Safety in Road Tunnels
– taking Germany as an example
06./07.12.2016, São Paulo, No. 2
Traffic Longest Tunnels Road Status Length Width
 Rennsteigtunnel A 71 Operation 7.900 9,50
 Tunnel Königshainer Berge A 4 Operation 3.300 9,50
 Jagdbergtunnel A 4 Operation 3.070 13,00
 Elbtunnel 1.-3. Tube A 7 Operation 2.653 9,00
 Engelberg Basis Tunnel A 81 Operation 2.500 15,50
 Tunnel Hirschhagen A 44 Construction 9,50
Two-wayTraffic





Saukopftunnel Weinheim B 38A Operation 2.715 9,50
Michaelstunnel Baden-Baden B 500 Operation 2.700 9,50
Schwäbisch Gmünd B 29 Operation 2.230 9,50
Kramertunnel B 23 Construction 3.604 9,50
Kirchholztunnel B 21 Planning 2.950 9,50
4.100
One-wayTraffic
Reason for Retrofitting of Road Tunnels
06./07.12.2016, São Paulo, No. 3
Standards and Guidelines
 European Guideline 2004/54/EC
New and existing Road Tunnels
in TERN
 German Guideline on Operation
of Road Tunnels RABT 2006,
Update in 2017 (expected)
 Additional technical terms of
contract and guidelines for civil engineering
structures (ZTV-ING); Part 5 “Tunnelling”
06./07.12.2016, São Paulo, No. 4
0
200
400
600
800
1000
1200
1400
1600
0 30 60 90 120 150 180 210
Time since start of fire [minutes]
Temperature[°C]
Hydro-Carbon (HC)
RWS (Rijkswaterstaat, NL)
Temperature-Time-Curves
Increased-HC (France)
06./07.12.2016, São Paulo, No. 5
Structural Fire-Safety
 Common measures: Concrete cover 6 cm
 Concrete using PP fibres to prevent spalling
Normal concrete Concrete using PP fibres
06./07.12.2016, São Paulo, No. 6Source: Friebel, Heimbecher, 44 Forschung + Praxis: STUVA-Conference 2011
Structural Fire-Safety
 Additional measures
for special tunnels
(e. g. under water)
 Prolongation fire curve
 Fire protection boards
 Fire protection plasters
Note: Visual inspection
of structure not
(or only partly) possible
0
200
400
600
800
1000
1200
1400
1600
0 30 60 90 120 150 180 210
06./07.12.2016, São Paulo, No. 7
Retrofitting of Road Tunnels in Germany
 Immediate action programme, 48 Tunnels
 10 Mio. €, 2003 – 2009
 e. g. Emergency Exit Signage
 Operational Retrofitting, 140 Tunnels
 500 Mio. €, 2003 – 2015
 e. g. Ventilation
 Structural Retrofitting, 80 Tunnels
 450 Mio. €, 2005 – 2015
 e. g. Construction of new Emergency Exits
06./07.12.2016, São Paulo, No. 8
  
  
 
   
    
    
2)    
   
    
5)    
   
3)    
   
4)    
   
    
1)    
Emergency/Breakdown Lay-Bys
Reversing bays 1)
Cross-Passages in Tunnel
Emergency Exits
Emergency Walk-way
Drainage
Emergency Call Devices
Video Surveillance
Tunnel Radio System (Stuff)
PA Systems, Radio Messages
Manual Fire Alarm Button
Automatic fire detection devices
Hand fire extinguisher
Water supply line
Emergency Orientation Lighting
Structural
Measures
Communi-
cation
Devices
Fire
Detection
Fire Extin-
guishing
Emergency Exit Signage
Guiding Lighting
Safety Devices
 Standard  Special requirement 06./07.12.2016, São Paulo, No. 9
Tunnel Length [m]
Safety devices
< 400
≥ 400
< 600
≥ 600
< 900
≥ 900
< 1800
≥ 1800
Source:RABT,tobepublishedin2017
L ≤ 400 m Natural ventilation
400 m < L
≤ 600 m
Longitudinal ventilation
600 m < L
≤ 1.200 m
Risk Analysis
a) Longitudinal ventilation
b) Smoke extraction via
one big duct in middle
of tunnel
(point extraction)
c) Smoke extraction via
controllable flaps and
exhaust air ducts
L > 1.200 m Smoke extraction via
controllable flaps and
exhaust air ducts
Ventilation in Case of Fire
Two-way traffic ()
06./07.12.2016, São Paulo, No. 10
Tunnel Length Type of Ventilation
Source:RABT,tobepublishedin2017
L ≤ 600 m Natural ventilation
600 m < L
≤ 3.000 m
Longitudinal ventilation
L > 3.000 m Longitudinal ventilation
with point extraction
every 2000 m
or
smoke extraction via
controllable flaps and
exhaust air ducts
L ≤ 400 m Natural ventilation
400 m < L
≤ 600 m
Longitudinal ventilation
600 m < L
≤ 1.200 m
Risk Analysis
a) Longitudinal ventilation
b) Smoke extraction via
one big duct in middle
of tunnel
(point extraction)
c) Smoke extraction via
controllable flaps and
exhaust air ducts
L > 1.200 m Smoke extraction via
controllable flaps and
exhaust air ducts
Ventilation in Case of Fire
Two-way traffic () One-way traffic ( )
06./07.12.2016, São Paulo, No. 11
Tunnel Length Type of Ventilation Tunnel Length Type of Ventilation
Source:RABT,tobepublishedin2017
Fixed Fire Fighting Systems (FFFS)
 are explicitly mentioned in RABT as additional
measures in tunnels with HRR ≥ 100 MW and
 Length ≥ 3.000 m (uni-directional traffic) or
 Length ≥ 1.200 m (bi-directional traffic)
 shall improve 3rd-party rescue, fire extinguishing
 protect structural components against high
temperatures
 protection goals are to be assessed (self-/3rd-party
rescue, building protection, availability etc.)
06./07.12.2016, São Paulo, No. 12
Evaluation based on Large
Scale Fire Tests (SOLIT2)
Impact of Water Mist FFFS on the Safety of
Users and on the Tunnel Structure
06./07.12.2016, São Paulo, No. 13
SOLIT2: Safety of Life in Tunnels 2
 Fixed Fire Suppression Systems in Tunnels
 Integration into a holistic tunnel safety system
 Compensation of other safety systems
(e. g. increase of efficiency of ventilation)
 Reduction of temperatures and heat release rate
 Big work package: large scale fire tests
06./07.12.2016, São Paulo, No. 14
South
„Upstream“
North
„Downstream“
120m
Test tunnel
TST (Spain)
False Ceiling
Exhaust Gas Tunnel
ThermoWall
7.25
5.20
06./07.12.2016, São Paulo, No. 16
7.25
5.20
06./07.12.2016, São Paulo, No. 17
Test setup
Fire Load
Target
Pump
North
South
06./07.12.2016, São Paulo, No. 18
Pool fires (Diesel)
 HHR: 100 MW
 Longitudinal Ventilation 3 m/s
 Semi-transversal
ventilation 120 m³/s
 Water Mist, Nozzle 5.0 m
above Road Surface
5.0
06./07.12.2016, São Paulo, No. 19
Heat Release Rate 100 MW Fire
0
20
40
60
80
100
120
140
0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10
Time [h:mm]
HRR[MW]
Activation
45 45
06./07.12.2016, São Paulo, No. 20
Temperatures 100 MW with FFFS
0
200
400
600
800
1000
1200
1400
0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10
Time [h:min]
Temperature[°C]
HCinc-Curve
D007, H=5.20 m
D015, H=5.00 m
D045, H=5.00 m
5,0
40102
Activation
5.0
06./07.12.2016, São Paulo, No. 21
Temperature Distribution inside Structural
Concrete
4cm
3cm
2cm
1cm
0,2cm
5cm
TE01
TE02
TE03
TE04
TE05
06./07.12.2016, São Paulo, No. 22
Temperature Distribution inside Structural
Concrete
06./07.12.2016, São Paulo, No. 23
Temperature Distribution inside Structural
Concrete
06./07.12.2016, São Paulo, No. 24
Temperatures 100 MW with FFFS
0
200
400
600
800
1000
1200
1400
0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10
Time [h:min]
Temperature[°C]
D007, H=5.20 m
concrete cover 0.2 cm
concrete cover 4.0 cm
5,0
Activation
2
HCinc-Curve
06./07.12.2016, São Paulo, No. 25
 trucks (with and
w/o PVC-tarpaulin)
 fire load: 408 wooden palettes (9 t)
(B=2.4 m, L=10.0 m, H=2.5 m)
 Socket 1.5 m => top 4.0 m
Truck Loads
2.4
2.51.5
Solid Fire Load 100 MW
 „normal“ start delay
(4 Min.)
 semi transv. vent. 120 m³/s
 „delayed“ activation of
water mist (12 Min.)
 w/o semi transversal vent.
 HRR 100 MW
 Longitudinal ventilation 3 m/s
 Height Fire Load: 4.0 m,
with PVC-tarpaulin
 with water mist, nozzle 5.0 m above
road surface
06./07.12.2016, São Paulo, No. 27
0
200
400
600
800
1.000
1.200
0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40
Test duration [h:min]
Temperatur[°C]
Temperatures (10 m behind fire load)
5,0
10
5,0
100MW,12min.delay
100MW,4min.delay
Activationofwatermist
Activation
06./07.12.2016, São Paulo, No. 28
0
200
400
600
800
1.000
1.200
0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40
Test duration [h:min]
Temperature[°C]
0
20
40
60
80
100
120
HeatReleaseRate[MW]
Heat Release Rate (HRR)
100 MW
Activationofwatermist
Activation
100 MW, 12 min. delay
100 MW, 4 min. delay
06./07.12.2016, São Paulo, No. 29
5.2
2.5
Temperatures
0
200
400
600
800
1.000
1.200
0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40
Test duration [h:min]
Temperature[°C]
H=5.20 m
Concrete Cover 0.2 cm
Concrete Cover 4.0 cm
Activationofwatermist
06./07.12.2016, São Paulo, No. 30
5.2
2.5
Temperatures
0
200
400
600
800
1.000
1.200
0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40
Test duration [h:min]
Temperature[°C]
H=5.20 m
Concrete Cover
0.2 cm
Concrete Cover 4.0 cm
Activation
06./07.12.2016, São Paulo, No. 31
Thermal Image of Concrete Surface
 Heating up of Concrete
only in the immediate Fire Zone 06./07.12.2016, São Paulo, No. 32
Undamaged Target
(4 min delay of activation)
06./07.12.2016, São Paulo, No. 33
Target is not burned during test
(12 min delay of activation)
06./07.12.2016, São Paulo, No. 34
Heat Release Rate
Time [h:mm]
HRR[MW]
Activation HRRmeasured
HRRsuppressed
HRRconv+rad
06./07.12.2016, São Paulo, No. 35
-30 -20 -10 0 10 20 30 40 50 60 70
Centre Tunnel [m]
SprayDensity[l/m²/min]
0 m/s 3 m/s 5 m/s
Distribution of Watermist
Installation of Watermist over 60 m
06./07.12.2016, São Paulo, No. 36
 Early intervention prevents development of fire
 small fires are not so dangerous for persons
 small fires have less economic consequences
 dimensioning for 100, 200 or even 300 MW fires
may not be necessary
 Fire is „encapsulated“
 spread of fire between objects (vehicles) is prevented
 reduced heat radiation, third-party rescue is supported
 Potential for compensation of conventional
measures (ventilation, passive protection)
Effects of water mist systems
06./07.12.2016, São Paulo, No. 37
Safety in Metro Tunnels
– taking Germany as an example
Case Studies of
Cologne North-South Line and
Karlsruhe combined Solution 06./07.12.2016, São Paulo, No. 38
Source:HOCHBAHNHamburg
Regulations require safe design
of transport structures
 Tram construction and operation regulation
(BOStrab)
 tunneling guideline
 TR Strab Tunneling
guideline
 fire safety,
 electrical installations
 Avoid generation and spread of fires
06./07.12.2016, São Paulo, No. 39
 “An Engineering Methodology
for Performance-Based Fire
Safety Design of Underground
Rail Systems”
 Prepared by ITA-COSUF
Activity Group 2 on
“Regulations, Guidelines and
Best Practice”
ITA-COSUF Guideline
06./07.12.2016, São Paulo, No. 40
Protection goals for self and
third-party rescue
 Sufficiently thick low-density smoke layer;
tolerable temperatures and
concentrations of pollutants
 Securing temporary low-
density smoke escape routes
 Adequate dimensioning of
escape routes
 Support of emergency services with suitable aids
and constraints
06./07.12.2016, São Paulo, No. 41
Verification of protection goals
 Fire simulation using (CFD) field-model, e. g. KOBRA 3D
 Determination of evacuation time according to NFPA 130
and research project “Emergency Scenarios”
06./07.12.2016, São Paulo, No. 42
Verification of protection goals
 Comparison of smoke accumulation
vs. evacuation time
 evacuation time < smoke accumulation
 if not, measures have to be taken
 Setup of individual holistic fire safety concepts
06./07.12.2016, São Paulo, No. 43
Protection of stairways
 Fire protection vs.
architectural open design
 Stairs preferably closed
 Compromise, e. g. fire
protection glazing or
mobile smoke curtains
 Combination of different
safety measures
smoke curtains glazing
06./07.12.2016, São Paulo, No. 44
Wall and ceiling cladding
 F30 dowel and non-
combustible materials
 Fire protection design (hot
dimensioning) of sub-
structure according
to EC3 for 30 minutes
 Small-format design
(of panels)
 Expansion joints
06./07.12.2016, São Paulo, No. 45
Separation of fire sections:
Meeting room
 Access via
open
intermediate
level
 Glazing
towards
platform
 Joint escape
routes
F90-glazing
06./07.12.2016, São Paulo, No. 46
Smoke extraction
 Combustion gases to be
extracted separately
(Separated from persons)
 Normally ducts using
thermal lift are sufficient
 In special cases: mechanical
smoke extraction is needed
06./07.12.2016, São Paulo, No. 47
Fire detection
 Aspirating smoke detectors for
platform areas
 Point type smoke detector
equipment rooms
 Two message dependency
 Manual call point at passage to
public area
 Surveillance of elevator entrance
area for evacuation shuttle
operation
06./07.12.2016, São Paulo, No. 48
Point type smoke detectors for surveillance
of elevator entrance area
06./07.12.2016, São Paulo, No. 49
Guiding of people
 Escape and
rescue plan
 Emergency signs
 Dynamic floor
guiding system
 Voice alarm system
06./07.12.2016, São Paulo, No. 50
Evacuation of the station
 Complete evacuation in case
of alarm in public area
 Partial evacuation in case
of alarm in technical area
 Maintaining train operation
due to separation of areas
in terms of fire protection
 Coordination between fire
brigade and transport
company
06./07.12.2016, São Paulo, No. 51
Fire brigade information center
 First port of call for the fire
service
 Display/control panel of the
fire alarm system
 Microphone for PA-system
 Key depot
 Fire brigade response plans
and routing cards
06./07.12.2016, São Paulo, No. 52
Extinguishing water tapping points
 In stations in staircase area
 In tunnels every 50 m or 80 m
 B connector with
B/C interface
 Labeling and flash
 Water supply line;
Cologne: dry,
Karlsruhe: wet
06./07.12.2016, São Paulo, No. 53
Current drain (power supply unit)
 Supply of rescue
equipment
 In tunnels, every 50 m
 230 V two-pin earthed
socket
 400 V three-phase CEE
socket
06./07.12.2016, São Paulo, No. 54
Other Safety precautions in tunnels
 Safety areas
 flat, no trip
hazards
 Emergency
walkway,
at least
0.7 m x 2.0 m
(0.45 m to
squeeze through)
0.7 m
x
2.0 m
06./07.12.2016, São Paulo, No. 55
Other Safety precautions in tunnels
 Emergency
lighting at least
1 Lux, positioned
as low as possible
 transport aid,
railbound, for man
and machine
06./07.12.2016, São Paulo, No. 56
Other Safety precautions in tunnels
 Emergency signs
 Long luminescent green
along the tunnel
 Every 25 m with distance
indication to safe area
 Backlit blue at emergency
exit
06./07.12.2016, São Paulo, No. 57
Tunnel access signage
 Determination of position of
damaged trains
 via radio message of the driver
 track circuit occupancy/axle
counters
 No thermal sensors,
preventing false alarms due to
braking resistors on roof of
vehicle
06./07.12.2016, São Paulo, No. 58
Tunnel access signage
 Alphabetical listing of every tunnel section provides
unique description for firefighters
06./07.12.2016, São Paulo, No. 59
Summary
 Primary Protection goal: self and third-party rescue
 Sufficiently thick low-smoke layer
 Fire protection vs. architectural design
 Solutions for Metro Stations:
 Fire protection glazing, mobile smoke curtains, guiding of
people
 Support of fire brigade: information center, tapping
points, current drain, transport aid, …
 Secondary Protection goal: protection of structure
06./07.12.2016, São Paulo, No. 60
06./07.12.2016, São Paulo, No. 61
Thank you very much
for your attention!

More Related Content

Similar to Estado da Arte na Segurança de Túneis - Roland Leucker

160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)Anders Trewe
 
PhD seminars: Rainwater runoff on porous building materials
PhD seminars: Rainwater runoff on porous building materialsPhD seminars: Rainwater runoff on porous building materials
PhD seminars: Rainwater runoff on porous building materialsThijs Van den Brande
 
Fully coupled atmospheric hydrological modelling
Fully coupled atmospheric hydrological modellingFully coupled atmospheric hydrological modelling
Fully coupled atmospheric hydrological modellingRiccardo Rigon
 
Eltherm ELKM-AS Heat Trace Cable - Spec Sheet
Eltherm ELKM-AS Heat Trace Cable - Spec SheetEltherm ELKM-AS Heat Trace Cable - Spec Sheet
Eltherm ELKM-AS Heat Trace Cable - Spec SheetThorne & Derrick UK
 
Wind observer 90 windguard test report
Wind observer 90   windguard test reportWind observer 90   windguard test report
Wind observer 90 windguard test reportAlexandre Ferrete
 
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...Francesco Mangia
 
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...Conference Papers
 
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...Centro Studi Galileo
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...RDH Building Science
 
Gyromat in tunnelling practice
Gyromat in tunnelling practiceGyromat in tunnelling practice
Gyromat in tunnelling practiceNorbert Benecke
 
Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Richard Skinner
 
Offshore gas kick detector
Offshore gas kick detectorOffshore gas kick detector
Offshore gas kick detectorIBJ Technology
 

Similar to Estado da Arte na Segurança de Túneis - Roland Leucker (20)

Pipeline b
Pipeline bPipeline b
Pipeline b
 
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
160621 Experience of Shipboard firefighting with Cutting Extinguishers (v 1.0)
 
Testo 320
Testo 320Testo 320
Testo 320
 
varioelcube
varioelcubevarioelcube
varioelcube
 
PhD seminars: Rainwater runoff on porous building materials
PhD seminars: Rainwater runoff on porous building materialsPhD seminars: Rainwater runoff on porous building materials
PhD seminars: Rainwater runoff on porous building materials
 
Fully coupled atmospheric hydrological modelling
Fully coupled atmospheric hydrological modellingFully coupled atmospheric hydrological modelling
Fully coupled atmospheric hydrological modelling
 
CO2QUEST Materials Selection - Solomon Brown at EC FP7 Projects: Leading the ...
CO2QUEST Materials Selection - Solomon Brown at EC FP7 Projects: Leading the ...CO2QUEST Materials Selection - Solomon Brown at EC FP7 Projects: Leading the ...
CO2QUEST Materials Selection - Solomon Brown at EC FP7 Projects: Leading the ...
 
Eltherm ELKM-AS Heat Trace Cable - Spec Sheet
Eltherm ELKM-AS Heat Trace Cable - Spec SheetEltherm ELKM-AS Heat Trace Cable - Spec Sheet
Eltherm ELKM-AS Heat Trace Cable - Spec Sheet
 
Wind observer 90 windguard test report
Wind observer 90   windguard test reportWind observer 90   windguard test report
Wind observer 90 windguard test report
 
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...
M.Sc. thesis: Techno-economic assessment of a power-to-gas system through dyn...
 
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...
Nanocrystalline graphite humidity sensors for wearable breath monitoring appl...
 
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...
XVI CONVEGNO EUROPEO N. Calabrese - CO2 heat pump tested at ENEA CASACCIA Res...
 
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
Moisture Buffering and Ventilation Strategies to Control Indoor Humidity in a...
 
30120140506010 2
30120140506010 230120140506010 2
30120140506010 2
 
Gyromat in tunnelling practice
Gyromat in tunnelling practiceGyromat in tunnelling practice
Gyromat in tunnelling practice
 
Master's degree final dissertation
Master's degree final dissertationMaster's degree final dissertation
Master's degree final dissertation
 
Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012Full AQ safety Catalogue 2012
Full AQ safety Catalogue 2012
 
Santosh_Kr_Yadav_RAIM08
Santosh_Kr_Yadav_RAIM08Santosh_Kr_Yadav_RAIM08
Santosh_Kr_Yadav_RAIM08
 
Noise Monitoring
Noise Monitoring  Noise Monitoring
Noise Monitoring
 
Offshore gas kick detector
Offshore gas kick detectorOffshore gas kick detector
Offshore gas kick detector
 

More from slides-mci

11h00 alex bastos 24 08 pao de acucar
11h00 alex bastos  24 08 pao de acucar11h00 alex bastos  24 08 pao de acucar
11h00 alex bastos 24 08 pao de acucarslides-mci
 
17h10 2 marco braga politica ufrj 21-08 pao de acucar
17h10 2 marco braga politica ufrj 21-08 pao de acucar17h10 2 marco braga politica ufrj 21-08 pao de acucar
17h10 2 marco braga politica ufrj 21-08 pao de acucarslides-mci
 
09h10 1 fernanda delgado 23 08 pedra da gavea
09h10 1 fernanda delgado 23 08 pedra da gavea 09h10 1 fernanda delgado 23 08 pedra da gavea
09h10 1 fernanda delgado 23 08 pedra da gavea slides-mci
 
17h10 ricardo gotelib 21 08 pao de acucar
17h10 ricardo gotelib 21 08 pao de acucar17h10 ricardo gotelib 21 08 pao de acucar
17h10 ricardo gotelib 21 08 pao de acucarslides-mci
 
09h10 1 marcelo sperle 24-08 pao de acucar
09h10 1  marcelo sperle 24-08 pao de acucar09h10 1  marcelo sperle 24-08 pao de acucar
09h10 1 marcelo sperle 24-08 pao de acucarslides-mci
 
14h40 2 marcelo sperle 24-08 pao de acucar
14h40 2   marcelo sperle 24-08 pao de acucar14h40 2   marcelo sperle 24-08 pao de acucar
14h40 2 marcelo sperle 24-08 pao de acucarslides-mci
 
11h00 st11 elton dantas 22 8 urca
11h00 st11 elton dantas 22 8 urca11h00 st11 elton dantas 22 8 urca
11h00 st11 elton dantas 22 8 urcaslides-mci
 
09h10 victor ramos 23 08 - corcovado
09h10 victor ramos 23 08 - corcovado09h10 victor ramos 23 08 - corcovado
09h10 victor ramos 23 08 - corcovadoslides-mci
 
09h10 ricardo hirata 22 09 pontal
09h10 ricardo hirata 22 09 pontal09h10 ricardo hirata 22 09 pontal
09h10 ricardo hirata 22 09 pontalslides-mci
 
17h10 mesa redonda ildeu moreira 23 08 - corcovado
17h10 mesa redonda ildeu moreira 23 08 - corcovado17h10 mesa redonda ildeu moreira 23 08 - corcovado
17h10 mesa redonda ildeu moreira 23 08 - corcovadoslides-mci
 
17h10 marcus marques 21 08 pao de acucar
17h10 marcus marques 21 08 pao de acucar17h10 marcus marques 21 08 pao de acucar
17h10 marcus marques 21 08 pao de acucarslides-mci
 
17h10 1 marco braga acidentes 21 08 pao de acucar
17h10 1 marco braga acidentes 21 08 pao de acucar17h10 1 marco braga acidentes 21 08 pao de acucar
17h10 1 marco braga acidentes 21 08 pao de acucarslides-mci
 
17h00 decio oddone pao de acucar 22 08
17h00 decio oddone pao de acucar 22 0817h00 decio oddone pao de acucar 22 08
17h00 decio oddone pao de acucar 22 08slides-mci
 
15h20 marcelo sperle 24 08 pao de acucar
15h20 marcelo sperle 24 08 pao de acucar15h20 marcelo sperle 24 08 pao de acucar
15h20 marcelo sperle 24 08 pao de acucarslides-mci
 
14h40 marcio remedio 23 08 leme
14h40 marcio remedio 23 08 leme 14h40 marcio remedio 23 08 leme
14h40 marcio remedio 23 08 leme slides-mci
 
14h00 rosangela botelho 22 08 barra
14h00 rosangela botelho 22 08 barra14h00 rosangela botelho 22 08 barra
14h00 rosangela botelho 22 08 barraslides-mci
 
11h00 carlos roberto 21 08 botafogo
11h00 carlos roberto 21 08 botafogo11h00 carlos roberto 21 08 botafogo
11h00 carlos roberto 21 08 botafogoslides-mci
 
11h00 aline rocha 24 08 barra
11h00 aline rocha 24 08 barra11h00 aline rocha 24 08 barra
11h00 aline rocha 24 08 barraslides-mci
 
10h10 carlos roberto 21 08 botafogo
10h10 carlos roberto 21 08 botafogo10h10 carlos roberto 21 08 botafogo
10h10 carlos roberto 21 08 botafogoslides-mci
 
09h50 mr marcia gaspar 24 08 pontal
09h50 mr marcia gaspar 24 08 pontal09h50 mr marcia gaspar 24 08 pontal
09h50 mr marcia gaspar 24 08 pontalslides-mci
 

More from slides-mci (20)

11h00 alex bastos 24 08 pao de acucar
11h00 alex bastos  24 08 pao de acucar11h00 alex bastos  24 08 pao de acucar
11h00 alex bastos 24 08 pao de acucar
 
17h10 2 marco braga politica ufrj 21-08 pao de acucar
17h10 2 marco braga politica ufrj 21-08 pao de acucar17h10 2 marco braga politica ufrj 21-08 pao de acucar
17h10 2 marco braga politica ufrj 21-08 pao de acucar
 
09h10 1 fernanda delgado 23 08 pedra da gavea
09h10 1 fernanda delgado 23 08 pedra da gavea 09h10 1 fernanda delgado 23 08 pedra da gavea
09h10 1 fernanda delgado 23 08 pedra da gavea
 
17h10 ricardo gotelib 21 08 pao de acucar
17h10 ricardo gotelib 21 08 pao de acucar17h10 ricardo gotelib 21 08 pao de acucar
17h10 ricardo gotelib 21 08 pao de acucar
 
09h10 1 marcelo sperle 24-08 pao de acucar
09h10 1  marcelo sperle 24-08 pao de acucar09h10 1  marcelo sperle 24-08 pao de acucar
09h10 1 marcelo sperle 24-08 pao de acucar
 
14h40 2 marcelo sperle 24-08 pao de acucar
14h40 2   marcelo sperle 24-08 pao de acucar14h40 2   marcelo sperle 24-08 pao de acucar
14h40 2 marcelo sperle 24-08 pao de acucar
 
11h00 st11 elton dantas 22 8 urca
11h00 st11 elton dantas 22 8 urca11h00 st11 elton dantas 22 8 urca
11h00 st11 elton dantas 22 8 urca
 
09h10 victor ramos 23 08 - corcovado
09h10 victor ramos 23 08 - corcovado09h10 victor ramos 23 08 - corcovado
09h10 victor ramos 23 08 - corcovado
 
09h10 ricardo hirata 22 09 pontal
09h10 ricardo hirata 22 09 pontal09h10 ricardo hirata 22 09 pontal
09h10 ricardo hirata 22 09 pontal
 
17h10 mesa redonda ildeu moreira 23 08 - corcovado
17h10 mesa redonda ildeu moreira 23 08 - corcovado17h10 mesa redonda ildeu moreira 23 08 - corcovado
17h10 mesa redonda ildeu moreira 23 08 - corcovado
 
17h10 marcus marques 21 08 pao de acucar
17h10 marcus marques 21 08 pao de acucar17h10 marcus marques 21 08 pao de acucar
17h10 marcus marques 21 08 pao de acucar
 
17h10 1 marco braga acidentes 21 08 pao de acucar
17h10 1 marco braga acidentes 21 08 pao de acucar17h10 1 marco braga acidentes 21 08 pao de acucar
17h10 1 marco braga acidentes 21 08 pao de acucar
 
17h00 decio oddone pao de acucar 22 08
17h00 decio oddone pao de acucar 22 0817h00 decio oddone pao de acucar 22 08
17h00 decio oddone pao de acucar 22 08
 
15h20 marcelo sperle 24 08 pao de acucar
15h20 marcelo sperle 24 08 pao de acucar15h20 marcelo sperle 24 08 pao de acucar
15h20 marcelo sperle 24 08 pao de acucar
 
14h40 marcio remedio 23 08 leme
14h40 marcio remedio 23 08 leme 14h40 marcio remedio 23 08 leme
14h40 marcio remedio 23 08 leme
 
14h00 rosangela botelho 22 08 barra
14h00 rosangela botelho 22 08 barra14h00 rosangela botelho 22 08 barra
14h00 rosangela botelho 22 08 barra
 
11h00 carlos roberto 21 08 botafogo
11h00 carlos roberto 21 08 botafogo11h00 carlos roberto 21 08 botafogo
11h00 carlos roberto 21 08 botafogo
 
11h00 aline rocha 24 08 barra
11h00 aline rocha 24 08 barra11h00 aline rocha 24 08 barra
11h00 aline rocha 24 08 barra
 
10h10 carlos roberto 21 08 botafogo
10h10 carlos roberto 21 08 botafogo10h10 carlos roberto 21 08 botafogo
10h10 carlos roberto 21 08 botafogo
 
09h50 mr marcia gaspar 24 08 pontal
09h50 mr marcia gaspar 24 08 pontal09h50 mr marcia gaspar 24 08 pontal
09h50 mr marcia gaspar 24 08 pontal
 

Recently uploaded

BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrsaastr
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 

Recently uploaded (20)

BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 

Estado da Arte na Segurança de Túneis - Roland Leucker

  • 1. Estado da Arte na Segurança de Túneis State of the Art in Tunnel Safety Dr.-Ing. Roland Leucker Managing Director STUVA Managing Director DAUB Chairman ITA-COSUF
  • 2. Safety in Road Tunnels – taking Germany as an example 06./07.12.2016, São Paulo, No. 2 Traffic Longest Tunnels Road Status Length Width  Rennsteigtunnel A 71 Operation 7.900 9,50  Tunnel Königshainer Berge A 4 Operation 3.300 9,50  Jagdbergtunnel A 4 Operation 3.070 13,00  Elbtunnel 1.-3. Tube A 7 Operation 2.653 9,00  Engelberg Basis Tunnel A 81 Operation 2.500 15,50  Tunnel Hirschhagen A 44 Construction 9,50 Two-wayTraffic      Saukopftunnel Weinheim B 38A Operation 2.715 9,50 Michaelstunnel Baden-Baden B 500 Operation 2.700 9,50 Schwäbisch Gmünd B 29 Operation 2.230 9,50 Kramertunnel B 23 Construction 3.604 9,50 Kirchholztunnel B 21 Planning 2.950 9,50 4.100 One-wayTraffic
  • 3. Reason for Retrofitting of Road Tunnels 06./07.12.2016, São Paulo, No. 3
  • 4. Standards and Guidelines  European Guideline 2004/54/EC New and existing Road Tunnels in TERN  German Guideline on Operation of Road Tunnels RABT 2006, Update in 2017 (expected)  Additional technical terms of contract and guidelines for civil engineering structures (ZTV-ING); Part 5 “Tunnelling” 06./07.12.2016, São Paulo, No. 4
  • 5. 0 200 400 600 800 1000 1200 1400 1600 0 30 60 90 120 150 180 210 Time since start of fire [minutes] Temperature[°C] Hydro-Carbon (HC) RWS (Rijkswaterstaat, NL) Temperature-Time-Curves Increased-HC (France) 06./07.12.2016, São Paulo, No. 5
  • 6. Structural Fire-Safety  Common measures: Concrete cover 6 cm  Concrete using PP fibres to prevent spalling Normal concrete Concrete using PP fibres 06./07.12.2016, São Paulo, No. 6Source: Friebel, Heimbecher, 44 Forschung + Praxis: STUVA-Conference 2011
  • 7. Structural Fire-Safety  Additional measures for special tunnels (e. g. under water)  Prolongation fire curve  Fire protection boards  Fire protection plasters Note: Visual inspection of structure not (or only partly) possible 0 200 400 600 800 1000 1200 1400 1600 0 30 60 90 120 150 180 210 06./07.12.2016, São Paulo, No. 7
  • 8. Retrofitting of Road Tunnels in Germany  Immediate action programme, 48 Tunnels  10 Mio. €, 2003 – 2009  e. g. Emergency Exit Signage  Operational Retrofitting, 140 Tunnels  500 Mio. €, 2003 – 2015  e. g. Ventilation  Structural Retrofitting, 80 Tunnels  450 Mio. €, 2005 – 2015  e. g. Construction of new Emergency Exits 06./07.12.2016, São Paulo, No. 8
  • 9.                       2)              5)         3)         4)              1)     Emergency/Breakdown Lay-Bys Reversing bays 1) Cross-Passages in Tunnel Emergency Exits Emergency Walk-way Drainage Emergency Call Devices Video Surveillance Tunnel Radio System (Stuff) PA Systems, Radio Messages Manual Fire Alarm Button Automatic fire detection devices Hand fire extinguisher Water supply line Emergency Orientation Lighting Structural Measures Communi- cation Devices Fire Detection Fire Extin- guishing Emergency Exit Signage Guiding Lighting Safety Devices  Standard  Special requirement 06./07.12.2016, São Paulo, No. 9 Tunnel Length [m] Safety devices < 400 ≥ 400 < 600 ≥ 600 < 900 ≥ 900 < 1800 ≥ 1800 Source:RABT,tobepublishedin2017
  • 10. L ≤ 400 m Natural ventilation 400 m < L ≤ 600 m Longitudinal ventilation 600 m < L ≤ 1.200 m Risk Analysis a) Longitudinal ventilation b) Smoke extraction via one big duct in middle of tunnel (point extraction) c) Smoke extraction via controllable flaps and exhaust air ducts L > 1.200 m Smoke extraction via controllable flaps and exhaust air ducts Ventilation in Case of Fire Two-way traffic () 06./07.12.2016, São Paulo, No. 10 Tunnel Length Type of Ventilation Source:RABT,tobepublishedin2017
  • 11. L ≤ 600 m Natural ventilation 600 m < L ≤ 3.000 m Longitudinal ventilation L > 3.000 m Longitudinal ventilation with point extraction every 2000 m or smoke extraction via controllable flaps and exhaust air ducts L ≤ 400 m Natural ventilation 400 m < L ≤ 600 m Longitudinal ventilation 600 m < L ≤ 1.200 m Risk Analysis a) Longitudinal ventilation b) Smoke extraction via one big duct in middle of tunnel (point extraction) c) Smoke extraction via controllable flaps and exhaust air ducts L > 1.200 m Smoke extraction via controllable flaps and exhaust air ducts Ventilation in Case of Fire Two-way traffic () One-way traffic ( ) 06./07.12.2016, São Paulo, No. 11 Tunnel Length Type of Ventilation Tunnel Length Type of Ventilation Source:RABT,tobepublishedin2017
  • 12. Fixed Fire Fighting Systems (FFFS)  are explicitly mentioned in RABT as additional measures in tunnels with HRR ≥ 100 MW and  Length ≥ 3.000 m (uni-directional traffic) or  Length ≥ 1.200 m (bi-directional traffic)  shall improve 3rd-party rescue, fire extinguishing  protect structural components against high temperatures  protection goals are to be assessed (self-/3rd-party rescue, building protection, availability etc.) 06./07.12.2016, São Paulo, No. 12
  • 13. Evaluation based on Large Scale Fire Tests (SOLIT2) Impact of Water Mist FFFS on the Safety of Users and on the Tunnel Structure 06./07.12.2016, São Paulo, No. 13
  • 14. SOLIT2: Safety of Life in Tunnels 2  Fixed Fire Suppression Systems in Tunnels  Integration into a holistic tunnel safety system  Compensation of other safety systems (e. g. increase of efficiency of ventilation)  Reduction of temperatures and heat release rate  Big work package: large scale fire tests 06./07.12.2016, São Paulo, No. 14
  • 16. False Ceiling Exhaust Gas Tunnel ThermoWall 7.25 5.20 06./07.12.2016, São Paulo, No. 16
  • 19. Pool fires (Diesel)  HHR: 100 MW  Longitudinal Ventilation 3 m/s  Semi-transversal ventilation 120 m³/s  Water Mist, Nozzle 5.0 m above Road Surface 5.0 06./07.12.2016, São Paulo, No. 19
  • 20. Heat Release Rate 100 MW Fire 0 20 40 60 80 100 120 140 0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10 Time [h:mm] HRR[MW] Activation 45 45 06./07.12.2016, São Paulo, No. 20
  • 21. Temperatures 100 MW with FFFS 0 200 400 600 800 1000 1200 1400 0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10 Time [h:min] Temperature[°C] HCinc-Curve D007, H=5.20 m D015, H=5.00 m D045, H=5.00 m 5,0 40102 Activation 5.0 06./07.12.2016, São Paulo, No. 21
  • 22. Temperature Distribution inside Structural Concrete 4cm 3cm 2cm 1cm 0,2cm 5cm TE01 TE02 TE03 TE04 TE05 06./07.12.2016, São Paulo, No. 22
  • 23. Temperature Distribution inside Structural Concrete 06./07.12.2016, São Paulo, No. 23
  • 24. Temperature Distribution inside Structural Concrete 06./07.12.2016, São Paulo, No. 24
  • 25. Temperatures 100 MW with FFFS 0 200 400 600 800 1000 1200 1400 0:00 0:01 0:02 0:03 0:04 0:05 0:06 0:07 0:08 0:09 0:10 Time [h:min] Temperature[°C] D007, H=5.20 m concrete cover 0.2 cm concrete cover 4.0 cm 5,0 Activation 2 HCinc-Curve 06./07.12.2016, São Paulo, No. 25
  • 26.  trucks (with and w/o PVC-tarpaulin)  fire load: 408 wooden palettes (9 t) (B=2.4 m, L=10.0 m, H=2.5 m)  Socket 1.5 m => top 4.0 m Truck Loads 2.4 2.51.5
  • 27. Solid Fire Load 100 MW  „normal“ start delay (4 Min.)  semi transv. vent. 120 m³/s  „delayed“ activation of water mist (12 Min.)  w/o semi transversal vent.  HRR 100 MW  Longitudinal ventilation 3 m/s  Height Fire Load: 4.0 m, with PVC-tarpaulin  with water mist, nozzle 5.0 m above road surface 06./07.12.2016, São Paulo, No. 27
  • 28. 0 200 400 600 800 1.000 1.200 0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40 Test duration [h:min] Temperatur[°C] Temperatures (10 m behind fire load) 5,0 10 5,0 100MW,12min.delay 100MW,4min.delay Activationofwatermist Activation 06./07.12.2016, São Paulo, No. 28
  • 29. 0 200 400 600 800 1.000 1.200 0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40 Test duration [h:min] Temperature[°C] 0 20 40 60 80 100 120 HeatReleaseRate[MW] Heat Release Rate (HRR) 100 MW Activationofwatermist Activation 100 MW, 12 min. delay 100 MW, 4 min. delay 06./07.12.2016, São Paulo, No. 29
  • 30. 5.2 2.5 Temperatures 0 200 400 600 800 1.000 1.200 0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40 Test duration [h:min] Temperature[°C] H=5.20 m Concrete Cover 0.2 cm Concrete Cover 4.0 cm Activationofwatermist 06./07.12.2016, São Paulo, No. 30
  • 31. 5.2 2.5 Temperatures 0 200 400 600 800 1.000 1.200 0:00 0:05 0:10 0:15 0:20 0:25 0:30 0:35 0:40 Test duration [h:min] Temperature[°C] H=5.20 m Concrete Cover 0.2 cm Concrete Cover 4.0 cm Activation 06./07.12.2016, São Paulo, No. 31
  • 32. Thermal Image of Concrete Surface  Heating up of Concrete only in the immediate Fire Zone 06./07.12.2016, São Paulo, No. 32
  • 33. Undamaged Target (4 min delay of activation) 06./07.12.2016, São Paulo, No. 33
  • 34. Target is not burned during test (12 min delay of activation) 06./07.12.2016, São Paulo, No. 34
  • 35. Heat Release Rate Time [h:mm] HRR[MW] Activation HRRmeasured HRRsuppressed HRRconv+rad 06./07.12.2016, São Paulo, No. 35
  • 36. -30 -20 -10 0 10 20 30 40 50 60 70 Centre Tunnel [m] SprayDensity[l/m²/min] 0 m/s 3 m/s 5 m/s Distribution of Watermist Installation of Watermist over 60 m 06./07.12.2016, São Paulo, No. 36
  • 37.  Early intervention prevents development of fire  small fires are not so dangerous for persons  small fires have less economic consequences  dimensioning for 100, 200 or even 300 MW fires may not be necessary  Fire is „encapsulated“  spread of fire between objects (vehicles) is prevented  reduced heat radiation, third-party rescue is supported  Potential for compensation of conventional measures (ventilation, passive protection) Effects of water mist systems 06./07.12.2016, São Paulo, No. 37
  • 38. Safety in Metro Tunnels – taking Germany as an example Case Studies of Cologne North-South Line and Karlsruhe combined Solution 06./07.12.2016, São Paulo, No. 38 Source:HOCHBAHNHamburg
  • 39. Regulations require safe design of transport structures  Tram construction and operation regulation (BOStrab)  tunneling guideline  TR Strab Tunneling guideline  fire safety,  electrical installations  Avoid generation and spread of fires 06./07.12.2016, São Paulo, No. 39
  • 40.  “An Engineering Methodology for Performance-Based Fire Safety Design of Underground Rail Systems”  Prepared by ITA-COSUF Activity Group 2 on “Regulations, Guidelines and Best Practice” ITA-COSUF Guideline 06./07.12.2016, São Paulo, No. 40
  • 41. Protection goals for self and third-party rescue  Sufficiently thick low-density smoke layer; tolerable temperatures and concentrations of pollutants  Securing temporary low- density smoke escape routes  Adequate dimensioning of escape routes  Support of emergency services with suitable aids and constraints 06./07.12.2016, São Paulo, No. 41
  • 42. Verification of protection goals  Fire simulation using (CFD) field-model, e. g. KOBRA 3D  Determination of evacuation time according to NFPA 130 and research project “Emergency Scenarios” 06./07.12.2016, São Paulo, No. 42
  • 43. Verification of protection goals  Comparison of smoke accumulation vs. evacuation time  evacuation time < smoke accumulation  if not, measures have to be taken  Setup of individual holistic fire safety concepts 06./07.12.2016, São Paulo, No. 43
  • 44. Protection of stairways  Fire protection vs. architectural open design  Stairs preferably closed  Compromise, e. g. fire protection glazing or mobile smoke curtains  Combination of different safety measures smoke curtains glazing 06./07.12.2016, São Paulo, No. 44
  • 45. Wall and ceiling cladding  F30 dowel and non- combustible materials  Fire protection design (hot dimensioning) of sub- structure according to EC3 for 30 minutes  Small-format design (of panels)  Expansion joints 06./07.12.2016, São Paulo, No. 45
  • 46. Separation of fire sections: Meeting room  Access via open intermediate level  Glazing towards platform  Joint escape routes F90-glazing 06./07.12.2016, São Paulo, No. 46
  • 47. Smoke extraction  Combustion gases to be extracted separately (Separated from persons)  Normally ducts using thermal lift are sufficient  In special cases: mechanical smoke extraction is needed 06./07.12.2016, São Paulo, No. 47
  • 48. Fire detection  Aspirating smoke detectors for platform areas  Point type smoke detector equipment rooms  Two message dependency  Manual call point at passage to public area  Surveillance of elevator entrance area for evacuation shuttle operation 06./07.12.2016, São Paulo, No. 48
  • 49. Point type smoke detectors for surveillance of elevator entrance area 06./07.12.2016, São Paulo, No. 49
  • 50. Guiding of people  Escape and rescue plan  Emergency signs  Dynamic floor guiding system  Voice alarm system 06./07.12.2016, São Paulo, No. 50
  • 51. Evacuation of the station  Complete evacuation in case of alarm in public area  Partial evacuation in case of alarm in technical area  Maintaining train operation due to separation of areas in terms of fire protection  Coordination between fire brigade and transport company 06./07.12.2016, São Paulo, No. 51
  • 52. Fire brigade information center  First port of call for the fire service  Display/control panel of the fire alarm system  Microphone for PA-system  Key depot  Fire brigade response plans and routing cards 06./07.12.2016, São Paulo, No. 52
  • 53. Extinguishing water tapping points  In stations in staircase area  In tunnels every 50 m or 80 m  B connector with B/C interface  Labeling and flash  Water supply line; Cologne: dry, Karlsruhe: wet 06./07.12.2016, São Paulo, No. 53
  • 54. Current drain (power supply unit)  Supply of rescue equipment  In tunnels, every 50 m  230 V two-pin earthed socket  400 V three-phase CEE socket 06./07.12.2016, São Paulo, No. 54
  • 55. Other Safety precautions in tunnels  Safety areas  flat, no trip hazards  Emergency walkway, at least 0.7 m x 2.0 m (0.45 m to squeeze through) 0.7 m x 2.0 m 06./07.12.2016, São Paulo, No. 55
  • 56. Other Safety precautions in tunnels  Emergency lighting at least 1 Lux, positioned as low as possible  transport aid, railbound, for man and machine 06./07.12.2016, São Paulo, No. 56
  • 57. Other Safety precautions in tunnels  Emergency signs  Long luminescent green along the tunnel  Every 25 m with distance indication to safe area  Backlit blue at emergency exit 06./07.12.2016, São Paulo, No. 57
  • 58. Tunnel access signage  Determination of position of damaged trains  via radio message of the driver  track circuit occupancy/axle counters  No thermal sensors, preventing false alarms due to braking resistors on roof of vehicle 06./07.12.2016, São Paulo, No. 58
  • 59. Tunnel access signage  Alphabetical listing of every tunnel section provides unique description for firefighters 06./07.12.2016, São Paulo, No. 59
  • 60. Summary  Primary Protection goal: self and third-party rescue  Sufficiently thick low-smoke layer  Fire protection vs. architectural design  Solutions for Metro Stations:  Fire protection glazing, mobile smoke curtains, guiding of people  Support of fire brigade: information center, tapping points, current drain, transport aid, …  Secondary Protection goal: protection of structure 06./07.12.2016, São Paulo, No. 60