SlideShare a Scribd company logo
1 of 63
Download to read offline
86 92
ABOUT
LSF
STUDIO
Weat LSF Studio areproudtoberecognizedasthepioneersof the LSF- Light Steel Framing
RESIDENTIAL
BUILDINGS
OFFICE
BUILDINGS
revolution in India,and aremarket leaders inoffering complete turnkey solution- right from Design,
SupplyandErectionofFramestothefinishedproductusingLSF Technology.
With commendable work experience across diverse sectors and terrains PAN India, and a strong
inhouse team of on-site andoff-site skilled manpower, we take complete responsibility of realizing
your dreams to build-be it a new home, holiday home, office, school or any other institutional
building.
Apart from the fact that LSF has constructed G+5 and G+13 buildings in India, some of our
noteworthy projects in steel include Industrial Training Institutes, Polytechnic institutes,
Government offices, resortsandvillasat Multiplelocations.
52 EDUCATION 78 RESORTS
RECREATION HEALTHCARE
CENTRE CENTRES
98 DRY WALLS 110 STUDY
YOU NAME IT, WE BUILD IT.
1 Light Steel Framing Solutions 2 Light Steel FramingSolutions
2 26
This book is a showcase of the various projects that we have dealt with over the years with clients CASE
from b o t h public and private sectors. Projects includes the various sectors starting from
residential, commercial to recreational with high end to cost constraint projects
2
52
86
98
26
78
92
110
ABOUT STRATUS STEEL
Stratus steel is the LGSF division of MGI India Pvt Ltd
founded by Mr.Vidur Chandra with the purpose of
providing well-engineered superior steel frames. Stratus
Steel also provides design and comprehensive back-end
support for all LGSF projects.
ParadiseAvenue Jammu
Mira House
Orchid Greens 11
Ramban 15
Residence of Mr Rakesh Sharma 17
NTPC Khargaon 19
Field hostel, Chambha 23
YOU NAME IT, WE BUILD IT.
3 Light Steel Framing Solutions 4 Light Steel Framing Solutions
RESIDENTIAL BUILDINGS
PARADISE AVENUE
JAMMU
This technology could be highly advantageous to residential buildings due to increased carpet
space. Buildings are occupied sooner in up to half the time of conventional construction. Huge
savingsontransport andlesslaborascomparedtobrickandmortarbuildingsarealsoa major
factor in considering LSF.
Jammu comes under Seismic Zone-4, and as such earthquake, resistant structures are a
necessity. Steel due to its ductility can absorb earthquake shocks and energy. Since the overall
weight of the building is one-fourth that of a conventional brick and mortar building, it remains
unaffected during an earthquake.
This thirteen- story (excluding stilt)
residential project with a
basement car park at Narwal,
Jammu, meets all prevalent green
building programs and
standards. A hot rolled s t eel
skeleton forms the exterior of the
entire building with infill of LSF
walls. The steel columns begin
at the basement slab level in a
regular grid pattern and extend
upwards to the roof level.
Structural steel work has been
done with composite metal
decking floors together with the
metal roof and stairs, a perfect
example of Hybrid construction
methodology.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+13
1,35,000 square feet
Steel structure including exterior and interior cladding along with slab
8 months
Completed
5 LightSteel Framing Solutions 6 Light Steel Framing Solutions
MIRA
HOUSE
Thiscontemporary StateofthearthomewithachicfacadeatNewDelhihasbeencompleted
withinaspanof I.5months.
The polymer-based finishes with EIFS in the exteriors allow for a vast range of colors and
textures. Also, additional insulation with the layer of polystyrene makes lower-capacity heating
andairconditioning possiblewithout compromising in terms of interior comfort
LSF home is the preferred choice for renowned architects and home owners who want an
innovative and durable customized project. This villa is built with the intention of exceeding our
client’sexpectationsforsafety,quality,functionality,andaesthetics.
FLOORS
COVEREDAREA
SCOPE
DURATION OF WORK
STATUS
G+1
1,690 squarefeet
Steel structure including exterior and interior cladding along with slab
8 months
Completed
Light Steel Framing Solutions 8 Light Steel Framing Solutions
7
Interior design elements are incorporated here, like wooden flooring, designer bathrooms.
There are no restrictions as to choice of materials in any part of the home be it the
doors/windows, kitchen layout and accessories, glazing, stone cladding or staircase railings.
LSF buildings are built to meet or exceed the same building codes and standards as site-
built structures, a n d the s a m e architect -specified materials u s e d i n
conventionally constructed buildings are used in modular construction projects.
9 LightSteel Framing Solutions 10 Light Steel Framing Solutions
ORCHID
GREENS
Architects love LSF for its versatility in design and consistency as a product. In this is project
spired roof reminiscent of Thai temple had been envisioned by the architect Improvements in
galvanizing and coating steel have resulted in stronger, thinner, easier to shape and corrosion-
resistant products.
Unlike other materials that require chemical treatment during manufacture followed by regular
treatments to minimize termite damage, Light steel frames are manufactured chemical
free preventing long term chemical exposure for you and your family. Steel frames
are not slammable. There by increasing fire rating. Light steel frames are moisture resistance
and prevent all seepages andmold formation.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
1600 Square feet (10 units)
Turnkey
3 months
Completed
11 Light Steel Framing Solutions 12 Light Steel Framing Solutions
The entrance to the building is double heighted which adds to is plush look. Large windows
ensure an inlet for natural ventilat ion and lighting. The use of wooden louvers enhances the
play of light and shadow inside the building. To add to the aesthetics of the interior, we have
used wooden flooring and Italian stone on the floors, beautiful crack free f inished to this unique
home and superiors high quality gypsum boards land an.
13 Light SteelFraming Solutions 14 Light Steel Framing Solutions
RAM BAN
The residential structure is situated between Jammu and Srinagar in a high seismic zone and
is the first of its kind in the area. LGSF was chosen for the dual benefits of speedy construction
and for its earthquake resistant the load inducted on the building is less due to the lightness of
the structure and chances of progressive collapse are marginal due to the ductile and load
causingnature of closely spacedstuds/joists.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
2,455 squarefeet
Turnkey
3 months
Completed
15 Light Steel Framing Solutions 16 Light Steel Framing Solutions
RESIDENCE OF
MR. RAKESH SHARMA
ThisvillaislocatedatKullu wherethetemperatureisasfaras-4DegreeCelsius.Thebuilding
was designed keeping in mind snow loads, and seismic intensity and recurring storms.
Being thermally efficient, these buildings can withstand a wide range of temperature change
andcan bekeptwarm/cool atafraction ofthecostof conventional structures
FLOORS
COVERED AREA
SCOPE
STATUS
G+1
1050 squarefeet (2 units)
Turnkey
Ongoing
17 Light Steel Framing Solutions 18 Light Steel Framing Solutions
NTPC.
KHARGAON
This was our first project with NTPC, involving low-cost accommodation on Khargaon. The
scope of work involved supply of steel, fabrication & erection, as well as civil foundat ion,
galvalume roofing & cladding. Since NTPC requires fast track construction for their new plan is
LSF was the perfect buildingsolution.
FLOORS
COVEREDAREA
SCOPE
DURATION OF WORK
STATUS
G+1
59,848
Turnkey
4 months
Completed
19 Light Steel Framing Solutions 20 Light Steel Framing Solutions
Light Steel Framing Solutions 22 Light Steel Framing Solutions
FIELD HOSTEL.
CHAMBA
Chamba, situated in a remote hilly region where temperature fall below -4DC, was the site of
our field hostel constructed for GMR. Erection took place during snowfall which was possible
as the steel structure is mostly completed in a factory controlled environment using dry
material. Our technology requires less manual labor & limited material movements, lending
itself advantageously to difficult terrains.
FLOORS
COVEREDAREA
SCOPE
DURATION OF WORK
STATUS
G+2
10,280squarefeet
Turnkey
4 months
Completed
23 Light Steel Framing Solutions 24 Light Steel Framing Solutions
Cairn Energy Building 27
SRO Alipur 31
Police and Irrigation Office 35
Sub Registrar Office Saket 39
Sub Registrar Office Nangloi 43
SDO office Nazafgarh 47
YOU NAME IT, WE BUILD IT.
25 Light Steel Framing Solutions 26 Light Steel Framing Solutions
OFFICE BUILDINGS
CAIRN ENERGY
BUILDING
CAIRN energy chose LSF for constructing its accommodation building, laboratories and
other ancillary buildings at its Badmer facility. Besides the fast paced construction, the other
major deciding criteria were advanced thermal insulation (as temp. rise 50DC) and strict for
ratingsof minimum 4 hours.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
38,750 square feet
Turnkey
6 months
Completed
27 Light Steel FramingSolutions 28 Light Steel FramingSolutions
29 LightSteelFramingSolutions 30 LightSteelFramingSolutions
;
r .
SRO
ALIPUR
The Sub registrar's office at Alipur is the first of many such buildings constructed by us for
` DTIDC. This structure demonstrates that steel can lend a tasteful, aesthetic facade to public
offices.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
15,898square feet
Steel Structure including exterior and interior cladding along with slab
6 months
Finished
31 Light Steel FramingSolutions 32 Light Steel FramingSolutions
33 LightSteelFramingSolutions 34 LightSteelFramingSolutions
POLICE AND IRRIGATION
OFFICE
This Police cum Irrigation office is one of the first steel buildings in Lucknow, located in the up
market Gomti River district. It demonstrates the use of steel framework and external glazing
techniques which can beadapted to high uses as well.
FLOORS
COVERED AREA
SCOPE
STATUS
Stilt+2
4,700 squarefeet
Turnkey
Finished
35 Light Steel FramingSolutions 36 Light Steel FramingSolutions
37 LightSteelFramingSolutions 38 Light SteelFramingSolutions
SUB REGISTRAR
OFFICESAKET
This Sub registrar's office is located at Saket, a densely populated area in Delhi. Due to
constraint & having buildings on either side, LSF was the perfect solution as a dry
construction technology. Fewer vehicular movements, less disruption on site and limited
laborensure hassle-freebuildingprocess.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
8,500 square feet
Steel Structure including exterior and interior cladding along with slab
4 months
Finished
39 Light SteelFramingSolutions 40 Light SteelFraming Solutions
LightSteelFramingSolutions Light Steel Framing Solutions
SUB REGISTRAR OFFICE
NANGLOI
Asimilar subregistrar officeinNangloai constructed for DCCDC.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
15,566 square feet
Steel Structure including exterior and interior cladding along with slab
4 months
Finished
43 Light Steel FramingSolutions 44 Light Steel FramingSolutions
Light Steel FramingSolutions 46 LightSteelFramingSolutions
SDO OFFICE
NAZAFGARH
A similar SDO officeinNazafgarh Constructed for DTIDC
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
10,064squarefeet
Steel Structure including exterior and interior cladding along with slab
4 months
Finished
47 Light Steel FramingSolutions 48 Light Steel FramingSolutions
LightSteel FramingSolutions 50 LightSteelFramingSolutions
YOU NAME IT, WE BUILD IT.
51 Light Steel Framing Solutions
DTIDC School Roof Top Extension
Disaster Resource And Training Centre - Rajokari
AWHA School RoofTop Extension Project
Nehru Institute Of Mountaineering
School Nepal
Design School Faridabad
ITl6 Trade Umaria
52
53
57
61
63
65
69
73
Light Steel Framing Solutions
EDUCATIONAL
DTTDC SCHOOL
ROOF TOP EXTENSION
LGSF is perfectly suited for expansion projects, both vertical and horizontal. The weight of an
LGSF structure being 1/3 that of a conventional building, it is widely used across the world
where regular structure would prove to b e heavy. This advantage has been seen across 25
MGI Infra sites in New Delhi alone, where in the existing government sector and higher
secondary schoolshavebeenextended.
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
20000 square feet (average)
Steel Structure, Internal & External Boarding, EIFS
3 Months
Our Scope Completed
53 Light Steel Framing Solutions 54 Light Steel Framing Solutions
Light Steel FramingSolutions 56 Light Steel Framing Solutions
DISASTER RESOURCE AND
TRAINING CENTRE - RAJOKARI
Our auditorium in the DSRC Building, Rajokari is a particular achievement in LSF construction
located on the first f loor of the building. This auditorium has large spans measuring beyond 12
meters, making it a column less space. The tiered steps have also been constructed in cold
rolled steel and the specified acoustics have been achieved using different insulations and
acoustical cladding.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
8,300 square feet
Steel Structure including exterior and interior cladding along with slab
4 months
Completed
57 Light Steel FramingSolutions 58 Light Steel FramingSolutions
59 LightSteelFramingSolutions 60 Light SteelFramingSolutions
AWHA SCHOOL ROOF
TOP EXTENSION PROJECT
Similar and the Delhi government school, AWHA {a school funded and promoted by United
Phosphorous Public Ltd.) chose our technology for the benefits of a fast-track, light weight roof
top extension.
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
16,705 square feet
Turnkey
5 months
Completed
61 Light Steel Framing Solutions 62 Light Steel Framing Solutions
NEHRU INSTITUTE OF
MOUNTAINEERING
A mountaineering is being built by us in Munsiyari, uttarakhand. Situated 7200ft above mean
sea level,its extreme weather conditions allow for avery short period inwhich construction can
be undertaken, thus making civil work unfeasible. Our technology is perfect for building in such
areas.
FLOORS
COVERED AREA
SCOPE
STATUS
G+2
29,000 squarefeet
Turnkey
Ongoing
63 Light Steel FramingSolutions 64 Light Steel Framing Solutions
SCHOOL -
NEPAL
In the aftermath of a devastating earthquake, the Nepal government is looking torebuild Nepal
not only with celerity, but using a method of construction that will ensure the
safety of its residents in the event of another. This school project has beenfunded by an
NGOaspartofthe initiativetobuildschool inremoteareas.
FLOORS
COVERED AREA
SCOPE
STATUS
Ground
1,280squarefeet
Steel Structure
Ongoing
65 Light Steel FramingSolutions 66 Light Steel FramingSolutions
67 Light Steel Framing Solutions 68 Light Steel Framing Solutions
DESIGN SCHOOL
FARIDABAD
The design school in Faridabad is one of our signature projects. The structural skeleton is
going to be left exposed, giving it a raw, industrial look that extends to the interiors. It is
characterised by longspans, openspaces and minimalist interiors
FLOORS
COVEREDAREA
SCOPE
STATUS
G+2
30,000 square meter
Steel Structure
Ongoing
69 Light Steel FramingSolutions 70 Light Steel FramingSolutions
71 Light Steel Framing Solutions 72 Light Steel Framing Solutions
ITI 6 TRADE
UMARIA
As a part of central and state government initiative, technical training has received a huge
impetus, and several industrial training institutes are being conceived throughout India. These
institutes are located in remote areas and require fast -track constructive. LSF Studio has
now constructed 20 such buildings across India.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+1
25,000 square feet
Turnkey
6 months
Completed
73 Light Steel FramingSolutions 74 Light Steel FramingSolutions
75 Light SteelFramingSolutions 76 LightSteelFramingSolutions
Cottages Chail
79
Tourist Rest House- Munshlyari. Uttrakhand 81
Thai StyleCottages
83
YOU NAME IT, WE BUILD IT.
77 Light Steel Framing Solutions
78 Light Steel Framing Solutions
RESORTS
RESORT
COTTAGES
Any hotel/resort property is mainly concerned with a quick return on investment. Our
technology, because of its fast construction, helps these properties get into business inhalf the
time of conventional, thereby giving them a faster return on their investment. A part from this
benefit, LSF is well suited to buildings in remote areas where such resorts are typically
located,andoffersforbetterfinishes.
FLOORS
COVERED AREA
SCOPE
STATUS
RoofOnly
6,329 square feet
Turnkey
Ongoing
79 Light Steel Framing Solutions 80 Light Steel Framing Solutions
FLOORS
COVEREDAREA
SCOPE
STATUS
G+2
17,000square feet
Turnkey
Ongoing
Light Steel FramingSolutions 82 Light Steel Framing Solutions
TOURIST REST HOUSE -
MUNSIYARI UTTKHARAND
THAI STYLE
COTTAGES
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
Ground
15928squarefeet
Turnkey
4 months
Completed
83 Light Steel Framing Solutions 8
4 Light Steel Framing Solutions
Multipurpose Hall Morena 87
YOU NAME IT, WE FRAME IT.
85 LightSteelFramingSolutions
86 LightSteelFramingSolutions
RECREATIONAL CENTRES
MULTIPURPOSE HALL
MORENA
This multipurpose hall inMorena, MP, houses a badminton court among other facilities. LGSF
adapts easily when itcomes to buildinglarge hallorcolumless areas.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
G+1
10,000squarefeet
Turnkey
7 months
87 Light Steel Framing Solutions 88 Light Steel Framing Solutions
89 Light Steel FramingSolutions 90 Light Steel FramingSolutions
PHC Bhutti 93
ESIC Hospital Varanasi 95
YOU NAME IT, WE BUILD IT.
91 Light Steel FramingSolutions 92 LightSteelFramingSolutions
HEALTHCARE CENTRES
PHC
BHUTTI
The Himachal Pradesh Healthcare Department is constructing several primary health centres
across the state. They have chosen LSF for this purpose primarily because of the case of
steel construction in hilly areas, its superior insulation properties and the speed that it lends to
theentire building process.
FLOORS
COVEREDAREA
DURATION OF WORK
STATUS
G+1
4,470 square feet
4 months
Completed
93 Light Steel Framing Solutions 94 Light Steel Framing Solutions
ESIC HOSPITAL
VARANASI
This hospital is being constructed for ESIC with Hindustan Prefab Pvt Lid as the nodal agency.
LSF was chosen to add an additional f loor to the existing hospital, which was possible only
due to the light weight of the steel structure. The hospital also continues to function unimpeded
because of minimal site disruption, less labour and vehicular movements. Being a day
construction method, There is no dust and debris which one would see in a regular
construction site.
FLOORS
COVEREDAREA
STATUS
G+1
26,000 square feet
Ongoing
95 Light Steel Framing Solutions 96 Light Steel Framing Solutions
SRM Hospital Vadapalani, Chennai
Jai Prakash Narayan International Centre
LSF
99
103
107
YOU NAME IT, WE BUILD IT.
97 Light Steel Framing Solutions
98 Light Steel Framing Solutions
DRYWALLS
SRM HOSPITAL -
VADAPALANI, CHENNAI
Dry wall construction for non-load bearing walls, using LSF section with various claddings, is a
widely used technology throughout the world. In comparison to brick work/block work, this
system is faster and delivers better acoustics and fire ratings based on the application of the
building. It also helps in economizing foundation and structural costs by reducing the overall
dead weight of the structure.
FLOORS
COVERED AREA
SCOPE
DURATION OF WORK
STATUS
G+4
1,75,000 Sq.Ft.
Steel Structure along with plasterboard & insulation, Floor & Wall Tiling,
False Ceiling, Doors & Windows, Painting, Operation Theatres, ICU's,
Gas Pipeline & Other Critical Areas
8 months
Completed
99 Light Steel Framing Solutions 100 Light Steel Framing Solutions
Light Steel FramingSolutions 102 Light Steel Framing Solutions
J
JAi PRAKASH NARAYAN
INTERNATIONAL CENTRE
COVERED AREA
SCOPE
STATUS
1,25,000 square feet
Steel Structure along with plasterboard & insulation, Floor & Wall Tiling,
False Ceiling, Doors & Windows, Painting
Ongoing
103 Light Steel Framing Solutions 104 Light Steel Framing Solutions
Light Steel Framing Solutions 106 Light Steel Framing Solutions
LSF
ROOF
107 Light Steel Framing Solutions 108 Light Steel Framing Solutions
YOU NAME IT, WE BUILD IT.
109 Light Steel Framing Solutions
Byron house. Nottingham student accommodation
Whitley bay joint Services centre
Melbourne,Australia light steel house Premier inn
Block one, Addlestone
First Mcdonald's Outlet In LSF
LSF Homes
1
10
111
113
115
117
119
Light Steel Framing Solutions
CASE STUDY
BYRON HOUSE.
NOTTINGHAM STUDENT ACCOMMODATION
Byron House is an award-winning accommodation scheme in the heart of Nottingham
city centre. P.A.W.'s light gauge steel frame expertise enabled the eye-catching and
imaginative designs to take shape.
Situated in a vibrant urban environment just minutes away from the c ity's academic facilities, Byron
House is a 911-bed student scheme that incorporates a series of five interlinked buildings with
heights ranging from 4 to 9 storeys.
The P.A.W. design team worked closely with Vinci, the main contractor, to deliver a very successful
scheme within a constricted urban site. Bespoke light gauge steel frames were needed to achieve
the complex facade requirements of the stunning buildings, designed by Church Lukas architects.
The angular, non-standard shapes of the buildings can be clearly seen in the photographs shown
and Block A (shown on the right) includes a significant overhang, which created an
unprecedentedchallenge to the P.A.W. team.
The angular, non-standard shapes of the buildings can be clearly seen in the photographs shown
and Block A (shown on the right) includes a significant overhang, which created an
unprecedentedchallenge to the P.A.W. team.
111 Light Steel FramingSolutions
P.A.W. Contract Value
Circa ÂŁ4m
Frame Details
- 5 buildings - total floor area 23,746m2:
gill Street 7,674m', Block A 5,395m',
Block B4,629m', Blocks C&D 6,048m'
- Buildingheights are 4to9storeys
- P.A.W. designed, manufactured and
installed the frames
- P.A.W. also designed and installed
bespoke hot rolled steel staircases
Program Duration
- Frames erected in 36 weeks
Concept Architect
Church Lukas
Engineer
Airey & Coles
112 LightSteel Framing Solutions
WHITLEY B A Y
JOINT SERVICES
CENTRE
Metsec SFS lightweight steel framing system has been used to create a multi-million pound library and
joint services centreinthe heartofthe north-eastern seasidetownof Whitley Bay.
Designed by Ryder Architecture, with construction by Robertson, the new three-storey development
will accommodate a library and a variety of other local community services under one roof, creating a
vital and versatile resource at the heart of the community, and encouraging people into the town
centre.
The new state-of-the-art library facilities will replace the town's old library, which had become cramped
and unserviceable over the years. It will occupy two floors of the new building and will provide printed,
audio and visual medi a information services together with internet facilities for public use.
Metsec SFS lightweight steel framing system has been used to create a multi -mi llion pound li brary
113 LightSteel Framing Solutions
The centre's versatility and value to the community will be demonstrated through the wide range of
additional services that will be housed within it. These include contact points for adult social care, Age
Concern, primary care, police, employment and council services as well as a cafĂŠs, community
meeting rooms and event space.
The secondary structure for the ÂŁ5.59m project is constructed using Metsec lightweight steel framing,
with the external envelope featuring a combination of brickwork, f ibre cement cladding and curtain
walling. The result will be a light, airy and welcoming building which contrasts and empathizes with its
town centre surroundings.
Rowan Specialist Interiors of Gateshead carried out the installation of Metsec SFS as well as the
cl
ad
d
i
in
g Mervyn Hogg, general manager at the company, comments, "The scheme needed to deliver
economy and speed of const ruction, and Metsec proved the ideal choice. Their SFS framing system
is quick and easy to install, and its range of accessories enhanced versatility and speed of
construction on site. In addition, Metsec's were able to propose a number of solutions at the early
design stages of the project which delivered costeconomies and installationefficiencies."
Due to open in Spring 2013, the Whitley Bay Joint Services Centre is expected to become a hub of the
community which will reap benefits for the town's people and businesses
Project
Whitley Bay Joint Services Centre
Category
Public buildings
Products
SFS lightweight steelframing
Architect
Ryder Architecture
Contractor
Robertson Construction
Installer
Rowan Specialist Interiors
114 Light Steel Framing
Solutions
MELBOURNE, AUSTRALIA
LIGHT STEEL HOUSE
This5bedroom,5bath,indoorgym,winecellar,5carbasementgarage,650m2/6,994ft2lightgauge
steelhousewas manufactured with60%recycledsteel.The househasa90-year life guaranteefor
typhoon, earthquake, termite/mold resistances, and equaled the cost of wood framing. The home was
assembled on site in under three weeks bytemporary Chinese immigrant labor, saving 70% compared
totraditional construction labor costs. The house soldfor anestimated $5 millionAUD.
Features:
•Galvanizedsteelfr
a
mingstuds •9.0magnitudeearthquakeandtyphoonresistant
• 1% construction waste • Plumbing andelectricalcertifiedby SAA
• Windows certified by AWA
115 LightSteel Framing Solutions
Completed
November 2015
Developer
RT Edgar
Architect
Developer supplied architectural designs
Manufactured
Shanghai, China
Product
Light Steel Framing
Square space
550m2I5920 sqfeet
Prefab Structure Cost
$650 USD per m2 I$60 USD per sq feet
Shipping Containers Used
9containers @$1,300USD p
er=$11,700USD
Manufacturing Period
60days
Total Construction Period
100 days
Product Specifications
StructureSpecs:Lightsteel0345,G550;
coated by galvanization Z275 and galvanized
zinc Az150
116 LightSteel Framing Solutions
PREMIER INN BLOCK ONE:
ADDLESTONE
The developmentislocatedinAddlestone TownCentre,Surrey,the building consists of:
• Premier Inn Hotel
• Light Steel Frame + Hot Rolled Steel Transfer Structure
• Cement Particle BoardWrap
•Cassette Floors
•Cassette Roof
• Single ply membrane roof
The ORCA engineering team designed and manufactured this project offsite at the ORCA North
Shields facility.
117 LightSteel FramingSolutions 118 LightSteel FramingSolutions
FIRST McDonald's
OUTLET IN LSF
Why McDonald’schose light steel framing
McDonald's, the world renowned fast food franchise, has chosen light steel framing for their new
outlets; first ly because it achieved their goals for an energy efficient building and secondly
because speed of construction is one of light steel framing's maincharacteristics.
McDonald's hasinvestedinmanysustainability measuresinitsrestaurantsoverthepasttwo years.
This visionary program targets a 20% saving in water consumption, a 20% saving on electricity
consumption,20%savingoncostsand20%savingonconstructiontimeasthebrandcontinuesonits
strong growth path.
Thelightsteelframingmodelwas justtherightsystemtoaddressthesetargets. SiIverlineGroup(a
construction franchise that specializes in LSF) was awarded the tender, and convinced McDonald's
that LSF was the way to go. They also assisted in optimizing the design,inorder to shorten the
construction period.
119 Light Steel Framing Solutions
They not only reduced material waste by 30% andtransport cost by 80%,the insulating layers reduced
the building'senergy requirements by 17%to 20%,compared with those of conventional designs.
The time saving on the construction period has also
been far better than with brick and mortar,which has
enabled McDonald's to serve their customers earlier
than expected - surely a win-win for them.
Now you don't see it. Now you do1
The first LSF McDonald's outlet was in Good wood,Cape
Town. Aftercareful planning,the teamstartedonsitein
mid-March 2013.
Developer10wner:
McDonald's South Africa
Architect:
Architectural Design Associates
Structural Engineer:
Silverline Group Engineering
Quantity Surveyor:
Silverline Group
ProiectManager:
Silverline Group
Main Contractor:
Silverline Group & Marc Barnfather
Steelwork Contractors:
Techomes Construction (Pty) Lid,
lnnosteel(Ply) Ltd
Detailers1Detailing Company:
Silverline Group Engineering
120 Light Steel Framing Solutions
LSF Homes
Assembled from cold formed Galvalume steel, light gauge steel frames or LGSF are precision
designed structures that form the basis of all our homes. A strong structure, durable surfaces and
treatments to help resist termites and corrosion. Safer than reinforced concrete, light, and non-brittle.
Structures that are better positioned to deal with earthquakes. Constructed within a third of the time
compared to atraditional home. Respectful of the budget, and delivered ontime
121 LightSteel FramingSolutions 122 LightSteel FramingSolutions
LightSteel FramingSolutions 124 LightSteel FramingSolutions
123 LightSteel FramingSolutions 124 Light Steel Framing Solutions
WHY LSF
STUDIO
WHY STRATUS STEEL
2
4
6
1
5
7
9
WHO WE BUILD FOR
INSTITUTIONAL RESIDENTIAL COMMERCIAL

More Related Content

Similar to Executed Projects - Stratus Steel (1).pdf

02 jb fabinfra presentation
02 jb fabinfra  presentation02 jb fabinfra  presentation
02 jb fabinfra presentationsamidhathakur
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) correctedYap Xin
 
Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Hal Forsyth
 
SCS -SOQ January 2015 II
SCS -SOQ January 2015 IISCS -SOQ January 2015 II
SCS -SOQ January 2015 IIHal Forsyth
 
Decking sheets.pptx
Decking sheets.pptxDecking sheets.pptx
Decking sheets.pptxAadeshMane1
 
Decking sheets.pptx
Decking sheets.pptxDecking sheets.pptx
Decking sheets.pptxravijadhav55
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtParama Steel
 
ICES-Presentation
ICES-PresentationICES-Presentation
ICES-PresentationParivarta EXIM
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineersacebuilders
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and EngineersAmit Arora
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system reportshensin1015
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment shensin1015
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system reportw ss
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Benefits Of Using Metal Building Construction
Benefits Of Using Metal Building ConstructionBenefits Of Using Metal Building Construction
Benefits Of Using Metal Building ConstructionShows Steel LLC
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTUREANKIT BAHAL
 

Similar to Executed Projects - Stratus Steel (1).pdf (20)

tm
tmtm
tm
 
02 jb fabinfra presentation
02 jb fabinfra  presentation02 jb fabinfra  presentation
02 jb fabinfra presentation
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 
Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015Surtreat Construction Services -SOQ January 2015
Surtreat Construction Services -SOQ January 2015
 
SCS -SOQ January 2015 II
SCS -SOQ January 2015 IISCS -SOQ January 2015 II
SCS -SOQ January 2015 II
 
Decking sheets.pptx
Decking sheets.pptxDecking sheets.pptx
Decking sheets.pptx
 
Decking sheets.pptx
Decking sheets.pptxDecking sheets.pptx
Decking sheets.pptx
 
Product Katalog Bluescope Lysaght
Product Katalog Bluescope LysaghtProduct Katalog Bluescope Lysaght
Product Katalog Bluescope Lysaght
 
ICES-Presentation
ICES-PresentationICES-Presentation
ICES-Presentation
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Benefits Of Using Metal Building Construction
Benefits Of Using Metal Building ConstructionBenefits Of Using Metal Building Construction
Benefits Of Using Metal Building Construction
 
LIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURELIGHT GAUGE STEEL STRUCTURE
LIGHT GAUGE STEEL STRUCTURE
 
INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
 

Recently uploaded

Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vĂĄzquez
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 

Recently uploaded (20)

Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 

Executed Projects - Stratus Steel (1).pdf

  • 1. 86 92 ABOUT LSF STUDIO Weat LSF Studio areproudtoberecognizedasthepioneersof the LSF- Light Steel Framing RESIDENTIAL BUILDINGS OFFICE BUILDINGS revolution in India,and aremarket leaders inoffering complete turnkey solution- right from Design, SupplyandErectionofFramestothefinishedproductusingLSF Technology. With commendable work experience across diverse sectors and terrains PAN India, and a strong inhouse team of on-site andoff-site skilled manpower, we take complete responsibility of realizing your dreams to build-be it a new home, holiday home, office, school or any other institutional building. Apart from the fact that LSF has constructed G+5 and G+13 buildings in India, some of our noteworthy projects in steel include Industrial Training Institutes, Polytechnic institutes, Government offices, resortsandvillasat Multiplelocations. 52 EDUCATION 78 RESORTS RECREATION HEALTHCARE CENTRE CENTRES 98 DRY WALLS 110 STUDY YOU NAME IT, WE BUILD IT. 1 Light Steel Framing Solutions 2 Light Steel FramingSolutions 2 26 This book is a showcase of the various projects that we have dealt with over the years with clients CASE from b o t h public and private sectors. Projects includes the various sectors starting from residential, commercial to recreational with high end to cost constraint projects 2 52 86 98 26 78 92 110 ABOUT STRATUS STEEL Stratus steel is the LGSF division of MGI India Pvt Ltd founded by Mr.Vidur Chandra with the purpose of providing well-engineered superior steel frames. Stratus Steel also provides design and comprehensive back-end support for all LGSF projects.
  • 2. ParadiseAvenue Jammu Mira House Orchid Greens 11 Ramban 15 Residence of Mr Rakesh Sharma 17 NTPC Khargaon 19 Field hostel, Chambha 23 YOU NAME IT, WE BUILD IT. 3 Light Steel Framing Solutions 4 Light Steel Framing Solutions RESIDENTIAL BUILDINGS
  • 3. PARADISE AVENUE JAMMU This technology could be highly advantageous to residential buildings due to increased carpet space. Buildings are occupied sooner in up to half the time of conventional construction. Huge savingsontransport andlesslaborascomparedtobrickandmortarbuildingsarealsoa major factor in considering LSF. Jammu comes under Seismic Zone-4, and as such earthquake, resistant structures are a necessity. Steel due to its ductility can absorb earthquake shocks and energy. Since the overall weight of the building is one-fourth that of a conventional brick and mortar building, it remains unaffected during an earthquake. This thirteen- story (excluding stilt) residential project with a basement car park at Narwal, Jammu, meets all prevalent green building programs and standards. A hot rolled s t eel skeleton forms the exterior of the entire building with infill of LSF walls. The steel columns begin at the basement slab level in a regular grid pattern and extend upwards to the roof level. Structural steel work has been done with composite metal decking floors together with the metal roof and stairs, a perfect example of Hybrid construction methodology. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+13 1,35,000 square feet Steel structure including exterior and interior cladding along with slab 8 months Completed 5 LightSteel Framing Solutions 6 Light Steel Framing Solutions
  • 4. MIRA HOUSE Thiscontemporary StateofthearthomewithachicfacadeatNewDelhihasbeencompleted withinaspanof I.5months. The polymer-based finishes with EIFS in the exteriors allow for a vast range of colors and textures. Also, additional insulation with the layer of polystyrene makes lower-capacity heating andairconditioning possiblewithout compromising in terms of interior comfort LSF home is the preferred choice for renowned architects and home owners who want an innovative and durable customized project. This villa is built with the intention of exceeding our client’sexpectationsforsafety,quality,functionality,andaesthetics. FLOORS COVEREDAREA SCOPE DURATION OF WORK STATUS G+1 1,690 squarefeet Steel structure including exterior and interior cladding along with slab 8 months Completed Light Steel Framing Solutions 8 Light Steel Framing Solutions 7
  • 5. Interior design elements are incorporated here, like wooden flooring, designer bathrooms. There are no restrictions as to choice of materials in any part of the home be it the doors/windows, kitchen layout and accessories, glazing, stone cladding or staircase railings. LSF buildings are built to meet or exceed the same building codes and standards as site- built structures, a n d the s a m e architect -specified materials u s e d i n conventionally constructed buildings are used in modular construction projects. 9 LightSteel Framing Solutions 10 Light Steel Framing Solutions
  • 6. ORCHID GREENS Architects love LSF for its versatility in design and consistency as a product. In this is project spired roof reminiscent of Thai temple had been envisioned by the architect Improvements in galvanizing and coating steel have resulted in stronger, thinner, easier to shape and corrosion- resistant products. Unlike other materials that require chemical treatment during manufacture followed by regular treatments to minimize termite damage, Light steel frames are manufactured chemical free preventing long term chemical exposure for you and your family. Steel frames are not slammable. There by increasing fire rating. Light steel frames are moisture resistance and prevent all seepages andmold formation. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 1600 Square feet (10 units) Turnkey 3 months Completed 11 Light Steel Framing Solutions 12 Light Steel Framing Solutions
  • 7. The entrance to the building is double heighted which adds to is plush look. Large windows ensure an inlet for natural ventilat ion and lighting. The use of wooden louvers enhances the play of light and shadow inside the building. To add to the aesthetics of the interior, we have used wooden flooring and Italian stone on the floors, beautiful crack free f inished to this unique home and superiors high quality gypsum boards land an. 13 Light SteelFraming Solutions 14 Light Steel Framing Solutions
  • 8. RAM BAN The residential structure is situated between Jammu and Srinagar in a high seismic zone and is the first of its kind in the area. LGSF was chosen for the dual benefits of speedy construction and for its earthquake resistant the load inducted on the building is less due to the lightness of the structure and chances of progressive collapse are marginal due to the ductile and load causingnature of closely spacedstuds/joists. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 2,455 squarefeet Turnkey 3 months Completed 15 Light Steel Framing Solutions 16 Light Steel Framing Solutions
  • 9. RESIDENCE OF MR. RAKESH SHARMA ThisvillaislocatedatKullu wherethetemperatureisasfaras-4DegreeCelsius.Thebuilding was designed keeping in mind snow loads, and seismic intensity and recurring storms. Being thermally efficient, these buildings can withstand a wide range of temperature change andcan bekeptwarm/cool atafraction ofthecostof conventional structures FLOORS COVERED AREA SCOPE STATUS G+1 1050 squarefeet (2 units) Turnkey Ongoing 17 Light Steel Framing Solutions 18 Light Steel Framing Solutions
  • 10. NTPC. KHARGAON This was our first project with NTPC, involving low-cost accommodation on Khargaon. The scope of work involved supply of steel, fabrication & erection, as well as civil foundat ion, galvalume roofing & cladding. Since NTPC requires fast track construction for their new plan is LSF was the perfect buildingsolution. FLOORS COVEREDAREA SCOPE DURATION OF WORK STATUS G+1 59,848 Turnkey 4 months Completed 19 Light Steel Framing Solutions 20 Light Steel Framing Solutions
  • 11. Light Steel Framing Solutions 22 Light Steel Framing Solutions
  • 12. FIELD HOSTEL. CHAMBA Chamba, situated in a remote hilly region where temperature fall below -4DC, was the site of our field hostel constructed for GMR. Erection took place during snowfall which was possible as the steel structure is mostly completed in a factory controlled environment using dry material. Our technology requires less manual labor & limited material movements, lending itself advantageously to difficult terrains. FLOORS COVEREDAREA SCOPE DURATION OF WORK STATUS G+2 10,280squarefeet Turnkey 4 months Completed 23 Light Steel Framing Solutions 24 Light Steel Framing Solutions
  • 13. Cairn Energy Building 27 SRO Alipur 31 Police and Irrigation Office 35 Sub Registrar Office Saket 39 Sub Registrar Office Nangloi 43 SDO office Nazafgarh 47 YOU NAME IT, WE BUILD IT. 25 Light Steel Framing Solutions 26 Light Steel Framing Solutions OFFICE BUILDINGS
  • 14. CAIRN ENERGY BUILDING CAIRN energy chose LSF for constructing its accommodation building, laboratories and other ancillary buildings at its Badmer facility. Besides the fast paced construction, the other major deciding criteria were advanced thermal insulation (as temp. rise 50DC) and strict for ratingsof minimum 4 hours. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 38,750 square feet Turnkey 6 months Completed 27 Light Steel FramingSolutions 28 Light Steel FramingSolutions
  • 15. 29 LightSteelFramingSolutions 30 LightSteelFramingSolutions ; r .
  • 16. SRO ALIPUR The Sub registrar's office at Alipur is the first of many such buildings constructed by us for ` DTIDC. This structure demonstrates that steel can lend a tasteful, aesthetic facade to public offices. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 15,898square feet Steel Structure including exterior and interior cladding along with slab 6 months Finished 31 Light Steel FramingSolutions 32 Light Steel FramingSolutions
  • 17. 33 LightSteelFramingSolutions 34 LightSteelFramingSolutions
  • 18. POLICE AND IRRIGATION OFFICE This Police cum Irrigation office is one of the first steel buildings in Lucknow, located in the up market Gomti River district. It demonstrates the use of steel framework and external glazing techniques which can beadapted to high uses as well. FLOORS COVERED AREA SCOPE STATUS Stilt+2 4,700 squarefeet Turnkey Finished 35 Light Steel FramingSolutions 36 Light Steel FramingSolutions
  • 19. 37 LightSteelFramingSolutions 38 Light SteelFramingSolutions
  • 20. SUB REGISTRAR OFFICESAKET This Sub registrar's office is located at Saket, a densely populated area in Delhi. Due to constraint & having buildings on either side, LSF was the perfect solution as a dry construction technology. Fewer vehicular movements, less disruption on site and limited laborensure hassle-freebuildingprocess. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 8,500 square feet Steel Structure including exterior and interior cladding along with slab 4 months Finished 39 Light SteelFramingSolutions 40 Light SteelFraming Solutions
  • 22. SUB REGISTRAR OFFICE NANGLOI Asimilar subregistrar officeinNangloai constructed for DCCDC. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 15,566 square feet Steel Structure including exterior and interior cladding along with slab 4 months Finished 43 Light Steel FramingSolutions 44 Light Steel FramingSolutions
  • 23. Light Steel FramingSolutions 46 LightSteelFramingSolutions
  • 24. SDO OFFICE NAZAFGARH A similar SDO officeinNazafgarh Constructed for DTIDC FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 10,064squarefeet Steel Structure including exterior and interior cladding along with slab 4 months Finished 47 Light Steel FramingSolutions 48 Light Steel FramingSolutions
  • 25. LightSteel FramingSolutions 50 LightSteelFramingSolutions
  • 26. YOU NAME IT, WE BUILD IT. 51 Light Steel Framing Solutions DTIDC School Roof Top Extension Disaster Resource And Training Centre - Rajokari AWHA School RoofTop Extension Project Nehru Institute Of Mountaineering School Nepal Design School Faridabad ITl6 Trade Umaria 52 53 57 61 63 65 69 73 Light Steel Framing Solutions EDUCATIONAL
  • 27. DTTDC SCHOOL ROOF TOP EXTENSION LGSF is perfectly suited for expansion projects, both vertical and horizontal. The weight of an LGSF structure being 1/3 that of a conventional building, it is widely used across the world where regular structure would prove to b e heavy. This advantage has been seen across 25 MGI Infra sites in New Delhi alone, where in the existing government sector and higher secondary schoolshavebeenextended. COVERED AREA SCOPE DURATION OF WORK STATUS 20000 square feet (average) Steel Structure, Internal & External Boarding, EIFS 3 Months Our Scope Completed 53 Light Steel Framing Solutions 54 Light Steel Framing Solutions
  • 28. Light Steel FramingSolutions 56 Light Steel Framing Solutions
  • 29. DISASTER RESOURCE AND TRAINING CENTRE - RAJOKARI Our auditorium in the DSRC Building, Rajokari is a particular achievement in LSF construction located on the first f loor of the building. This auditorium has large spans measuring beyond 12 meters, making it a column less space. The tiered steps have also been constructed in cold rolled steel and the specified acoustics have been achieved using different insulations and acoustical cladding. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 8,300 square feet Steel Structure including exterior and interior cladding along with slab 4 months Completed 57 Light Steel FramingSolutions 58 Light Steel FramingSolutions
  • 30. 59 LightSteelFramingSolutions 60 Light SteelFramingSolutions
  • 31. AWHA SCHOOL ROOF TOP EXTENSION PROJECT Similar and the Delhi government school, AWHA {a school funded and promoted by United Phosphorous Public Ltd.) chose our technology for the benefits of a fast-track, light weight roof top extension. COVERED AREA SCOPE DURATION OF WORK STATUS 16,705 square feet Turnkey 5 months Completed 61 Light Steel Framing Solutions 62 Light Steel Framing Solutions
  • 32. NEHRU INSTITUTE OF MOUNTAINEERING A mountaineering is being built by us in Munsiyari, uttarakhand. Situated 7200ft above mean sea level,its extreme weather conditions allow for avery short period inwhich construction can be undertaken, thus making civil work unfeasible. Our technology is perfect for building in such areas. FLOORS COVERED AREA SCOPE STATUS G+2 29,000 squarefeet Turnkey Ongoing 63 Light Steel FramingSolutions 64 Light Steel Framing Solutions
  • 33. SCHOOL - NEPAL In the aftermath of a devastating earthquake, the Nepal government is looking torebuild Nepal not only with celerity, but using a method of construction that will ensure the safety of its residents in the event of another. This school project has beenfunded by an NGOaspartofthe initiativetobuildschool inremoteareas. FLOORS COVERED AREA SCOPE STATUS Ground 1,280squarefeet Steel Structure Ongoing 65 Light Steel FramingSolutions 66 Light Steel FramingSolutions
  • 34. 67 Light Steel Framing Solutions 68 Light Steel Framing Solutions
  • 35. DESIGN SCHOOL FARIDABAD The design school in Faridabad is one of our signature projects. The structural skeleton is going to be left exposed, giving it a raw, industrial look that extends to the interiors. It is characterised by longspans, openspaces and minimalist interiors FLOORS COVEREDAREA SCOPE STATUS G+2 30,000 square meter Steel Structure Ongoing 69 Light Steel FramingSolutions 70 Light Steel FramingSolutions
  • 36. 71 Light Steel Framing Solutions 72 Light Steel Framing Solutions
  • 37. ITI 6 TRADE UMARIA As a part of central and state government initiative, technical training has received a huge impetus, and several industrial training institutes are being conceived throughout India. These institutes are located in remote areas and require fast -track constructive. LSF Studio has now constructed 20 such buildings across India. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+1 25,000 square feet Turnkey 6 months Completed 73 Light Steel FramingSolutions 74 Light Steel FramingSolutions
  • 38. 75 Light SteelFramingSolutions 76 LightSteelFramingSolutions
  • 39. Cottages Chail 79 Tourist Rest House- Munshlyari. Uttrakhand 81 Thai StyleCottages 83 YOU NAME IT, WE BUILD IT. 77 Light Steel Framing Solutions 78 Light Steel Framing Solutions RESORTS
  • 40. RESORT COTTAGES Any hotel/resort property is mainly concerned with a quick return on investment. Our technology, because of its fast construction, helps these properties get into business inhalf the time of conventional, thereby giving them a faster return on their investment. A part from this benefit, LSF is well suited to buildings in remote areas where such resorts are typically located,andoffersforbetterfinishes. FLOORS COVERED AREA SCOPE STATUS RoofOnly 6,329 square feet Turnkey Ongoing 79 Light Steel Framing Solutions 80 Light Steel Framing Solutions
  • 41. FLOORS COVEREDAREA SCOPE STATUS G+2 17,000square feet Turnkey Ongoing Light Steel FramingSolutions 82 Light Steel Framing Solutions TOURIST REST HOUSE - MUNSIYARI UTTKHARAND
  • 42. THAI STYLE COTTAGES FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS Ground 15928squarefeet Turnkey 4 months Completed 83 Light Steel Framing Solutions 8 4 Light Steel Framing Solutions
  • 43. Multipurpose Hall Morena 87 YOU NAME IT, WE FRAME IT. 85 LightSteelFramingSolutions 86 LightSteelFramingSolutions RECREATIONAL CENTRES
  • 44. MULTIPURPOSE HALL MORENA This multipurpose hall inMorena, MP, houses a badminton court among other facilities. LGSF adapts easily when itcomes to buildinglarge hallorcolumless areas. FLOORS COVERED AREA SCOPE DURATION OF WORK G+1 10,000squarefeet Turnkey 7 months 87 Light Steel Framing Solutions 88 Light Steel Framing Solutions
  • 45. 89 Light Steel FramingSolutions 90 Light Steel FramingSolutions
  • 46. PHC Bhutti 93 ESIC Hospital Varanasi 95 YOU NAME IT, WE BUILD IT. 91 Light Steel FramingSolutions 92 LightSteelFramingSolutions HEALTHCARE CENTRES
  • 47. PHC BHUTTI The Himachal Pradesh Healthcare Department is constructing several primary health centres across the state. They have chosen LSF for this purpose primarily because of the case of steel construction in hilly areas, its superior insulation properties and the speed that it lends to theentire building process. FLOORS COVEREDAREA DURATION OF WORK STATUS G+1 4,470 square feet 4 months Completed 93 Light Steel Framing Solutions 94 Light Steel Framing Solutions
  • 48. ESIC HOSPITAL VARANASI This hospital is being constructed for ESIC with Hindustan Prefab Pvt Lid as the nodal agency. LSF was chosen to add an additional f loor to the existing hospital, which was possible only due to the light weight of the steel structure. The hospital also continues to function unimpeded because of minimal site disruption, less labour and vehicular movements. Being a day construction method, There is no dust and debris which one would see in a regular construction site. FLOORS COVEREDAREA STATUS G+1 26,000 square feet Ongoing 95 Light Steel Framing Solutions 96 Light Steel Framing Solutions
  • 49. SRM Hospital Vadapalani, Chennai Jai Prakash Narayan International Centre LSF 99 103 107 YOU NAME IT, WE BUILD IT. 97 Light Steel Framing Solutions 98 Light Steel Framing Solutions DRYWALLS
  • 50. SRM HOSPITAL - VADAPALANI, CHENNAI Dry wall construction for non-load bearing walls, using LSF section with various claddings, is a widely used technology throughout the world. In comparison to brick work/block work, this system is faster and delivers better acoustics and fire ratings based on the application of the building. It also helps in economizing foundation and structural costs by reducing the overall dead weight of the structure. FLOORS COVERED AREA SCOPE DURATION OF WORK STATUS G+4 1,75,000 Sq.Ft. Steel Structure along with plasterboard & insulation, Floor & Wall Tiling, False Ceiling, Doors & Windows, Painting, Operation Theatres, ICU's, Gas Pipeline & Other Critical Areas 8 months Completed 99 Light Steel Framing Solutions 100 Light Steel Framing Solutions
  • 51. Light Steel FramingSolutions 102 Light Steel Framing Solutions J
  • 52. JAi PRAKASH NARAYAN INTERNATIONAL CENTRE COVERED AREA SCOPE STATUS 1,25,000 square feet Steel Structure along with plasterboard & insulation, Floor & Wall Tiling, False Ceiling, Doors & Windows, Painting Ongoing 103 Light Steel Framing Solutions 104 Light Steel Framing Solutions
  • 53. Light Steel Framing Solutions 106 Light Steel Framing Solutions
  • 54. LSF ROOF 107 Light Steel Framing Solutions 108 Light Steel Framing Solutions
  • 55. YOU NAME IT, WE BUILD IT. 109 Light Steel Framing Solutions Byron house. Nottingham student accommodation Whitley bay joint Services centre Melbourne,Australia light steel house Premier inn Block one, Addlestone First Mcdonald's Outlet In LSF LSF Homes 1 10 111 113 115 117 119 Light Steel Framing Solutions CASE STUDY
  • 56. BYRON HOUSE. NOTTINGHAM STUDENT ACCOMMODATION Byron House is an award-winning accommodation scheme in the heart of Nottingham city centre. P.A.W.'s light gauge steel frame expertise enabled the eye-catching and imaginative designs to take shape. Situated in a vibrant urban environment just minutes away from the c ity's academic facilities, Byron House is a 911-bed student scheme that incorporates a series of five interlinked buildings with heights ranging from 4 to 9 storeys. The P.A.W. design team worked closely with Vinci, the main contractor, to deliver a very successful scheme within a constricted urban site. Bespoke light gauge steel frames were needed to achieve the complex facade requirements of the stunning buildings, designed by Church Lukas architects. The angular, non-standard shapes of the buildings can be clearly seen in the photographs shown and Block A (shown on the right) includes a significant overhang, which created an unprecedentedchallenge to the P.A.W. team. The angular, non-standard shapes of the buildings can be clearly seen in the photographs shown and Block A (shown on the right) includes a significant overhang, which created an unprecedentedchallenge to the P.A.W. team. 111 Light Steel FramingSolutions P.A.W. Contract Value Circa ÂŁ4m Frame Details - 5 buildings - total floor area 23,746m2: gill Street 7,674m', Block A 5,395m', Block B4,629m', Blocks C&D 6,048m' - Buildingheights are 4to9storeys - P.A.W. designed, manufactured and installed the frames - P.A.W. also designed and installed bespoke hot rolled steel staircases Program Duration - Frames erected in 36 weeks Concept Architect Church Lukas Engineer Airey & Coles 112 LightSteel Framing Solutions
  • 57. WHITLEY B A Y JOINT SERVICES CENTRE Metsec SFS lightweight steel framing system has been used to create a multi-million pound library and joint services centreinthe heartofthe north-eastern seasidetownof Whitley Bay. Designed by Ryder Architecture, with construction by Robertson, the new three-storey development will accommodate a library and a variety of other local community services under one roof, creating a vital and versatile resource at the heart of the community, and encouraging people into the town centre. The new state-of-the-art library facilities will replace the town's old library, which had become cramped and unserviceable over the years. It will occupy two floors of the new building and will provide printed, audio and visual medi a information services together with internet facilities for public use. Metsec SFS lightweight steel framing system has been used to create a multi -mi llion pound li brary 113 LightSteel Framing Solutions The centre's versatility and value to the community will be demonstrated through the wide range of additional services that will be housed within it. These include contact points for adult social care, Age Concern, primary care, police, employment and council services as well as a cafĂŠs, community meeting rooms and event space. The secondary structure for the ÂŁ5.59m project is constructed using Metsec lightweight steel framing, with the external envelope featuring a combination of brickwork, f ibre cement cladding and curtain walling. The result will be a light, airy and welcoming building which contrasts and empathizes with its town centre surroundings. Rowan Specialist Interiors of Gateshead carried out the installation of Metsec SFS as well as the cl ad d i in g Mervyn Hogg, general manager at the company, comments, "The scheme needed to deliver economy and speed of const ruction, and Metsec proved the ideal choice. Their SFS framing system is quick and easy to install, and its range of accessories enhanced versatility and speed of construction on site. In addition, Metsec's were able to propose a number of solutions at the early design stages of the project which delivered costeconomies and installationefficiencies." Due to open in Spring 2013, the Whitley Bay Joint Services Centre is expected to become a hub of the community which will reap benefits for the town's people and businesses Project Whitley Bay Joint Services Centre Category Public buildings Products SFS lightweight steelframing Architect Ryder Architecture Contractor Robertson Construction Installer Rowan Specialist Interiors 114 Light Steel Framing Solutions
  • 58. MELBOURNE, AUSTRALIA LIGHT STEEL HOUSE This5bedroom,5bath,indoorgym,winecellar,5carbasementgarage,650m2/6,994ft2lightgauge steelhousewas manufactured with60%recycledsteel.The househasa90-year life guaranteefor typhoon, earthquake, termite/mold resistances, and equaled the cost of wood framing. The home was assembled on site in under three weeks bytemporary Chinese immigrant labor, saving 70% compared totraditional construction labor costs. The house soldfor anestimated $5 millionAUD. Features: •Galvanizedsteelfr a mingstuds •9.0magnitudeearthquakeandtyphoonresistant • 1% construction waste • Plumbing andelectricalcertifiedby SAA • Windows certified by AWA 115 LightSteel Framing Solutions Completed November 2015 Developer RT Edgar Architect Developer supplied architectural designs Manufactured Shanghai, China Product Light Steel Framing Square space 550m2I5920 sqfeet Prefab Structure Cost $650 USD per m2 I$60 USD per sq feet Shipping Containers Used 9containers @$1,300USD p er=$11,700USD Manufacturing Period 60days Total Construction Period 100 days Product Specifications StructureSpecs:Lightsteel0345,G550; coated by galvanization Z275 and galvanized zinc Az150 116 LightSteel Framing Solutions
  • 59. PREMIER INN BLOCK ONE: ADDLESTONE The developmentislocatedinAddlestone TownCentre,Surrey,the building consists of: • Premier Inn Hotel • Light Steel Frame + Hot Rolled Steel Transfer Structure • Cement Particle BoardWrap •Cassette Floors •Cassette Roof • Single ply membrane roof The ORCA engineering team designed and manufactured this project offsite at the ORCA North Shields facility. 117 LightSteel FramingSolutions 118 LightSteel FramingSolutions
  • 60. FIRST McDonald's OUTLET IN LSF Why McDonald’schose light steel framing McDonald's, the world renowned fast food franchise, has chosen light steel framing for their new outlets; first ly because it achieved their goals for an energy efficient building and secondly because speed of construction is one of light steel framing's maincharacteristics. McDonald's hasinvestedinmanysustainability measuresinitsrestaurantsoverthepasttwo years. This visionary program targets a 20% saving in water consumption, a 20% saving on electricity consumption,20%savingoncostsand20%savingonconstructiontimeasthebrandcontinuesonits strong growth path. Thelightsteelframingmodelwas justtherightsystemtoaddressthesetargets. SiIverlineGroup(a construction franchise that specializes in LSF) was awarded the tender, and convinced McDonald's that LSF was the way to go. They also assisted in optimizing the design,inorder to shorten the construction period. 119 Light Steel Framing Solutions They not only reduced material waste by 30% andtransport cost by 80%,the insulating layers reduced the building'senergy requirements by 17%to 20%,compared with those of conventional designs. The time saving on the construction period has also been far better than with brick and mortar,which has enabled McDonald's to serve their customers earlier than expected - surely a win-win for them. Now you don't see it. Now you do1 The first LSF McDonald's outlet was in Good wood,Cape Town. Aftercareful planning,the teamstartedonsitein mid-March 2013. Developer10wner: McDonald's South Africa Architect: Architectural Design Associates Structural Engineer: Silverline Group Engineering Quantity Surveyor: Silverline Group ProiectManager: Silverline Group Main Contractor: Silverline Group & Marc Barnfather Steelwork Contractors: Techomes Construction (Pty) Lid, lnnosteel(Ply) Ltd Detailers1Detailing Company: Silverline Group Engineering 120 Light Steel Framing Solutions
  • 61. LSF Homes Assembled from cold formed Galvalume steel, light gauge steel frames or LGSF are precision designed structures that form the basis of all our homes. A strong structure, durable surfaces and treatments to help resist termites and corrosion. Safer than reinforced concrete, light, and non-brittle. Structures that are better positioned to deal with earthquakes. Constructed within a third of the time compared to atraditional home. Respectful of the budget, and delivered ontime 121 LightSteel FramingSolutions 122 LightSteel FramingSolutions
  • 62. LightSteel FramingSolutions 124 LightSteel FramingSolutions
  • 63. 123 LightSteel FramingSolutions 124 Light Steel Framing Solutions WHY LSF STUDIO WHY STRATUS STEEL 2 4 6 1 5 7 9 WHO WE BUILD FOR INSTITUTIONAL RESIDENTIAL COMMERCIAL