SlideShare a Scribd company logo
1
PROJECT PROFILE ON GENTS SHIRTS AND TROUSERS
NAME OF THE PRODUCT : GENTS SHIRTS AND TROUSERS.
PRODUCT CODE : 264104005.
QUALITY & STANDARD : The following Indian Standards may be
referred.
Garment Quality Guide – IS:12675.
Readymade Garment – IS:4039.
Packaging for Export.
Garment Guide for – IS:10194.
Positioning of Labels.
MONTH & YEAR : May, 2011.
OF PREPARATION
PREPARED BY : MSME - Development Institute,
Ministry of Micro, Small & Medium
Enterprises,
Government of India
107, Industrial Estate, Kalpi Road,
Kanpur-208012.
Tele. 2295070, 2295071 & 2295073
(EPBAX)
Tele. No. 2295072 (SENET & TRC)
Tele/Fax No.: 0512- 2240143
email: dcdi-kanpur@dcmsme.gov.in
Website: msmedikanpur.gov.in
2
INTRODUCTION:
Manufacturing of Shirts and Trousers are under the category of readymade
Garment industry. Readymade garment industry has occupied a unique place
in the industrial scenario of our country by generating substantial export
earnings and creating lot of employment. Its contribution to industrial
production, employment and export earnings are very significant. This
industry provides one of the basic necessities of life. The employment
provided by it is a source of livelihood for millions of people. It also
provides maximum employment with minimum capital investment. Since
this industry is highly labour-intensive, it is ideally suited to Indian
condition. This project report is prepared for the manufacture of gent’s
shirts, gent’s trousers as they find wide acceptance in local and international
markets. Any person having the knowledge of cutting and stitching
operations can easily set up such establishments.
MARKET POTENTIAL:
Readymade garments are the choice of urban people. It is also gaining wider
acceptance in semi-urban and rural areas. The huge charges made by tailors
and delay in delivery has made people to switch over to readymade
garments. In domestic market and export market, it has made spectacular
progress in the last decade. This industry is becoming very vibrant and lot of
foreign investment pouring in this industry because of low risk and high
earning nature of this industry. As these products are fashion oriented,
entrepreneurs should always keep in mind the changing fashion styles.
Considering its advantageous position, it is assumed that there will be no
constraint in marketing of gent’s readymade garments.
BASIS & PRESUMPTIONS:
1. This project is based on single shift basis and 300 working days in a year.
2. Since this industry is labour-intensive, the working efficiency is
considered at 75%.
3. Costs of machinery and equipment/ material indicated refer to a
particular make and approximately to those prevailing at the time of
preparation of this project.
3
4. Installation and electrification cost is taken @ 10% of cost of machinery
and equipment.
5. Non-refundable deposits, project report cost, trial production, security
deposits with Electricity Board are taken under pre-operative expenses.
6. Depreciation has been considered:
(a) On Building @ 5%
(b)On plant and machinery @ 10%
(c) On office furniture and fixtures @ 15%
(d)On other fixed assets @ 15%.
7. Interest on capital investment has been taken @ 16% per annum.
8. Minimum 25% of total investment is required as margin money.
IMPLEMENTATION SCHEDULE
Implementation period in months for executing this project in stage-wise is
given below:
Sl. No. Activity Period
1. Selection of site/working shed 1 month
2. Formation of company (ownership/partnership) 1 month
3. Preparation of feasibility report 1 month
4. Registration with commissioner of Industries/DIC 1 month
5. Arrangement of finance (Term loan and working capital) 3 month
6. Procurement of machinery and equipment 1 month
7. Plant erection and electrification 2 weeks
8. Arrangement of raw material including packaging
material etc.
1 month
9. Recruitment of manpower 1 month
10. Selection of market channel 1 month
11. Miscellaneous works like power/water connection etc. 2 month
4
12. Note: Considering that some of the above activities may be
overlapping, the project implementation will take a total period of six
months approximately for starting the production.
TECHNICAL ASPECTS
Process of Manufacture: The manufacturing process involves the
following steps:
1. Procurement of Fabrics
Procurement of Fabric: Dyed/bleached/printed cotton/synthetic fabrics as
per demand are to be procured from the open market. The fabric will be
inspected by laying on the inspection table against light before cutting so
that unevenness in colour/shade or any other fault, if any visible in the fabric
are eliminated.
Cutting and Stitching: The inspected fabric is placed on the cutting table in
layers and then the different parts of the respective garments are demarked
by a chalk as per different sizes. Cutting is carried out by the cutting
machine. Stitching is carried out for individual portion of the garments by
skilled workers with the help of over-lock, lock stitch machines etc.
Washing, Checking, Pressing and Packing: All garments are charged into
washing machine containing mild detergent and washed for 4 hours in order
to remove dirt and stains acquired during the manufacturing process. After
washing, the garments are hydro extracted to remove excess water and after
this, these garments are dried in tumbler dryer. Final checking is done before
pressing and packing on the checking table so that any fault in the piece may
be removed and protruding threads eliminated. The individual pieces are
pressed by steam presses to remove any wrinkle marks and packed in the
carton boxes.
QUALITY CONTROL & STANDARD:
The quality of garments mainly depends on quality of fabric used. Therefore,
care must be taken while purchasing fabrics to ensure good colourfastness
properties, uniformity in shade etc. Generally garments are made as per
customer's specification in respect of size, design and fashion.
5
Sl. No. BIS No. Title
1. IS:12675 Garment Quality Guide
2. IS:4039 Readymade Garment Packaging for Export.
3. IS:10194 Garment Guide for Positioning of Labels.
PRODUCTION CAPACITY (Per Month):
Products Quantity (Pcs.) Value (Rs.)
Gents Shirts 90,000 4,68,00,000/-
Gents Trousers 90,000
MOTIVE POWER REQUIRED:
Total 30 HP is required to run this unit at installed capacity.
POLLUTION CONTROL:
The process of manufacture does not generate pollution. However,
entrepreneurs are to contact State Pollution Control Board for necessary
guidance.
ENERGY CONSERVATION:
Maximum care should be taken while selecting the machinery and other
electrical equipments so as to ensure minimum power consumption.
FINANCIAL ASPECTS:
(A) Fixed Capital
(i) Land & Building:
Land : 800 sq. mtr. @ Rs. 30 per sq. mtr.
Building Area
Factory Shed : 200 sq. mtr.
6
Store (Raw
Material)
: 50 sq. mtr.
Rs. 24,000/-
Store (Finished
Goods)
: 50 sq. mtr.
Total Covered Area: : 300 sq. mtr.
(ii) Machinery & Equipments
Sl.
No
Machinery Description Qty
Nos.
Rate
(Rs.)
Value
(In Rs.)
1. Single Needle Lock Stitch Machine
with motor.
50 23,650/- 11,82,500/-
2. 6” Power driven cloth cutting
machine
1 50,000/- 50,000/-
3. 2 Needle Overlock Safety Stitching
Machine with Trimmer
1 50,000 50,000/-
4. Double Needle Lock Stitch Machine 2 75,000/- 1,50,000/-
5. Button Hole making Machine 1 1,45,000/- 1,45,000/-
6. Button Stitching Machine 1 75,000/- 75,000/-
7. Hot Fusing Press 1 65,000/- 65,000/-
8. Garment Washing Machine 25 Kg
capacity
1 1,45,000/- 1,45,000/-
9. Hydro extractor 25 Kg capacity 1 70,000/- 70,000/-
10. Tumbler Dryer 25 Kg capacity 1 1,40,000/- 1,40,000/-
11. Flat Bed Steam Iron Press with
Vacuum Table.
4 75,000/- 3,00,000/-
12. Zig Zag Embroidery Machine 1 45,000/- 45,000/-
13. Generator Set 30 KVA 1 1,00,000/- 1,00,000/-
14. Wash Room Trolleys 4 10,000/- 40,000/-
Total 25,57,500/-
(iii) Other Fixed Assets
i. Erection and installation 2,17,500/-
7
ii. Office Furniture 40,000/-
iii. Pre-operative expenses 30,000/-
Total: 2,87,500/-
Total Fixed Capital: 28,45,000/-
(B) Working Capital (per month)
(i) Staff & Labour (Per Month):
Sl.
No.
Personnel No. Rate(Rs.) Amount ( In Rs.)
1. Marketing Manager 1 10000 10,000/-
2. Sales Representative 1 6000 6,000/-
3. Accounts Officer 1 5000 5,000/-
4. Clerk/ Store-Keeper 2 3500 7,000/-
5. Electrician 1 3500 3,500/-
6. Peon/Watchman 2 3000 6,000/-
Total: 37,500/-
Production Staff:
7. Production Manager 1 10000 10,000/-
8. Cutting Master 1 8000 8,000/-
9. Skilled Workers 55 3500 1,92,500/-
10. Pressman 4 3500 14,000/-
11. Unskilled Workers 6 3000 18,000/-
Total: 2,42,500
Perquisites @ 20% on the total salary 56,000/-
8
Grand Total 3,36,000/-
(ii) Raw Material ( Per month):
Sl.
No
Item description Qty.
Unit
Rate
(Rs.)
Value
(In Rs.)
1. Cotton Fabric Shirts (Mtrs.) 16500 80/- 13,20,000/-
2. Blended Fabric for Trousers
(Mtrs.).
10000 150/- 15,00,000/-
3. Trims and Embellishments
(Nos.)
7500 15/- 1,80,000/-
4. Sewing Thread (Mtrs.) 15000 LS 1,23,750/-
5. Washing Detergents LS 5,000/-
6. Packing Material (Nos.) 15000 3 45,000/-
Total
:
30,16,250/-
(iii) Utilities: (Per Month)
1. Electricity Rs. 24,000/-
2. Water charges Rs. 2,000/-
3. Fuel for Generator Set Rs. 5,000/-
Total: - Rs. 31,000/-
(iv) Other Contingent Expense (Per Month):
1. Rent Rs. 24,000/-
2. Advertisement & Publicity Rs. 3,000/-
3. Postage & Stationery Rs. 1,000/-
4. Repair and maintenance Rs. 2,000/-
5. Transport /Traveling charges Rs. 5,000/-
6. Telephone Bills Rs. 2,000/-
7. Miscellaneous Expenses Rs. 2,000/-
Total: Rs. 39,000/-
9
(v) Total Recurring expenses ( per month):
i. Staff & Labour Rs. 3,36,000/-
ii. Raw Material Rs. 30,16,250/-
iii. Utilities Rs. 31,000/-
iv. Other contingent expenses Rs. 39,000/-
Total: Rs. 34,22,250/-
(vi) Total Working Capital for 3 months: 34,22,250 X 3 = Rs. 1,02,66,250/-
(C) TOTAL CAPITAL INVESTMENT:
1. Machinery & Equipment Rs. 28,45,000/-
2. Working Capital for 3 months Rs. 1,02,66,250/-
Total: Rs. 1,31,11,750/-
MACHINERY UTILISATION:
Capacity utilization of plant and machinery is considered as 75% of installed
capacity. However, this can be improved to 80% during 3rd
year of
production.
FIFNANCIAL ASPECTS:
(1) Cost Of Production (Per Annum)
1. Recurring Expenses Rs. 4,10,67,000/-
2. Depreciation on Machinery @ 10% Rs. 2,39,250/-
10
3. Depreciation on Office Furniture & other
fixed assets @ 20%
Rs. 8,000/-
4. Interest on Total Investment @ 16% Rs. 20,97,880/-
Total: Rs. 4,34,12,130/-
(2) Turn Over(per year) by Sales
Products Quantity
(Nos.)
Rate/Pc. (Rs.) Value (Rs.)
Gents Shirts 90,000 210/- 1,89,00,000/-
Gents Trousers 90,0000 320/- 2,88,00,000/-
Total 4,77,00,000/-
(3) Net Profit (per year)
(Before Income Tax)
Sales Value (-) Cost of Production
4,77,00,000/- (-) 4,34,12,130/- Rs. 42,87,870/-
(4) Net Profit Ratio:
Net profit X 100 42,87,870X 100
Turn Over/Annum 4,77,00,000 =
22.68%
(5)Rate of Return on Investment:
(Net Profit/Total Capital Investment)
Annual Profit X 100 42,87,870X 100
11
Total Capital
Investment
1,31,11,750 = 32.70%
(6) Break Even Point/Analysis:
Fixed Cost (Per Annum):
1. Rent Rs. 2,88,000/-
2. Depreciation Rs. 2,47,250/-
3. Interest on Capital Investment Rs. 20,97,880/-
4. 40% of Wages of Staff & Labour Rs. 16,12,800/-
5. 40% of other contingent expenses Rs. 72,000/-
Total Fixed Cost: Rs. 43,17,930/-
Break Even Point:
Fixed Cost X 100 43,17,930/- X 100
Fixed Cost + Annual
Profit
43,17,930/- +
42,87,870/-
= 50.17%
12
Name & Addresses of Machinery & Equipment Suppliers
Sl.
No.
Name & Address
1. M/s Paras Special Machine Co.,
Madhopur Kucha No. 7,
Rohan Road, Ludhiana.
2. M/s Mehala Machines India Limited,
C-62, Okhla Industrial Area, Phase-1,
New Delhi-110020.
3. M/s Vijay Sewing (P) Ltd.,
17-D, Everest House, 46-C,
Chowringhee Road, Kolkata.
4. M/s Industrial Machines Pvt. Ltd.,
1/23 B, Asaf Ali Road, New Delhi-110002.
5. M/s Apparel & Leather Techniques Pvt. Ltd.,
Kaikondanahalli, Near Bellaandur Gate,
Bangalore-560035.
6. M/s Industrial Sewing Systems,
30, Ramakrishna Street, North Usman Road,
T. Nagar, Chennai.
7. JUKI Machinery (India) Pvt. Ltd.,
A-215/B, Okhla Industrial Area, Phase-1,
New Delhi.
8. M/s B. B. Corporation,
123-B, Dada Nagar, Kanpur.
9. M/s Star International Pvt. Ltd.,
Star Tower, 109/366-2, R. K. Nagar,
G.T. Road, Kanpur.
10. M/s Mehala Machine India Ltd.,
Plot NO. 18, Block H-1, 117/447, Pandu Nagar,
Kanpur.
Name & Addresses of Raw Material Suppliers:
Sl. No. Address
1. M/s Vardhman Threads,
Mahavir Spinning Mills Ltd.,
Chandigarh Road,
Ludhiana-141001.
2. Local Market.

More Related Content

Similar to experimental analysis of concrete using fibre.pdf

Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited
Fazle R. Rumman
 
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITEDReport on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
ashfaq91
 
I ndustrial attachment of apex spinning and kniting mills ltd.
I ndustrial attachment of apex spinning and kniting mills ltd.I ndustrial attachment of apex spinning and kniting mills ltd.
I ndustrial attachment of apex spinning and kniting mills ltd.Md. Mazadul Hasan Shishir
 
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments Industry
Shohag Ahammed
 
Industrial Attachment of Interstoff apparels limited
Industrial Attachment of Interstoff apparels limitedIndustrial Attachment of Interstoff apparels limited
Industrial Attachment of Interstoff apparels limitedMd. Mazadul Hasan Shishir
 
CT (1).pptx
CT (1).pptxCT (1).pptx
CT (1).pptx
GutpaShobha
 
Financial feasibilty report of readyment garment
Financial feasibilty report of readyment garmentFinancial feasibilty report of readyment garment
Financial feasibilty report of readyment garmentsameerv91
 
Industrial attachment of landmark textile mills ltd.
Industrial attachment of landmark textile mills ltd.Industrial attachment of landmark textile mills ltd.
Industrial attachment of landmark textile mills ltd.Md. Mazadul Hasan Shishir
 
Woven garments merchandising
Woven garments merchandisingWoven garments merchandising
Woven garments merchandising
ABU TALEB TARAQUE
 
Corrugated box pratik pourkar
Corrugated box   pratik pourkarCorrugated box   pratik pourkar
Corrugated box pratik pourkarANIKET KULKARNI
 
Industrial attachment of sadma fashion wear ltd. (2)
Industrial attachment of sadma fashion wear ltd. (2)Industrial attachment of sadma fashion wear ltd. (2)
Industrial attachment of sadma fashion wear ltd. (2)tanjheel47
 
Body karnaphuli-report for interne
Body karnaphuli-report for interneBody karnaphuli-report for interne
Body karnaphuli-report for interneahad003
 
Textile internship report
Textile internship reportTextile internship report
Textile internship report
Noorul Islam Saiful
 
Industrial attachment of knit concern limited (kcl)
Industrial  attachment  of   knit concern limited (kcl)Industrial  attachment  of   knit concern limited (kcl)
Industrial attachment of knit concern limited (kcl)Md. Mazadul Hasan Shishir
 
Square textiles ltd. .A.S.
Square textiles ltd. .A.S.Square textiles ltd. .A.S.
Square textiles ltd. .A.S.
Md. Mehedi Hossain
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
Mahibur Rahman
 
Industrial attachment of APS group ltd
Industrial attachment of APS group ltdIndustrial attachment of APS group ltd
Industrial attachment of APS group ltd
Md. Mazadul Hasan Shishir
 
Wet Processing Technology
Wet Processing TechnologyWet Processing Technology
Wet Processing Technology
Engr Md Yusuf Miah
 

Similar to experimental analysis of concrete using fibre.pdf (20)

Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited Industrial Attachment undertaken at Knit Concern Group Limited
Industrial Attachment undertaken at Knit Concern Group Limited
 
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITEDReport on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
Report on Industrial Attachment at SINHA ROTOR SPINNING LIMITED
 
I ndustrial attachment of apex spinning and kniting mills ltd.
I ndustrial attachment of apex spinning and kniting mills ltd.I ndustrial attachment of apex spinning and kniting mills ltd.
I ndustrial attachment of apex spinning and kniting mills ltd.
 
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments Industry
 
Industrial Attachment of Interstoff apparels limited
Industrial Attachment of Interstoff apparels limitedIndustrial Attachment of Interstoff apparels limited
Industrial Attachment of Interstoff apparels limited
 
CT (1).pptx
CT (1).pptxCT (1).pptx
CT (1).pptx
 
Financial feasibilty report of readyment garment
Financial feasibilty report of readyment garmentFinancial feasibilty report of readyment garment
Financial feasibilty report of readyment garment
 
Industrial attachment of landmark textile mills ltd.
Industrial attachment of landmark textile mills ltd.Industrial attachment of landmark textile mills ltd.
Industrial attachment of landmark textile mills ltd.
 
Woven garments merchandising
Woven garments merchandisingWoven garments merchandising
Woven garments merchandising
 
Corrugated box pratik pourkar
Corrugated box   pratik pourkarCorrugated box   pratik pourkar
Corrugated box pratik pourkar
 
Industrial attachment of sadma fashion wear ltd. (2)
Industrial attachment of sadma fashion wear ltd. (2)Industrial attachment of sadma fashion wear ltd. (2)
Industrial attachment of sadma fashion wear ltd. (2)
 
Industrial attachment of knit concern ltd.
Industrial  attachment of knit concern ltd.Industrial  attachment of knit concern ltd.
Industrial attachment of knit concern ltd.
 
Body karnaphuli-report for interne
Body karnaphuli-report for interneBody karnaphuli-report for interne
Body karnaphuli-report for interne
 
Textile internship report
Textile internship reportTextile internship report
Textile internship report
 
Industrial attachment of m. m. knitwear ltd
Industrial  attachment  of m. m. knitwear ltdIndustrial  attachment  of m. m. knitwear ltd
Industrial attachment of m. m. knitwear ltd
 
Industrial attachment of knit concern limited (kcl)
Industrial  attachment  of   knit concern limited (kcl)Industrial  attachment  of   knit concern limited (kcl)
Industrial attachment of knit concern limited (kcl)
 
Square textiles ltd. .A.S.
Square textiles ltd. .A.S.Square textiles ltd. .A.S.
Square textiles ltd. .A.S.
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
 
Industrial attachment of APS group ltd
Industrial attachment of APS group ltdIndustrial attachment of APS group ltd
Industrial attachment of APS group ltd
 
Wet Processing Technology
Wet Processing TechnologyWet Processing Technology
Wet Processing Technology
 

Recently uploaded

Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 

Recently uploaded (20)

Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 

experimental analysis of concrete using fibre.pdf

  • 1. 1 PROJECT PROFILE ON GENTS SHIRTS AND TROUSERS NAME OF THE PRODUCT : GENTS SHIRTS AND TROUSERS. PRODUCT CODE : 264104005. QUALITY & STANDARD : The following Indian Standards may be referred. Garment Quality Guide – IS:12675. Readymade Garment – IS:4039. Packaging for Export. Garment Guide for – IS:10194. Positioning of Labels. MONTH & YEAR : May, 2011. OF PREPARATION PREPARED BY : MSME - Development Institute, Ministry of Micro, Small & Medium Enterprises, Government of India 107, Industrial Estate, Kalpi Road, Kanpur-208012. Tele. 2295070, 2295071 & 2295073 (EPBAX) Tele. No. 2295072 (SENET & TRC) Tele/Fax No.: 0512- 2240143 email: dcdi-kanpur@dcmsme.gov.in Website: msmedikanpur.gov.in
  • 2. 2 INTRODUCTION: Manufacturing of Shirts and Trousers are under the category of readymade Garment industry. Readymade garment industry has occupied a unique place in the industrial scenario of our country by generating substantial export earnings and creating lot of employment. Its contribution to industrial production, employment and export earnings are very significant. This industry provides one of the basic necessities of life. The employment provided by it is a source of livelihood for millions of people. It also provides maximum employment with minimum capital investment. Since this industry is highly labour-intensive, it is ideally suited to Indian condition. This project report is prepared for the manufacture of gent’s shirts, gent’s trousers as they find wide acceptance in local and international markets. Any person having the knowledge of cutting and stitching operations can easily set up such establishments. MARKET POTENTIAL: Readymade garments are the choice of urban people. It is also gaining wider acceptance in semi-urban and rural areas. The huge charges made by tailors and delay in delivery has made people to switch over to readymade garments. In domestic market and export market, it has made spectacular progress in the last decade. This industry is becoming very vibrant and lot of foreign investment pouring in this industry because of low risk and high earning nature of this industry. As these products are fashion oriented, entrepreneurs should always keep in mind the changing fashion styles. Considering its advantageous position, it is assumed that there will be no constraint in marketing of gent’s readymade garments. BASIS & PRESUMPTIONS: 1. This project is based on single shift basis and 300 working days in a year. 2. Since this industry is labour-intensive, the working efficiency is considered at 75%. 3. Costs of machinery and equipment/ material indicated refer to a particular make and approximately to those prevailing at the time of preparation of this project.
  • 3. 3 4. Installation and electrification cost is taken @ 10% of cost of machinery and equipment. 5. Non-refundable deposits, project report cost, trial production, security deposits with Electricity Board are taken under pre-operative expenses. 6. Depreciation has been considered: (a) On Building @ 5% (b)On plant and machinery @ 10% (c) On office furniture and fixtures @ 15% (d)On other fixed assets @ 15%. 7. Interest on capital investment has been taken @ 16% per annum. 8. Minimum 25% of total investment is required as margin money. IMPLEMENTATION SCHEDULE Implementation period in months for executing this project in stage-wise is given below: Sl. No. Activity Period 1. Selection of site/working shed 1 month 2. Formation of company (ownership/partnership) 1 month 3. Preparation of feasibility report 1 month 4. Registration with commissioner of Industries/DIC 1 month 5. Arrangement of finance (Term loan and working capital) 3 month 6. Procurement of machinery and equipment 1 month 7. Plant erection and electrification 2 weeks 8. Arrangement of raw material including packaging material etc. 1 month 9. Recruitment of manpower 1 month 10. Selection of market channel 1 month 11. Miscellaneous works like power/water connection etc. 2 month
  • 4. 4 12. Note: Considering that some of the above activities may be overlapping, the project implementation will take a total period of six months approximately for starting the production. TECHNICAL ASPECTS Process of Manufacture: The manufacturing process involves the following steps: 1. Procurement of Fabrics Procurement of Fabric: Dyed/bleached/printed cotton/synthetic fabrics as per demand are to be procured from the open market. The fabric will be inspected by laying on the inspection table against light before cutting so that unevenness in colour/shade or any other fault, if any visible in the fabric are eliminated. Cutting and Stitching: The inspected fabric is placed on the cutting table in layers and then the different parts of the respective garments are demarked by a chalk as per different sizes. Cutting is carried out by the cutting machine. Stitching is carried out for individual portion of the garments by skilled workers with the help of over-lock, lock stitch machines etc. Washing, Checking, Pressing and Packing: All garments are charged into washing machine containing mild detergent and washed for 4 hours in order to remove dirt and stains acquired during the manufacturing process. After washing, the garments are hydro extracted to remove excess water and after this, these garments are dried in tumbler dryer. Final checking is done before pressing and packing on the checking table so that any fault in the piece may be removed and protruding threads eliminated. The individual pieces are pressed by steam presses to remove any wrinkle marks and packed in the carton boxes. QUALITY CONTROL & STANDARD: The quality of garments mainly depends on quality of fabric used. Therefore, care must be taken while purchasing fabrics to ensure good colourfastness properties, uniformity in shade etc. Generally garments are made as per customer's specification in respect of size, design and fashion.
  • 5. 5 Sl. No. BIS No. Title 1. IS:12675 Garment Quality Guide 2. IS:4039 Readymade Garment Packaging for Export. 3. IS:10194 Garment Guide for Positioning of Labels. PRODUCTION CAPACITY (Per Month): Products Quantity (Pcs.) Value (Rs.) Gents Shirts 90,000 4,68,00,000/- Gents Trousers 90,000 MOTIVE POWER REQUIRED: Total 30 HP is required to run this unit at installed capacity. POLLUTION CONTROL: The process of manufacture does not generate pollution. However, entrepreneurs are to contact State Pollution Control Board for necessary guidance. ENERGY CONSERVATION: Maximum care should be taken while selecting the machinery and other electrical equipments so as to ensure minimum power consumption. FINANCIAL ASPECTS: (A) Fixed Capital (i) Land & Building: Land : 800 sq. mtr. @ Rs. 30 per sq. mtr. Building Area Factory Shed : 200 sq. mtr.
  • 6. 6 Store (Raw Material) : 50 sq. mtr. Rs. 24,000/- Store (Finished Goods) : 50 sq. mtr. Total Covered Area: : 300 sq. mtr. (ii) Machinery & Equipments Sl. No Machinery Description Qty Nos. Rate (Rs.) Value (In Rs.) 1. Single Needle Lock Stitch Machine with motor. 50 23,650/- 11,82,500/- 2. 6” Power driven cloth cutting machine 1 50,000/- 50,000/- 3. 2 Needle Overlock Safety Stitching Machine with Trimmer 1 50,000 50,000/- 4. Double Needle Lock Stitch Machine 2 75,000/- 1,50,000/- 5. Button Hole making Machine 1 1,45,000/- 1,45,000/- 6. Button Stitching Machine 1 75,000/- 75,000/- 7. Hot Fusing Press 1 65,000/- 65,000/- 8. Garment Washing Machine 25 Kg capacity 1 1,45,000/- 1,45,000/- 9. Hydro extractor 25 Kg capacity 1 70,000/- 70,000/- 10. Tumbler Dryer 25 Kg capacity 1 1,40,000/- 1,40,000/- 11. Flat Bed Steam Iron Press with Vacuum Table. 4 75,000/- 3,00,000/- 12. Zig Zag Embroidery Machine 1 45,000/- 45,000/- 13. Generator Set 30 KVA 1 1,00,000/- 1,00,000/- 14. Wash Room Trolleys 4 10,000/- 40,000/- Total 25,57,500/- (iii) Other Fixed Assets i. Erection and installation 2,17,500/-
  • 7. 7 ii. Office Furniture 40,000/- iii. Pre-operative expenses 30,000/- Total: 2,87,500/- Total Fixed Capital: 28,45,000/- (B) Working Capital (per month) (i) Staff & Labour (Per Month): Sl. No. Personnel No. Rate(Rs.) Amount ( In Rs.) 1. Marketing Manager 1 10000 10,000/- 2. Sales Representative 1 6000 6,000/- 3. Accounts Officer 1 5000 5,000/- 4. Clerk/ Store-Keeper 2 3500 7,000/- 5. Electrician 1 3500 3,500/- 6. Peon/Watchman 2 3000 6,000/- Total: 37,500/- Production Staff: 7. Production Manager 1 10000 10,000/- 8. Cutting Master 1 8000 8,000/- 9. Skilled Workers 55 3500 1,92,500/- 10. Pressman 4 3500 14,000/- 11. Unskilled Workers 6 3000 18,000/- Total: 2,42,500 Perquisites @ 20% on the total salary 56,000/-
  • 8. 8 Grand Total 3,36,000/- (ii) Raw Material ( Per month): Sl. No Item description Qty. Unit Rate (Rs.) Value (In Rs.) 1. Cotton Fabric Shirts (Mtrs.) 16500 80/- 13,20,000/- 2. Blended Fabric for Trousers (Mtrs.). 10000 150/- 15,00,000/- 3. Trims and Embellishments (Nos.) 7500 15/- 1,80,000/- 4. Sewing Thread (Mtrs.) 15000 LS 1,23,750/- 5. Washing Detergents LS 5,000/- 6. Packing Material (Nos.) 15000 3 45,000/- Total : 30,16,250/- (iii) Utilities: (Per Month) 1. Electricity Rs. 24,000/- 2. Water charges Rs. 2,000/- 3. Fuel for Generator Set Rs. 5,000/- Total: - Rs. 31,000/- (iv) Other Contingent Expense (Per Month): 1. Rent Rs. 24,000/- 2. Advertisement & Publicity Rs. 3,000/- 3. Postage & Stationery Rs. 1,000/- 4. Repair and maintenance Rs. 2,000/- 5. Transport /Traveling charges Rs. 5,000/- 6. Telephone Bills Rs. 2,000/- 7. Miscellaneous Expenses Rs. 2,000/- Total: Rs. 39,000/-
  • 9. 9 (v) Total Recurring expenses ( per month): i. Staff & Labour Rs. 3,36,000/- ii. Raw Material Rs. 30,16,250/- iii. Utilities Rs. 31,000/- iv. Other contingent expenses Rs. 39,000/- Total: Rs. 34,22,250/- (vi) Total Working Capital for 3 months: 34,22,250 X 3 = Rs. 1,02,66,250/- (C) TOTAL CAPITAL INVESTMENT: 1. Machinery & Equipment Rs. 28,45,000/- 2. Working Capital for 3 months Rs. 1,02,66,250/- Total: Rs. 1,31,11,750/- MACHINERY UTILISATION: Capacity utilization of plant and machinery is considered as 75% of installed capacity. However, this can be improved to 80% during 3rd year of production. FIFNANCIAL ASPECTS: (1) Cost Of Production (Per Annum) 1. Recurring Expenses Rs. 4,10,67,000/- 2. Depreciation on Machinery @ 10% Rs. 2,39,250/-
  • 10. 10 3. Depreciation on Office Furniture & other fixed assets @ 20% Rs. 8,000/- 4. Interest on Total Investment @ 16% Rs. 20,97,880/- Total: Rs. 4,34,12,130/- (2) Turn Over(per year) by Sales Products Quantity (Nos.) Rate/Pc. (Rs.) Value (Rs.) Gents Shirts 90,000 210/- 1,89,00,000/- Gents Trousers 90,0000 320/- 2,88,00,000/- Total 4,77,00,000/- (3) Net Profit (per year) (Before Income Tax) Sales Value (-) Cost of Production 4,77,00,000/- (-) 4,34,12,130/- Rs. 42,87,870/- (4) Net Profit Ratio: Net profit X 100 42,87,870X 100 Turn Over/Annum 4,77,00,000 = 22.68% (5)Rate of Return on Investment: (Net Profit/Total Capital Investment) Annual Profit X 100 42,87,870X 100
  • 11. 11 Total Capital Investment 1,31,11,750 = 32.70% (6) Break Even Point/Analysis: Fixed Cost (Per Annum): 1. Rent Rs. 2,88,000/- 2. Depreciation Rs. 2,47,250/- 3. Interest on Capital Investment Rs. 20,97,880/- 4. 40% of Wages of Staff & Labour Rs. 16,12,800/- 5. 40% of other contingent expenses Rs. 72,000/- Total Fixed Cost: Rs. 43,17,930/- Break Even Point: Fixed Cost X 100 43,17,930/- X 100 Fixed Cost + Annual Profit 43,17,930/- + 42,87,870/- = 50.17%
  • 12. 12 Name & Addresses of Machinery & Equipment Suppliers Sl. No. Name & Address 1. M/s Paras Special Machine Co., Madhopur Kucha No. 7, Rohan Road, Ludhiana. 2. M/s Mehala Machines India Limited, C-62, Okhla Industrial Area, Phase-1, New Delhi-110020. 3. M/s Vijay Sewing (P) Ltd., 17-D, Everest House, 46-C, Chowringhee Road, Kolkata. 4. M/s Industrial Machines Pvt. Ltd., 1/23 B, Asaf Ali Road, New Delhi-110002. 5. M/s Apparel & Leather Techniques Pvt. Ltd., Kaikondanahalli, Near Bellaandur Gate, Bangalore-560035. 6. M/s Industrial Sewing Systems, 30, Ramakrishna Street, North Usman Road, T. Nagar, Chennai. 7. JUKI Machinery (India) Pvt. Ltd., A-215/B, Okhla Industrial Area, Phase-1, New Delhi. 8. M/s B. B. Corporation, 123-B, Dada Nagar, Kanpur. 9. M/s Star International Pvt. Ltd., Star Tower, 109/366-2, R. K. Nagar, G.T. Road, Kanpur. 10. M/s Mehala Machine India Ltd., Plot NO. 18, Block H-1, 117/447, Pandu Nagar, Kanpur. Name & Addresses of Raw Material Suppliers: Sl. No. Address 1. M/s Vardhman Threads, Mahavir Spinning Mills Ltd., Chandigarh Road, Ludhiana-141001. 2. Local Market.