Installation Instruction
ESD-6949-2/16
Joint for Single-Core
Polymeric Insulated
Cables 1.1 kV
with Aluminium Wire
Armour
Tyco Electronics Raychem GmbH
a TE Connectivity Ltd. Company
TE Energy
Finsinger Feld 1
85521 Ottobrunn/Munich, Germany
Tel:	+49-89-6089-0
Fax:	+49-89-6096-345
energy.te.com
To view the TE Energy website:
ESD-6949-2/16 Page 2/5
Before Starting
Check to ensure that the kit you are going to use fits the cable.
Refer to the kit label and the title of the installation instruction.
Components or working steps may have been improved since you last installed this product.
Carefully read and follow the steps in the installation instruction.
General Instructions
Use a propane (preferred) or butane gas torch.
Ensure the torch is always used in a well-ventilated environment.
Adjust the torch to obtain a soft blue flame with a yellow tip.
Pencil-like blue flames should be avoided.
Keep the torch aimed in the shrink direction to preheat the material.
Keep the flame moving continuously to avoid scorching the material.
Clean and degrease all parts that will come into contact with adhesive.
If a solvent is used follow the manufacturer’s handling instructions.
Tubing should be cut smoothly with a sharp knife leaving no jagged edges.
Start shrinking the tubing at the position recommended in the instruction.
Ensure that the tubing is shrunk smoothly all around before continuing along the cable.
Tubing should be smooth and wrinkle free with inner components clearly defined.
The Information contained in these installation instructions is for use only by installers trained to make electrical power
installations and is intended to describe the correct method of installation for this product. However, TE Connectivity has
no control over the field conditions which influence product installation.
It is the user’s responsibility to determine the suitability of the installation method in the user’s field conditions. TE
Connectivity’s only obligations are those in TE Connectivity’s standard Conditions of Sale for this product and in no case
will TE Connectivity be liable for any other incidental, indirect or consequential damages arising from the use or misuse
of the products.
Raychem, TE Connectivity and TE connectivity (logo) are trademarks.
© 2011 Tyco Electronics Raychem GmbH.
ESD-6949-2/16 Page 3/5
Remove the oversheath of both cables to dimension a, measured from the reference line.
Clean the remaining oversheath of both cables for about 600 mm.
Cable 1: Do not cut the armour wires. Carefully bend them back away from the joint area.
Cable 2: Cut partly through the armour wires at the oversheath cut. Bend and break them off at this position.
Cable Overlap
Overlap the cables to be jointed according to dimensions in
drawing.For dimension a see table below.
Mark the reference line as shown in drawing.
Cable 1
Cable 2
Reference line
100
a a
Reference lineInner sheath
AL-wire armour
Oversheath
Cable Preparation
a + 100
Dimensions in mm
Table1
Kit-Range
[mm2
]
a
[mm]
b
[mm]
185-300 150 100
400-630 175 130
Cut the cores at the reference line. Remove the inner sheath to dimension b (see Table 1).
b b
Reference line
Inner sheath Insulation
ESD-6949-2/16 Page 4/5
2
3
Cut back the insulation to dimension I = half length of
connector + 5 mm.
Joint the conductors by crimping.
Remove any sharp edges.
Clean and degrease the connector and insulation.
Completion of joint
Slide the connector insulating tubing and the outer sleeve
over the cable end where the armour wires are still covered.
1. Connector insulating tubing
2. Outer sleeve (black)
1
21
l l
4
Pull the connector insulating tubing and position it centrally
over the connector.
Start shrinking in the centre working towards the ends.
The tubing should be fully shrunk and wrinkle free.
1
ESD-6949-2/16 Page 5/5
6
7
8
9
Thoroughly clean the armour wires from cable 1.
Separate the armour wires and form equal bunches,
according to the number of the mechanical connectors
supplied with the kit.
Fold back the long armour wires tightly across the joint, cut to
length, and connect them using the mechanical connectors
provided. Shear off the connector bolts.
The joint is now completed. Allow to cool before moving.
Wrap a piece of the inner bedding of the cable sheath over
the connectors.
Using the adhesive cotton tape provided, ensure all the wires
are close to the cable and tubing set over the length of the
joint and that there are no sharp edges.
Abrade and degrease the cable jacket for 100 mm at both
sides of the joint.
Position the outer sealing sleeve centrally, then shrink the
sleeve down starting in the centre and working towards
the ends.
Carefully remove 100 mm of the oversheath on cable side 2.
Do not cut the armour wires.
Lift the armour wires and thoroughly clean.
Separate the armour wires and form equal bunches to suit
the number of armour wire connectors included in the joint
kit.
Please dispose of all waste according to
environmental regulations.
5
2
Side 2
100

More Related Content

What's hot

Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints TYCO- RA...
Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints  TYCO- RA...Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints  TYCO- RA...
Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints TYCO- RA...AKBAR TRADING
 
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...AKBAR TRADING
 
Raychem inline joints for plastic and rubber insulated cables up to 1 kV
Raychem inline joints for plastic and rubber insulated cables up to 1 kVRaychem inline joints for plastic and rubber insulated cables up to 1 kV
Raychem inline joints for plastic and rubber insulated cables up to 1 kVAKBAR TRADING
 
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.com
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.comRaychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.com
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.comAKBAR TRADING
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...Thorne & Derrick International
 
Raychem termination kits tyco-te-stock
Raychem termination kits tyco-te-stockRaychem termination kits tyco-te-stock
Raychem termination kits tyco-te-stockAKBAR TRADING
 
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable Cleats
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable CleatsEllis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable Cleats
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable CleatsThorne & Derrick International
 
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Thorne & Derrick International
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 CablesThorne & Derrick International
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Thorne & Derrick International
 
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable Cleat
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable CleatPrysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable Cleat
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable CleatThorne & Derrick International
 
Nexans Airfield Ground Lighting Cables (Primary Secondary)
Nexans Airfield Ground Lighting Cables (Primary  Secondary)Nexans Airfield Ground Lighting Cables (Primary  Secondary)
Nexans Airfield Ground Lighting Cables (Primary Secondary)Thorne & Derrick International
 
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint KitsAirfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint KitsThorne & Derrick International
 
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)Thorne & Derrick International
 
Torque Sensor - Pts 1kgm
Torque Sensor - Pts 1kgmTorque Sensor - Pts 1kgm
Torque Sensor - Pts 1kgmRajendra Singh
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
Crimping Guidelines
Crimping GuidelinesCrimping Guidelines
Crimping GuidelinesPhil Heft
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 CablesThorne & Derrick International
 
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS ApprovedThorne & Derrick International
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Thorne & Derrick International
 

What's hot (20)

Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints TYCO- RA...
Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints  TYCO- RA...Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints  TYCO- RA...
Raychem Saudi Arabia Ltd|AKBAR TRADING EST. SAUDI ARABIA| Lv joints TYCO- RA...
 
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...
Raychem saudi arabia ltd. high voltage , medium voltage & low voltage cab...
 
Raychem inline joints for plastic and rubber insulated cables up to 1 kV
Raychem inline joints for plastic and rubber insulated cables up to 1 kVRaychem inline joints for plastic and rubber insulated cables up to 1 kV
Raychem inline joints for plastic and rubber insulated cables up to 1 kV
 
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.com
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.comRaychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.com
Raychem KIT STOCKIST | AKBAR TRADING EST | mail@akbartrading.com
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
 
Raychem termination kits tyco-te-stock
Raychem termination kits tyco-te-stockRaychem termination kits tyco-te-stock
Raychem termination kits tyco-te-stock
 
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable Cleats
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable CleatsEllis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable Cleats
Ellis Patents Aluminium Two Hole Cable Clamps - Aluminium Cable Cleats
 
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
Elastimold Connectors Loadbreak & Deadbreak, Cable Joints & Cable Termination...
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable Cleat
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable CleatPrysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable Cleat
Prysmian Bicon Aluminium Claw Cleats - 370 Series Claw Cable Cleat
 
Nexans Airfield Ground Lighting Cables (Primary Secondary)
Nexans Airfield Ground Lighting Cables (Primary  Secondary)Nexans Airfield Ground Lighting Cables (Primary  Secondary)
Nexans Airfield Ground Lighting Cables (Primary Secondary)
 
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint KitsAirfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
Airfield Ground Lighting (AGL) Heat Shrink Cable Joint Kits
 
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
Airfield Ground Lighting Cables - 5kV Single Core 6sqmm (Primary & Secondary)
 
Torque Sensor - Pts 1kgm
Torque Sensor - Pts 1kgmTorque Sensor - Pts 1kgm
Torque Sensor - Pts 1kgm
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
Crimping Guidelines
Crimping GuidelinesCrimping Guidelines
Crimping Guidelines
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
 
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved
25kV Cable Termination - 3M Cold Shrink 95-EP-631-2 - Network Rail PADS Approved
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 

Viewers also liked

Viewers also liked (9)

Presentaciones en Slideshare
Presentaciones  en SlidesharePresentaciones  en Slideshare
Presentaciones en Slideshare
 
Worldwide surgical solutions scope edited (8)
Worldwide surgical solutions scope edited (8)Worldwide surgical solutions scope edited (8)
Worldwide surgical solutions scope edited (8)
 
Business plan sky_way_en.compressed
Business plan sky_way_en.compressedBusiness plan sky_way_en.compressed
Business plan sky_way_en.compressed
 
Dossier vegetales - Fermac Cargo (es)
Dossier vegetales - Fermac Cargo (es)Dossier vegetales - Fermac Cargo (es)
Dossier vegetales - Fermac Cargo (es)
 
CNOR Exam Practice Questions
CNOR Exam Practice QuestionsCNOR Exam Practice Questions
CNOR Exam Practice Questions
 
Day1 images
Day1 imagesDay1 images
Day1 images
 
Day2 images
Day2 imagesDay2 images
Day2 images
 
Globaalikasvatus osana koulun toimintakulttuuria
Globaalikasvatus osana koulun toimintakulttuuriaGlobaalikasvatus osana koulun toimintakulttuuria
Globaalikasvatus osana koulun toimintakulttuuria
 
Supernode Lab (Fablab Taipei)
Supernode Lab (Fablab Taipei)Supernode Lab (Fablab Taipei)
Supernode Lab (Fablab Taipei)
 

Similar to Install single-core cable joint quickly

Samsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smSamsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smMalik Arif
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 CablesThorne & Derrick International
 
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...AKBAR TRADING
 
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform Cable
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform CableWaveform Cable Jointing Manual - Preparing & Working on LV Waveform Cable
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform CableThorne & Derrick International
 
67711911(lj36 b)42ln5460 sm
67711911(lj36 b)42ln5460 sm67711911(lj36 b)42ln5460 sm
67711911(lj36 b)42ln5460 smtecxel
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Thorne & Derrick International
 
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair Guide
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair GuidePanasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair Guide
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair GuideSantySingh5
 
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...Thorne & Derrick International
 
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...Thorne & Derrick International
 
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.Manual de serviço TV LED LG 22LN4050TB chassis LB35A.
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.Portal Eletrônica
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionRai University
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionRai University
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionRai University
 
Lg 32 lk330u +chasis+ld01u
Lg 32 lk330u +chasis+ld01uLg 32 lk330u +chasis+ld01u
Lg 32 lk330u +chasis+ld01uedy rod
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionThorne & Derrick International
 
Manual de la Mezcladora SoundCraft Notepad -12Fx
Manual de la Mezcladora SoundCraft Notepad -12FxManual de la Mezcladora SoundCraft Notepad -12Fx
Manual de la Mezcladora SoundCraft Notepad -12Fxjavierdavidvelasco17
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguidebui thequan
 
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00Arturo Nava Hernandez
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...Thorne & Derrick International
 

Similar to Install single-core cable joint quickly (20)

Samsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_smSamsung ps43d450a2wxzg chassis_f82a_sm
Samsung ps43d450a2wxzg chassis_f82a_sm
 
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
 
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08   solderle...
|AKBAR TRADING EST. SAUDI ARABIA|TE TYCO ELECTRONICS Epp 0317-4 08 solderle...
 
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform Cable
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform CableWaveform Cable Jointing Manual - Preparing & Working on LV Waveform Cable
Waveform Cable Jointing Manual - Preparing & Working on LV Waveform Cable
 
67711911(lj36 b)42ln5460 sm
67711911(lj36 b)42ln5460 sm67711911(lj36 b)42ln5460 sm
67711911(lj36 b)42ln5460 sm
 
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
Heat Shrink Rail Cable Joints - LSF Zero Halogen Cable Joints - SPS (Installa...
 
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair Guide
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair GuidePanasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair Guide
Panasonic Dmr ex99v Ex99veb Ex99veg Service Manual And Repair Guide
 
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE  to 3 x Sing...
7. Heat Shrink Cable Joint (HV) - 11kV Trifurcating (3 Core XLPE to 3 x Sing...
 
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
11kV Cable Box Terminations - Breaking Down & Remaking Compound Filled Cables...
 
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.Manual de serviço TV LED LG 22LN4050TB chassis LB35A.
Manual de serviço TV LED LG 22LN4050TB chassis LB35A.
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protection
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protection
 
Diploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protectionDiploma i boee u 5 electrical wiring & safety and protection
Diploma i boee u 5 electrical wiring & safety and protection
 
Lg 32 lk330u +chasis+ld01u
Lg 32 lk330u +chasis+ld01uLg 32 lk330u +chasis+ld01u
Lg 32 lk330u +chasis+ld01u
 
Hawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation InstructionHawke Universal Cable Glands - Installation Instruction
Hawke Universal Cable Glands - Installation Instruction
 
Manual de la Mezcladora SoundCraft Notepad -12Fx
Manual de la Mezcladora SoundCraft Notepad -12FxManual de la Mezcladora SoundCraft Notepad -12Fx
Manual de la Mezcladora SoundCraft Notepad -12Fx
 
Finaltechwrit&CADproj
Finaltechwrit&CADprojFinaltechwrit&CADproj
Finaltechwrit&CADproj
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
 
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00
Lg 42lw5700 da-chassis_lt12c_mfl67007911_1103-rev00
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
 

More from AKBAR TRADING

Eaton price list 2020 innteso 01042020 AKBAR TRADING EST
Eaton price list 2020 innteso 01042020 AKBAR TRADING ESTEaton price list 2020 innteso 01042020 AKBAR TRADING EST
Eaton price list 2020 innteso 01042020 AKBAR TRADING ESTAKBAR TRADING
 
Akbar trading stock list
Akbar trading stock listAkbar trading stock list
Akbar trading stock listAKBAR TRADING
 
Class RK5 Fusetron™ FRN-R
 Class RK5 Fusetron™ FRN-R Class RK5 Fusetron™ FRN-R
Class RK5 Fusetron™ FRN-RAKBAR TRADING
 
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAbb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAKBAR TRADING
 
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING EST
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING ESTDENSO densyl tape SAUDI ARABIA | AKBAR TRADING EST
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING ESTAKBAR TRADING
 
DENSO densyl tape | AKBAR TRADING EST
DENSO densyl tape | AKBAR TRADING ESTDENSO densyl tape | AKBAR TRADING EST
DENSO densyl tape | AKBAR TRADING ESTAKBAR TRADING
 
Partex identification catalogue 2017 | AKBAR TRADING EST.
Partex identification catalogue 2017 | AKBAR TRADING EST. Partex identification catalogue 2017 | AKBAR TRADING EST.
Partex identification catalogue 2017 | AKBAR TRADING EST. AKBAR TRADING
 
Partex lugs and_connectors_catalogue | AKBAR TRADING EST.
Partex lugs and_connectors_catalogue | AKBAR TRADING EST. Partex lugs and_connectors_catalogue | AKBAR TRADING EST.
Partex lugs and_connectors_catalogue | AKBAR TRADING EST. AKBAR TRADING
 
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.com
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.comABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.com
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.comAKBAR TRADING
 
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIA
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIASCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIA
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIAAKBAR TRADING
 
Raychem rpg cable tie stockist - SAUDI ARABIA - AKBAR TRADING
Raychem rpg cable tie  stockist - SAUDI ARABIA - AKBAR TRADING Raychem rpg cable tie  stockist - SAUDI ARABIA - AKBAR TRADING
Raychem rpg cable tie stockist - SAUDI ARABIA - AKBAR TRADING AKBAR TRADING
 
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...AKBAR TRADING
 
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...AKBAR TRADING
 
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING EST
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING ESTHAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING EST
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING ESTAKBAR TRADING
 
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...AKBAR TRADING
 
AKBAR TRADING EST| Thomas & Betts Cable Tie Tyrap
AKBAR TRADING EST| Thomas & Betts Cable Tie TyrapAKBAR TRADING EST| Thomas & Betts Cable Tie Tyrap
AKBAR TRADING EST| Thomas & Betts Cable Tie TyrapAKBAR TRADING
 
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...AKBAR TRADING
 
Akbar trading splicing_kit_raychem_te_connectivity
Akbar trading splicing_kit_raychem_te_connectivityAkbar trading splicing_kit_raychem_te_connectivity
Akbar trading splicing_kit_raychem_te_connectivityAKBAR TRADING
 
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAkbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAKBAR TRADING
 
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAkbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAKBAR TRADING
 

More from AKBAR TRADING (20)

Eaton price list 2020 innteso 01042020 AKBAR TRADING EST
Eaton price list 2020 innteso 01042020 AKBAR TRADING ESTEaton price list 2020 innteso 01042020 AKBAR TRADING EST
Eaton price list 2020 innteso 01042020 AKBAR TRADING EST
 
Akbar trading stock list
Akbar trading stock listAkbar trading stock list
Akbar trading stock list
 
Class RK5 Fusetron™ FRN-R
 Class RK5 Fusetron™ FRN-R Class RK5 Fusetron™ FRN-R
Class RK5 Fusetron™ FRN-R
 
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAILAbb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
Abb Combiflex Lugs 1.5, Abb Combiflex Lugs 2.5 | AKBAR TRADING EST. JUBAIL
 
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING EST
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING ESTDENSO densyl tape SAUDI ARABIA | AKBAR TRADING EST
DENSO densyl tape SAUDI ARABIA | AKBAR TRADING EST
 
DENSO densyl tape | AKBAR TRADING EST
DENSO densyl tape | AKBAR TRADING ESTDENSO densyl tape | AKBAR TRADING EST
DENSO densyl tape | AKBAR TRADING EST
 
Partex identification catalogue 2017 | AKBAR TRADING EST.
Partex identification catalogue 2017 | AKBAR TRADING EST. Partex identification catalogue 2017 | AKBAR TRADING EST.
Partex identification catalogue 2017 | AKBAR TRADING EST.
 
Partex lugs and_connectors_catalogue | AKBAR TRADING EST.
Partex lugs and_connectors_catalogue | AKBAR TRADING EST. Partex lugs and_connectors_catalogue | AKBAR TRADING EST.
Partex lugs and_connectors_catalogue | AKBAR TRADING EST.
 
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.com
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.comABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.com
ABB-STOCK-LIST-AKBAR-TRADING-SAUDI-ARABIA, mail@akbartrading.com
 
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIA
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIASCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIA
SCHNEIDER-ELECTRIC-STOCK-AKBAR-TRADING-SAUDI-ARABIA
 
Raychem rpg cable tie stockist - SAUDI ARABIA - AKBAR TRADING
Raychem rpg cable tie  stockist - SAUDI ARABIA - AKBAR TRADING Raychem rpg cable tie  stockist - SAUDI ARABIA - AKBAR TRADING
Raychem rpg cable tie stockist - SAUDI ARABIA - AKBAR TRADING
 
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...
RAYCHEM HEAT-SHRINKABLE TUBING (WCSM) | AKBAR TRADING EST.| mail@akbartrading...
 
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...
SCHNEIDER - STOCK - SAUDI ARABIA- AKBAR TRADINGI c60n circuit_breakers_schnei...
 
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING EST
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING ESTHAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING EST
HAWKE CABLE GLAND SAUDI ARABIA STOCKIST-AKBAR TRADING EST
 
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...
RAYCHEM RPG CABLE TIE STOCKIST-AKBAR TRADING EST-Stainless Steel Ball Lock Ca...
 
AKBAR TRADING EST| Thomas & Betts Cable Tie Tyrap
AKBAR TRADING EST| Thomas & Betts Cable Tie TyrapAKBAR TRADING EST| Thomas & Betts Cable Tie Tyrap
AKBAR TRADING EST| Thomas & Betts Cable Tie Tyrap
 
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...
TY523MX - THOMAS & BETTS - Cable Tie, Ty Rap® Self Lock, Nylon| AKBAR TRADING...
 
Akbar trading splicing_kit_raychem_te_connectivity
Akbar trading splicing_kit_raychem_te_connectivityAkbar trading splicing_kit_raychem_te_connectivity
Akbar trading splicing_kit_raychem_te_connectivity
 
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAkbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
 
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivityAkbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
Akbar trading splicing_kit_loadbreak_elbow_raychem_te_connectivity
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...aditipandeya
 
Branding strategies of new company .pptx
Branding strategies of new company .pptxBranding strategies of new company .pptx
Branding strategies of new company .pptxVikasTiwari846641
 
Cost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesCost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesPushON Ltd
 
Forecast of Content Marketing through AI
Forecast of Content Marketing through AIForecast of Content Marketing through AI
Forecast of Content Marketing through AIRinky
 
Situation Analysis | Management Company.
Situation Analysis | Management Company.Situation Analysis | Management Company.
Situation Analysis | Management Company.DanielaQuiroz63
 
Unraveling the Mystery of the Hinterkaifeck Murders.pptx
Unraveling the Mystery of the Hinterkaifeck Murders.pptxUnraveling the Mystery of the Hinterkaifeck Murders.pptx
Unraveling the Mystery of the Hinterkaifeck Murders.pptxelizabethella096
 
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024Moving beyond multi-touch attribution - DigiMarCon CanWest 2024
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024Richard Ingilby
 
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent Kubie
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent KubieBeyond Resumes_ How Volunteering Shapes Career Trajectories by Kent Kubie
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent KubieKent Kubie
 
marketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfmarketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfarsathsahil
 
Social Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa
 
April 2024 - VBOUT Partners Meeting Group
April 2024 - VBOUT Partners Meeting GroupApril 2024 - VBOUT Partners Meeting Group
April 2024 - VBOUT Partners Meeting GroupVbout.com
 
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...ChesterYang6
 
Unraveling the Mystery of Roanoke Colony: What Really Happened?
Unraveling the Mystery of Roanoke Colony: What Really Happened?Unraveling the Mystery of Roanoke Colony: What Really Happened?
Unraveling the Mystery of Roanoke Colony: What Really Happened?elizabethella096
 
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
GreenSEO April 2024: Join the Green Web Revolution
GreenSEO April 2024: Join the Green Web RevolutionGreenSEO April 2024: Join the Green Web Revolution
GreenSEO April 2024: Join the Green Web RevolutionWilliam Barnes
 
Mastering SEO in the Evolving AI-driven World
Mastering SEO in the Evolving AI-driven WorldMastering SEO in the Evolving AI-driven World
Mastering SEO in the Evolving AI-driven WorldScalenut
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
 
No Cookies No Problem - Steve Krull, Be Found Online
No Cookies No Problem - Steve Krull, Be Found OnlineNo Cookies No Problem - Steve Krull, Be Found Online
No Cookies No Problem - Steve Krull, Be Found Online
 
Branding strategies of new company .pptx
Branding strategies of new company .pptxBranding strategies of new company .pptx
Branding strategies of new company .pptx
 
Cost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesCost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surges
 
Forecast of Content Marketing through AI
Forecast of Content Marketing through AIForecast of Content Marketing through AI
Forecast of Content Marketing through AI
 
Situation Analysis | Management Company.
Situation Analysis | Management Company.Situation Analysis | Management Company.
Situation Analysis | Management Company.
 
Unraveling the Mystery of the Hinterkaifeck Murders.pptx
Unraveling the Mystery of the Hinterkaifeck Murders.pptxUnraveling the Mystery of the Hinterkaifeck Murders.pptx
Unraveling the Mystery of the Hinterkaifeck Murders.pptx
 
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024Moving beyond multi-touch attribution - DigiMarCon CanWest 2024
Moving beyond multi-touch attribution - DigiMarCon CanWest 2024
 
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent Kubie
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent KubieBeyond Resumes_ How Volunteering Shapes Career Trajectories by Kent Kubie
Beyond Resumes_ How Volunteering Shapes Career Trajectories by Kent Kubie
 
marketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfmarketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdf
 
Top 5 Breakthrough AI Innovations Elevating Content Creation and Personalizat...
Top 5 Breakthrough AI Innovations Elevating Content Creation and Personalizat...Top 5 Breakthrough AI Innovations Elevating Content Creation and Personalizat...
Top 5 Breakthrough AI Innovations Elevating Content Creation and Personalizat...
 
Social Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdf
 
The Future of Brands on LinkedIn - Alison Kaltman
The Future of Brands on LinkedIn - Alison KaltmanThe Future of Brands on LinkedIn - Alison Kaltman
The Future of Brands on LinkedIn - Alison Kaltman
 
April 2024 - VBOUT Partners Meeting Group
April 2024 - VBOUT Partners Meeting GroupApril 2024 - VBOUT Partners Meeting Group
April 2024 - VBOUT Partners Meeting Group
 
Creator Influencer Strategy Master Class - Corinne Rose Guirgis
Creator Influencer Strategy Master Class - Corinne Rose GuirgisCreator Influencer Strategy Master Class - Corinne Rose Guirgis
Creator Influencer Strategy Master Class - Corinne Rose Guirgis
 
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
 
Unraveling the Mystery of Roanoke Colony: What Really Happened?
Unraveling the Mystery of Roanoke Colony: What Really Happened?Unraveling the Mystery of Roanoke Colony: What Really Happened?
Unraveling the Mystery of Roanoke Colony: What Really Happened?
 
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Dlf City Phase 4 Gurgaon >༒8448380779 Escort Service
 
GreenSEO April 2024: Join the Green Web Revolution
GreenSEO April 2024: Join the Green Web RevolutionGreenSEO April 2024: Join the Green Web Revolution
GreenSEO April 2024: Join the Green Web Revolution
 
Mastering SEO in the Evolving AI-driven World
Mastering SEO in the Evolving AI-driven WorldMastering SEO in the Evolving AI-driven World
Mastering SEO in the Evolving AI-driven World
 

Install single-core cable joint quickly

  • 1. Installation Instruction ESD-6949-2/16 Joint for Single-Core Polymeric Insulated Cables 1.1 kV with Aluminium Wire Armour Tyco Electronics Raychem GmbH a TE Connectivity Ltd. Company TE Energy Finsinger Feld 1 85521 Ottobrunn/Munich, Germany Tel: +49-89-6089-0 Fax: +49-89-6096-345 energy.te.com To view the TE Energy website:
  • 2. ESD-6949-2/16 Page 2/5 Before Starting Check to ensure that the kit you are going to use fits the cable. Refer to the kit label and the title of the installation instruction. Components or working steps may have been improved since you last installed this product. Carefully read and follow the steps in the installation instruction. General Instructions Use a propane (preferred) or butane gas torch. Ensure the torch is always used in a well-ventilated environment. Adjust the torch to obtain a soft blue flame with a yellow tip. Pencil-like blue flames should be avoided. Keep the torch aimed in the shrink direction to preheat the material. Keep the flame moving continuously to avoid scorching the material. Clean and degrease all parts that will come into contact with adhesive. If a solvent is used follow the manufacturer’s handling instructions. Tubing should be cut smoothly with a sharp knife leaving no jagged edges. Start shrinking the tubing at the position recommended in the instruction. Ensure that the tubing is shrunk smoothly all around before continuing along the cable. Tubing should be smooth and wrinkle free with inner components clearly defined. The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is intended to describe the correct method of installation for this product. However, TE Connectivity has no control over the field conditions which influence product installation. It is the user’s responsibility to determine the suitability of the installation method in the user’s field conditions. TE Connectivity’s only obligations are those in TE Connectivity’s standard Conditions of Sale for this product and in no case will TE Connectivity be liable for any other incidental, indirect or consequential damages arising from the use or misuse of the products. Raychem, TE Connectivity and TE connectivity (logo) are trademarks. © 2011 Tyco Electronics Raychem GmbH.
  • 3. ESD-6949-2/16 Page 3/5 Remove the oversheath of both cables to dimension a, measured from the reference line. Clean the remaining oversheath of both cables for about 600 mm. Cable 1: Do not cut the armour wires. Carefully bend them back away from the joint area. Cable 2: Cut partly through the armour wires at the oversheath cut. Bend and break them off at this position. Cable Overlap Overlap the cables to be jointed according to dimensions in drawing.For dimension a see table below. Mark the reference line as shown in drawing. Cable 1 Cable 2 Reference line 100 a a Reference lineInner sheath AL-wire armour Oversheath Cable Preparation a + 100 Dimensions in mm Table1 Kit-Range [mm2 ] a [mm] b [mm] 185-300 150 100 400-630 175 130 Cut the cores at the reference line. Remove the inner sheath to dimension b (see Table 1). b b Reference line Inner sheath Insulation
  • 4. ESD-6949-2/16 Page 4/5 2 3 Cut back the insulation to dimension I = half length of connector + 5 mm. Joint the conductors by crimping. Remove any sharp edges. Clean and degrease the connector and insulation. Completion of joint Slide the connector insulating tubing and the outer sleeve over the cable end where the armour wires are still covered. 1. Connector insulating tubing 2. Outer sleeve (black) 1 21 l l 4 Pull the connector insulating tubing and position it centrally over the connector. Start shrinking in the centre working towards the ends. The tubing should be fully shrunk and wrinkle free. 1
  • 5. ESD-6949-2/16 Page 5/5 6 7 8 9 Thoroughly clean the armour wires from cable 1. Separate the armour wires and form equal bunches, according to the number of the mechanical connectors supplied with the kit. Fold back the long armour wires tightly across the joint, cut to length, and connect them using the mechanical connectors provided. Shear off the connector bolts. The joint is now completed. Allow to cool before moving. Wrap a piece of the inner bedding of the cable sheath over the connectors. Using the adhesive cotton tape provided, ensure all the wires are close to the cable and tubing set over the length of the joint and that there are no sharp edges. Abrade and degrease the cable jacket for 100 mm at both sides of the joint. Position the outer sealing sleeve centrally, then shrink the sleeve down starting in the centre and working towards the ends. Carefully remove 100 mm of the oversheath on cable side 2. Do not cut the armour wires. Lift the armour wires and thoroughly clean. Separate the armour wires and form equal bunches to suit the number of armour wire connectors included in the joint kit. Please dispose of all waste according to environmental regulations. 5 2 Side 2 100