SlideShare a Scribd company logo
Palmal Group of Industries
HAMZA Monthly Knowledge Sharing Meeting-KSM
Organized by:
Central-IE
Manufacturing Audit & Central Costing
1-0
Objectives of the Meeting:
1-1
To review factory last month performance
To understand our present position against
management expectation
To know about the scope of improvement
To set next month performance target
Key Discussion points:
1-2
1. Planning, Production & IE KPI:
Monthly Target Vs. achievement status
Monthly Efficiency %
Monthly PCD Hit rate status
Monthly Revenue status
Monthly Profit/Loss status
Monthly Machine utilization %
3. Quality Assurance Department KPI:
 Monthly Final inspection pass status
2. Human Resource Department KPI:
 Monthly worker absenteeism status
4. Set next month performance target
Month wise Plan Vs. Achievement status:
1-3
Month wise Floor target Vs. achievement status:
1-4
Month wise Plan Vs. Actual Style Analysis (JUNE-21):
1-5
SMV Type Style Type Style Qty
Produced
Minute
Produced Qty
Avg qty % out
of total
Produce Qty
<4.5 Very Basic 10 62047 14220 1.7%
4.51-7.5 Basic 21 4305274 762465 92.7%
7.51-10.5 Semi Critical 10 344810 41260 5.0%
10.51-15 Heavy Semi Critical 2 44880 4250 0.5%
15.1-20 Critical 0 0 0 0.0%
20.1- >=28 Heavy Critical 0 0 0 0.0%
5.79 Basic 43 4757010 822195 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 0 0 0 0.00%
4.51-7.5 Basic 19 4653023 822507 100.00%
7.51-10.5 Semi Critical 0 0 0 0.00%
10.51-15 Heavy Semi Critical 0 0 0 0.00%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
5.66 Basic 19 4653023 822507 100%
Month wise Plan Vs. Actual Style Analysis (JULY-21):
1-6
SMVType StyleType StyleQty
Produced
Minute
ProducedQty
Avgqty%out
oftotal
ProduceQty
<4.5 VeryBasic 27 10046 660 0.1%
4.51-7.5 Basic 13 2461719 374370 84.6%
7.51-10.5 SemiCritical 1 173537 22985 5.2%
10.51-15 HeavySemiCritical 2 1117080 44610 10.1%
15.1-20 Critical 0 0 0 0.0%
20.1->=28 HeavyCritical 0 0 0 0.0%
8.50 Basic 43 3762381 442625 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 2 38503 9120 1.69%
4.51-7.5 Basic 13 2462516 437260 81.04%
7.51-10.5 Semi Critical 4 321879 40200 7.45%
10.51-15 Heavy Semi Critical 6 686828 53005 9.82%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
6.50 Basic 25 3509725 539585 100%
Month wise Plan Vs. Actual Style Analysis (AUG-21):
1-7
SMVType StyleType StyleQty
Produced
Minute
ProducedQty
Avgqty%out
oftotal
ProduceQty
<4.5 VeryBasic 13 154434 37800 6.4%
4.51-7.5 Basic 19 2585304 437710 74.2%
7.51-10.5 SemiCritical 5 823378 91710 15.5%
10.51-15 HeavySemiCritical 6 265906 22850 3.9%
15.1-20 Critical 0 0 0 0.0%
20.1->=28 HeavyCritical 0 0 0 0.0%
6.49 Basic 43 3829023 590070 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 0 155321 37964 5.17%
4.51-7.5 Basic 18 3310823 554156 75.50%
7.51-10.5 Semi Critical 5 1207289 127515 17.37%
10.51-15 Heavy Semi Critical 3 160247 14335 1.95%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
6.59 Basic 26 4833680 733970 100%
Month wise efficiency %:
1-8
Month wise facts analysis :
1-9
SMV 1st
day 2nd
day 3rd
day 4th
day 5th
day 6th
day 7th
day 8th
day 9th
day 10th
day
<4.5 45% 60% 70% 75% 85% 85% 85% 85% 85% 85%
4.51-7.5 40% 55% 65% 70% 75% 75% 75% 75% 75% 80%
7.51-10.5 35% 45% 55% 60% 65% 65% 65% 70% 70% 70%
10.51-15 35% 45% 50% 55% 60% 60% 60% 65% 65% 65%
15.1-20 25% 35% 45% 50% 55% 55% 55% 55% 55% 60%
20.1-28 25% 35% 40% 45% 50% 50% 50% 55% 55% 55%
>=28.1 10% 20% 30% 35% 40% 45% 45% 45% 45% 50%
Efficiency Requirement
Month Factory
Noof
Working
days
No.Style
Running
No.Styling
No.ofAvg.
Line
Run
days/Styling/
Line
Expected
Efficiency
Achieved
Efficiency%
June-21 KRC(U-3&4) 28 42 9 15 47days 75.0% 55.3%
July-21 KRC(U-3&4) 16 19 13 15 18days 75.0% 54.9%
August-21 KRC(U-3&4) 26 32 12 15 32days 75.0% 52.0%
G.Total H&MTOTAL 23 93 34 45 31days 75.0% 54.1%
PCD Hit & Fail Status :
1-10
Month wise NPT status :
1-11
Non
Productive
Minute
NPT Value
NPT Value in
Tk.
NPT% NPT (Pcs)
NPT (Man-
Hour)
NPT MC/Day
Total Earning
(Including NPT
Value)
Revenue/MC
(Without NPT)
7190 Min. 503.30
$ 41,774৳ 0.08% 1260 Pcs 120 0.4 MC 364,099.91
$ BDT 73621
17460 Min. 1,222.20
$ 101,443৳ 0.34% 2706 Pcs 291 1.8 MC 232,037.53
$ BDT 78925
16800 Min. 1,176.00
$ 97,608৳ 0.23% 2589 Pcs 280 1.1 MC 301,604.55
$ BDT 65856
41450 Min. 2,901.50
$ 240,825৳ 0.20% 6554 Pcs 691 1.1 MC 897,741.99
$ BDT 72019
Month wise Machine utilization % :
1-12
Month wise worker absenteeism status :
1-13
Month wise profit/Loss status (Excluding Abnormal Loss) :
1-14
Month wise per Machine Plan Vs. Achieve Revenue status:
1-15
Month wise On Time Delivery status:
1-17

More Related Content

Similar to Factory Monthly HAMZA.ppt

Factory Monthly Silvar.ppt
Factory Monthly Silvar.pptFactory Monthly Silvar.ppt
Factory Monthly Silvar.ppt
Nittamallik216
 
Factory Monthly KPI.ppt
Factory Monthly KPI.pptFactory Monthly KPI.ppt
Factory Monthly KPI.ppt
Nittamallik216
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
Nittamallik216
 
Factory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).pptFactory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).ppt
Nittamallik216
 
Factory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).pptFactory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).ppt
Nittamallik216
 
Factory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptFactory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.ppt
Nittamallik216
 
Factory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).pptFactory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).ppt
Nittamallik216
 
Factory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).pptFactory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).ppt
Nittamallik216
 
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptFactory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Nittamallik216
 
Weekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptWeekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .ppt
Nittamallik216
 
Weekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptWeekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.ppt
Nittamallik216
 
Weekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptWeekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.ppt
Nittamallik216
 
Factory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.pptFactory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.ppt
Nittamallik216
 
Weekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptWeekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.ppt
Nittamallik216
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Nittamallik216
 
MFG Strategy 2015 AB
MFG Strategy 2015 ABMFG Strategy 2015 AB
MFG Strategy 2015 ABJohn Barney
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013John Barney
 
Performance Goal Seting
Performance Goal SetingPerformance Goal Seting
Performance Goal Seting
Laurence Yap M.A. (UM) CHRM
 
3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)
nguyenanvuong2007
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
TKMG, Inc.
 

Similar to Factory Monthly HAMZA.ppt (20)

Factory Monthly Silvar.ppt
Factory Monthly Silvar.pptFactory Monthly Silvar.ppt
Factory Monthly Silvar.ppt
 
Factory Monthly KPI.ppt
Factory Monthly KPI.pptFactory Monthly KPI.ppt
Factory Monthly KPI.ppt
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
Factory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).pptFactory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).ppt
 
Factory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).pptFactory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).ppt
 
Factory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptFactory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.ppt
 
Factory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).pptFactory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).ppt
 
Factory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).pptFactory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).ppt
 
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptFactory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
 
Weekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptWeekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .ppt
 
Weekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptWeekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.ppt
 
Weekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptWeekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.ppt
 
Factory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.pptFactory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.ppt
 
Weekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptWeekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.ppt
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
 
MFG Strategy 2015 AB
MFG Strategy 2015 ABMFG Strategy 2015 AB
MFG Strategy 2015 AB
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
 
Performance Goal Seting
Performance Goal SetingPerformance Goal Seting
Performance Goal Seting
 
3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 

More from Nittamallik216

Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
Nittamallik216
 
160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx
Nittamallik216
 
TP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfTP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdf
Nittamallik216
 
SILAS PJ SET .pdf
SILAS PJ SET .pdfSILAS PJ SET .pdf
SILAS PJ SET .pdf
Nittamallik216
 
SANDY SS TVP.pdf
SANDY SS TVP.pdfSANDY SS TVP.pdf
SANDY SS TVP.pdf
Nittamallik216
 
ROMY BODY.pdf
ROMY BODY.pdfROMY BODY.pdf
ROMY BODY.pdf
Nittamallik216
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
Nittamallik216
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
Nittamallik216
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
Nittamallik216
 
Factory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.pptFactory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.ppt
Nittamallik216
 

More from Nittamallik216 (10)

Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx
 
TP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfTP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdf
 
SILAS PJ SET .pdf
SILAS PJ SET .pdfSILAS PJ SET .pdf
SILAS PJ SET .pdf
 
SANDY SS TVP.pdf
SANDY SS TVP.pdfSANDY SS TVP.pdf
SANDY SS TVP.pdf
 
ROMY BODY.pdf
ROMY BODY.pdfROMY BODY.pdf
ROMY BODY.pdf
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
 
Factory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.pptFactory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.ppt
 

Recently uploaded

FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
MaleehaSheikh2
 
tapal brand analysis PPT slide for comptetive data
tapal brand analysis PPT slide for comptetive datatapal brand analysis PPT slide for comptetive data
tapal brand analysis PPT slide for comptetive data
theahmadsaood
 
Jpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization SampleJpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization Sample
James Polillo
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
John Andrews
 
Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
AlejandraGmez176757
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Subhajit Sahu
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
ewymefz
 
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project PresentationPredicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Boston Institute of Analytics
 
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
Tiktokethiodaily
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
nscud
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
haila53
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar
 
Adjusting primitives for graph : SHORT REPORT / NOTES
Adjusting primitives for graph : SHORT REPORT / NOTESAdjusting primitives for graph : SHORT REPORT / NOTES
Adjusting primitives for graph : SHORT REPORT / NOTES
Subhajit Sahu
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Subhajit Sahu
 
Tabula.io Cheatsheet: automate your data workflows
Tabula.io Cheatsheet: automate your data workflowsTabula.io Cheatsheet: automate your data workflows
Tabula.io Cheatsheet: automate your data workflows
alex933524
 
一比一原版(QU毕业证)皇后大学毕业证成绩单
一比一原版(QU毕业证)皇后大学毕业证成绩单一比一原版(QU毕业证)皇后大学毕业证成绩单
一比一原版(QU毕业证)皇后大学毕业证成绩单
enxupq
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
ewymefz
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
ukgaet
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
Oppotus
 

Recently uploaded (20)

FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
 
tapal brand analysis PPT slide for comptetive data
tapal brand analysis PPT slide for comptetive datatapal brand analysis PPT slide for comptetive data
tapal brand analysis PPT slide for comptetive data
 
Jpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization SampleJpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization Sample
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
 
Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
 
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project PresentationPredicting Product Ad Campaign Performance: A Data Analysis Project Presentation
Predicting Product Ad Campaign Performance: A Data Analysis Project Presentation
 
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
1.Seydhcuxhxyxhccuuxuxyxyxmisolids 2019.pptx
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
 
Adjusting primitives for graph : SHORT REPORT / NOTES
Adjusting primitives for graph : SHORT REPORT / NOTESAdjusting primitives for graph : SHORT REPORT / NOTES
Adjusting primitives for graph : SHORT REPORT / NOTES
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
 
Tabula.io Cheatsheet: automate your data workflows
Tabula.io Cheatsheet: automate your data workflowsTabula.io Cheatsheet: automate your data workflows
Tabula.io Cheatsheet: automate your data workflows
 
一比一原版(QU毕业证)皇后大学毕业证成绩单
一比一原版(QU毕业证)皇后大学毕业证成绩单一比一原版(QU毕业证)皇后大学毕业证成绩单
一比一原版(QU毕业证)皇后大学毕业证成绩单
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
 

Factory Monthly HAMZA.ppt

  • 1. Palmal Group of Industries HAMZA Monthly Knowledge Sharing Meeting-KSM Organized by: Central-IE Manufacturing Audit & Central Costing 1-0
  • 2. Objectives of the Meeting: 1-1 To review factory last month performance To understand our present position against management expectation To know about the scope of improvement To set next month performance target
  • 3. Key Discussion points: 1-2 1. Planning, Production & IE KPI: Monthly Target Vs. achievement status Monthly Efficiency % Monthly PCD Hit rate status Monthly Revenue status Monthly Profit/Loss status Monthly Machine utilization % 3. Quality Assurance Department KPI:  Monthly Final inspection pass status 2. Human Resource Department KPI:  Monthly worker absenteeism status 4. Set next month performance target
  • 4. Month wise Plan Vs. Achievement status: 1-3
  • 5. Month wise Floor target Vs. achievement status: 1-4
  • 6. Month wise Plan Vs. Actual Style Analysis (JUNE-21): 1-5 SMV Type Style Type Style Qty Produced Minute Produced Qty Avg qty % out of total Produce Qty <4.5 Very Basic 10 62047 14220 1.7% 4.51-7.5 Basic 21 4305274 762465 92.7% 7.51-10.5 Semi Critical 10 344810 41260 5.0% 10.51-15 Heavy Semi Critical 2 44880 4250 0.5% 15.1-20 Critical 0 0 0 0.0% 20.1- >=28 Heavy Critical 0 0 0 0.0% 5.79 Basic 43 4757010 822195 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 0 0 0 0.00% 4.51-7.5 Basic 19 4653023 822507 100.00% 7.51-10.5 Semi Critical 0 0 0 0.00% 10.51-15 Heavy Semi Critical 0 0 0 0.00% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 5.66 Basic 19 4653023 822507 100%
  • 7. Month wise Plan Vs. Actual Style Analysis (JULY-21): 1-6 SMVType StyleType StyleQty Produced Minute ProducedQty Avgqty%out oftotal ProduceQty <4.5 VeryBasic 27 10046 660 0.1% 4.51-7.5 Basic 13 2461719 374370 84.6% 7.51-10.5 SemiCritical 1 173537 22985 5.2% 10.51-15 HeavySemiCritical 2 1117080 44610 10.1% 15.1-20 Critical 0 0 0 0.0% 20.1->=28 HeavyCritical 0 0 0 0.0% 8.50 Basic 43 3762381 442625 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 2 38503 9120 1.69% 4.51-7.5 Basic 13 2462516 437260 81.04% 7.51-10.5 Semi Critical 4 321879 40200 7.45% 10.51-15 Heavy Semi Critical 6 686828 53005 9.82% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 6.50 Basic 25 3509725 539585 100%
  • 8. Month wise Plan Vs. Actual Style Analysis (AUG-21): 1-7 SMVType StyleType StyleQty Produced Minute ProducedQty Avgqty%out oftotal ProduceQty <4.5 VeryBasic 13 154434 37800 6.4% 4.51-7.5 Basic 19 2585304 437710 74.2% 7.51-10.5 SemiCritical 5 823378 91710 15.5% 10.51-15 HeavySemiCritical 6 265906 22850 3.9% 15.1-20 Critical 0 0 0 0.0% 20.1->=28 HeavyCritical 0 0 0 0.0% 6.49 Basic 43 3829023 590070 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 0 155321 37964 5.17% 4.51-7.5 Basic 18 3310823 554156 75.50% 7.51-10.5 Semi Critical 5 1207289 127515 17.37% 10.51-15 Heavy Semi Critical 3 160247 14335 1.95% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 6.59 Basic 26 4833680 733970 100%
  • 10. Month wise facts analysis : 1-9 SMV 1st day 2nd day 3rd day 4th day 5th day 6th day 7th day 8th day 9th day 10th day <4.5 45% 60% 70% 75% 85% 85% 85% 85% 85% 85% 4.51-7.5 40% 55% 65% 70% 75% 75% 75% 75% 75% 80% 7.51-10.5 35% 45% 55% 60% 65% 65% 65% 70% 70% 70% 10.51-15 35% 45% 50% 55% 60% 60% 60% 65% 65% 65% 15.1-20 25% 35% 45% 50% 55% 55% 55% 55% 55% 60% 20.1-28 25% 35% 40% 45% 50% 50% 50% 55% 55% 55% >=28.1 10% 20% 30% 35% 40% 45% 45% 45% 45% 50% Efficiency Requirement Month Factory Noof Working days No.Style Running No.Styling No.ofAvg. Line Run days/Styling/ Line Expected Efficiency Achieved Efficiency% June-21 KRC(U-3&4) 28 42 9 15 47days 75.0% 55.3% July-21 KRC(U-3&4) 16 19 13 15 18days 75.0% 54.9% August-21 KRC(U-3&4) 26 32 12 15 32days 75.0% 52.0% G.Total H&MTOTAL 23 93 34 45 31days 75.0% 54.1%
  • 11. PCD Hit & Fail Status : 1-10
  • 12. Month wise NPT status : 1-11 Non Productive Minute NPT Value NPT Value in Tk. NPT% NPT (Pcs) NPT (Man- Hour) NPT MC/Day Total Earning (Including NPT Value) Revenue/MC (Without NPT) 7190 Min. 503.30 $ 41,774৳ 0.08% 1260 Pcs 120 0.4 MC 364,099.91 $ BDT 73621 17460 Min. 1,222.20 $ 101,443৳ 0.34% 2706 Pcs 291 1.8 MC 232,037.53 $ BDT 78925 16800 Min. 1,176.00 $ 97,608৳ 0.23% 2589 Pcs 280 1.1 MC 301,604.55 $ BDT 65856 41450 Min. 2,901.50 $ 240,825৳ 0.20% 6554 Pcs 691 1.1 MC 897,741.99 $ BDT 72019
  • 13. Month wise Machine utilization % : 1-12
  • 14. Month wise worker absenteeism status : 1-13
  • 15. Month wise profit/Loss status (Excluding Abnormal Loss) : 1-14
  • 16. Month wise per Machine Plan Vs. Achieve Revenue status: 1-15
  • 17. Month wise On Time Delivery status: 1-17