SlideShare a Scribd company logo
Faikcan ALTIPARMAK Mechanical Engineer, MBA 
Date of Birth 09.10.1982 Place of Birth İstanbul Marital Status Single Nationality Turkish Military Service 2005 – 2006 Driving License B class Adress Haznedar / İSTANBUL GSM +90535 429 4937 E-mail faikcaa@gmail.com 
2011 - 2013 Bahçeşehir University, Institute of Social Sciences Executive MBA 2001 - 2005 Marmara University, Faculty of Engineering Mechanical Engineering 1996 - 2000 Arnavutköy Korkmaz Yiğit Super High School (Sciences) 
EREN Holding A.Ş. (02.2013 - ) Investment Procurement Engineer (Modern Karton) Execute procurement isssues, investigation and evaluation of supplier companies of all required systems, machines and equipments being installed in PM5 paper mill project executed in Corlu. Prepare the tender documents and negotiate with suppliers. Prepare contracts and follow up the contractual process. Generate system specifications according to the information obtained from main machine supplier company (Voith). The project is budgeted above 300 million Euro. Attend on scheduled project progress site visits, project meetings and prepare detailed progress reports on MS Project. Design, Execute and Supervise of HVAC, Fire Protection, Dewatering, Plumbing System and all mechanical installation projects of Eren Retail Occasion Building (13.000 m2 closed area, 4 main floor and 2 mezzanine). Manage bid & tender process, determine subcontractors and prepare the contractual documents. Controlling and Approving of subcontractors jobs, preparing progress payment reports. Supervision of service and personal elevator projects. Execute PAC and FAT tests. Total mechanical project cost is about 2.7 million TL. AKÇANSA Çimento San. ve Tic. A.Ş. (2011 – 11.2012) Maintenance Planning Supervisor (Chief) Plan and supervise all maintenance activities (mechanical & electrical) in Buyukcekmece plant. Manage maintenance and planning department personnel and perform all reporting issues about maintenance activities. Plan, manage and execute improvement projects in the plant. Prepare budget and CAPEX plans and reporting to top management. Perform OHSAS 18001 and ISO 14001 system obligations and organize trainings. Manage and follow up all related Health and Safety Management system and Environmental system requirements. Participate in Energy Management Unit studies and carry out ISO 50001 Energy Management System configuration. Manage and evalute energy efficieny projects and perform them on site. Manage all planned, preventive and predictive maintenance activies and build up proactive maintenance system. Plan and execute periodical ans systematical equipment monitoring acitivities. Manage improvement projects and implications on SAP PM system as a key-user. Plan and manage improvement projects on maintenance activities. Organize 5S tarinings, OHSAS and on work trainings. Build up soft technical doument library structure. Perform lubrication system cost and consumption analyses, plan lubrication inventory and fulfill procurement issues and create all lubrication amount and cost reports. Carry out behavioural based audits on site, represent as internal auditor. Manage Maintenance Improvement Project (MIP) aim to level maintenance system up to World Class maintenance standards, cooperation with Heidelberg Cement team in Buyukcekmece plant and support other two plant in Ladik and Canakkale. AKÇANSA Çimento San. ve Tic. A.Ş. (2007 – 2010) Mechanical Maintenance Engineer Plan and carry out all of the mechanical maintenance issues of whole 3 production lines of AKÇANSA Buyukcekmece plant. Plan and follow up the material and outsource service supplies. Plan and execute maintenance activities of Hydraulic-Pneumatic, HVAC, Gearboxes, Pressurized Air and Lubrication system and machinery. Carry out all planned, preventive, and predictive maintenance activities through perform monitoring of systems and equipment with the help of periodical and systematical measurements in the plant. Plan proactive maintenance activities. Participate in yearly budget and CAPEX studies, prepare budget and CAPEX reports. Execution of OHSAS 18001 and ISO 14001 obligations. Perform vibration analysis studies and measurements. Improve lubrication systems and carry out lubrication oil analyses. Start-up and commissioning issues of Vertical Raw Grinding Mill. Performing of Rotary Kiln and Cement Mill maintenance activities, creating yearly and monthly shutdown maintenace plans. Creating walk on routes and visit plans of maintenance planning department. Perform data entrance onto SAP PM system , maintenance and analysis of the system, follow-up business processes and creating reports on SAP. Prepare maintenance instructions, procedures and check lists. Organize technical documentation. HALKALI Kağıt Karton San. ve Tic. A. Ş. (2006 – 2007) Mechanical Engineer Carry out all of the mechanical overhaul duties of the machineries and systems. Execute project steps on the renewing of Fluting Paper Mill OCC and Wet end Press Section parts. Coordinate new paper machinery installation project via communicating with foreign supervisors. Follow up project supervision, execution, PAC, FAT, start-up and commissioning steps. 
EDUCATION 
WORK EXPERIENCE 
CAREER OBJECTIVE: To get a challenging management position where I can use my academic, professional and personal skills for improvement, creating value within a dynamic, productive, creative and peaceful environment in a growing organization to achieve optimum utilization of all resources and to reach maximum profits.
Faikcan ALTIPARMAK 
Mechanical Engineer, MBA 
TECHNICAL SKILLS 
SAP R/3, MS Project 2007-2010, DLI Vibration Analysis Program, MatLab, I-DEAS, AutoCAD, Mechanical Desktop, Fortran, Ucinet, SPSS, WIN’98/2000/XP, MS Office 
LANGUAGE SKILLS 
English (Advanced) German (Intermediate) 
INTERESTS 
Playing guitar, tennis, sailing, dragon boat paddling, blogging, paragliding, making puzzles, canyoning, scuba diving, making trips, playing chess, reading books, riding horse, folk dance, watching theatre. 
SEMINARS - CERTIFICATES 
•Basics of NLP – Istanbul Coaching Center 08-09.06.2013 
•Procurement & Management of Contracts – Arelsem 16-17.02.2013 
•Project Management – YTU & Istanbul Institute 15.12 - 03.02.2013 
•Accident Investigation and Root Cause Analysis – Dönüşen Adam 05-06.11.2012 
•Professional Image Management – Masters 16.06.2012 
•ISO14001 & OHSAS18001 Environment - Operational Health and Safety Internal Auditor Training – TEMIS 24-25.04.2012 
•ISO 50001 Energy Management System Training – BSI 05-06.01.2012 
•Strategic Team Leadership – Eriksson & Associates 16-17.12.2011 
•Effective People Management – TMI 25-29.11.2011 
•Finance for Non-finance People – TMI 17-18.06.2011 
•Training of Trainer – TMI 03-04.06.2011 
•MS Project 2007 – Bilişim Training Center 07-09.04.2011 
•Master of Business Success – İstanbul Business School 26.02.2011 
•Lean 6 Sigma Yellow Belt Training – OMS 08-09.11.2010 
•Shutdown Planning and Contractor Management Workshop Heidelberg Technology Center 22-23.09.2010 
•SAP Weekly Planning, MPI Enhancement Training – Heidelberg Technology Center 18-19.05.2010 
•Scaffold Safety Inspection – National Construction College 26-27.04.2010 
•Advanced Level Bearing Maintenance Techniques Course for Engineers – ITU - SKF TÜRK 07-11.09.2009 
•Risk Assesment – Gelişim Yönetim Sistemleri 15.04.2009 
•Successful Techniques in Work Safety Management for Mid-Level Managers – DuPont Safety Resources 18-19.12.2008 
•Vibration Engineering & Artificial Intelligence Vibration Analysis Device Application Seminar – VİBRATEK 11-12.11.2008 
•Industrial Lubricants and Lubricant Implementations Seminar – MOBIL 25.06.2009 – 04.07.2008 
•Fire Management – TULIP 24.09.2008 
•Risk Analysis in Work Health & Safety Seminar – BSI 17.06.2008 
•Vibration Analysis and Balancing Training – TOPAZ 02-05.07.2007 
•Pneumatic Basics Training – ENTEK 14-15.05.2007 
PROJECTS 
The Study of the Concept of Luxury and Luxury Marketıng as a Phenomenon : Executive MBA proficiency project aims to study deals with the all aspects of luxury and luxury marketing as a phenomenon Maintenance Improvement Project (MIP) : The project aims to improve all maintenance steps / procedures and build up a standard maintenance structure. It has also been guided by Heidelberg Cement SAP PM Improvement Project : In the scope of the project, new implementation of work order system and some reporting issues has been executed with consultant agency Common Stock Keeping (CSK) : Settling up of warehouse inventory and optimisation of all stock levels Dynamic Seperator for Cement Mill #1 : Application of a dynamic seperator in order to achieve high seperation efficiency Alternative Fuel Feeding System : Installation of a novel-design belt conveying system to transport RDF to the rotary kilns Energy Management System : Setting up of energy management system and its requirements in the plant Continuously Variable Transmission Systems (CVT) : The project aimed to transfer power to transmission with continuous pattern

More Related Content

What's hot (20)

Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
Jabir CV
Jabir CVJabir CV
Jabir CV
 
HSE Engineer
HSE EngineerHSE Engineer
HSE Engineer
 
My cv
My cvMy cv
My cv
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
khaled-engineering
khaled-engineeringkhaled-engineering
khaled-engineering
 
Maintenance
MaintenanceMaintenance
Maintenance
 
MY RESUME 2016
MY RESUME 2016MY RESUME 2016
MY RESUME 2016
 
Ahmed Elzafarany.
Ahmed Elzafarany.Ahmed Elzafarany.
Ahmed Elzafarany.
 
Basem Rashad CV 2
Basem Rashad CV 2Basem Rashad CV 2
Basem Rashad CV 2
 
BERNARD CVD
BERNARD CVDBERNARD CVD
BERNARD CVD
 
CV EN PC
CV EN PCCV EN PC
CV EN PC
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
 
Thomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPointThomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPoint
 
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
 
MOHANNAD CV
MOHANNAD  CVMOHANNAD  CV
MOHANNAD CV
 
SDKCV
SDKCVSDKCV
SDKCV
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
 
My final resume
My final resumeMy final resume
My final resume
 
RALPH-GUMBA-RESUME
RALPH-GUMBA-RESUMERALPH-GUMBA-RESUME
RALPH-GUMBA-RESUME
 

Similar to Faikcan Altiparmak_Resume

Similar to Faikcan Altiparmak_Resume (20)

Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
NAIK CV(AM)
NAIK CV(AM)NAIK CV(AM)
NAIK CV(AM)
 
Marcus Mansour CV
Marcus Mansour CVMarcus Mansour CV
Marcus Mansour CV
 
Nooh CV221115
Nooh CV221115Nooh CV221115
Nooh CV221115
 
suleyman_pasay_cv_rev2
suleyman_pasay_cv_rev2suleyman_pasay_cv_rev2
suleyman_pasay_cv_rev2
 
Eduardo Neira - Project Experience
Eduardo Neira - Project ExperienceEduardo Neira - Project Experience
Eduardo Neira - Project Experience
 
Hussam
HussamHussam
Hussam
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
Uğur Sadık ÖZDEMİR - CV
Uğur Sadık ÖZDEMİR - CVUğur Sadık ÖZDEMİR - CV
Uğur Sadık ÖZDEMİR - CV
 
Tamer Akl C.V
Tamer Akl C.VTamer Akl C.V
Tamer Akl C.V
 
Majo quality engineer cv
Majo quality engineer cvMajo quality engineer cv
Majo quality engineer cv
 
999saeed
999saeed999saeed
999saeed
 
Resume waleed 1-6-7.2MGM
Resume waleed 1-6-7.2MGMResume waleed 1-6-7.2MGM
Resume waleed 1-6-7.2MGM
 
Ashraf el malak(mobile equipment maintenance supervisor)
Ashraf el malak(mobile equipment maintenance supervisor)Ashraf el malak(mobile equipment maintenance supervisor)
Ashraf el malak(mobile equipment maintenance supervisor)
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
CV _Mustafa ARSLAN
CV _Mustafa ARSLANCV _Mustafa ARSLAN
CV _Mustafa ARSLAN
 
MY CV RESUME reviewed
MY CV RESUME reviewedMY CV RESUME reviewed
MY CV RESUME reviewed
 
Ahmed Badr CV
Ahmed Badr CVAhmed Badr CV
Ahmed Badr CV
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 

Faikcan Altiparmak_Resume

  • 1. Faikcan ALTIPARMAK Mechanical Engineer, MBA Date of Birth 09.10.1982 Place of Birth İstanbul Marital Status Single Nationality Turkish Military Service 2005 – 2006 Driving License B class Adress Haznedar / İSTANBUL GSM +90535 429 4937 E-mail faikcaa@gmail.com 2011 - 2013 Bahçeşehir University, Institute of Social Sciences Executive MBA 2001 - 2005 Marmara University, Faculty of Engineering Mechanical Engineering 1996 - 2000 Arnavutköy Korkmaz Yiğit Super High School (Sciences) EREN Holding A.Ş. (02.2013 - ) Investment Procurement Engineer (Modern Karton) Execute procurement isssues, investigation and evaluation of supplier companies of all required systems, machines and equipments being installed in PM5 paper mill project executed in Corlu. Prepare the tender documents and negotiate with suppliers. Prepare contracts and follow up the contractual process. Generate system specifications according to the information obtained from main machine supplier company (Voith). The project is budgeted above 300 million Euro. Attend on scheduled project progress site visits, project meetings and prepare detailed progress reports on MS Project. Design, Execute and Supervise of HVAC, Fire Protection, Dewatering, Plumbing System and all mechanical installation projects of Eren Retail Occasion Building (13.000 m2 closed area, 4 main floor and 2 mezzanine). Manage bid & tender process, determine subcontractors and prepare the contractual documents. Controlling and Approving of subcontractors jobs, preparing progress payment reports. Supervision of service and personal elevator projects. Execute PAC and FAT tests. Total mechanical project cost is about 2.7 million TL. AKÇANSA Çimento San. ve Tic. A.Ş. (2011 – 11.2012) Maintenance Planning Supervisor (Chief) Plan and supervise all maintenance activities (mechanical & electrical) in Buyukcekmece plant. Manage maintenance and planning department personnel and perform all reporting issues about maintenance activities. Plan, manage and execute improvement projects in the plant. Prepare budget and CAPEX plans and reporting to top management. Perform OHSAS 18001 and ISO 14001 system obligations and organize trainings. Manage and follow up all related Health and Safety Management system and Environmental system requirements. Participate in Energy Management Unit studies and carry out ISO 50001 Energy Management System configuration. Manage and evalute energy efficieny projects and perform them on site. Manage all planned, preventive and predictive maintenance activies and build up proactive maintenance system. Plan and execute periodical ans systematical equipment monitoring acitivities. Manage improvement projects and implications on SAP PM system as a key-user. Plan and manage improvement projects on maintenance activities. Organize 5S tarinings, OHSAS and on work trainings. Build up soft technical doument library structure. Perform lubrication system cost and consumption analyses, plan lubrication inventory and fulfill procurement issues and create all lubrication amount and cost reports. Carry out behavioural based audits on site, represent as internal auditor. Manage Maintenance Improvement Project (MIP) aim to level maintenance system up to World Class maintenance standards, cooperation with Heidelberg Cement team in Buyukcekmece plant and support other two plant in Ladik and Canakkale. AKÇANSA Çimento San. ve Tic. A.Ş. (2007 – 2010) Mechanical Maintenance Engineer Plan and carry out all of the mechanical maintenance issues of whole 3 production lines of AKÇANSA Buyukcekmece plant. Plan and follow up the material and outsource service supplies. Plan and execute maintenance activities of Hydraulic-Pneumatic, HVAC, Gearboxes, Pressurized Air and Lubrication system and machinery. Carry out all planned, preventive, and predictive maintenance activities through perform monitoring of systems and equipment with the help of periodical and systematical measurements in the plant. Plan proactive maintenance activities. Participate in yearly budget and CAPEX studies, prepare budget and CAPEX reports. Execution of OHSAS 18001 and ISO 14001 obligations. Perform vibration analysis studies and measurements. Improve lubrication systems and carry out lubrication oil analyses. Start-up and commissioning issues of Vertical Raw Grinding Mill. Performing of Rotary Kiln and Cement Mill maintenance activities, creating yearly and monthly shutdown maintenace plans. Creating walk on routes and visit plans of maintenance planning department. Perform data entrance onto SAP PM system , maintenance and analysis of the system, follow-up business processes and creating reports on SAP. Prepare maintenance instructions, procedures and check lists. Organize technical documentation. HALKALI Kağıt Karton San. ve Tic. A. Ş. (2006 – 2007) Mechanical Engineer Carry out all of the mechanical overhaul duties of the machineries and systems. Execute project steps on the renewing of Fluting Paper Mill OCC and Wet end Press Section parts. Coordinate new paper machinery installation project via communicating with foreign supervisors. Follow up project supervision, execution, PAC, FAT, start-up and commissioning steps. EDUCATION WORK EXPERIENCE CAREER OBJECTIVE: To get a challenging management position where I can use my academic, professional and personal skills for improvement, creating value within a dynamic, productive, creative and peaceful environment in a growing organization to achieve optimum utilization of all resources and to reach maximum profits.
  • 2. Faikcan ALTIPARMAK Mechanical Engineer, MBA TECHNICAL SKILLS SAP R/3, MS Project 2007-2010, DLI Vibration Analysis Program, MatLab, I-DEAS, AutoCAD, Mechanical Desktop, Fortran, Ucinet, SPSS, WIN’98/2000/XP, MS Office LANGUAGE SKILLS English (Advanced) German (Intermediate) INTERESTS Playing guitar, tennis, sailing, dragon boat paddling, blogging, paragliding, making puzzles, canyoning, scuba diving, making trips, playing chess, reading books, riding horse, folk dance, watching theatre. SEMINARS - CERTIFICATES •Basics of NLP – Istanbul Coaching Center 08-09.06.2013 •Procurement & Management of Contracts – Arelsem 16-17.02.2013 •Project Management – YTU & Istanbul Institute 15.12 - 03.02.2013 •Accident Investigation and Root Cause Analysis – Dönüşen Adam 05-06.11.2012 •Professional Image Management – Masters 16.06.2012 •ISO14001 & OHSAS18001 Environment - Operational Health and Safety Internal Auditor Training – TEMIS 24-25.04.2012 •ISO 50001 Energy Management System Training – BSI 05-06.01.2012 •Strategic Team Leadership – Eriksson & Associates 16-17.12.2011 •Effective People Management – TMI 25-29.11.2011 •Finance for Non-finance People – TMI 17-18.06.2011 •Training of Trainer – TMI 03-04.06.2011 •MS Project 2007 – Bilişim Training Center 07-09.04.2011 •Master of Business Success – İstanbul Business School 26.02.2011 •Lean 6 Sigma Yellow Belt Training – OMS 08-09.11.2010 •Shutdown Planning and Contractor Management Workshop Heidelberg Technology Center 22-23.09.2010 •SAP Weekly Planning, MPI Enhancement Training – Heidelberg Technology Center 18-19.05.2010 •Scaffold Safety Inspection – National Construction College 26-27.04.2010 •Advanced Level Bearing Maintenance Techniques Course for Engineers – ITU - SKF TÜRK 07-11.09.2009 •Risk Assesment – Gelişim Yönetim Sistemleri 15.04.2009 •Successful Techniques in Work Safety Management for Mid-Level Managers – DuPont Safety Resources 18-19.12.2008 •Vibration Engineering & Artificial Intelligence Vibration Analysis Device Application Seminar – VİBRATEK 11-12.11.2008 •Industrial Lubricants and Lubricant Implementations Seminar – MOBIL 25.06.2009 – 04.07.2008 •Fire Management – TULIP 24.09.2008 •Risk Analysis in Work Health & Safety Seminar – BSI 17.06.2008 •Vibration Analysis and Balancing Training – TOPAZ 02-05.07.2007 •Pneumatic Basics Training – ENTEK 14-15.05.2007 PROJECTS The Study of the Concept of Luxury and Luxury Marketıng as a Phenomenon : Executive MBA proficiency project aims to study deals with the all aspects of luxury and luxury marketing as a phenomenon Maintenance Improvement Project (MIP) : The project aims to improve all maintenance steps / procedures and build up a standard maintenance structure. It has also been guided by Heidelberg Cement SAP PM Improvement Project : In the scope of the project, new implementation of work order system and some reporting issues has been executed with consultant agency Common Stock Keeping (CSK) : Settling up of warehouse inventory and optimisation of all stock levels Dynamic Seperator for Cement Mill #1 : Application of a dynamic seperator in order to achieve high seperation efficiency Alternative Fuel Feeding System : Installation of a novel-design belt conveying system to transport RDF to the rotary kilns Energy Management System : Setting up of energy management system and its requirements in the plant Continuously Variable Transmission Systems (CVT) : The project aimed to transfer power to transmission with continuous pattern