The document provides an overview of the engineering sector in India. It discusses key segments within heavy engineering such as machine tools, textile machinery, cement machinery, and material handling equipment. It also outlines segments within heavy electricals including boilers, turbines and generator sets, transformers, and switchgear and control gear. The executive summary highlights that the capital goods and engineering market in India is expected to reach $125.4 billion by FY17 from $46.18 billion in FY15. The electrical equipment market is also forecasted to reach $100 billion by FY22 from $21 billion in FY15.