ES-SYSTEM S.A.
L i g h t I m p r e s s i o n s
Presentation of the results for Q2 and 1st half of the year 2010
ES-SYSTEMLIGHT IMPRESSIONS
1
ES-SYSTEM Capital Group – financial data, status on June 30, 2010
NET REVENUE from sales: PLN 68 437 k – increase by 1.82% yoy
NET PROFIT: PLN 3 566 K – increase by 50.91% yoy
EBIT: PLN 3 636 k – increase by 8.34% yoy
Return on operational activities: 5.31% in comparison with 4.99% in the same period
of the previous year
ES-SYSTEMLIGHT IMPRESSIONS
of the previous year
Return on net sale: 0.34% in comparison with 3.52% in the same period of the
previous year
Status of cash at the end of period: PLN 29 615 k
2
Evaluation of the market situation
ES-SYSTEMLIGHT IMPRESSIONS
Speed up of construction and assembly production in June 2010 to near 10%
Expected further increase in the second half of the year but due mainly to a larger number of began
residential investments
Few per cent increase of the electro-technical market since April 2010
Concerns about the sustainability of the economic growth in the sector
3
48 573
33 962 33 252
67 214
41 237
29 571
38 866
68 437
20 000
30 000
40 000
50 000
60 000
70 000
ES-SYSTEM – sales revenues
-
15,1%
-
12,93
%
+
16,88
%
+
1,82%
Revival in domestic and
international lighting
sector
ES-SYSTEMLIGHT IMPRESSIONS
4
33 962 33 252
29 571
0
10 000
IV Q 08/09 I Q 09/10 II Q 09/10 I-II Q 09/10
Distinct increase of sales in the Capital Group due to better situation in sector in Q2 2010
Increase of sales in infrastructure sector – investments subsided by EU funds
36 797 38 298
26 062 26 104
52 765
31 892 35 552
24 360 28 404
52 166
0
5 000
10 000
15 000
20 000
25 000
30 000
35 000
40 000
45 000
50 000
55 000
60 000
IIIQ 08/09 IVQ 08/09 IQ 09/10 IIQ 09/10 I-IIQ 09/10
ES-SYSTEM – domestic and export sale
-
7,2%
-
13,3
%
+1,2
%
domestic sale
79,9%79,9%79,9%79,9% 75,3%75,3%75,3%75,3% 86,2%86,2%86,2%86,2%78,9%78,9%78,9%78,9% 76,7%76,7%76,7%76,7% 82,3%82,3%82,3%82,3% 78,5%78,5%78,5%78,5% 73,0%73,0%73,0%73,0% 77,6%77,6%77,6%77,6% 77,1%77,1%77,1%77,1%
-
6,5%
+
8,8%
Distinct increase of the sale
on the domestic market: mainly
in the sector of outdoor and
ES-SYSTEMLIGHT IMPRESSIONS
-2 000
1 000
4 000
7 000
10 000
13 000
16 000
IIIQ08/09 IVQ08/09 IQ 09/10 IIQ09/10 I-IIQ09/10
export sale
20,1%20,1%20,1%20,1% 24,7%24,7%24,7%24,7% 21,1%21,1%21,1%21,1% 13,8%13,8%13,8%13,8% 23,3%23,3%23,3%23,3% 17,6%17,6%17,6%17,6% 21,5%21,5%21,5%21,5% 22,4%22,4%22,4%22,4%26,9%26,9%26,9%26,9% 22,9%22,9%22,9%22,9%
+
12,8
%
-
44,7
%
-
34,0
%
+
46,4
%
+
4,2%
in the sector of outdoor and
commercial lighting
Maintained stable growth of sale
in the wholesale segment
Increase of the export sale:
(one of the growth factors –
completion of the shopping center
in Bulgaria – value about PLN 4.3 M.
High level of export orders for the
following months of the current year
ES-SYSTEM S.A. – structure of export countries and business partners
ES-SYSTEMLIGHT IMPRESSIONS
6
Diversification of export customers: more than 50 export countries, of which 80% are countries from the European Union
4 987
9.82%
11.78%
8.39% 8.46%
8,00%
10,00%
12,00%
14,00%
3 000
4 000
5 000
ES-SYSTEM – operating result and return on operating profit: IQ09 – IIQ10
Operating profit EBIT
Return on operating profit (in %)
In PLN k
ES-SYSTEMLIGHT IMPRESSIONS
7
3 335
21
348
3 288
0.06%
1.18%
0,00%
2,00%
4,00%
6,00%
0
1 000
2 000
IQ09 IIQ09 IIIQ09 IVQ09 IQ10 IIQ10
• Increase of the operating profit:
- effect of increase of sales
- decrease of sales and administrative expenses by 5.1%
- result of financial activity
3 460
3 120
3 764
2 893
3 465
9.19% 8.89%
7.02%
8.92%
2,00%
4,00%
6,00%
8,00%
10,00%
1 000
1 500
2 000
2 500
3 000
3 500
4 000
in PLN k
ES-SYSTEM – net profit
2 469
Net profit
Return on net profit (in %)
ES-SYSTEMLIGHT IMPRESSIONS
8
-757
101
-2.28%
0.34%
-4,00%
-2,00%
0,00%
2,00%
-1 000
-500
0
500
1 000
IQ09 IIQ09 IIIQ09 IVQ09 IQ10 IIQ10
• Increase of the net profit due to:
Sales increase,
Lower income tax expense (change of the tax regulations in the scope of qualifying
unpaid salaries and bad debt)
Domestic market in Q2 2010 and prospects for Q3
• Domestic market – growing since Q2 2010 on the wave of the economic growth in the investment sector
• In Q2 was noticed a gradual improvement in the construction sector: an increase in the construction and assembly
production nearly 10% yoy.
• Growth on the eletrotechnical market. In Q1 persisted declines in the sector, market growth from April of the current year.
• Revival of the construction and electrotechnical market transfered into improvement of the economic trend in the lighting
sector.
– Increase of the level of orders. Particular revival regards segments connected with infrastructural investments:
• Street and road lighting,
• Lighting for schools, hospitals, public facilities as the result of modernization of lighting in connection with the
ES-SYSTEMLIGHT IMPRESSIONS
• Lighting for schools, hospitals, public facilities as the result of modernization of lighting in connection with the
EU funds.
• A small upward tendency in the segment of office lighting.
– Growth consolidation in the segment of shopping centers.
• Situation in the sector in Q2 gives grounds for cautious optimism with regard to Q3-Q4 of the current year.
– Improvement of the condition of the lighting sector.
– Sales results at least at the level of 2009.
– Level of the Group’s orders in July of this year exceeded considerably levels reached in the same period of
2009.
– High level of investments in the area of municipal infrastucture fills with optimism.
Central Bank of Kuwait – planned completion of the project: end of 2010
ES-SYSTEMLIGHT IMPRESSIONS
• Investor: Central Bank of Kuwait
• Location: Sharq, Kuwait City, Kuwait
• Area: 130 000m² of commercial area
• Investment value: USD 330 M
• Value of ES-SYSTEM contract: PLN 1 M (up-to-date)10
Shopping Center RUSE – planned completion of the project: Q3 2010
ES-SYSTEMLIGHT IMPRESSIONS
• Investor: Real Estate Services Bulgaria
• Location: Lipnik Blvd, Rousse, Bulgaria
• Area: 36 000m², 3 levels, 160 boutiques, car park for 1200 cars
• Investment value: EURO 100 M
• Value of ES-SYSTEM contract: PLN 0.7 M11
Exemplary investment in progress – airport in Las Palmas
ES-SYSTEMLIGHT IMPRESSIONS
• Investor: Las Palmas de Gran Canaria Airport
• Value of ES-SYSTEM contract: EURO 80 k
12
Exemplary investment in progress – footbridges in Aarhus, 1st stage
ES-SYSTEMLIGHT IMPRESSIONS
• Investor: public funds of Aarhus
• Location: Nordhaven – Aarhus / Denmark
• Value of ES-SYSTEM contract: EURO 9 000 - 1st stage (completed)
EURO 20 000 - 2nd stage in 2011
13
Project under completion – QUATTRO BUSINESS – class A office building
(opening: September 2010)
ES-SYSTEMLIGHT IMPRESSIONS
• Investor: BUMA GROUP
• Location: Krakow, Poland
• Area: 12 000 m² - 1st of four stages
• Value of ES-SYSTEM: PLN 700 000
14
Exemplary investment in progress – modernization of the City Stadium
CRACOVIACRACOVIACRACOVIACRACOVIA , 1st stage, 1st stage, 1st stage, 1st stage
ES-SYSTEMLIGHT IMPRESSIONS
• Location: Błonia, Krakow
• Investment value: PLN 157 M
• Value of ES-SYSTEM contract: PLN 625 000
15
Exemplary investment in progress ---- EAST STANDEAST STANDEAST STANDEAST STAND TS WISŁA KrakowTS WISŁA KrakowTS WISŁA KrakowTS WISŁA Krakow
ES-SYSTEMLIGHT IMPRESSIONS
• Scope of delivery: interior and stands’ lighting
• Investor: Municipality Krakow
• Location: Krakow
• Capacity: 12 831 spectators
• Investment value: PLN 144 M
• Value of ES-SYSTEM contract: PLN 950 000
16

More Related Content

Similar to ES-SYSTEM Presentation of data for the first half of 2010

ES-SYSTEM Presentation of data for Q3 2010
ES-SYSTEM Presentation of data for Q3 2010ES-SYSTEM Presentation of data for Q3 2010
ES-SYSTEM Presentation of data for Q3 2010ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q1 2010
ES-SYSTEM Presentation of data for Q1 2010ES-SYSTEM Presentation of data for Q1 2010
ES-SYSTEM Presentation of data for Q1 2010ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2011
ES-SYSTEM Presentation of data for the first half of 2011ES-SYSTEM Presentation of data for the first half of 2011
ES-SYSTEM Presentation of data for the first half of 2011ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q3 2009
ES-SYSTEM Presentation of data for Q3 2009ES-SYSTEM Presentation of data for Q3 2009
ES-SYSTEM Presentation of data for Q3 2009ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2012
ES-SYSTEM Presentation of data for the first half of 2012ES-SYSTEM Presentation of data for the first half of 2012
ES-SYSTEM Presentation of data for the first half of 2012ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q3 2011
ES-SYSTEM Presentation of data for Q3 2011ES-SYSTEM Presentation of data for Q3 2011
ES-SYSTEM Presentation of data for Q3 2011ES-SYSTEM
 
ES-SYSTEM Presentation of data for the year 2009
ES-SYSTEM Presentation of data for the year 2009ES-SYSTEM Presentation of data for the year 2009
ES-SYSTEM Presentation of data for the year 2009ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q1 2012
ES-SYSTEM Presentation of data for Q1 2012ES-SYSTEM Presentation of data for Q1 2012
ES-SYSTEM Presentation of data for Q1 2012ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q4 2008
ES-SYSTEM Presentation of data for Q4 2008ES-SYSTEM Presentation of data for Q4 2008
ES-SYSTEM Presentation of data for Q4 2008ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q3 2008
ES-SYSTEM Presentation of data for Q3 2008ES-SYSTEM Presentation of data for Q3 2008
ES-SYSTEM Presentation of data for Q3 2008ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q3 2016
ES-SYSTEM Presentation of data for Q3 2016ES-SYSTEM Presentation of data for Q3 2016
ES-SYSTEM Presentation of data for Q3 2016ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q1 2009
ES-SYSTEM Presentation of data for Q1 2009ES-SYSTEM Presentation of data for Q1 2009
ES-SYSTEM Presentation of data for Q1 2009ES-SYSTEM
 
AT&S Half-Year Financial Report H1 2016/17
AT&S Half-Year Financial Report H1 2016/17AT&S Half-Year Financial Report H1 2016/17
AT&S Half-Year Financial Report H1 2016/17AT&S_IR
 
ES-SYSTEM Presentation of data for the year 2010
ES-SYSTEM Presentation of data for the year 2010ES-SYSTEM Presentation of data for the year 2010
ES-SYSTEM Presentation of data for the year 2010ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2015
ES-SYSTEM Presentation of data for the first half of 2015ES-SYSTEM Presentation of data for the first half of 2015
ES-SYSTEM Presentation of data for the first half of 2015ES-SYSTEM
 
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020IndexBox Marketing
 
ES-SYSTEM Presentation of data for Q1 2011
ES-SYSTEM Presentation of data for Q1 2011ES-SYSTEM Presentation of data for Q1 2011
ES-SYSTEM Presentation of data for Q1 2011ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2016
ES-SYSTEM Presentation of data for the first half of 2016ES-SYSTEM Presentation of data for the first half of 2016
ES-SYSTEM Presentation of data for the first half of 2016ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2013
ES-SYSTEM Presentation of data for the first half of 2013ES-SYSTEM Presentation of data for the first half of 2013
ES-SYSTEM Presentation of data for the first half of 2013ES-SYSTEM
 

Similar to ES-SYSTEM Presentation of data for the first half of 2010 (20)

ES-SYSTEM Presentation of data for Q3 2010
ES-SYSTEM Presentation of data for Q3 2010ES-SYSTEM Presentation of data for Q3 2010
ES-SYSTEM Presentation of data for Q3 2010
 
ES-SYSTEM Presentation of data for Q1 2010
ES-SYSTEM Presentation of data for Q1 2010ES-SYSTEM Presentation of data for Q1 2010
ES-SYSTEM Presentation of data for Q1 2010
 
ES-SYSTEM Presentation of data for the first half of 2011
ES-SYSTEM Presentation of data for the first half of 2011ES-SYSTEM Presentation of data for the first half of 2011
ES-SYSTEM Presentation of data for the first half of 2011
 
ES-SYSTEM Presentation of data for Q3 2009
ES-SYSTEM Presentation of data for Q3 2009ES-SYSTEM Presentation of data for Q3 2009
ES-SYSTEM Presentation of data for Q3 2009
 
ES-SYSTEM Presentation of data for the first half of 2012
ES-SYSTEM Presentation of data for the first half of 2012ES-SYSTEM Presentation of data for the first half of 2012
ES-SYSTEM Presentation of data for the first half of 2012
 
ES-SYSTEM Presentation of data for Q3 2011
ES-SYSTEM Presentation of data for Q3 2011ES-SYSTEM Presentation of data for Q3 2011
ES-SYSTEM Presentation of data for Q3 2011
 
ES-SYSTEM Presentation of data for the year 2009
ES-SYSTEM Presentation of data for the year 2009ES-SYSTEM Presentation of data for the year 2009
ES-SYSTEM Presentation of data for the year 2009
 
ES-SYSTEM Presentation of data for Q1 2012
ES-SYSTEM Presentation of data for Q1 2012ES-SYSTEM Presentation of data for Q1 2012
ES-SYSTEM Presentation of data for Q1 2012
 
ES-SYSTEM Presentation of data for Q4 2008
ES-SYSTEM Presentation of data for Q4 2008ES-SYSTEM Presentation of data for Q4 2008
ES-SYSTEM Presentation of data for Q4 2008
 
ES-SYSTEM Presentation of data for Q3 2008
ES-SYSTEM Presentation of data for Q3 2008ES-SYSTEM Presentation of data for Q3 2008
ES-SYSTEM Presentation of data for Q3 2008
 
ES-SYSTEM Presentation of data for Q3 2016
ES-SYSTEM Presentation of data for Q3 2016ES-SYSTEM Presentation of data for Q3 2016
ES-SYSTEM Presentation of data for Q3 2016
 
ES-SYSTEM Presentation of data for Q1 2009
ES-SYSTEM Presentation of data for Q1 2009ES-SYSTEM Presentation of data for Q1 2009
ES-SYSTEM Presentation of data for Q1 2009
 
AT&S Half-Year Financial Report H1 2016/17
AT&S Half-Year Financial Report H1 2016/17AT&S Half-Year Financial Report H1 2016/17
AT&S Half-Year Financial Report H1 2016/17
 
ES-SYSTEM Presentation of data for the year 2010
ES-SYSTEM Presentation of data for the year 2010ES-SYSTEM Presentation of data for the year 2010
ES-SYSTEM Presentation of data for the year 2010
 
ES-SYSTEM Presentation of data for the first half of 2015
ES-SYSTEM Presentation of data for the first half of 2015ES-SYSTEM Presentation of data for the first half of 2015
ES-SYSTEM Presentation of data for the first half of 2015
 
Current economic situation in Kazakhstan, Jan'21, 2011
Current economic situation in Kazakhstan, Jan'21, 2011Current economic situation in Kazakhstan, Jan'21, 2011
Current economic situation in Kazakhstan, Jan'21, 2011
 
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020
EU: Electrical Transformers – Market Report. Analysis and Forecast to 2020
 
ES-SYSTEM Presentation of data for Q1 2011
ES-SYSTEM Presentation of data for Q1 2011ES-SYSTEM Presentation of data for Q1 2011
ES-SYSTEM Presentation of data for Q1 2011
 
ES-SYSTEM Presentation of data for the first half of 2016
ES-SYSTEM Presentation of data for the first half of 2016ES-SYSTEM Presentation of data for the first half of 2016
ES-SYSTEM Presentation of data for the first half of 2016
 
ES-SYSTEM Presentation of data for the first half of 2013
ES-SYSTEM Presentation of data for the first half of 2013ES-SYSTEM Presentation of data for the first half of 2013
ES-SYSTEM Presentation of data for the first half of 2013
 

More from ES-SYSTEM

Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019ES-SYSTEM
 
Es system prezentacja I-III kwartal 2019
Es system prezentacja I-III kwartal 2019Es system prezentacja I-III kwartal 2019
Es system prezentacja I-III kwartal 2019ES-SYSTEM
 
Prezentacja es system raport za i polrocze 2019 r
Prezentacja es system raport za i polrocze 2019 rPrezentacja es system raport za i polrocze 2019 r
Prezentacja es system raport za i polrocze 2019 rES-SYSTEM
 
Presentation of the es system capital group's financial data for 2 q and 1h 2019
Presentation of the es system capital group's financial data for 2 q and 1h 2019Presentation of the es system capital group's financial data for 2 q and 1h 2019
Presentation of the es system capital group's financial data for 2 q and 1h 2019ES-SYSTEM
 
Presentation of the es system capital group's financial data for 1 q 2019-eng
Presentation of the es system capital group's financial data for 1 q 2019-engPresentation of the es system capital group's financial data for 1 q 2019-eng
Presentation of the es system capital group's financial data for 1 q 2019-engES-SYSTEM
 
Presentation of the es system capital group's financial data for the year 2018
Presentation of the es system capital group's financial data for the year 2018Presentation of the es system capital group's financial data for the year 2018
Presentation of the es system capital group's financial data for the year 2018ES-SYSTEM
 
ES-SYSTEM prezentacja wyników za I kwartał 2019
ES-SYSTEM prezentacja wyników za I kwartał 2019ES-SYSTEM prezentacja wyników za I kwartał 2019
ES-SYSTEM prezentacja wyników za I kwartał 2019ES-SYSTEM
 
ES-SYSTEM prezentacja wynikow za 2018 rok
ES-SYSTEM prezentacja wynikow za 2018 rokES-SYSTEM prezentacja wynikow za 2018 rok
ES-SYSTEM prezentacja wynikow za 2018 rokES-SYSTEM
 
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018ES-SYSTEM
 
ES-SYSTEM prezentacja wyników za III kwartał 2018
ES-SYSTEM prezentacja wyników za III kwartał 2018ES-SYSTEM prezentacja wyników za III kwartał 2018
ES-SYSTEM prezentacja wyników za III kwartał 2018ES-SYSTEM
 
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018ES-SYSTEM
 
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018ES-SYSTEM
 
Presentation of The ES-SYSTEM Capital Group for Q1 2018
Presentation of The ES-SYSTEM Capital Group for Q1 2018Presentation of The ES-SYSTEM Capital Group for Q1 2018
Presentation of The ES-SYSTEM Capital Group for Q1 2018ES-SYSTEM
 
Es system prezentacja wynikow za i kw 2018
Es system prezentacja wynikow za i kw 2018Es system prezentacja wynikow za i kw 2018
Es system prezentacja wynikow za i kw 2018ES-SYSTEM
 
Presentation of the es system capital group's finanacial data for the year 2017
Presentation of the es system capital group's finanacial data for the year 2017Presentation of the es system capital group's finanacial data for the year 2017
Presentation of the es system capital group's finanacial data for the year 2017ES-SYSTEM
 
ES-SYSTEM prezentacja wyników za 2017 rok
ES-SYSTEM prezentacja wyników za 2017 rokES-SYSTEM prezentacja wyników za 2017 rok
ES-SYSTEM prezentacja wyników za 2017 rokES-SYSTEM
 
ES-SYSTEM prezentacja wyników za IIIkw 2017
ES-SYSTEM prezentacja wyników za IIIkw 2017ES-SYSTEM prezentacja wyników za IIIkw 2017
ES-SYSTEM prezentacja wyników za IIIkw 2017ES-SYSTEM
 
ES-SYSTEM Presentation of data for the first half of 2017
ES-SYSTEM Presentation of data for the first half of 2017ES-SYSTEM Presentation of data for the first half of 2017
ES-SYSTEM Presentation of data for the first half of 2017ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q1 2017
ES-SYSTEM Presentation of data for Q1 2017ES-SYSTEM Presentation of data for Q1 2017
ES-SYSTEM Presentation of data for Q1 2017ES-SYSTEM
 
ES-SYSTEM Presentation of data for Q3 2015
ES-SYSTEM Presentation of data for Q3 2015ES-SYSTEM Presentation of data for Q3 2015
ES-SYSTEM Presentation of data for Q3 2015ES-SYSTEM
 

More from ES-SYSTEM (20)

Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2019
 
Es system prezentacja I-III kwartal 2019
Es system prezentacja I-III kwartal 2019Es system prezentacja I-III kwartal 2019
Es system prezentacja I-III kwartal 2019
 
Prezentacja es system raport za i polrocze 2019 r
Prezentacja es system raport za i polrocze 2019 rPrezentacja es system raport za i polrocze 2019 r
Prezentacja es system raport za i polrocze 2019 r
 
Presentation of the es system capital group's financial data for 2 q and 1h 2019
Presentation of the es system capital group's financial data for 2 q and 1h 2019Presentation of the es system capital group's financial data for 2 q and 1h 2019
Presentation of the es system capital group's financial data for 2 q and 1h 2019
 
Presentation of the es system capital group's financial data for 1 q 2019-eng
Presentation of the es system capital group's financial data for 1 q 2019-engPresentation of the es system capital group's financial data for 1 q 2019-eng
Presentation of the es system capital group's financial data for 1 q 2019-eng
 
Presentation of the es system capital group's financial data for the year 2018
Presentation of the es system capital group's financial data for the year 2018Presentation of the es system capital group's financial data for the year 2018
Presentation of the es system capital group's financial data for the year 2018
 
ES-SYSTEM prezentacja wyników za I kwartał 2019
ES-SYSTEM prezentacja wyników za I kwartał 2019ES-SYSTEM prezentacja wyników za I kwartał 2019
ES-SYSTEM prezentacja wyników za I kwartał 2019
 
ES-SYSTEM prezentacja wynikow za 2018 rok
ES-SYSTEM prezentacja wynikow za 2018 rokES-SYSTEM prezentacja wynikow za 2018 rok
ES-SYSTEM prezentacja wynikow za 2018 rok
 
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 3Q 2018
 
ES-SYSTEM prezentacja wyników za III kwartał 2018
ES-SYSTEM prezentacja wyników za III kwartał 2018ES-SYSTEM prezentacja wyników za III kwartał 2018
ES-SYSTEM prezentacja wyników za III kwartał 2018
 
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018
Presentation of the ES-SYSTEM Capital Group's financial data for 2Q and 1H 2018
 
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018
Prezentacja wyników Grupy Kapitałowej ES-SYSTEM za II kwartał i I półrocze 2018
 
Presentation of The ES-SYSTEM Capital Group for Q1 2018
Presentation of The ES-SYSTEM Capital Group for Q1 2018Presentation of The ES-SYSTEM Capital Group for Q1 2018
Presentation of The ES-SYSTEM Capital Group for Q1 2018
 
Es system prezentacja wynikow za i kw 2018
Es system prezentacja wynikow za i kw 2018Es system prezentacja wynikow za i kw 2018
Es system prezentacja wynikow za i kw 2018
 
Presentation of the es system capital group's finanacial data for the year 2017
Presentation of the es system capital group's finanacial data for the year 2017Presentation of the es system capital group's finanacial data for the year 2017
Presentation of the es system capital group's finanacial data for the year 2017
 
ES-SYSTEM prezentacja wyników za 2017 rok
ES-SYSTEM prezentacja wyników za 2017 rokES-SYSTEM prezentacja wyników za 2017 rok
ES-SYSTEM prezentacja wyników za 2017 rok
 
ES-SYSTEM prezentacja wyników za IIIkw 2017
ES-SYSTEM prezentacja wyników za IIIkw 2017ES-SYSTEM prezentacja wyników za IIIkw 2017
ES-SYSTEM prezentacja wyników za IIIkw 2017
 
ES-SYSTEM Presentation of data for the first half of 2017
ES-SYSTEM Presentation of data for the first half of 2017ES-SYSTEM Presentation of data for the first half of 2017
ES-SYSTEM Presentation of data for the first half of 2017
 
ES-SYSTEM Presentation of data for Q1 2017
ES-SYSTEM Presentation of data for Q1 2017ES-SYSTEM Presentation of data for Q1 2017
ES-SYSTEM Presentation of data for Q1 2017
 
ES-SYSTEM Presentation of data for Q3 2015
ES-SYSTEM Presentation of data for Q3 2015ES-SYSTEM Presentation of data for Q3 2015
ES-SYSTEM Presentation of data for Q3 2015
 

Recently uploaded

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Recently uploaded (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

ES-SYSTEM Presentation of data for the first half of 2010

  • 1. ES-SYSTEM S.A. L i g h t I m p r e s s i o n s Presentation of the results for Q2 and 1st half of the year 2010 ES-SYSTEMLIGHT IMPRESSIONS 1
  • 2. ES-SYSTEM Capital Group – financial data, status on June 30, 2010 NET REVENUE from sales: PLN 68 437 k – increase by 1.82% yoy NET PROFIT: PLN 3 566 K – increase by 50.91% yoy EBIT: PLN 3 636 k – increase by 8.34% yoy Return on operational activities: 5.31% in comparison with 4.99% in the same period of the previous year ES-SYSTEMLIGHT IMPRESSIONS of the previous year Return on net sale: 0.34% in comparison with 3.52% in the same period of the previous year Status of cash at the end of period: PLN 29 615 k 2
  • 3. Evaluation of the market situation ES-SYSTEMLIGHT IMPRESSIONS Speed up of construction and assembly production in June 2010 to near 10% Expected further increase in the second half of the year but due mainly to a larger number of began residential investments Few per cent increase of the electro-technical market since April 2010 Concerns about the sustainability of the economic growth in the sector 3
  • 4. 48 573 33 962 33 252 67 214 41 237 29 571 38 866 68 437 20 000 30 000 40 000 50 000 60 000 70 000 ES-SYSTEM – sales revenues - 15,1% - 12,93 % + 16,88 % + 1,82% Revival in domestic and international lighting sector ES-SYSTEMLIGHT IMPRESSIONS 4 33 962 33 252 29 571 0 10 000 IV Q 08/09 I Q 09/10 II Q 09/10 I-II Q 09/10 Distinct increase of sales in the Capital Group due to better situation in sector in Q2 2010 Increase of sales in infrastructure sector – investments subsided by EU funds
  • 5. 36 797 38 298 26 062 26 104 52 765 31 892 35 552 24 360 28 404 52 166 0 5 000 10 000 15 000 20 000 25 000 30 000 35 000 40 000 45 000 50 000 55 000 60 000 IIIQ 08/09 IVQ 08/09 IQ 09/10 IIQ 09/10 I-IIQ 09/10 ES-SYSTEM – domestic and export sale - 7,2% - 13,3 % +1,2 % domestic sale 79,9%79,9%79,9%79,9% 75,3%75,3%75,3%75,3% 86,2%86,2%86,2%86,2%78,9%78,9%78,9%78,9% 76,7%76,7%76,7%76,7% 82,3%82,3%82,3%82,3% 78,5%78,5%78,5%78,5% 73,0%73,0%73,0%73,0% 77,6%77,6%77,6%77,6% 77,1%77,1%77,1%77,1% - 6,5% + 8,8% Distinct increase of the sale on the domestic market: mainly in the sector of outdoor and ES-SYSTEMLIGHT IMPRESSIONS -2 000 1 000 4 000 7 000 10 000 13 000 16 000 IIIQ08/09 IVQ08/09 IQ 09/10 IIQ09/10 I-IIQ09/10 export sale 20,1%20,1%20,1%20,1% 24,7%24,7%24,7%24,7% 21,1%21,1%21,1%21,1% 13,8%13,8%13,8%13,8% 23,3%23,3%23,3%23,3% 17,6%17,6%17,6%17,6% 21,5%21,5%21,5%21,5% 22,4%22,4%22,4%22,4%26,9%26,9%26,9%26,9% 22,9%22,9%22,9%22,9% + 12,8 % - 44,7 % - 34,0 % + 46,4 % + 4,2% in the sector of outdoor and commercial lighting Maintained stable growth of sale in the wholesale segment Increase of the export sale: (one of the growth factors – completion of the shopping center in Bulgaria – value about PLN 4.3 M. High level of export orders for the following months of the current year
  • 6. ES-SYSTEM S.A. – structure of export countries and business partners ES-SYSTEMLIGHT IMPRESSIONS 6 Diversification of export customers: more than 50 export countries, of which 80% are countries from the European Union
  • 7. 4 987 9.82% 11.78% 8.39% 8.46% 8,00% 10,00% 12,00% 14,00% 3 000 4 000 5 000 ES-SYSTEM – operating result and return on operating profit: IQ09 – IIQ10 Operating profit EBIT Return on operating profit (in %) In PLN k ES-SYSTEMLIGHT IMPRESSIONS 7 3 335 21 348 3 288 0.06% 1.18% 0,00% 2,00% 4,00% 6,00% 0 1 000 2 000 IQ09 IIQ09 IIIQ09 IVQ09 IQ10 IIQ10 • Increase of the operating profit: - effect of increase of sales - decrease of sales and administrative expenses by 5.1% - result of financial activity 3 460
  • 8. 3 120 3 764 2 893 3 465 9.19% 8.89% 7.02% 8.92% 2,00% 4,00% 6,00% 8,00% 10,00% 1 000 1 500 2 000 2 500 3 000 3 500 4 000 in PLN k ES-SYSTEM – net profit 2 469 Net profit Return on net profit (in %) ES-SYSTEMLIGHT IMPRESSIONS 8 -757 101 -2.28% 0.34% -4,00% -2,00% 0,00% 2,00% -1 000 -500 0 500 1 000 IQ09 IIQ09 IIIQ09 IVQ09 IQ10 IIQ10 • Increase of the net profit due to: Sales increase, Lower income tax expense (change of the tax regulations in the scope of qualifying unpaid salaries and bad debt)
  • 9. Domestic market in Q2 2010 and prospects for Q3 • Domestic market – growing since Q2 2010 on the wave of the economic growth in the investment sector • In Q2 was noticed a gradual improvement in the construction sector: an increase in the construction and assembly production nearly 10% yoy. • Growth on the eletrotechnical market. In Q1 persisted declines in the sector, market growth from April of the current year. • Revival of the construction and electrotechnical market transfered into improvement of the economic trend in the lighting sector. – Increase of the level of orders. Particular revival regards segments connected with infrastructural investments: • Street and road lighting, • Lighting for schools, hospitals, public facilities as the result of modernization of lighting in connection with the ES-SYSTEMLIGHT IMPRESSIONS • Lighting for schools, hospitals, public facilities as the result of modernization of lighting in connection with the EU funds. • A small upward tendency in the segment of office lighting. – Growth consolidation in the segment of shopping centers. • Situation in the sector in Q2 gives grounds for cautious optimism with regard to Q3-Q4 of the current year. – Improvement of the condition of the lighting sector. – Sales results at least at the level of 2009. – Level of the Group’s orders in July of this year exceeded considerably levels reached in the same period of 2009. – High level of investments in the area of municipal infrastucture fills with optimism.
  • 10. Central Bank of Kuwait – planned completion of the project: end of 2010 ES-SYSTEMLIGHT IMPRESSIONS • Investor: Central Bank of Kuwait • Location: Sharq, Kuwait City, Kuwait • Area: 130 000m² of commercial area • Investment value: USD 330 M • Value of ES-SYSTEM contract: PLN 1 M (up-to-date)10
  • 11. Shopping Center RUSE – planned completion of the project: Q3 2010 ES-SYSTEMLIGHT IMPRESSIONS • Investor: Real Estate Services Bulgaria • Location: Lipnik Blvd, Rousse, Bulgaria • Area: 36 000m², 3 levels, 160 boutiques, car park for 1200 cars • Investment value: EURO 100 M • Value of ES-SYSTEM contract: PLN 0.7 M11
  • 12. Exemplary investment in progress – airport in Las Palmas ES-SYSTEMLIGHT IMPRESSIONS • Investor: Las Palmas de Gran Canaria Airport • Value of ES-SYSTEM contract: EURO 80 k 12
  • 13. Exemplary investment in progress – footbridges in Aarhus, 1st stage ES-SYSTEMLIGHT IMPRESSIONS • Investor: public funds of Aarhus • Location: Nordhaven – Aarhus / Denmark • Value of ES-SYSTEM contract: EURO 9 000 - 1st stage (completed) EURO 20 000 - 2nd stage in 2011 13
  • 14. Project under completion – QUATTRO BUSINESS – class A office building (opening: September 2010) ES-SYSTEMLIGHT IMPRESSIONS • Investor: BUMA GROUP • Location: Krakow, Poland • Area: 12 000 m² - 1st of four stages • Value of ES-SYSTEM: PLN 700 000 14
  • 15. Exemplary investment in progress – modernization of the City Stadium CRACOVIACRACOVIACRACOVIACRACOVIA , 1st stage, 1st stage, 1st stage, 1st stage ES-SYSTEMLIGHT IMPRESSIONS • Location: Błonia, Krakow • Investment value: PLN 157 M • Value of ES-SYSTEM contract: PLN 625 000 15
  • 16. Exemplary investment in progress ---- EAST STANDEAST STANDEAST STANDEAST STAND TS WISŁA KrakowTS WISŁA KrakowTS WISŁA KrakowTS WISŁA Krakow ES-SYSTEMLIGHT IMPRESSIONS • Scope of delivery: interior and stands’ lighting • Investor: Municipality Krakow • Location: Krakow • Capacity: 12 831 spectators • Investment value: PLN 144 M • Value of ES-SYSTEM contract: PLN 950 000 16