Margaret Middleton

                                             Bill Nye’s Climate Lab
315.406.2850

                margaret.k.middleton@gmail

                margaretmiddleton.com




          I created the illustrations,
          diagrams and maps, for                  Bill Nye’s Climate Lab is a solutions-focused
          Chabot Space and Science                science exhibit about climate change for Chabot
          Center’s exhibit Bill Nye’s
          Climate Lab.
                                                  Space and Science Center of Oakland, California

          Most of the illustrations are
          digital. The design team
          chose the content and
          message for their image
          requests and we used a
          collaborative editing process
          to ensure that each diagram
          was accurate and conveyed
          the desired meaning.

          The exhibit is set to open in
          November 2010.




                                                                                                       Communication and power
                                                        Steps of oil and natural gas formation         flow within a “Smart Grid”




               Jet streams, wrapping around the globe                        Green home construction                           Mock-up of interactive showing the greenhouse effect
Margaret Middleton

                                                geometry playground prototype
315.406.2850

                   margaret.k.middleton@gmail

                   margaretmiddleton.com




          This prototype was developed
          for Geometry Playground as an            Geometry Playground is a
          example of “forced                       traveling exhibit by the
          perspective”- the image is               Exploratorium of San Francisco
          painted across many surfaces
          at an extreme angle so visitors
          must position themselves just
          so in order to make sense of
          the image.                                             Find the right vantage point and
                                                                 the image magically comes together....
          I created a variety of graphics
          using the exhibit’s graphic
          standards for font and palette.
          The graphics we chose to use
          in the prototype were the word
          “Look” and a geometric bird.

          I projected my images onto a
          series of plywood pieces that
          had been assembled for me
          and I painted the images
          directly onto the wood with
          latex paint.

          A version of “Look” appears in
          the final exhibit.




                                                                                                           ...from any other angle
               •
               •                                                                                              the image falls apart
               •
               •


           My original digital graphic                   Projecting “Look”               “Look” finished
Margaret Middleton

                                            underland: sketch to finish
315.406.2850

               margaret.k.middleton@gmail

               margaretmiddleton.com




           I worked on a team of
           exhibit developers to design
           a look and feel for the
           space of the exhibit and
           synthesized those ideas in
           my scale model and
           detailed sketches.
                                                                                        Scale model
           My model and sketches
           were then used to propose
           and promote the exhibit                                                   Underland is an outdoor exhibit that gives visitors the
           and generate funding.                       The entrance to Underland     feeling of being underground. It was designed for the
                                                                                     Providence Children’s Museum of Rhode Island.
           Additionally, I designed
           costumes representing
           six different local
           burrowing animals
           including a chipmunk,
           a cicada, and a
           painted turtle. Since
           the exhibit is outdoors,
           I chose rugged fabrics
           that were easy to wash
           and would hold up to
           New England weather.
                                                                                       Interior rooms with musical instruments and underground kitchen




                                    Root chandeliers

                                                        Salamander and turtle play the xylophone
                                                                                                   Sandbox with Mastodon bones to dig up
                                                                                                                                           “Loose parts”- scattered natural items to inspire play
Margaret Middleton

                                                kidworks
315.406.2850

                   margaret.k.middleton@gmail

                   margaretmiddleton.com




          During my time as an exhibits
          intern at the Metropolitan               KidWorks is a special part of
          WaterWorks Museum in                     the Metropolitan WaterWorks
          Boston MA, I conceived of                Museum dedicated to their
          and drew up a funding
          proposal for a space                     youngest visitors.
          dedicated to the museum’s
          youngest visitors.

          Out of the way, yet still in
          view, KidWorks provides a
          safe place for children under
          5 to learn through play, and
          let their older siblings and
          parents enjoy a longer visit in
          the rest of the museum.
          KidWorks would also make a
          great meeting place for local
          parents and their
          preschoolers.

          The museum is set to open in
          October 2010 and whether it
          will include the KidWorks
          space is dependent on
          funding.

                   Why a space for children?




                                                                                             EnterTRAINment Junction, Cincinnati OH   Austin Children’s Museum, Austin TX




               •   wider audience
               •   longer visits
               •   more repeat visits                                              141 ft2
               •   building community
                                                                                             Canal Museum, Easton PA                         Titanic Museum, Branson MO


           Selections from the KidWorks proposal presentation
Margaret Middleton

                                            PCM renovation/play power
315.406.2850

               margaret.k.middleton@gmail

               margaretmiddleton.com




         I was in charge of the
         painting operation for our
         ambitious two-month
         renovation. My job involved
         organizing paint, creating a
         project calendar, managing
         volunteers, keeping the
         operation on schedule, and
         of course, lots of painting.

                The Providence Children’s
                Museum underwent a massive
                renovation, including the
                installation of a new exhibit
                called Play Power.
          After we painted the walls,
          we were ready to install
          Play Power. As part of the
          exhibit team, I helped plan
                                                                                                            Exhibit components inspire creative problem-solving,
          exhibit components that
                                                                                                            imaginative and dramatic play, and experimentation
          would support our message
          that play is a valuable and                              The exhibit team chose inspirational
          important part of a child’s                              quotations for the walls of Play Power
          development.




           Our process from left to right: sanding, cleaning, painting, and touch-up                                           Post-its reminded volunteers
                                                                                                                               what colors to use
Margaret Middleton

                                            conservation cabin
315.406.2850

               margaret.k.middleton@gmail

               margaretmiddleton.com




          The goal of this renovation
          project was to transform            The Conservation Cabin
          what was built as a
          temporary turtle exhibit,           invites visitors to explore
          into Conservation Cabin, a          reptile habitats from
          reptile house with a focus          around the world at the
          on habitats.
                                              Roger Williams Park Zoo of
          I wrote a proposal and              Rhode Island.
          devised a budget for the
          renovation. I worked with a
          carpenter and together we
          added the porch, fixed the
          roof, installed the cedar
          shingling and false
          windows, and painted the                before
          trim.




                                                                                                                                 after




         Shingles in progress                                               Priming the window boxes   My hand-carved sign above the entrance
Margaret Middleton

                                             anteater cantina
315.406.2850

                margaret.k.middleton@gmail

                margaretmiddleton.com




               I designed the look of the
               Anteater Cantina, styled
               after a Latin American diner,
               chose the decorations, and
               painted it with faux finishes
               to look like stucco, terra
               cotta tile, stone, and kitchen
               tile.

               The posters inside, the sign
               on the door, and the short
               order window in the back are
               painted directly on the wall.
               Even the panels on the door
               are trompe l’oeil illusions.


                                                        The Anteater Cantina is a docent station
                                                           at Roger Williams Park Zoo of Rhode
                                                            Island, designed to complement the
                                                                       exhibit, Tropical America.




               Original proposal sketch



                                                                   Painted “advertisement” on building exterior   Detail of “Sloth Brand Decaf” label design
Margaret Middleton

                                            waterways signage
315.406.2850

               margaret.k.middleton@gmail

               margaretmiddleton.com




          I created digital graphics
          in Adobe Illustrator for
          these five signs. The
          imagery in each sign is
          specific to its message
          and location and the
          colors were chosen to
          complement the exhibit’s
          color scheme.

          The designs were printed
          on Sintra and I suspended
          them from monofilament
          above the water tanks.


                 The signage in Waterways
                 at the Providence Children’s
                 Museum of Rhode Island is
                 designed to inspire a child’s
                 exploration of water.


          The designs for the five signs I created:
Margaret Middleton

                                            milking goat
315.406.2850

               margaret.k.middleton@gmail

               margaretmiddleton.com




          I constructed the milking
          goat from 2x4’s and
          plywood. The interior
          reservoir is made from
          watertight PVC so it can be
          filled from the top and
          children can then “milk”
          from the goat through rubber
          “udders”.

          I designed the goat to match
                                                The milking goat gives
          existing cow versions and             children a hands-on
          painted it to resemble one of         experience at the
          the zoo’s LaMancha dairy
          goats.                                Rosamond Gifford Zoo
                                                at Burnet Park of
                                                Syracuse, New York.




         Detail of paint job                               Wood framework   Interior reservoir, full of water   Milking a goat is fun!
Margaret Middleton

                                             too small to see
315.406.2850

                margaret.k.middleton@gmail

                margaretmiddleton.com




               This exhibit was a
               collaboration between              Small
                                                    particles
                                                                                                Smaller
                                                                                                  particles
                                                                                                                                                                Nano
                                                                                                                                                                  particles
               Cornell’s Main Street
               Science and Ithaca’s Painted
               Universe, in conjunction with
               the Ithaca Sciencenter
               through a grant from NSF.                                                                    1 nanometer

               In preparation for the exhibit,
               I conducted research on
                                                                                                         a smell molecule
               techniques for helping
                                                                                                               Smell molecules are even smaller
               children visualize atoms. I
               was also involved in some of                                                                    than dust particles.
               the early interpretive work,
                                                                                                               Sniff the air
               as well as illustrations for a
               children’s book, and the                                                                        above the tube.
               creation of the character,                                                                                                             You can smell the
               Quark the Science Dog, a                                                                                                             scent, but you can’t
               bull terrier with a flair for                                                                                                              see anything.
               chemistry.
                                                                                                                                         Smell molecules are
                                                                                                                                         too small to see but
                                                                                                                                they’re not too small to smell.
                 Too Small to See is a traveling children’s museum
                 exhibit about atoms and nanotechnology, developed
                 at Cornell University of Ithaca, New York.

                                                                                                                        Do YOU Nanooze?
                                                                                                                       It’s the only place online
                                                                                                                        to nd ME. Come visit!
                                                                                                                      Your puppies- I mean kids-
                                                                                                                                will love it!




                                                                                                                         Quark the Science Dog, PhD
                                                                                                                         Official Spokes-terrier for
                                                                                                                         Main Street Science




               Initial concept page                  Sample page from the book dummy   Final illustration proposal   Promotion featuring Quark the Science Dog

Exhibit Portfolio

  • 1.
    Margaret Middleton Bill Nye’s Climate Lab 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I created the illustrations, diagrams and maps, for Bill Nye’s Climate Lab is a solutions-focused Chabot Space and Science science exhibit about climate change for Chabot Center’s exhibit Bill Nye’s Climate Lab. Space and Science Center of Oakland, California Most of the illustrations are digital. The design team chose the content and message for their image requests and we used a collaborative editing process to ensure that each diagram was accurate and conveyed the desired meaning. The exhibit is set to open in November 2010. Communication and power Steps of oil and natural gas formation flow within a “Smart Grid” Jet streams, wrapping around the globe Green home construction Mock-up of interactive showing the greenhouse effect
  • 2.
    Margaret Middleton geometry playground prototype 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com This prototype was developed for Geometry Playground as an Geometry Playground is a example of “forced traveling exhibit by the perspective”- the image is Exploratorium of San Francisco painted across many surfaces at an extreme angle so visitors must position themselves just so in order to make sense of the image. Find the right vantage point and the image magically comes together.... I created a variety of graphics using the exhibit’s graphic standards for font and palette. The graphics we chose to use in the prototype were the word “Look” and a geometric bird. I projected my images onto a series of plywood pieces that had been assembled for me and I painted the images directly onto the wood with latex paint. A version of “Look” appears in the final exhibit. ...from any other angle • • the image falls apart • • My original digital graphic Projecting “Look” “Look” finished
  • 3.
    Margaret Middleton underland: sketch to finish 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I worked on a team of exhibit developers to design a look and feel for the space of the exhibit and synthesized those ideas in my scale model and detailed sketches. Scale model My model and sketches were then used to propose and promote the exhibit Underland is an outdoor exhibit that gives visitors the and generate funding. The entrance to Underland feeling of being underground. It was designed for the Providence Children’s Museum of Rhode Island. Additionally, I designed costumes representing six different local burrowing animals including a chipmunk, a cicada, and a painted turtle. Since the exhibit is outdoors, I chose rugged fabrics that were easy to wash and would hold up to New England weather. Interior rooms with musical instruments and underground kitchen Root chandeliers Salamander and turtle play the xylophone Sandbox with Mastodon bones to dig up “Loose parts”- scattered natural items to inspire play
  • 4.
    Margaret Middleton kidworks 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com During my time as an exhibits intern at the Metropolitan KidWorks is a special part of WaterWorks Museum in the Metropolitan WaterWorks Boston MA, I conceived of Museum dedicated to their and drew up a funding proposal for a space youngest visitors. dedicated to the museum’s youngest visitors. Out of the way, yet still in view, KidWorks provides a safe place for children under 5 to learn through play, and let their older siblings and parents enjoy a longer visit in the rest of the museum. KidWorks would also make a great meeting place for local parents and their preschoolers. The museum is set to open in October 2010 and whether it will include the KidWorks space is dependent on funding. Why a space for children? EnterTRAINment Junction, Cincinnati OH Austin Children’s Museum, Austin TX • wider audience • longer visits • more repeat visits 141 ft2 • building community Canal Museum, Easton PA Titanic Museum, Branson MO Selections from the KidWorks proposal presentation
  • 5.
    Margaret Middleton PCM renovation/play power 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I was in charge of the painting operation for our ambitious two-month renovation. My job involved organizing paint, creating a project calendar, managing volunteers, keeping the operation on schedule, and of course, lots of painting. The Providence Children’s Museum underwent a massive renovation, including the installation of a new exhibit called Play Power. After we painted the walls, we were ready to install Play Power. As part of the exhibit team, I helped plan Exhibit components inspire creative problem-solving, exhibit components that imaginative and dramatic play, and experimentation would support our message that play is a valuable and The exhibit team chose inspirational important part of a child’s quotations for the walls of Play Power development. Our process from left to right: sanding, cleaning, painting, and touch-up Post-its reminded volunteers what colors to use
  • 6.
    Margaret Middleton conservation cabin 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com The goal of this renovation project was to transform The Conservation Cabin what was built as a temporary turtle exhibit, invites visitors to explore into Conservation Cabin, a reptile habitats from reptile house with a focus around the world at the on habitats. Roger Williams Park Zoo of I wrote a proposal and Rhode Island. devised a budget for the renovation. I worked with a carpenter and together we added the porch, fixed the roof, installed the cedar shingling and false windows, and painted the before trim. after Shingles in progress Priming the window boxes My hand-carved sign above the entrance
  • 7.
    Margaret Middleton anteater cantina 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I designed the look of the Anteater Cantina, styled after a Latin American diner, chose the decorations, and painted it with faux finishes to look like stucco, terra cotta tile, stone, and kitchen tile. The posters inside, the sign on the door, and the short order window in the back are painted directly on the wall. Even the panels on the door are trompe l’oeil illusions. The Anteater Cantina is a docent station at Roger Williams Park Zoo of Rhode Island, designed to complement the exhibit, Tropical America. Original proposal sketch Painted “advertisement” on building exterior Detail of “Sloth Brand Decaf” label design
  • 8.
    Margaret Middleton waterways signage 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I created digital graphics in Adobe Illustrator for these five signs. The imagery in each sign is specific to its message and location and the colors were chosen to complement the exhibit’s color scheme. The designs were printed on Sintra and I suspended them from monofilament above the water tanks. The signage in Waterways at the Providence Children’s Museum of Rhode Island is designed to inspire a child’s exploration of water. The designs for the five signs I created:
  • 9.
    Margaret Middleton milking goat 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com I constructed the milking goat from 2x4’s and plywood. The interior reservoir is made from watertight PVC so it can be filled from the top and children can then “milk” from the goat through rubber “udders”. I designed the goat to match The milking goat gives existing cow versions and children a hands-on painted it to resemble one of experience at the the zoo’s LaMancha dairy goats. Rosamond Gifford Zoo at Burnet Park of Syracuse, New York. Detail of paint job Wood framework Interior reservoir, full of water Milking a goat is fun!
  • 10.
    Margaret Middleton too small to see 315.406.2850 margaret.k.middleton@gmail margaretmiddleton.com This exhibit was a collaboration between Small particles Smaller particles Nano particles Cornell’s Main Street Science and Ithaca’s Painted Universe, in conjunction with the Ithaca Sciencenter through a grant from NSF. 1 nanometer In preparation for the exhibit, I conducted research on a smell molecule techniques for helping Smell molecules are even smaller children visualize atoms. I was also involved in some of than dust particles. the early interpretive work, Sniff the air as well as illustrations for a children’s book, and the above the tube. creation of the character, You can smell the Quark the Science Dog, a scent, but you can’t bull terrier with a flair for see anything. chemistry. Smell molecules are too small to see but they’re not too small to smell. Too Small to See is a traveling children’s museum exhibit about atoms and nanotechnology, developed at Cornell University of Ithaca, New York. Do YOU Nanooze? It’s the only place online to nd ME. Come visit! Your puppies- I mean kids- will love it! Quark the Science Dog, PhD Official Spokes-terrier for Main Street Science Initial concept page Sample page from the book dummy Final illustration proposal Promotion featuring Quark the Science Dog