Engineering Economics
November 3, 2004
2
Engineering Economy
• It deals with the concepts and techniques
of analysis useful in evaluating the worth
of systems, products, and services in
relation to their costs
3
Engineering Economy
• It is used to answer many different
questions
– Which engineering projects are worthwhile?
• Has the mining or petroleum engineer shown that
the mineral or oil deposits is worth developing?
– Which engineering projects should have a
higher priority?
• Has the industrial engineer shown which factory
improvement projects should be funded with the
available dollars?
– How should the engineering project be
designed?
• Has civil or mechanical engineer chosen the best
thickness for insulation?
4
Basic Concepts
• Cash flow
• Interest Rate and Time value of money
• Equivalence technique
5
Cash Flow
• Engineering projects generally have economic
consequences that occur over an extended
period of time
– For example, if an expensive piece of machinery is
installed in a plant were brought on credit, the simple
process of paying for it may take several years
– The resulting favorable consequences may last as
long as the equipment performs its useful function
• Each project is described as cash receipts or
disbursements (expenses) at different points in
time
6
Categories of Cash Flows
• The expenses and receipts due to
engineering projects usually fall into one of
the following categories:
– First cost: expense to build or to buy and install
– Operations and maintenance (O&M): annual
expense, such as electricity, labor, and minor
repairs
– Salvage value: receipt at project termination for
sale or transfer of the equipment (can be a
salvage cost)
– Revenues: annual receipts due to sale of products
or services
– Overhaul: major capital expenditure that occurs
during the asset’s life
7
Cash Flow diagrams
• The costs and benefits of engineering
projects over time are summarized on a cash
flow diagram (CFD). Specifically, CFD
illustrates the size, sign, and timing of
individual cash flows, and forms the basis for
engineering economic analysis
• A CFD is created by first drawing a
segmented time-based horizontal line,
divided into appropriate time unit. Each time
when there is a cash flow, a vertical arrow is
added  pointing down for costs and up for
revenues or benefits. The cost flows are
drawn to relative scale
8
Drawing a Cash Flow Diagram
• In a cash flow diagram (CFD) the end of period t is
the same as the beginning of period (t+1)
• Beginning of period cash flows are: rent, lease, and
insurance payments
• End-of-period cash flows are: O&M, salvages,
revenues, overhauls
• The choice of time 0 is arbitrary. It can be when a
project is analyzed, when funding is approved, or
when construction begins
• One person’s cash outflow (represented as a
negative value) is another person’s inflow
(represented as a positive value)
• It is better to show two or more cash flows occurring
in the same year individually so that there is a clear
connection from the problem statement to each cash
flow in the diagram
9
An Example of Cash Flow Diagram
• A man borrowed $1,000 from a bank at 8%
interest. Two end-of-year payments: at the
end of the first year, he will repay half of the
$1000 principal plus the interest that is due.
At the end of the second year, he will repay
the remaining half plus the interest for the
second year.
• Cash flow for this problem is:
End of year Cash flow
0 +$1000
1 -$580 (-$500 - $80)
2 -$540 (-$500 - $40)
10
Cash Flow Diagram
$1,000
0
1 2
$580
$540
11
Time Value of Money
• Money has value
– Money can be leased or rented
– The payment is called interest
– If you put $100 in a bank at 9% interest for one time
period you will receive back your original $100 plus
$9
Original amount to be returned = $100
Interest to be returned = $100 x .09 = $9
12
Compound Interest
• Interest that is computed on the original
unpaid debt and the unpaid interest
• Compound interest is most commonly
used in practice
• Total interest earned = In = P (1+i)n - P
– Where,
• P – present sum of money
• i – interest rate
• n – number of periods (years)
I2 = $100 x (1+.09)2 - $100 = $18.81
13
Future Value of a Loan With
Compound Interest
• Amount of money due at the end of a loan
– F = P(1+i)1(1+i)2…..(1+i)n or F = P (1 + i)n
– Where,
• F = future value and P = present value
• Referring to slide #10, i = 9%, P = $100 and say n=
2. Determine the value of F.
F = $100 (1 + .09)2 = $118.81
14
Notation for
Calculating a Future Value
• Formula:
F=P(1+i)n is the
single payment compound amount factor.
• Functional notation:
F=P(F/P,i,n) F=5000(F/P,6%,10)
• F =P(F/P) which is dimensionally
correct.
15
Notation for
Calculating a Present Value
• P=F(1/(1+i))n=F(1+i)-n is the
single payment present worth factor.
• Functional notation:
P=F(P/F,i,n) P=5000(P/F,6%,10)
Interpretation of (P/F, i, n): a present sum P,
given a future sum, F, n interest periods
hence at an interest rate i per interest
period
16
Spreadsheet Function
P = PV(i,N,A,F,Type)
F = FV(i,N,A,P,Type)
i = RATE(N,A,P,F,Type,guess)
Where, i = interest rate, N = number of interest
periods, A = uniform amount, P = present sum
of money, F = future sum of money, Type = 0
means end-of-period cash payments, Type =
1 means beginning-of-period payments,
guess is a guess value of the interest rate
17
Equivalence
• Relative attractiveness of different
alternatives can be judged by using the
technique of equivalence
• We use comparable equivalent values of
alternatives to judge the relative
attractiveness of the given alternatives
• Equivalence is dependent on interest rate
• Compound Interest formulas can be
used to facilitate equivalence
computations
18
Technique of Equivalence
• Determine a single equivalent value at a
point in time for plan 1.
• Determine a single equivalent value at a
point in time for plan 2.
Both at the same interest rate and at the same time point.
•Judge the relative attractiveness of the
two alternatives from the comparable
equivalent values.
19
Engineering Economic Analysis
Calculation
• Generally involves compound interest
formulas (factors)
• Compound interest formulas (factors) can
be evaluated by using one of the three
methods
– Interest factor tables
– Calculator
– Spreadsheet
20
Given the choice of these two plans
which would you choose?
Year Plan 1 Plan 2
0 $5,000
1 $1,000
2 $1,000
3 $1,000
4 $1,000
5 $1,000
Total $5,000 $5,000
To make a choice the cash flows must be altered
so a comparison may be made.
21
Resolving Cash Flows to Equivalent Present
Values
• P = $1,000(PA,10%,5)
• P = $1,000(3.791) =
$3,791
• P = $5,000
• Alternative 2 is better
than alternative 1 since
alternative 2 has a
greater present value
22
An Example of Future Value
• Example: If $500 were deposited in a
bank savings account, how much would
be in the account three years hence if
the bank paid 6% interest compounded
annually?
• Given P = 500, i = 6%, n = 3, use F =
FV(6%,3,,500,0) = -595.91
• Note that the spreadsheet gives a
negative number to find equivalent of P.
If we find P using F = -$595.91, we get
P = 500.
23
An Example of Present Value
• Example 3-5: If you wished to have
$800 in a savings account at the end of
four years, and 5% interest we paid
annually, how much should you put into
the savings account?
• n = 4, F = $800, i = 5%, P = ?
• P = PV(5%,4,,800,0) = -$658.16
• You should use P = $658.16
24
Economic Analysis Methods
• Three commonly used economic analysis
methods are
• Present Worth Analysis
• Annual Worth Analysis
• Rate of Return Analysis
25
Present Worth Analysis
• Steps to do present worth analysis for a
single alternative (investment)
– Select a desired value of the return on
investment (i)
– Using the compound interest formulas bring
all benefits and costs to present worth
– Select the alternative if its net present worth
(Present worth of benefits – Present worth of
costs) ≥ 0
26
Present Worth Analysis
• Steps to do present worth analysis for
selecting a single alternative (investment)
from among multiple alternatives
– Step 1: Select a desired value of the return on
investment (i)
– Step 2: Using the compound interest formulas
bring all benefits and costs to present worth
for each alternative
– Step 3: Select the alternative with the largest
net present worth (Present worth of benefits –
Present worth of costs)
27
Present Worth Analysis
• A construction enterprise is investigating the
purchase of a new dump truck. Interest rate is
9%. The cash flow for the dump truck are as
follows:
• First cost = $50,000, annual operating cost =
$2000, annual income = $9,000, salvage value
is $10,000, life = 10 years. Is this investment
worth undertaking?
• P = $50,000, A = annual net income = $9,000 -
$2,000 = $7,000, S = 10,000, n = 10.
• Evaluate net present worth = present worth of
benefits – present worth of costs
28
Present Worth Analysis
• Present worth of benefits = $9,000(PA,9%,10) =
$9,000(6.418) = $57,762
• Present worth of costs = $50,000 +
$2,000(PA,9%,10) - $10,000(PF,9%,10)=
$50,000 + $2,000(6..418) - $10,000(.4224) =
$58,612
• Net present worth = $57,762 - $58,612 < 0  do
not invest
• What should be the minimum annual benefit for
making it a worthy of investment at 9% rate of
return?
29
Present Worth Analysis
• Present worth of benefits = A(PA,9%,10)
= A(6.418)
• Present worth of costs = $50,000 +
$2,000(PA,9%,10) - $10,000(PF,9%,10)=
$50,000 + $2,000(6..418) - $10,000(.4224)
= $58,612
• A(6.418) = $58,612  A = $58,612/6.418
= $9,312.44
30
Cost and Benefit Estimates
• Present and future benefits (income) and
costs need to be estimated to determine
the attractiveness (worthiness) of a new
product investment alternative
31
Annual costs and Income for a Product
• Annual product total cost is the sum of
annual material, labor, and overhead
(salaries, taxes, marketing expenses,
office costs, and related costs), annual
operating costs (power, maintenance,
repairs, space costs, and related
expenses), and annual first cost minus the
annual salvage value.
• Annual income generated through the
sales of a product = number of units sold
annuallyxunit price
32
Rate of Return Analysis
• Single alternative case
• In this method all revenues and costs of
the alternative are reduced to a single
percentage number
• This percentage number can be compared
to other investment returns and interest
rates inside and outside the organization
33
Rate of Return Analysis
• Steps to determine rate of return for a
single stand-alone investment
– Step 1: Take the dollar amounts to the same
point in time using the compound interest
formulas
– Step 2: Equate the sum of the revenues to the
sum of the costs at that point in time and
solve for i
34
Rate of Return Analysis
• An initial investment of $500 is being
considered. The revenues from this
investment are $300 at the end of the first
year, $300 at the end of the second, and
$200 at the end of the third. If the desired
return on investment is 15%, is the project
acceptable?
• In this example we will take benefits and
costs to the present time and their present
values are then equated
35
Rate of Return Analysis
• $500 = $300(PF, i, n=1) + 300(PF, i, n=2) +
$200(PF, i, n=3)
• Now solve for i using trial and error method
• Try 10%: $500 = ? $272 + $247 + $156 = $669
(not equal)
• Try 20%: $500 = ? $250 + $208 + $116 = $574
(not equal)
• Try 30%: $500 = ? $231 + $178 + $91 = $500
(equal)  i = 30%
• The desired return on investment is 15%, the
project returns 30%, so it should be
implemented

More Related Content

Similar to engineering economics presentation1.pptx

Lecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptxLecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptxMuhammadZuhdiIbrahim
 
L3 - With Answers.pdf
L3 - With Answers.pdfL3 - With Answers.pdf
L3 - With Answers.pdfnewton47
 
Future Worth method
Future Worth methodFuture Worth method
Future Worth methodSuhail Ahmed
 
Engineering Economy Costing and Accounting
Engineering Economy Costing and Accounting Engineering Economy Costing and Accounting
Engineering Economy Costing and Accounting Shailesh Dewangan
 
FD8004 PEIM - II Unit.pptx
FD8004 PEIM - II Unit.pptxFD8004 PEIM - II Unit.pptx
FD8004 PEIM - II Unit.pptxPrakashR802687
 
Time Value of Money.pptx .
Time Value of Money.pptx                       .Time Value of Money.pptx                       .
Time Value of Money.pptx .Athar739197
 
BlueBookAcademy.com - Value companies using Discounted Cash Flow Valuation
BlueBookAcademy.com - Value companies using Discounted Cash Flow ValuationBlueBookAcademy.com - Value companies using Discounted Cash Flow Valuation
BlueBookAcademy.com - Value companies using Discounted Cash Flow Valuationbluebookacademy
 
Chapter 2 CFD 2015 civil engineering debre markos university.pptx
Chapter 2 CFD 2015 civil engineering debre markos university.pptxChapter 2 CFD 2015 civil engineering debre markos university.pptx
Chapter 2 CFD 2015 civil engineering debre markos university.pptxHeniyit
 
BlueBookAcademy.com Explains Capital Budgeting
BlueBookAcademy.com Explains Capital BudgetingBlueBookAcademy.com Explains Capital Budgeting
BlueBookAcademy.com Explains Capital Budgetingbluebookacademy
 
Fundamentos para el armado de flujo de fondos miguel pato
Fundamentos para el armado de flujo de fondos miguel patoFundamentos para el armado de flujo de fondos miguel pato
Fundamentos para el armado de flujo de fondos miguel patoPTF
 
FM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptxFM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptxBarzalaCarcar
 
LECTURE 4 (2).pptx
LECTURE 4 (2).pptxLECTURE 4 (2).pptx
LECTURE 4 (2).pptxhaiqamalik
 

Similar to engineering economics presentation1.pptx (20)

Lecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptxLecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptx
 
L3 - With Answers.pdf
L3 - With Answers.pdfL3 - With Answers.pdf
L3 - With Answers.pdf
 
Future Worth method
Future Worth methodFuture Worth method
Future Worth method
 
Project management
Project managementProject management
Project management
 
Engineering Economy Costing and Accounting
Engineering Economy Costing and Accounting Engineering Economy Costing and Accounting
Engineering Economy Costing and Accounting
 
FD8004 PEIM - II Unit.pptx
FD8004 PEIM - II Unit.pptxFD8004 PEIM - II Unit.pptx
FD8004 PEIM - II Unit.pptx
 
Time Value of Money.pptx .
Time Value of Money.pptx                       .Time Value of Money.pptx                       .
Time Value of Money.pptx .
 
BlueBookAcademy.com - Value companies using Discounted Cash Flow Valuation
BlueBookAcademy.com - Value companies using Discounted Cash Flow ValuationBlueBookAcademy.com - Value companies using Discounted Cash Flow Valuation
BlueBookAcademy.com - Value companies using Discounted Cash Flow Valuation
 
Chapter 2 CFD 2015 civil engineering debre markos university.pptx
Chapter 2 CFD 2015 civil engineering debre markos university.pptxChapter 2 CFD 2015 civil engineering debre markos university.pptx
Chapter 2 CFD 2015 civil engineering debre markos university.pptx
 
Capital Investment Analysis
Capital Investment AnalysisCapital Investment Analysis
Capital Investment Analysis
 
Time value Ch6.pdf
Time value Ch6.pdfTime value Ch6.pdf
Time value Ch6.pdf
 
F.M - Chapter 5.pptx
F.M - Chapter 5.pptxF.M - Chapter 5.pptx
F.M - Chapter 5.pptx
 
BlueBookAcademy.com Explains Capital Budgeting
BlueBookAcademy.com Explains Capital BudgetingBlueBookAcademy.com Explains Capital Budgeting
BlueBookAcademy.com Explains Capital Budgeting
 
Fundamentos para el armado de flujo de fondos miguel pato
Fundamentos para el armado de flujo de fondos miguel patoFundamentos para el armado de flujo de fondos miguel pato
Fundamentos para el armado de flujo de fondos miguel pato
 
FM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptxFM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptx
 
Evaluation
EvaluationEvaluation
Evaluation
 
UNIT-5 FM ETC1.pptx
UNIT-5 FM ETC1.pptxUNIT-5 FM ETC1.pptx
UNIT-5 FM ETC1.pptx
 
Nce603 mod unit3
Nce603 mod unit3Nce603 mod unit3
Nce603 mod unit3
 
LECTURE 4 (2).pptx
LECTURE 4 (2).pptxLECTURE 4 (2).pptx
LECTURE 4 (2).pptx
 
Valuation 2
Valuation 2Valuation 2
Valuation 2
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

engineering economics presentation1.pptx

  • 2. 2 Engineering Economy • It deals with the concepts and techniques of analysis useful in evaluating the worth of systems, products, and services in relation to their costs
  • 3. 3 Engineering Economy • It is used to answer many different questions – Which engineering projects are worthwhile? • Has the mining or petroleum engineer shown that the mineral or oil deposits is worth developing? – Which engineering projects should have a higher priority? • Has the industrial engineer shown which factory improvement projects should be funded with the available dollars? – How should the engineering project be designed? • Has civil or mechanical engineer chosen the best thickness for insulation?
  • 4. 4 Basic Concepts • Cash flow • Interest Rate and Time value of money • Equivalence technique
  • 5. 5 Cash Flow • Engineering projects generally have economic consequences that occur over an extended period of time – For example, if an expensive piece of machinery is installed in a plant were brought on credit, the simple process of paying for it may take several years – The resulting favorable consequences may last as long as the equipment performs its useful function • Each project is described as cash receipts or disbursements (expenses) at different points in time
  • 6. 6 Categories of Cash Flows • The expenses and receipts due to engineering projects usually fall into one of the following categories: – First cost: expense to build or to buy and install – Operations and maintenance (O&M): annual expense, such as electricity, labor, and minor repairs – Salvage value: receipt at project termination for sale or transfer of the equipment (can be a salvage cost) – Revenues: annual receipts due to sale of products or services – Overhaul: major capital expenditure that occurs during the asset’s life
  • 7. 7 Cash Flow diagrams • The costs and benefits of engineering projects over time are summarized on a cash flow diagram (CFD). Specifically, CFD illustrates the size, sign, and timing of individual cash flows, and forms the basis for engineering economic analysis • A CFD is created by first drawing a segmented time-based horizontal line, divided into appropriate time unit. Each time when there is a cash flow, a vertical arrow is added  pointing down for costs and up for revenues or benefits. The cost flows are drawn to relative scale
  • 8. 8 Drawing a Cash Flow Diagram • In a cash flow diagram (CFD) the end of period t is the same as the beginning of period (t+1) • Beginning of period cash flows are: rent, lease, and insurance payments • End-of-period cash flows are: O&M, salvages, revenues, overhauls • The choice of time 0 is arbitrary. It can be when a project is analyzed, when funding is approved, or when construction begins • One person’s cash outflow (represented as a negative value) is another person’s inflow (represented as a positive value) • It is better to show two or more cash flows occurring in the same year individually so that there is a clear connection from the problem statement to each cash flow in the diagram
  • 9. 9 An Example of Cash Flow Diagram • A man borrowed $1,000 from a bank at 8% interest. Two end-of-year payments: at the end of the first year, he will repay half of the $1000 principal plus the interest that is due. At the end of the second year, he will repay the remaining half plus the interest for the second year. • Cash flow for this problem is: End of year Cash flow 0 +$1000 1 -$580 (-$500 - $80) 2 -$540 (-$500 - $40)
  • 11. 11 Time Value of Money • Money has value – Money can be leased or rented – The payment is called interest – If you put $100 in a bank at 9% interest for one time period you will receive back your original $100 plus $9 Original amount to be returned = $100 Interest to be returned = $100 x .09 = $9
  • 12. 12 Compound Interest • Interest that is computed on the original unpaid debt and the unpaid interest • Compound interest is most commonly used in practice • Total interest earned = In = P (1+i)n - P – Where, • P – present sum of money • i – interest rate • n – number of periods (years) I2 = $100 x (1+.09)2 - $100 = $18.81
  • 13. 13 Future Value of a Loan With Compound Interest • Amount of money due at the end of a loan – F = P(1+i)1(1+i)2…..(1+i)n or F = P (1 + i)n – Where, • F = future value and P = present value • Referring to slide #10, i = 9%, P = $100 and say n= 2. Determine the value of F. F = $100 (1 + .09)2 = $118.81
  • 14. 14 Notation for Calculating a Future Value • Formula: F=P(1+i)n is the single payment compound amount factor. • Functional notation: F=P(F/P,i,n) F=5000(F/P,6%,10) • F =P(F/P) which is dimensionally correct.
  • 15. 15 Notation for Calculating a Present Value • P=F(1/(1+i))n=F(1+i)-n is the single payment present worth factor. • Functional notation: P=F(P/F,i,n) P=5000(P/F,6%,10) Interpretation of (P/F, i, n): a present sum P, given a future sum, F, n interest periods hence at an interest rate i per interest period
  • 16. 16 Spreadsheet Function P = PV(i,N,A,F,Type) F = FV(i,N,A,P,Type) i = RATE(N,A,P,F,Type,guess) Where, i = interest rate, N = number of interest periods, A = uniform amount, P = present sum of money, F = future sum of money, Type = 0 means end-of-period cash payments, Type = 1 means beginning-of-period payments, guess is a guess value of the interest rate
  • 17. 17 Equivalence • Relative attractiveness of different alternatives can be judged by using the technique of equivalence • We use comparable equivalent values of alternatives to judge the relative attractiveness of the given alternatives • Equivalence is dependent on interest rate • Compound Interest formulas can be used to facilitate equivalence computations
  • 18. 18 Technique of Equivalence • Determine a single equivalent value at a point in time for plan 1. • Determine a single equivalent value at a point in time for plan 2. Both at the same interest rate and at the same time point. •Judge the relative attractiveness of the two alternatives from the comparable equivalent values.
  • 19. 19 Engineering Economic Analysis Calculation • Generally involves compound interest formulas (factors) • Compound interest formulas (factors) can be evaluated by using one of the three methods – Interest factor tables – Calculator – Spreadsheet
  • 20. 20 Given the choice of these two plans which would you choose? Year Plan 1 Plan 2 0 $5,000 1 $1,000 2 $1,000 3 $1,000 4 $1,000 5 $1,000 Total $5,000 $5,000 To make a choice the cash flows must be altered so a comparison may be made.
  • 21. 21 Resolving Cash Flows to Equivalent Present Values • P = $1,000(PA,10%,5) • P = $1,000(3.791) = $3,791 • P = $5,000 • Alternative 2 is better than alternative 1 since alternative 2 has a greater present value
  • 22. 22 An Example of Future Value • Example: If $500 were deposited in a bank savings account, how much would be in the account three years hence if the bank paid 6% interest compounded annually? • Given P = 500, i = 6%, n = 3, use F = FV(6%,3,,500,0) = -595.91 • Note that the spreadsheet gives a negative number to find equivalent of P. If we find P using F = -$595.91, we get P = 500.
  • 23. 23 An Example of Present Value • Example 3-5: If you wished to have $800 in a savings account at the end of four years, and 5% interest we paid annually, how much should you put into the savings account? • n = 4, F = $800, i = 5%, P = ? • P = PV(5%,4,,800,0) = -$658.16 • You should use P = $658.16
  • 24. 24 Economic Analysis Methods • Three commonly used economic analysis methods are • Present Worth Analysis • Annual Worth Analysis • Rate of Return Analysis
  • 25. 25 Present Worth Analysis • Steps to do present worth analysis for a single alternative (investment) – Select a desired value of the return on investment (i) – Using the compound interest formulas bring all benefits and costs to present worth – Select the alternative if its net present worth (Present worth of benefits – Present worth of costs) ≥ 0
  • 26. 26 Present Worth Analysis • Steps to do present worth analysis for selecting a single alternative (investment) from among multiple alternatives – Step 1: Select a desired value of the return on investment (i) – Step 2: Using the compound interest formulas bring all benefits and costs to present worth for each alternative – Step 3: Select the alternative with the largest net present worth (Present worth of benefits – Present worth of costs)
  • 27. 27 Present Worth Analysis • A construction enterprise is investigating the purchase of a new dump truck. Interest rate is 9%. The cash flow for the dump truck are as follows: • First cost = $50,000, annual operating cost = $2000, annual income = $9,000, salvage value is $10,000, life = 10 years. Is this investment worth undertaking? • P = $50,000, A = annual net income = $9,000 - $2,000 = $7,000, S = 10,000, n = 10. • Evaluate net present worth = present worth of benefits – present worth of costs
  • 28. 28 Present Worth Analysis • Present worth of benefits = $9,000(PA,9%,10) = $9,000(6.418) = $57,762 • Present worth of costs = $50,000 + $2,000(PA,9%,10) - $10,000(PF,9%,10)= $50,000 + $2,000(6..418) - $10,000(.4224) = $58,612 • Net present worth = $57,762 - $58,612 < 0  do not invest • What should be the minimum annual benefit for making it a worthy of investment at 9% rate of return?
  • 29. 29 Present Worth Analysis • Present worth of benefits = A(PA,9%,10) = A(6.418) • Present worth of costs = $50,000 + $2,000(PA,9%,10) - $10,000(PF,9%,10)= $50,000 + $2,000(6..418) - $10,000(.4224) = $58,612 • A(6.418) = $58,612  A = $58,612/6.418 = $9,312.44
  • 30. 30 Cost and Benefit Estimates • Present and future benefits (income) and costs need to be estimated to determine the attractiveness (worthiness) of a new product investment alternative
  • 31. 31 Annual costs and Income for a Product • Annual product total cost is the sum of annual material, labor, and overhead (salaries, taxes, marketing expenses, office costs, and related costs), annual operating costs (power, maintenance, repairs, space costs, and related expenses), and annual first cost minus the annual salvage value. • Annual income generated through the sales of a product = number of units sold annuallyxunit price
  • 32. 32 Rate of Return Analysis • Single alternative case • In this method all revenues and costs of the alternative are reduced to a single percentage number • This percentage number can be compared to other investment returns and interest rates inside and outside the organization
  • 33. 33 Rate of Return Analysis • Steps to determine rate of return for a single stand-alone investment – Step 1: Take the dollar amounts to the same point in time using the compound interest formulas – Step 2: Equate the sum of the revenues to the sum of the costs at that point in time and solve for i
  • 34. 34 Rate of Return Analysis • An initial investment of $500 is being considered. The revenues from this investment are $300 at the end of the first year, $300 at the end of the second, and $200 at the end of the third. If the desired return on investment is 15%, is the project acceptable? • In this example we will take benefits and costs to the present time and their present values are then equated
  • 35. 35 Rate of Return Analysis • $500 = $300(PF, i, n=1) + 300(PF, i, n=2) + $200(PF, i, n=3) • Now solve for i using trial and error method • Try 10%: $500 = ? $272 + $247 + $156 = $669 (not equal) • Try 20%: $500 = ? $250 + $208 + $116 = $574 (not equal) • Try 30%: $500 = ? $231 + $178 + $91 = $500 (equal)  i = 30% • The desired return on investment is 15%, the project returns 30%, so it should be implemented