan Nilekani
  13   Ms. Sujatha Ramdorai
  14   Dr. Amitabh Mattoo
  15   Mr. S Regunathan
  16   Ms. Kumud Bansal
  17   Ms. Kiran Datar
  18   Mr. CNS Nair
  19   Mr. Sunil Bahri
  20   Mr Amlan Goswami
  21   Ms Namita Dalmia
  22   Ms Megha Pradhan
  23   Ms Sukhman Randhawa
  24   Mr Vikas Bagri
  25   Ms Deepti Ayyanki
  26   Ms Aashima Seth
Designation & Official Details


Dy. Chairman Planning Commission, Govt. Of India
Secretary,School Education & Literacy , Ministry Of HRD, Govt. Of India
Finance Secretary, Ministry Of Finance, Govt. Of India
Secretary, Economic Affairs, Ministry of Finance, Govt. Of India
Jt. Sec, ( Infrastructure ) , Dept Of Economic Affairs, Govt. Of India

Former President Of India




Chairman, NKC
Member, NKC
Member, NKC
Member, NKC
Member, NKC
Member, NKC
Member, NKC
Member, NKC
Advisor, NKC
Advisor, NKC
Advisor, NKC
Advisor, NKC
Executive Director NKC
Research Associate
Research Associate
Research Associate
Research Associate
Research Associate
Research Associate
Research Associate
E Mail Address Used To Submit Project


dch@nic.in
secy.sel@nic.in
secy-fs@nic.in
secy-dea@nic.in
govindmohan1@yahoo.com

apj@abdulkalam.com



s.pitroda@nic.in, anna.faron@c-sam.com
a.ganguly@nic.in, ashok.ganguly@firstsource.com
p.balaram@nic.in, pb@mbu.iisc.ernet.in
j.ghosh@nic.in , jayatijnu@gmail.com
d.nayyar@nic.in , deepaknayyar@mail.jnu.ac.in, nayyar.deepak@gmail.com
n.nilekani@nic.in,nandan_mn@infosys.com
s.ramdorai@nic.in, sujatha@math.tifr.res.in
amitabh.mattoo@gmail.com
s.regunathan@nic.in
k.bansal@nic.in
k.datar@nic.in
E Mail Not available
s.bahri@nic.in
a.goswami@nic.in
n.dalmia@nic.in
m.pradhan@nic.in
s.randhawa@nic.in
v.bagri@nic.in
d.ayyanki@nic.in
a.chaney@nic.in

F:\for website deployment_1st_may_2010\nataraja\the_indian_primary_and_secondary_education_megaproject_excel_motherfile

  • 1.
    The Nataraja Foundation www.nataraja.org.in The Indian Primary & Secondary Education Megaproject 27 th March ' 2010 This Excel workbook deals mainly with the financial structures, cost estimates and detailed financials of the Education Megaproject. Project Concepts and Objectives The actual project, the thinking behind it, it's design criteria etc have been covered in detail in the project concept document which is available The Indian Primary & Secondary Education Megaproject for free download from the Nataraja Foundation's website www.nataraja.org.in Over the last 30 years India has spent very little money on building new schools . The focus has instead been on getting quick results through projects that involved the least possible expenditure. So few new schools were built even though India's population grew from from approx. 846 million in 1991 to almost 1.15 Billion people in 2009. In the schools that were built, the quality of infrastructure is very poor. Planning commission data clearly shows that 44 % of schools at the primary level do not have toilets for instance and 15 % do not have drinking water . Planning Commission data also reveals that nearly 45 % of Creating a lifestyle around the teaching the SC / ST children drop out of school by class V and by class XIII in excess of 60 % drop out of school. Various studies profession conducted by government of India as well as foreign agencies are showing that the percentage ( % ) of " Out Of School Children " is falling but no one is talking about the third rate quality of the schools that the children are being enrolled in and Low cost yet very elegant housing for the abysymal working conditions of the teachers who teach there. teachers under the programme. As a result of all this, in 6 - 8 years time , over 100 Million children will exit the school going age group without any This particular house was built at a cost of employable skills. This is going to create huge social problems in the country. Rs 750 / Sq Ft in 2007 in the Vernacular Architectural Style. Obviously something has gone terribly wrong with our entire approach to education and we need a robust strategy to solve the problems in our education system. Location : Bangalore Architect : RL Kumar Therefore ... www.vernarch.com Central to the thinking behind this project is the belief that the main reason for the steep decline in the quality of human resources in India has been the neglect of the teaching profession and teachers over the last several decades. In India today a crane operator with 5 years of experience makes more money than an MA in Economics or a MSC in Maths or a teacher with a proper BEd degree and with 10 years of teaching experience at the primary school level. This has warped the economic choices that a fresh graduate makes and has resulted in the least qualified individuals handling the most important of all the jobs in this country (The teaching of our children and tomorrows citizens ). This project takes note of the fact that India reached the height of its glory when the teacher was at the head of our society and therefore seeks to bring back this long lost Indian tradition through an innovative mechanism on a truly massive scale. The project is focused on providing a sound basic education as it is more important to have a sound education at the primary and secondary levels for a majority of our people than to spend billions of dollars on higher education and have most of those people going abroad. The whole project therefore is designed around the primary & secondary school teacher ( Project is not centered on the student ) with a view to creating a simple yet elegant lifestyle around the teaching profession so as to attract the best minds towards a career in teaching and thereby correcting a macro imbalance in our society. While doing this , the project also reaches more under privileged children than any other past or currently planned programme of the Govt. Of India. This Excel workbook concentrates on the financials of the project. For a detailed understanding of the various issues, readers are requested to go through the Project concept document which describes the project is proper detail. Project Scale : The project seeks to build a total of 30,000 New schools (with 600 students per school ) under the Public Private Partnership ( PPP ) format during the period 2012 - 2023. Each school under the programme will share teaching resources ( Teachers , Teaching aids etc ) with 14 other village schools in it's surrounding area so that a total of 420,000 additional schools are covered under the programme . The main problem then is money and since the government does not have adequate conventional resources , Innovative financing mechanisms needed to be found to finance this large education project. The project has therefore focused on bringing in innovative ideas on the finance side and we have been able to find innovative ways to raise approximately US $ 131.38 Billion as one time Capital expenditure to build the schools and US $ 42.57 Billion as yearly operational expenditure to run the 30,000 new school system as well as it's huge teacher sharing programme that will reach an additional 108 Million children in 420,000 assisted schools. As a result , once fully commissioned in 2023, a total of upto 126 Million children will receive high quality education totally free of cost .
  • 2.
    bringing in innovativeideas on the finance side and we have been able to find innovative ways to raise approximately US $ 131.38 Billion as one time Capital expenditure to build the schools and US $ 42.57 Billion as yearly operational expenditure to run the 30,000 new school system as well as it's huge teacher sharing programme that will reach an additional 108 Million children in 420,000 assisted schools. As a result , once fully commissioned in 2023, a total of upto 126 Million children will receive high quality education totally free of cost . Phase Number of Hub Schools Number Of Assisted Schools Commissioning Schedule ( Teacher Sharing Programme ) Bootstrap I - - Q1- Q4 2011 250 New Teacher Training Institutes to train 300 teachers Phase II each per year + 60 New Centers of Bootstrap II - - Q1- Q4 2012 Repeat Phase I Vernacular Archiecture to train 300 Master Masons Each every year Phase I 6000 Hub Schools 84,000 2012 – 2014 Phase II 9000 Hub Schools 220,000 2015 – 2017 Phase III 15000 Hub Schools 420,000 2018 – 2023 Phase IV Possible repeat of total project ( another 30,000 schools ) 2023 – 2029 to cover 4,20,000 additional schools Project Schedule To be Extremely _____________________________________________________________________________________ Aggressive 30,000 New Schools to be commissioned by 2023 _____________________________________________________________________________________ Notes : 1. Each Of Bootstrapping stages I & II will consist of 250 Teacher Training Institutes to train 300 teachers each per year + 60 Centers of Vernacular Archiecture to train 300 Master Masons each year. Bootstrap II will be a repeat of Bootstrap I 2. It is not possible to execute Phase I of this project faster as India currently does not have enough trained teachers who possess the necessary capability / sensitivity to train young minds. This problem will be overcome by 2016 after which project execution velocity will pick up. 3. Phase IV could essentially be a repeat order which will repeat phases I, II and III in half the time. It will be possible to dramatically crash commissioning schedules due to retained learning within the project enterprise. 4. Each day school will operate in two shifts to maximize coverage while keeping costs low. Economic & Environmental Impacts of the Project : The following are the main economic and environmental features of the project which seeks to use Traditional yet very elegant Indian Architecture ( where building life is over 100 years ) without any significant maintenance : 1. This will be the worlds largest , multi-location environmental project as it will use 80 % traditional earth based material and very little cement and steel in the construction of the 30,000 schools. The C02 / Green house gas addition by this project will therefore be virtually zero. It will thus allow huge development without adverse environmental impacts. 2. Project will in addition lead to the planting of around 150 Million trees all over India between 2012 and 2023. 3. While the project will lead to a direct expenditure of US $ 131.38 Billion Billion over the period ( 2012 - 2023 ) on the creation of the low cost , yet extremely elegant school campuses, It will provide huge additional employment opportunities to millions of Indians . The total money multiplier effect on the economy will be in the range of 3 ( conservative ) to yield a total GDP Net delta addition of US $ 300 Billion from the construction of this project alone. The high quality Human Resourses that will be created by building schools designed around the teaching profession will be additional. Prepared By Ashish Puntambekar Project Designer , The Nataraja Foundation (00-91-9867612368) ashish.puntambekar@gmail.com Analyst Note : This model is provided for the information of Educationists, Indian Government Officials , Corporates , Financial Institutions and NGO's and must be seen in conjunction with the project / business spreadsheets prepared for both the stand alone day schools and residential schools as well as the optimised chain that comprimises the megaproject. The Project has been designed based on Information published by the Indian Planning Comission ( XIth Plan
  • 3.
    Analyst Note : Thismodel is provided for the information of Educationists, Indian Government Officials , Corporates , Financial Institutions and NGO's and must be seen in conjunction with the project / business spreadsheets prepared for both the stand alone day schools and residential schools as well as the optimised chain that comprimises the megaproject. The Project has been designed based on Information published by the Indian Planning Comission ( XIth Plan documents ) as well as other published material on the National Knowledge Commission / Ministry of HRD websites. Published papers by experts on the Indian Education System have also been studied and means to overcome the shortcomings pointed out by the experts have been incorporated in the project design. While these agencies have not been a party to the conception of this project plan, the author would like to thank his sources for making this plan possible through their data.
  • 4.
    Project Design Basis/ Education Philosophy The Nataraja Foundation www.nataraja.org.in " Let the watchword be acceptance and not exclusion " Sufi Saint Kabir Guru Nanak Dev A project of this size and scale will be a dead and soul-less agglomeration of buildings and computer networks without a sound philosophy which is timeless and yet extremely advanced and which seeks, as it were , to bind people of diverse faiths and lead them towards the realization of their potential as human beings . The following words of Vivekananda will therefore serve as a Pole Star for future Indian thinkers on education “ Let the watchword be acceptance and not exclusion. Not only toleration , for so called toleration is blasphemy. Toleration Mother Teresa means that I think you are wrong and I am just allowing you to live. Is it not blasphemy to think that you and I are allowing others to live ? I accept all Rabindranath Tagore & Gandhiji religions that were in the past and worship them all. I worship God with everyone of them, in whatever form they worship him”. Vivekanand Continues … “ I shall go to the mosque of the Mohammedan ; I shall enter the Christian’s church and kneel before the crucifix. I shall enter the Buddhist temple where I shall take refuge in Buddha and in his law. I shall go into the forest and sit down in meditation with the Hindu, who is trying to see the light which enlightens the Dr. APJ Abdul Kalam in Class heart of everyone. Not only shall I do all these things but I shall keep my heart open for all that may come in the future . Is Gods book finished ? Or is it still a continuous revelation going on. It is a marvelous book – these spiritual revelations of the world . The Bible , The Vedas , The Koran and all other sacred books are but so many pages and an infinite number of pages remain to be unfolded ”. Please Click Here To Access The Full Copy of the Project Design Basis / The Importance Project PhilosophyIn The Indian Tradition Of The Teacher Document Gurur Brahma, Gurur Vishnu, Gurur Devo Mahesh Varah. Guru Shakshat Para Brahma, Tasmai Shri Guruve Namah. The teacher is Lord Brahma as he generates knowledge within us. He is like Lord Vishnu as he sustains us and guides us on the right path. He is like Lord Mahesha (Shiva) as he destroys ignorance and thereby enlightens us. My Salutation to such a Guru, who is verily the Supreme God. Note : The Project Design Basis / Education Philosophy can also be downloaded from the following website : www.nataraja.org.in
  • 5.
    EDUCATION MEGAPROJECT -OVERALL CAPEX / OPEX SNAPSHOT OF PPP SCHEME Cash Requirements Summary Bootstrap 1 Bootstrap 2 US $ / Rs Exchange Rate ( 18th march ' 2010 ) 45.49 Phase I Phase II Phase III Item 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Teachers Training Institutes ( Lot @ Rs 8 Crores Capex & 250 250 Rs 4 Crores Opex for each per year ) Pilot Projects ( Schools in 28 States + 7 Union Territories) … Assumed that 100 35 35 Assumed that In Actual Project 85 % day schools and 15 % Residential Schools % of Pilot Cost Construction 60 % Cost is borne borne in the same in the 1st year and 40 % in the year second year Masons Training Institutes ( Lot & Rs 5 Crore Capex and Rs 60 60 The Nataraja Foundation 2 Crore Opex for each / year ) www.nataraja.org.in Day Schools Nos Of 850 2125 2125 2550 2550 2550 3187 3187 3187 3187 Commissioning Sequence ( For Initiating Opex ) Institutions 850 2125 2125 2550 2550 2550 3187 3187 3187 3189 Cumulative commissioned 850 2975 5100 7650 10200 12750 15937 19124 22311 25500 Residential Schools 150 375 375 450 450 450 563 563 563 563 Commissioning Sequence ( For Initiating Opex ) 150 375 375 450 450 450 563 563 563 561 Cumulative commissioned 150 525 900 1350 1800 2250 2813 3376 3939 4500 Total Schools Construction Started Each Year 1000 2500 2500 3000 3000 3000 3750 3750 3750 3750 Commissioning Sequence ( For Initiating Opex ) 1000 2500 2500 3000 3000 3000 3750 3750 3750 3750 Cumulative commissioned 1000 3500 6000 9000 12000 15000 18750 22500 26250 30000 Costs Of Teacher Sharing Programme Costs Of Teachers Guest houses ( A total of 4,20,000 14000 35000 35000 42000 42000 42000 52500 52500 52500 52500 Guesthouses will be built under the teacher sharing programme ) Fuel Costs Of teacher sharing programme : Rs 11.56 115.6 404.6 693.6 1040.4 1387.2 1734 2167.5 2601 3034.5 3468 3468 Lakhs / School / Year to cover 14 assisted schools 0.12 Opex To Be added IT System for Existing Schools … ( % Complete ) 20% 40% 40% Capex & Opex to be be added depending on system Total Cost Of System with alerts @ Rs 500 Crores : 500 100 200 200 needs and the extent to which the teacher sharing programme is implemented. Taken as US $ 5 Billion IT System for Megaproject Schools … ( % Complete ) over 10 years ( IT Infra ) ( Launching of 12 Satellites + Using 4,00,000 Km of Existing 0 0 0 758 1895 1895 2275 2275 2275 2843 2843 2843 2843 0 Fibre Optic Across 30,000 Hub School and 420,000 Assisted Costs of Schools Via VSATS ) Essential Items in Crores % Completion 30% 70% 100% Forming and Staffing Of the ISIC with Average Salary @ Rs 450 135 315 450 450 450 450 450 450 450 450 450 450 450 450 20 Lakh / Year = Rs 450 Crores ( Fully Staffed as below ) ( 50 Senior Educationists , 300 Finance Professionals, 1200 Project Engineers, 300 IT Professionals, 100 Lawyers, 300 Architects ) Opex Cost of Teacher Training Institutes 1000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 Opex Costs of Masons Training Institutes 120 240 240 240 240 240 240 240 240 240 240 240 240 240 Development Of Vernacular Languages + Urdu+ Hindi + Sanskrit 933 2333 2333 2800 2800 2800 3500 3500 3500 3500 Capital Expenditure Rs.( Thousands Of Crores ) 3.00 13.319 32.371 45.273 54.405 57.813 59.153 66.824 71.938 73.949 73.949 35.610 10.051 ( US $ Billion ) 0.66 2.93 7.12 9.95 11.96 12.71 13.00 14.69 15.81 16.26 16.26 7.83 2.21 Total Capital Expenditure ( Rs Crores ) 597651 Total Capital Expenditure ( US $ Billion ) 131.38 Operational Expenditure ( Rs. Crores ) 1476.84 2998.68 3133.68 9565.31 25551.05 41396.80 60458.36 79473.25 98488.14 122327.60 146097.05 169866.51 193632.60 193632.60 ( US $ Billion ) 0.32 0.66 0.69 2.10 5.62 9.10 13.29 17.47 21.65 26.89 32.12 37.34 42.57 42.57 Sanskrit is possibly the worlds oldest language and it is dying in India. The Education Megaproject therefore allocates Rs 8000 Crores over 10 years to the promotion of Sanskrit in schools and for the digitizing of Sanskrit content as Sanskrit serves as the basis for several Indian and even international languages. This will reverse the huge neglect it has suffered neglect over the last 100 years . All other Indian Languages ( Tamil, Bengali, Marathi, Telugu, Gujarati, Kannada etc. ) including most importantly Urdu and Hindi together will receive an additional Rs 20,000 Crores over 10 years under the Megaproject for the development of digital content and opening of Institutions for scholars. Total Rs 28,000 Crores. Encouragement of local languages will allow the poorest citizen to participate fully in the economy. We want every farmer and labourer to have an equal opportunity and language should not be allowed to be a barrier due to lack of Funds. The Education Megaproject has a special large budget for Vernacular Language propogation.
  • 6.
    2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 3468 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 240 240 240 240 240 240 240 240 240 240 240 240 240 240 240 240 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 193632.60 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57 42.57
  • 7.
    TERM SHEET Assumptions OnFinancing / Sources Of Funds : The Nataraja Foundation US $ / Rs Exchange Rate ( 18th march 2010 ) 45.49 www.nataraja.org.in Sl. No. Source Description Estimate of Total Notional Amount % Of Source Amount Available Cash Available Each Possible Corpus Potentially Available / Proposed For Each Year Year ( ( US $ Billion ) Year ( Education ( US $ Million ) Thousands of Crores ) US $ Billion ) Megaproject YEARLY FUND FLOWS / Annuities 1 Net Present Value Of Inceremental GDP 500 20 10% 2000 9098 Increase after GST implementation starting 1st April ' 2010 ( Delta Over Current ) . The Total Corpus in the next column is assumed and calculated over a 25 year period with a discount rate at 3 %. This cash flow will triple by 2025 when the size of the Indian economy is expected to be US $ 4.5 Trillion. 2 30 % of a proposed new tax on the services 510 5.1 30% 1530 6959.97 component in future Infrastructure projects. The base case estimate of the delta / net additional Infrastructure investment in India over the next 10 years is taken at US $ 1.7 Trillion ( Goldman sachs View ). This cash stream will triple by 2025 when the size of the Indian economy is expected to be US $ 4.5 Trillion. 3 Graduate Tax Collected From Employers In 10.11 2.53 80% 2022.42 9200 India. It is assumed here that there are 46 Million Graduates in India ( 2004 Estimate ). This number today is larger. This cash stream will double by 2025 when the size of the Indian economy is expected to be US $ 4.5 Trillion. Assumptions On Financing / Sources Of Funds :
  • 8.
    US $ /Rs Exchange Rate ( 18th march 2010 ) 45.49 Sl. No. Source Description Estimate of Total Notional Amount % Of Source Amount Available Amount Available Each Possible Corpus Potentially Available / Proposed For Each Year Year ( ( US $ Billion ) Year ( Education ( US $ Million ) Thousands of Crores ) US $ Billion ) Megaproject 4 Quantized Tobin Tax on Forex Transactions. It 1.1 1.1 100% 1095 4981.16 has been assumed that the volume of daily average forex transactions in India and by companies doing business in India is of the order of US $ 15 Billion. A Tobin Tax ( First proposed by Nobel laureate James Tobin ) to be levied at the rate of 0.02 % on the total volume of the transaction which will be quantized as per the size of the transaction with higher rates applying to larger transactions to prevent speculation on the Indian Rupee as it moves towards Capital Account Convertability ). This cash stream will triple by 2025 when the size of the Indian economy is expected to be US $ 4.5 Trillion. 5 Yearly Rent From Re-developed PSU Land by 3.00 3.00 100% 3000 13647 the Indian Social Infrastructure Corporation ( ISIC ) Under The Urban Equity Withdrawl Programme ( Phase I ) . 6 Yearly Rent From Redeveloped PSU Land by 10.00 10.00 100% 10000 45490 the Indian Social Infrastructure Corporation ( ISIC ) Under The Urban Equity Withdrawl Programme ( Phase II ) .
  • 9.
    Assumptions On Financing/ Sources Of Funds : US $ / Rs Exchange Rate ( 18th march 2010 ) 45.49 Sl. No. Source Description Estimate of Total Notional Amount % Of Source Amount Available Amount Available Each Possible Corpus Potentially Available / Proposed For Each Year Year ( ( US $ Billion ) Year ( Education ( US $ Million ) Thousands of Crores ) US $ Billion ) Megaproject 7 Teacher / Content Outsourcing Business : The 21.04 10.52 40% 4207.52 19140 Education Megaproject will be employing approximately 1.74 Million Teachers across India on 5 year Rolling Contracts. It is proposed that the terms of the contracts be flexible enough to permit teachers to organize themselves into teams which could then, in an organized manner , produce education content for the world market. The revenue earned through this venture will be shared by teachers and the ISIC in the ratio 60:40 with the larger sum going to the participating teachers. They will also participate under the Aegis of the ISIC in a Teacher Exchange Programme with schools in foreign countries. For the purposes of this calculation the total teacher strength is assumed as 1.5 Million. It is further assumed that just 50 % of the teachers will participate in this venture and that each teacher's extra earning potential is Rs 5,50,000 each year. 8 Students on Fractional Vouchers / NRI Quota 5.10 5.10 100% 5103.80 23217.18 and SAARC / Foreign Students : A majority of the students within the Megaproject will be on Education Vouchers ( 60 - 70 % ). However some 37 % + of the students from middle class families and well off families will be on fractional vouchers with 2 / 3rd subsidy and an additional 2 - 3 % could be from SAARC countries or NRI / Foreign Students who will pay a premium ( Double The Voucher value ). ONE TIME FUND FLOWS - DIRECT FINANCE FOR CONSTRUCTION 9 Coordinated Equity Withdrawl By the ISIC on 40 40 100 40000 181960.00 PSU Owned Land in Metros and Large Cities 10 Un-Utilized Funds with various Ministries and 21.59 21.59 100 21590 98212.91 NGO's 11 Equity Infusion By Promoter groups for 25,500 6.74 6.74 100 6741.48 30666.98 Day Schools and 4500 Residential Schools 12 Committed and Un-Utilized Funds Lying with the 15.6 15.6 100 15600 70964.40 World bank and the Asian Development Bank, on which the government of India is paying Commitment Charges of over Rs 125 Crores each year. Assumptions On Financing / Sources Of Funds : ` US $ / Rs Exchange Rate ( 18th march 2010 ) 45.49
  • 10.
    Sl. No. Source Description Estimate of Total Notional Amount % Of Source Amount Available Amount Available Each Possible Corpus Potentially Available / Proposed For Each Year Year ( ( US $ Billion ) Year ( Education ( US $ Million ) Thousands of Crores ) US $ Billion ) Megaproject OTHER POTENTIAL SOURCES OF FINANCE 13 In early March ' 2010 , India's Foreign Exchange 278 2.78 1% 2780 12646.22 Reserves stood at US $ 278 Billion. This is a huge sum and it has earlier been suggested by several others that a small part of the RBI's reserves should be used to finance Infrastructure projects in India. Schools represent essential social Infrastructure and the Education megaproject could draw on some of this resource. 14 Dis-investment in Indian Public Sector Entities 30 3 10% 3000 13647.00 and Banks. This represents a huge potential scorce of funds . However successive governments have been using dis-investment proceeds to help bridge the huge fiscal deficits that the government of India runs. In fact this money is best used to finance productive capital expenditure as in education projects that greatly enhance the country's GDP. If US $ 1.7 Trillion is to be invested in Infrastructure over the next 10 years, the first sector that will expand exponentially is banking. Government of India will do well to dis- invest it's stake in a few large banks to raise additional resources while at the same time allowing a greater private sector role in the banking industry , with strict controls in place of course.
  • 11.
    Pg 1 0f4 Remarks / Critical Assumptions If net / delta addition to GDP is US $ 20 Billion each year solely due to GST implementation, then government can afford to earmark 10 % of that Delta to an Education Mega Project from the Consolidated Fund Of India through a special legislation that creates " The Education Megaproject Fund ". It is being assumed here that the NCAER has taken a 25 year period for calculating the Net Present value at a 3 % discount rate. If they have taken a 15 year period instead , then the yearly sums that will be available will be much larger. A new tax proposal on the lines of the recently implemented tax on the services component of housing projects ( 2010 Budget ) will need to be implemented to extend service tax to the labour and services component of Infrastructure projects. This will very easily generate a new cash source for creating the human resources necessary to plan and build large Infrastructure in India. Right now there is a shortage of 30 million trained people in the construction Industry alone ( Mckinsey 2008 ). So the imposition of a service tax on the labour / skill component of Infrastructure projects is fully justified . It is being assumed here that 30 % of an Infrastructure Projects cost is services and Labour. It is also being assumed that servoce tax on the Labour and services component will be @ 10 %. Employers are being taxed because they are getting access to qualified graduates free of cost and have not paid a single paise for their education. This tax will be levied at the rate of 3 % on the Cost to Company ( CTC ) of the employee and will be paid not by the employee but the employer. Please note that the current education cess and professional taxes are separate taxes and are being borne by the employee. Companies must also pay a tax because they are getting trained manpower free of cost. We believe that companies will not be able to pass this tax on to employees as companies will also be competing with each others in a rapidly growing economy where skills shortages are acute. Also it has been realistically assumed that only 25 % of this tax is collectable from graduates as many work in the un-organized sector. Many housewifes are graduates too . If independent professionals such as doctors can be taxed, the collection will go up dramatically. Also it is assumed that 80 % of this tax will go for primary education as a person spends 80 % of his time in school.
  • 12.
    Pg 2 Of4 Remarks / Critical Assumptions Given that India is going to be the largest growing market in the world over the next few years we do not expect business to move away from India due to the imporition of this tax. The Imposition of this tax has been considered in the latest meeting of the G 20 nations in 2009 and It has also been supported for implementation by none other than our own RBI governor Dr. D SubbaRao in Dec ' 2009. Since 90 % of the worlds forex transactions are cleared in just a few financial centres globally , it will not be difficult to impose this tax which can provide much needed funds to Education and Healthcare projects in Rural India. Subsequent to the sale of 3000 Acres out of a total of 30,000 Acres of prime real estate in Indian Cities, The ISIC will publish a Global Tender Inviting leading Urban Developers from around the world to come to India to develop Large Real Estate Projects. 27,000 Acres of Urban, Government owned land will be put out on bids under a Public Private Partnership. Indian companies will participate in the bidding rounds and will compete with foreign companies. The bids will require project developers to pay an upfront annuity / yearly instalment of US $ 3 Billion for the 27,000 acres taken together over the first 10 years and submit plans for the development of Financial centres where the ISIC will be the owner of 50 % in each project. Developers will need to come up with ideas whereby the net earnings to the ISIC will be of the order of US $ 10 Billion each year from the 27,000 Acres of prime real estate starting from the 7th year after the Bidding. This effective Urban Equity Withdrawl plan will provide funds for rural development. Phase II cashflows will begin to accrue from year 7 onwards as the PPP projects in Urban Development begin yielding a return of US $ 10 Billion to the ISIC as explained under V above.
  • 13.
    Pg 3 Of4 Remarks / Critical Assumptions It is being assumed that revenues from the Teaching Content Development Business and the Overseas Teacher Exchange Programme will be shared by Teachers / ISIC in the ratio 60 :40, with 60 % of the revenues going to the teachers. We have therefore included only the balance 40 % of revenues as ISIC Income. Further , we do not believe that this activity will disturb teaching activity in the country as teachers have considerable amounts of free time and because the schools have been overstaffed by design not just for sharing teachers with 420,000 existing and deprived schools but also with this kind of revenue opportunity clearly in mind. Fees for Children will be quite affordable to parents as they well be charged at 1/ 3rd of the value of the voucher. In the case of Day schools fees will be in the range of Rs 25000 / child and in the case of fully residential schools, fees will be in the range of Rs 65,000 - Rs 75,000 which we believe are very affordable for the Middle Class and above. The procedure for this is explained in great detail in the project concept document under construction phase financing. This financing option has emerged through a study of the Comptroller & Auditor General's report ( CAG Report ) for 2007 - 08. A special audit committee will be constituted to trace and recover this money for the Education Megaproject. This money will come from the Promoters of 30,000 Schools over a 10 year period ( 2012 - 2022 ) This financing option has emerged through a study of the Comptroller & Auditor General's report ( CAG Report ) for 2007 - 08. Usually World Bank / ADB Loans are available for specific projects and cannot usually be re-assigned , We believe it will be possible to lift the entire corpus for this single Education Megaproject as the project subsumes within itself areas as diverse as Women and Child health and education to rural sanitation and rural roads etc. Pg 4 Of 4
  • 14.
    Remarks / CriticalAssumptions The Education Megaproject has not included Foreign Exchange Reserves in its sources in the current Rev 03 of the project. This represents a potential future source of finance. The Education Megaproject has not included Dis-investment proceeds in its sources in the current Rev 03 of the project. This therefore represents a potential future source of finance.
  • 15.
    The Indian Primary& Secondary Education Mega Project The Nataraja Foundation Project Legal & Financial Structure www.nataraja.org.in Government Of India Ministry Of HRD Ministry Of Finance CONSTRUCTION PHASE ( 2012 – 2023 ) Parliament Ministry Of Disinvestment ( FUTURE SOURCE ) Consolidated Fund Of India Size Of The Indian Economy US $ 1.3 Trillion ( 2010 ) Exchange Rate ( 18th Mar ‘ 2010 ) : Financing Concept is similar to the 1 US $ = Rs 45.49 Golden Quadrangle / Highways Financing. 8 different sources of funds are routed to a special " Education Megaproject Fund " … A special Act of Parliament will enable this. INDIA BASED SOURCES OF FUNDS 1. Yearly Fund Flows Sovereign 10 % of New Goods & Services Tax ( GST ) US $ 2.0 Billion / Year Guarantee Receivables = US $ 2.0 Billion / Year US $ 6.64 Billion / Year US $ 6.64 Billion / Year INDIAN & INTERNATIONAL 30 % of Proposed New Tax on Service BANKS US $ 1.53 Billion / Year Component of Infrastructure Projects = US $ 1.53 Billion / Year Collected From Employers of Graduates US $ 2.02 Billion / Year Securitize 10 year annual Graduate Tax = US $ 2.02 Billion / Year Receivables at 6 % and Draw US $ 49 Billion Quantized Tobin Tax on US $ 1.09 Billion / Year Forex Transactions = US $ 1 .09 Billion/Year 2. One Time Fund Flows US $ 3 Billion Education Megaproject PSU Owned Metro / Large City Real Estate US $ 49 Billion For Capex Fund Act Equity Withdrawl = US $ 40 Billion Education Megaproject Fund Unutilized Funds ( US $ 21.59 Billion ) With Various Govt. Ministries and NGO’s US $ 67.15 Billion for Capex as per GAG Report 2007 -08 + US $ 3 Billion Annual Rent US $ 67.15 Billion Special Act Of Parliament to give Legal status to SPV and enable Sale Of Navratnas, PSU's , Banks = US $ 0.00 Future standby source Fast Track Execution based on US $ 0.00 Billion US $ 15.6 Billion Initial Sovereign Guarantees US $ 5.56 Billion For Capex 30,000 Private School Operators ( Equity Infusion ) Indian Social Infrastructure ( ISIC Act ) Corporation ( ISIC ) US $ 15.6 Billion Sovereign Guarantee Low cost Loans for Capex to Of Committed But For School Capex Loans School Concessionaires. This Un-Utilized is in addition to the US $ 15.6 Funds Billion that is paid as a bullet payment to the ISIC World ADB Bank Capacity To Raise / Spend US $ 134.75 Billion OR Rs 612,977 Crores Project Construction Cost = 131.38 Billion ( 30,000 Hub Schools + Infrastructure for Teachers Sharing Programme ) Financial plan therefore raises sufficient funds for construction
  • 20.
    The Indian Primary& Secondary Education Mega Project Project Legal & Financial Structure The Nataraja Foundation www.nataraja.org.in Government Of India Ministry Of HRD Ministry Of Finance BOT OPERATIONS PHASE Parliament Ministry Of Disinvestment ( FUTURE SOURCE ) Consolidated Fund Of India Size Of The Indian Economy US $ 4.5 Trillion ( 2025 ) Exchange Rate ( 18th Mar ‘ 2010 ) : 1 US $ = Rs 45.49 Key Point to note is the size of the INDIA BASED SOURCES OF FUNDS Indian Economy in 2025 1. Yearly Fund Flows 10 % of New General Service Tax Based US $ 6.0 Billion / Year Students on Fractional GST Receivables = US $ 6.00 Billion / Year Vouchers US $ 4.88 Billion / Year and NRI / SAARC Quota US $ 17.86 Billion / 30 % of Proposed New Tax on Service US $ 4.59 Billion / Year Component of Infrastructure Projects Year = US $ 4.59 Billion / Year Teacher Outsourcing Business US $ 4.207 Billion / Graduate Tax = US $ 4.0 Billion / Year US $ 4.0 Billion / Year Collected From Employers of Graduates Year US $ 3.55 Billion Securitization Quantized Tobin Tax on Forex Transactions = US $ 3.27 Billion / Year Facility Pending Grant / Year US $ 3.27 Billion / Year US $ 10 Billion Yearly Rent From High FSI Re-Developed PSU Properties all over India = US $ 10 Billion Education Megaproject US $ 17.86 Billion For Fund Act Opex US $ 4.5 Billion US $ 12.64 Billion Service Tax Feedback For Opex Special Act Of Parliament to give Service Tax US $ 10.0 Billion Annual Rent Received Legal status to SPV and enable From Developer Partnerships Fast Track Execution based on @ 10 % Initial Sovereign Guarantees Education Megaproject Fund Capacity To Raise & Spend US $ 45 Billion / Year Indian Social Infrastructure ( ISIC Act ) Corporation ( ISIC ) US $ 45 Billion Revenue For Created Ecosystem Spend US $ 45 Billion On Primary & Secondary School Operations / year + PHASE II Expansion ( if Any ) through securitization of specific cashflows 18 Million Students On Education Vouchers 30,000 Private School Operators TEACH ( Including 108 Million Students Under Teacher Sharing Programme ) = 126 Million Children Service Providers Ecosystem
  • 23.
    INSTITUTIONAL STRUCTURES ,LAND BANKS AND URBAN EQUITY WITHDRAWL & MISC ISSUES The Indian Primary & Secondary Education Mega Project Government Of India The Nataraja Foundation Ministry Of Finance www.nataraja.org.in Ministry Of HRD Ministry Of Disinvestment ( FUTURE SOURCE ) Parliament ISIC Act 25 % Equity 75 % Equity Central "The Indian Social Infrastructure Corporation " 28 State Government sets up Governments 30,000 Acres The Primary & Secondary Education Megaproject SPV 900,000 Acres Of Land For Setting Up Schools Of Land all Over This 9,30,000 Acres , can be visualized approximately as a strip of Land 62 India Km by 60 Km. It is not much land for India taken as a whole. Out of this, with Land Bank of 9,30,000 Acres all over India 30,000 Acres can be easily spared / collected by the central government from PSU's and government organizations in Metros and B category Towns . The balance 9,00,000 Acres will be in Villages and towns in 28 States and 7 Union Territories all over India and will be given out on bids for setting up Schools and Hospitals. Land For Equity Deal Service Partners PPP Contracts The Indian Comptroller & Auditor General Commercial Land Bank : 30,000 Acres to be held in Land Bank . Upto 24 % of Cherry Picked land to be sold to Finance 40 % Primary & Secondary Education Of India to Monitor All ISIC Cashflows + All Capex of Primary & Secondary Education Project / Healthcare Megaproject . Balance 76 % land to Mega Project Sales & Lease Rentals Of ISIC Related Land be given on rent in towns and cities to large city developers so as to earn Cash to meet project ( Executive Board ) Under This Project. Operating Cash Requirements so as to subsidize Education and Healthcare provision to Low Income Groups. Note on PSU Land Based Urban Equity Withdrawl : 10 % of 30,000 Acres Cherry Picked If just 10 % of the land transferred in Metros and Large Towns to the ISIC from PSU's is Prime Real Estate in Big Issue Of initial capital (2015 - 2016). prime real estate it will be approximately 3,000 Acres ( all over India as the SPV in all will Cities and Important Towns to be sold to finance 40 % Stock : India Domestic & International Offering have 9,30,000 acres, of which 30,000 acres will be held in the Land Bank while 900,000 will of Project Capex. All such go for the school project & Healthcare project). This 10 % land will be worth approximately sales will be under a Of 500 Million Equity Shares or Rs 100 each 180,000 crores ( Approximate land cost in a Metro per acre has been taken as Rs 60 Crores Transperant bidding For a premium of @ Rs 400 Per Share to raise while actual prices range from Rs 400 Crores / Acre in Mumbai to Rs 2 Crores / Acre in a process and SPV land sold US $ 5.28 Billion as Equity will have an FSI ranging small town ). from 4 - 16 for creation of Financial Centers in Bonds : International Bond Offering Sufficient The land bank will make the SPV one of the highest net worth companies on the Indian Stock major Towns. Thereby For 3 Years of Project Construction : Exchanges. It will then be possible for the SPV to raise its own resources by selling land maximizing development of scarce land as also available Targeted Debt / Equity Ratio = 3 : 1 ( Through a competitive and transperant bidding process ) to developers or by issuing long funding for the project. term tax free bonds on par with RBI bonds. Central and state governments will take land from Bond Amount = US $ 15.85 Billion PSU 's and state government undertakings which are not utilizing the land optimally and Coupon rate = transfer it to the ISIC which is working towards a National Mission. The Chief Secrateries of Duration = 5 Years the 28 states will be on the board of the ISIC so each states interests will be fully protected. Addressing PSU Concerns To fully accomodate the commercial concerns of PSU and their government and private shareholders, they will get an enhanced FSI ( either on the same plot or on their other Balance 90 % land to be The US $ 15.85 Billion Bond issue will help finance any properties that are not being given away ) . For instance if a PSU is giving away prime real given on rent by ISIC to large developers from around the world ( including Indian shortfall in Capital Requirements. estate in Mumbai city which currently has an FSI of 2.66 , they will get an FSI of 3.50 in developers ) to another property in the same locality ( if they own two properties close to each other and are Provide Operating Cash giving away only one property) or an FSI of 5.0 in a less valuable location, in a manner that Project Land to Finance Education, Food and Clothing their commercial interest is protected. They could also be issued TDR's ( Transfer of 900,000 Acres in all to be and Hostel Facilities for needy students from allocated for Social Low Income Families ( This will however be Development Rights ) which they could trade on the market or they could receive cash for the just once source for OPEX ). Money to be Infrastructure Projects in enhanced FSI that accrues on the actual sale of their plots. So , If the Plot has been granted Education & Healthcare given directly by ISIC to the school operators an additional FSI of 8 , Cash equivalent of 5.5 FSI will go to the Social Infrastructure without any involvement of local government. Megaprojects and a cash equivalent of 2.5 FSI will be paid in cash or issued as TDR's to the All such payments and their use to be monitored by Comptoller & Auditor General PSU after the sale of land through a transperant bidding process to Indian or International Of India. consortia , thereby avoiding any litigation from shareholders. It must be understood however that increased FSI requires increased Infrastructure support in terms of city amenities and better municipal infrastructure. This needs to be incorporated into the city's development plan. The land transfers and sales however can proceed immediately and need not wait for the city development plans to be changed. Execute US $ 131.38 Billion Primary & Secondary Education Mega Project between 2012 - 2023 Bootstrap I Bootstrap II Phase I Phase II Phase III Q1 - Q4 2011 Q1 - Q4 2012 2012-2014 2015-2017 2018-2023 School Megaproject Enabling School Megaproject Enabling Total Schools 6000 Total Schools 9000 Total Schools 15000 Infrastructure Infrastructure Teachers Teachers Training Training Day Schools 5100 Day Schools 7650 Day Schools 12750 100 100 Schools Schools Residential 900 Residential 1350 Residential 2250 Master Masons * 30 Master Masons* 30 Schools Schools Schools Training Schools Training Schools * Master Masons to be trained in the * Master Masons to be trained in the Vernarcular Architecture Style Vernarcular Architecture Style Once trained , Master Masons and Teachers could organize themselves into Guilds ( Not Cooperatives ). The Masons Guilds could bid for contracts to build the schools / hospitals. Note on SPV Executive / Regulatory Powers : The BOO / BOT concession for the Primary & Secondary Schools will be given with all necessary clearences and professional affiliations in a single window. If a promoter group / concession awardee fails to meet certain transparant criteria ( specified in a 1 page rule book ), the concession will be terminated and offered to a new developer ... there will be no appeal to any court and the 1 page rulebook will be very clear on concession termination issues. Same structural vehicle / arrangement can be used to finance higher education. Governance : Project & Operations Phase There are huge cashflows involved in both the project execution and operations phases of the Indian Primary & Secondary Education Megaproject . The execution phase will involve the raising and expenditure of approximately US $ 131.38 Billion or Rs 597,651 crores between 2011 and 2023 and the operations phase will involve project revenues and rent allocations ( which will help approx. 126 million children to receive quality education free of cost ) of approximately US $ 42.57 Billion each year after 2023. The scale of cashflows needs to be monitored in a transparent manner and the Megaproject needs to be open to public audit. It is therefore an explicit requirement of the project that it be executed in a
  • 24.
    Governance : Project& Operations Phase There are huge cashflows involved in both the project execution and operations phases of the Indian Primary & Secondary Education Megaproject . The execution phase will involve the raising and expenditure of approximately US $ 131.38 Billion or Rs 597,651 crores between 2011 and 2023 and the operations phase will involve project revenues and rent allocations ( which will help approx. 126 million children to receive quality education free of cost ) of approximately US $ 42.57 Billion each year after 2023. The scale of cashflows needs to be monitored in a transparent manner and the Megaproject needs to be open to public audit. It is therefore an explicit requirement of the project that it be executed in a corporate setup, outside the concerned ministries , under government of India and to implement a context based communications platform for project MIS. In fact , it is better not to execute this project , than to do it within a ministry or the existing education systems where information in-efficiencies and leakage of funds will undermine the very basis of the projects and lead to huge cost and time over-runs. The project needs therefore to be executed and operated in a corporate setup , under a Special Project Vehicle ( SPV ) set up under an act of Parliament ( The ISIC ) in the same manner as organizations such as IOC, ONGC, NHAI , IIFC and UTI were set up. The chief secretary’s of all states , The Chairman of the National Knowledge Commission, The Secretary , Ministry of HRD, the Deputy Chairman of the Planning Commission, The Minister of HRD will be members of the board. The responsibility for audit of the organization will vest with the Auditor General of India. The Masons guilds are a very important part of this project as they will generate huge employment opportunities in rural india. As envisaged however , the guilds will essentially be self governing and market forces. will decide their profitability. Government or local political control on these cooperatives will kill these guilds and therefore it is essential to protect their interests only through broad , non- interfering regulation. The guilds must therefore never be turned into cooperatives which breed corruption and in-efficiency.
  • 28.
    Stand Alone (Day School ) Facility With 300 Children X 2 Shifts, Full Time 51 www.nataraja.org.in Teachers + 7 Visiting Faculty Zero Drop out rate is being assumed IMPORTANT NOTE ON OPERATING FINANCIALS OF THE SCHOOLS: Floor Space Required ( Class due to superior teaching inputs … Room + Hostel ) in Sq Ft @ Fractional Vouchers in Day schools Project will rely less on pull factors such will provide 2/3 subsidy. Rs 850 / Sq Ft … This includes This project works because the Education SPV provides for the total costs of education for 18 as Mid Day Meal Schemethe Hub Schools) . Theconstruction & Furniture Million Children ( In & More on Vouchers also include the cost of the teacher sharing programme which reaches another For ease of calculations students 108 Million Children who are attopresent covered byrequired Better and Inspiring Teachers keep students in school. the Sarva Shiksha Abhiyan ( SSA ). A total of 126 Million Children are are added in on fractional vouchers therefore covered with the best teaching resources possible. the end. This spreadsheet Looks exclusively at the financial viability of the schools from the point of view of private developers / Consortia who will be investing just Rs 0.88 Crore equity each and raising the balance of their 60 % share as Interest free debt during the construction period from the World Bank / Asian Development Bank . Here again Government of India will back this debt with a revolving $ 10 Billion sovereign loan guarantee and take on the cost of the debt during the construction period. After the construction is complete, the World Bank / Asian Development Bank will be replaced in the financial structure by a commercial bank and the debt will carry a normal market rate of interest . The project developer will pay back this loan and any interest that will be due. The ISIC raises all the money required through unique and innovative financing. Please read the project concept document for more details on financing
  • 29.
    Stand Alone ResidentialFacility With 600 Children ( Residents )+ 200 Children as Day Scholars www.nataraja.org.in , 51 Full Time Teachers + 7 Visiting Faculty Zero Drop out rate is being assumed IMPORTANT NOTE ON OPERATING FINANCIALS OF THE SCHOOLS: due to superior teaching inputs … Floor Space Required ( Class System has sufficient inbuilt Project will rely less on pull factors such Room + Hostel ) in Sq Ft @ This project works because the Education capacity for de-bottlenecking. SPV provides for the total costs of educationfor Mid Day MealChildren&(More on Hub Schools) . Rs 850 / Sq Ft Furniture as 18 Million Scheme In the The construction & … This includes Vouchers also include the cost of the teacher sharing programme which reaches another 108 Million Children who to keep present covered by Better and Inspiring Teachers are at required students in school. the Sarva Shiksha Abhiyan ( SSA ). A total of 126 Million Children are therefore covered with the best teaching resources possible. This spreadsheet Looks exclusively at the financial viability of the schools from the point of view of private developers / Consortia who will be investing just Rs 1.75 Crore equity each and raising the balance of their 60 % share as Interest free debt during the construction period from the World Bank / Asian Development Bank . Here again Government of India will back this debt with a revolving $ 10 Billion sovereign loan guarantee and take on the cost of the debt during the construction period. After the construction is complete, the World Bank / Asian Development Bank will be replaced in the financial structure by a commercial bank and the debt will carry a normal market rate of interest . The project developer will pay back this loan and any interest that will be due. The ISIC raises all the money required through unique and innovative financing. Please read the project concept document for more details on financing
  • 30.
    The Nataraja Foundation www.nataraja.org.in Economics Of The Teacher Sharing Programme : It is felt that teachers ( many of them women ) will need a place to rest and refresh themselves during their work in the villages. A guesthouse has therefore been created in the area close to each of the assisted schools. This will allow for further expansion of the programme. The guesthouses will also allow for overnight stay. Sample Teacher Guest houses 1. Teacher Guesthouses Cost : Rs 850 / Sq Ft A small teacher guesthouse will be constructed in the environs of each of the 14 assisted village school Teacher Guesthouse Costing : Cost Cost of 1200 Sq Ft guesthouse @ Rs 850 / Sq Ft 10.2 Land Development Cost @ 15 % of Guesthouse cost 1.53 Guesthouse Furnishing 2 Land Cost ( land given by government for free ) 0 Total Cost 13.73 Total Cost of 30000 X 14 Guesthouses ( 420,000 Guesthouses ) 57666 2. Vehicle / Fuel Costs For The Teacher Sharing Programme Type Of Vehicle Qty Of Distance Mileage Cost of Diesel Total Running Vehicle Travelled ( Rs / Litre ) Cost / Day / Day Large Buses 2 50 4 40 1000.00 Mini Vans 2 50 6 40 666.67 Jeeps 4 75 10 40 1200.00 Cars 4 75 12 40 1000.00 TOTAL COSTS Assumptions All assisted schools will be within a 50 Km radius of the hub school
  • 31.
    Each Small VehicleDoes 75 Km / Day on Average and Each Bus / Minibus travels 50 Km / Day Cost of Diesel @ Rs 40 / Litre. Global petroleum markets are volatile and marginal pricing economics constrain upw Mileage Assumptions Km / Litre Of Diesel Bus 4 Mini Bus 6 Jeep 10 Car 12 Notes : 1. Driver & helper costs are included in staff costs 2. Teacher costs are included in the school costs and therefore not priced here.
  • 32.
    Architect : RLKumar ( Bangalore ) during their work in the villages. A l allow for further expansion of the Teacher Guest houses s 850 / Sq Ft 14 assisted village school Lakhs Lakhs Lakhs Crores Total Running Maintenance Total Total Operating Cost / Year of 250 Cost / Year / Maintenance Cost of Fleet Per Days Vehicle Cost Year 250000.00 30000 60000 310000.00 166666.67 25000 50000 216666.67 300000.00 10000 40000 340000.00 250000.00 10000 40000 290000.00 966666.67 190000 1156666.67
  • 33.
    50 Km /Day al pricing economics constrain upward price view.
  • 34.
    Project is capableof financing the launch of upto 12 New EDUSAT Statellites beginning in 2013 and can also finance the replacement of these satellites every 7 years. The Nataraja Foundation www.nataraja.org.in Network Enabled E Learning Children exploring the $ 100 Computer Pres. Kalam inaugurates a Portal ISRO - GSLV Prepares to Launch EDUSAT A Village Trainer introducing childr Internet / Network Enabled Learning The Education Megaproject is divided into two phases ( Phases I & II ). PHASE II : The Contextual Commu PHASE I : Improving The Current System The Education Mwegaproject has cho Phase I of the project will be initiated immediately with the objective of on the performance that such a system improving the current MIS within the Sarva Shiksha Abhiyaan ( SSA ). very large and complex project such whole system seamlessly into its oper Phase I will have 3 objectives : During project planning and execution 1. Improve Fund Flow Predictibility & Velocity In the Operations phase ... system w Reduce the time it takes for funds to flow from the Ministry Of HRD in Delhi Children. to schools in rural india from 3 - 4 months currently ... to just 2 - 3 days. This will be achieved by implementing a new internet based information If the document below does not open For a detailed write-up on the contex architecture which will send out E mail messages and SMS's to school on clicking …pls go to the Abraham pointed out by the arrow : principals informing them about the quantum of funds that have been Lincoln's Letter Worksheet. The sanctioned for their schools and exactly what the grant can be spent on same file is stored there as well. ( Furniture, Toilets , Computers etc ). Today even school principals have no A description if the IT Infrastructure idea what the money they receive can be spent on ... this problem will now be resolved. INTERNET / NETWORK ENABLED L 2. Improve Transparency / Visibility within the system Please note that the plan below wi Phase I of the IT implementation will execute a context based regional school cluster. The Teach communications system which will dramatically improve the visibility of scale deployment of IT infrastructu people and officials within various ministries. One of the major strengths of the Ed Specifically it will do the following : large amount of financial resources 8 different sources of financing. 1. If someone is holding up decisions for more than 10 days the system will generate an E mail alert which will be sent to his / her Network enabled learning is one of the superiors and to the individual schools which are affected. All schools have adequate resources. and funds will be mapped to certain material codes / budget codes to enable this functionality. This will greatly improve accountability. The 30,000 schools set up under th constitute the largest E Learming ne 2. If for any reason money allocated for one purpose is used for another level backed by sophisticated fiber purpose, the system will send out an E mail alert to all concerned. Special Note : satellites specially launched for the pu One of the fundamental ideas behind this However , E Learning needs to be 3. Improve Real Time Response project is to use Communication technologies by competent teachers to conv and the internet to further develop Vernacular systems to millions of children who w Phase I of the project will also put in place new architecture which will Languages and local cultures of the different allow access to the latest information about each school. Today the states of India. There can be no substitute for a good information about schools ( On the SSA website ) is at least 2 years old. the children inculcate their values. T Let us use the power of the internet to enable a impression that the internet and c This particular part of phase I will extend into the actual Megaproject when massive exchange of ideas among the many purposes of this project therefore we the larger quantum of funds will become available. different cultures of India. enabled internet based learning as jus English is the language of International commerce but a majority of our people do not STAGE I : Jan 2013 - Dec 201 know English. There is a need therefore to use technology to empower the Tamilian farmer who A. Connection To Existing Telecom knows no other language but his mothertongue or the Mizo tribal or the Bengali artisan who has In India we already have close no use for english in his daily life. Why should fiber carrying capacity is virtually unlim the poor be put at a disadvantage just because amplification , telecom companies they do not know English ? their capacity at a concessional rat knowledge network that will operate So while English will have its place in commerce, the massive E - Learning infrastructure being set B. ISRO EDUSAT enabled VSAT Ter up by this project needs to be also used ,
  • 35.
    allow access tothe latest information about each school. Today the states of India. There can be no substitute for a good information about schools ( On the SSA website ) is at least 2 years old. the children inculcate their values. T Let us use the power of the internet to enable a impression that the internet and c This particular part of phase I will extend into the actual Megaproject when massive exchange of ideas among the many purposes of this project therefore we the larger quantum of funds will become available. different cultures of India. enabled internet based learning as jus English is the language of International commerce but a majority of our people do not STAGE I : Jan 2013 - Dec 201 know English. There is a need therefore to use technology to empower the Tamilian farmer who A. Connection To Existing Telecom knows no other language but his mothertongue or the Mizo tribal or the Bengali artisan who has In India we already have close no use for english in his daily life. Why should fiber carrying capacity is virtually unlim the poor be put at a disadvantage just because amplification , telecom companies they do not know English ? their capacity at a concessional rat knowledge network that will operate So while English will have its place in commerce, the massive E - Learning infrastructure being set B. ISRO EDUSAT enabled VSAT Ter up by this project needs to be also used , through appropriate policy measures to catalyze However, to reach remote locations o a large local language content industry with to provide Video, Voice and data se people from every region of India putting their financed by the project SPV and best works and their practical ideas in every thousand locations : field, in their own vernacular medium on the internet. 1. 384 Kbps VSAT Terminal : Rs 2 2. Projector + Screen : Rs 2 3. Switch / Router / cabling and 6 terminals : Rs 3 -------- Total Cost Per School Rs 7 -------- For 30,000 schools built over a period Normally a 384 Kbps of leased VSA approx Rs 7000 / Kbps / Year) ... so f Since the Capex is low and the Oper for the SPV to own its own satellites. Satellite Launches To Commence in With a view to minimizing the opera ISRO to launch the ISRO EDUSAT's launch a total of 6 EDUSATs before would have been commissioned. Cost of each EDUSAT , including la involve an expenditure of US $ 1.65 B A total of 21,000 schools will then ha 21,000 schools , the Project SPV wil rural schools,thereby bringing a total January 2016. Given the above, t 15,250 Crores. STAGE II : Feb 2016 - Dec 201 Stage II will involve the launch of then, we will have a more advanced have reached every school in the cou Telecommunication technologies are G and other broadband technologies of schools on the network. Actually th need for VSAT and Satellite deploym Screen ) is found to be a cheaper solu Note : The current plan is looking at just th the market and a futuristic plan can are more qualified to deal with this s EDUSAT for launch in 2014. Ideas to improve this E - Learning mo
  • 36.
    ect is capableof financing the ch of upto 12 New EDUSAT ellites beginning in 2013 and also finance the replacement of se satellites every 7 years. A Village Trainer introducing children to the Internet HASE II : The Contextual Communications Platform he Education Mwegaproject has chosen a contextual communications platform based n the performance that such a system is capable of delivering , first while executing a ery large and complex project such as the Megaproject and then while migrating the hole system seamlessly into its operations phase. uring project planning and execution ... system will deliver huge cost savings the Operations phase ... system will allow for network enabled learning for upto 126 Million hildren. or a detailed write-up on the contextual communications platform please click on the document ointed out by the arrow : description if the IT Infrastructure that is proposed to be set up now follows : NTERNET / NETWORK ENABLED LEARNING lease note that the plan below will need to be changed to accomodate the needs of each egional school cluster. The Teacher sharing programme may reduce the need for a large cale deployment of IT infrastructure if recorded content and Laptops are a cleaper option. ne of the major strengths of the Education Megaproject and it's financing mechanism is the rge amount of financial resources that it is capable of raising to fund its projects based on it's different sources of financing. etwork enabled learning is one of the key projects that will be financed for which the SPV will have adequate resources. he 30,000 schools set up under this project and the 420,000 additional assisted schools will onstitute the largest E Learming network globally at the primary and secondary school vel backed by sophisticated fiber optic networks and upto 12 EDUSAT communication atellites specially launched for the purposes of this project by ISRO. owever , E Learning needs to be used and understood for what it is - A tool to used y competent teachers to convey the right knowledge inputs and the right value ystems to millions of children who will be on the network. here can be no substitute for a good teacher at the primary and secondary school level where e children inculcate their values. This point is made specifically since people have a wrong mpression that the internet and computers will solve all our national problems. For the urposes of this project therefore we are looking at E - learning, VSAT broadband and 3 G nabled internet based learning as just a tool ... to enable learning. TAGE I : Jan 2013 - Dec 2015 . Connection To Existing Telecom & Fiber Optic Networks India we already have close to 400,000 Km of Fibre Optic Cables in the ground. Since ber carrying capacity is virtually unlimited , a fact made possible by multiplexing and optical amplification , telecom companies operating in India can be required to lease some of eir capacity at a concessional rate for the purposes of building the government backed nowledge network that will operate between high traffic nodes on the school network. . ISRO EDUSAT enabled VSAT Terminals
  • 37.
    here can beno substitute for a good teacher at the primary and secondary school level where e children inculcate their values. This point is made specifically since people have a wrong mpression that the internet and computers will solve all our national problems. For the urposes of this project therefore we are looking at E - learning, VSAT broadband and 3 G nabled internet based learning as just a tool ... to enable learning. TAGE I : Jan 2013 - Dec 2015 . Connection To Existing Telecom & Fiber Optic Networks India we already have close to 400,000 Km of Fibre Optic Cables in the ground. Since ber carrying capacity is virtually unlimited , a fact made possible by multiplexing and optical amplification , telecom companies operating in India can be required to lease some of eir capacity at a concessional rate for the purposes of building the government backed nowledge network that will operate between high traffic nodes on the school network. . ISRO EDUSAT enabled VSAT Terminals owever, to reach remote locations on the school network, 384 Kbps VSAT's can be deployed o provide Video, Voice and data services to children in remote schools. These VSATs will be nanced by the project SPV and the following configuration can be provided at several ousand locations : 1. 384 Kbps VSAT Terminal : Rs 2.0 Lacks 2. Projector + Screen : Rs 2.0 Lacks 3. Switch / Router / cabling and 6 terminals : Rs 3.0 Lacks -------------------- Total Cost Per School Rs 7.0 Lacks ------------------- or 30,000 schools built over a period of 10 years , the total cost will be Rs 2100 Crores. ormally a 384 Kbps of leased VSAT bandwidth would cost Rs 26.88 Lakhs / year ( Rate is pprox Rs 7000 / Kbps / Year) ... so for 30,000 schools the cost would be Rs 8064 Crores / year . ince the Capex is low and the Operating leased line costs are extremely high ... it makes sense r the SPV to own its own satellites. atellite Launches To Commence in Mid 2013 With a view to minimizing the operating costs of the Network,the SPV will enter into a JV with SRO to launch the ISRO EDUSAT's in batches of 2 each every year from 2013 itself ... to unch a total of 6 EDUSATs before January 2016 by which time almost 14000 New schools ould have been commissioned. ost of each EDUSAT , including launch cost is estimated at US $ 275 Million. So Phase 1 will volve an expenditure of US $ 1.65 Billion on the 6 satellites. total of 21,000 schools will then have access to the EDUSAT linkage. In addition to the 1,000 schools , the Project SPV will finance the installation of VSAT terminals at 80,000 more ural schools,thereby bringing a total of 1,00,000 schools within the EDUSAT's coverage by anuary 2016. Given the above, the total installed cost of Phase I will be approximately Rs 5,250 Crores. TAGE II : Feb 2016 - Dec 2018 tage II will involve the launch of another 6 EDUSAT satellites if necessary ( Hopefully by en, we will have a more advanced satellite from ISRO ) as fiber optic based systems may ave reached every school in the country by then. elecommunication technologies are continuously evolving and costs keep coming down . 3 and other broadband technologies can be therefore deployed to get an increasing number schools on the network. Actually the teacher sharing programme may considerably reduce the eed for VSAT and Satellite deployment if recorded content on laptops ( using a Projector & creen ) is found to be a cheaper solution. ote : he current plan is looking at just the execution of a project to deploy technologies currently in e market and a futuristic plan can be incorporated based on advice from technologists who re more qualified to deal with this subject. This project is already assuming a higher capacity DUSAT for launch in 2014. eas to improve this E - Learning module of the project are therefore very welcome.
  • 38.
    Project Bootstrapping &Support Required The Nataraja Foundation Architect : Laurie Baker ( Cost Ford ) , Kerala www.nataraja.org.in 27 th March ' 2010 Kindergarten , Auroville Pondicherry Architect : Auroville Architects The Primary & Secondary Education Megaproject needs some help from the Government of India to get off th The following support is required from the Govt. Of India : 1. To enable fast track execution of this project, Government needs to initiate a total of 70 pilot projec across 28 states and 7 Union Territories. Each pilot project will include : - A school for 600 students ( design capacity of 300 students and operating in 2 Shifts ) - A large rural teachers training facility to train 300 teachers each year - A Masons training facility to train 300 masons in Vernacular / Low cost / sustainable architecture Each of the 70 pilot projects will require between 150 – 200 acres of land for the above activities. 2. A Statutory Organization “The Indian Social Infrastructure Corporation “ will need to be created under act of Parliament. The legal status of this organization and It’s financial structure / means of financing a made available for free download on (www.nataraja.org.in) with the caption “Legal and Financial Structu 3. A statutory fund named “The Indian Education Megaproject Fund “ will need to be created under an Act Parliament. This fund will be on the lines of the “Central Road Fund “ , which has been created to build t Golden Quadrangle Project. Therefore the passage of “The Education Megaproject Fund Act “ is critical put this project into execution mode. 4. A new tax proposal on the lines of the recently implemented tax, on the services component of housi projects (2010 Budget) will need to be implemented to extend service tax to the labour and servic component of Infrastructure projects. This will very easily generate a new cash source for creating th human resources necessary to plan and build large Infrastructure projects in India. At present, there a shortage of 30 million trained people in the construction Industry alone. So the imposition of a serv tax on the labour / skill component of Infrastructure projects is fully justified. 5. An initial corpus needs to be set aside, to set up the 70 pilot projects including the model schoo teachers training institutes and Masons training institutes. All this initial money that the governme
  • 39.
    Golden Quadrangle Project.Therefore the passage of “The Education Megaproject Fund Act “ is critical put this project into execution mode. 4. A new tax proposal on the lines of the recently implemented tax, on the services component of housi projects (2010 Budget) will need to be implemented to extend service tax to the labour and servic component of Infrastructure projects. This will very easily generate a new cash source for creating th human resources necessary to plan and build large Infrastructure projects in India. At present, there a shortage of 30 million trained people in the construction Industry alone. So the imposition of a serv tax on the labour / skill component of Infrastructure projects is fully justified. 5. An initial corpus needs to be set aside, to set up the 70 pilot projects including the model schoo teachers training institutes and Masons training institutes. All this initial money that the governme spends upfront will be returned by the “ The Indian Social Infrastructure Corporation ” within 2 – years with interest calculated at 12 %. The rest of the project (balance 30,000 schools) will be bu without any further demands on conventional means of financing .
  • 40.
    t Required LaurieBaker ( Cost Ford ) , Kerala Deens Academy Whitefield, Bangalore Kumar Architect : RL Cost : Rs 690 / Sq Ft Architect : RL Kumar ernment of India to get off the ground. te a total of 70 pilot projects erating in 2 Shifts ) / sustainable architecture or the above activities. l need to be created under an cture / means of financing are “Legal and Financial Structure “.. to be created under an Act of h has been created to build the aproject Fund Act “ is critical to ervices component of housing tax to the labour and services w cash source for creating the ts in India. At present, there is . So the imposition of a service s including the model schools, al money that the government
  • 41.
    aproject Fund Act“ is critical to ervices component of housing tax to the labour and services w cash source for creating the ts in India. At present, there is . So the imposition of a service s including the model schools, al money that the government cture Corporation ” within 2 – 3 e 30,000 schools) will be built
  • 42.
    Abraham Lincolns letterto his son’s headmaster. Written sometime in the late 1850’s … early 1860’s Project Design Basis Document / Project Ph Respected Teacher, He will have to learn, I know, that all men are not just, all men are not true. But teach him also that for every scoundrel there is a hero; that for every selfish politician, there is a dedicated leader … Teach him for every enemy there is a friend it will take time , I know; but teach him if you can, that a dollar earned is of far more value than five found … teach him to learn to lose … and also to enjoy winning. Steer him away from envy, if you can, teach him the secret of quiet laughter. Let him learn early that the bullies are the easiest to lick … Teach him, if you can, the wonder of books … but also give him quiet time to ponder the eternal mystery of birds in the sky, bees in the sun, and the flowers on a green hillside. In the school teach him MEGAPROJECT INFORMATION if is far more honourable to fail than to cheat … Teach him to have faith in his own ideas, even if everyone tells him they are wrong … Teach him to be gentle with gentle people, and tough with the tough, Try to give my son the strength not to follow the crowd when everyone is getting on the band wagon …
  • 43.
    Teach him tohave faith in his own ideas, even if everyone tells him they are wrong … Teach him to be gentle with gentle people, and tough with the tough, Try to give my son the strength not to follow the crowd when everyone is getting on the band wagon … Teach him to listen to all men … but teach him also to filter all he hears on the screen of truth, and take only the good that comes through Teach him if you can how to laugh when he is sad … teach him there is no shame in tears, Teach him to scoff at cynics and to beware of too much sweetness … Teach him to sell his brawn and brains to the highest bidders but never to put a price-tag on his heart and soul. Teach him to close his ears to a howling mob and to stand and fight if he thinks he’s right. Treat him gently but do not cuddle him, because only the test of fire makes fine steel. Let him have the courage to be impatient … let him have the patience to be brave. Teach him always to have sublime faith in himself, because then he will have sublime faith in mankind. This is a big order, but see what you can do … he is such a fine fellow, my son ! … Abraham Lincoln “ With malice towards none … with justice for all … with firmness in the right "
  • 44.
    This is abig order, but see what you can do … he is such a fine fellow, my son ! … Abraham Lincoln “ With malice towards none … with justice for all … with firmness in the right "
  • 45.
    esign Basis Document/ Project Philosophy Megaproject Information Architecture MEGAPROJECT INFORMATION ARCHITECTURE
  • 48.
    Any Syllabus asprescribed and regulated by Central & State Government Statutory Authorities is OK
  • 49.
    ated by Central& State orities is OK
  • 50.
    Project Concept SubmittedTo : SL. No. Name 1 Dr. Montek Singh Ahluwalia 2 Ms.Anshu Vaish 3 Mr. Arun Ramanathan 4 Mr. Ashok Chawla 5 Mr. Govind Mohan 6 Dr. APJ Abdul Kalam National Knowledge Commission 7 Mr. Sam Pitroda 8 Dr. Ashok Ganguly 9 Dr. P. Balaram 10 Dr. Jayati Ghosh 11 Dr. Deepak Nayyar 12 Mr. Nandan Nilekani 13 Ms. Sujatha Ramdorai 14 Dr. Amitabh Mattoo 15 Mr. S Regunathan 16 Ms. Kumud Bansal 17 Ms. Kiran Datar 18 Mr. CNS Nair 19 Mr. Sunil Bahri 20 Mr Amlan Goswami 21 Ms Namita Dalmia 22 Ms Megha Pradhan 23 Ms Sukhman Randhawa 24 Mr Vikas Bagri 25 Ms Deepti Ayyanki 26 Ms Aashima Seth
  • 51.
    Designation & OfficialDetails Dy. Chairman Planning Commission, Govt. Of India Secretary,School Education & Literacy , Ministry Of HRD, Govt. Of India Finance Secretary, Ministry Of Finance, Govt. Of India Secretary, Economic Affairs, Ministry of Finance, Govt. Of India Jt. Sec, ( Infrastructure ) , Dept Of Economic Affairs, Govt. Of India Former President Of India Chairman, NKC Member, NKC Member, NKC Member, NKC Member, NKC Member, NKC Member, NKC Member, NKC Advisor, NKC Advisor, NKC Advisor, NKC Advisor, NKC Executive Director NKC Research Associate Research Associate Research Associate Research Associate Research Associate Research Associate Research Associate
  • 52.
    E Mail AddressUsed To Submit Project dch@nic.in secy.sel@nic.in secy-fs@nic.in secy-dea@nic.in govindmohan1@yahoo.com apj@abdulkalam.com s.pitroda@nic.in, anna.faron@c-sam.com a.ganguly@nic.in, ashok.ganguly@firstsource.com p.balaram@nic.in, pb@mbu.iisc.ernet.in j.ghosh@nic.in , jayatijnu@gmail.com d.nayyar@nic.in , deepaknayyar@mail.jnu.ac.in, nayyar.deepak@gmail.com n.nilekani@nic.in,nandan_mn@infosys.com s.ramdorai@nic.in, sujatha@math.tifr.res.in amitabh.mattoo@gmail.com s.regunathan@nic.in k.bansal@nic.in k.datar@nic.in E Mail Not available s.bahri@nic.in a.goswami@nic.in n.dalmia@nic.in m.pradhan@nic.in s.randhawa@nic.in v.bagri@nic.in d.ayyanki@nic.in a.chaney@nic.in