Contents
1. Background
2. Problem statement
3. Objectives
4. Literature Review
5. Materials
6. Methods
7. Results
8. Drawing
9. Discussion
10. Project Planning
11. Conclusion & Recommendations
3Engineering Team Project Group 61
Background
The main function of the “Notibox” is to notify
the user when there is/are letter(s) inside the letter
box. The notification is only given when the user
open the house main door.
4Engineering Team Project Group 61
Problem Statement
These problems occur when the user is not in
the house when the letter is delivered:
 Important letters are uncollected
 Delay in responding urgent letters
 Stealing and destruction of the letters
5Engineering Team Project Group 61
Objectives
Objectives of this system are:
 To notify user about urgent letters
 To preserve the condition of the letters
 To modify the existing letter box
6Engineering Team Project Group 61
Literature Review
• A sensor according to www.wikepedia.com is a device that
measures a physical quantity and converts it into a signal.
• A buzzer referring to www.wikepedia.com is a signaling
device.
• A light-emitting diode (LED) is an electronic light source.
The description is from www.wikepedia.com.
• The micro switch is an electrical switch. The description is
from www.wikepedia.com.
Engineering Team Project Group 61 7
Material Function
Adaptor Provide power
Zinc plate Act as the sensor
Micro switch Trigger the buzzer
Buzzer Generate sound
Light –emitting diode (LED) Give signal
Materials
Materials used:
8Engineering Team Project Group 61
Methods
9Engineering Team Project Group 61
Switch 1 (Door)
Switch 2 (sensor)
Close
Open Close (letter)
circuit on
LED& BuzzerCircuit off
Results
• Working principles:
10Engineering Team Project Group 61
Drawings
11Engineering Team Project Group 61
Front view of the prototype
Sensor
LED
Micro switch
Buzzer
12Engineering Team Project Group 61
sensor
sensor
13Engineering Team Project Group 61
The system
14Engineering Team Project Group 61
Material Advantages Disadvantages
Zinc Low malleable Low creep
strength
Aluminum Lightweight Highly Malleable
Discussion
Justification for chosen materials:
 Sensor
15Engineering Team Project Group 61
Material Advantages Disadvantages
Zinc Low malleable Low creep
strength
Aluminum Lightweight Highly
Malleable
Material Advantages Disadvantages
Micro switch Cheap Low sensitivity
Reed Switch Sensitive Fragile
Material Advantages Disadvantages
Adaptor Longer life time High cost
Battery Cheap Low life time
 Switch & Power Supply
16Engineering Team Project Group 61
Material Advantages Disadvantages
Micro switch Cheap Low sensitivity
Reed switch Sensitive Fragile
Material Advantages Disadvantages
Adaptor Longer life
time
Costly
Battery Cheap Low life time
Problem Solution
Foreign objects Set a minimum load
Sensor exposed to heat Use plywood at the edge
Glue will melt Replace with small screws
Potential problems and solutions:
• In real life:
a. LED and buzzer will be inside the house
b. Micro switch will be replaces by reed switch
• The minimum weight sensor can detect is 70g.
17Engineering Team Project Group 61
Problem Solution
Foreign objects Set a minimum load
Sensor exposed to heat Use plywood as support
Melting of glue Replace with small screws
Overall cost of the prototype is only RM 23.00
Engineering Team Project Group 61 18
Materials Cost
LED (40units*RM0.10) RM4.00
Wire RM 0.30
Zinc plate RM 0.40
Resistor (5 units*RM 0.30) RM 1.50
Micro switch RM 0.50
Adaptor RM 10.00
Buzzer RM 3.00
Electrical board RM 3.00
Total RM 23.00
Project Planning
Name Tasks
Taufiq Sensor assembly
Shalini Fixing of speaker and LED
Nadiah Circuit assembly
Aliya Engineering Drawing
Afiq Lighting(LED)
Syafiq Design of the house
Engineering Team Project Group 61 19
Conclusion &
Recommendations
We successfully designed a better letter box than
the existing letter box. We would like to
recommend “Notibox” because it is cheap with
simple mechanism and very helpful in
making our life more organized.
20Engineering Team Project Group 61
THE END
Q&A
21Engineering Team Project Group 61

Engineering design: A model of notification post box

  • 1.
    A MODEL OFNOTIFICATION BOX: “NOTIBOX” GROUP 61 ENGINEERING TEAM PROJECT Date: 14/10/2009 Venue: 21.01.05
  • 2.
    Group Members • MuhammadTaufiq Bin Roslan 11608 • Shalini Subramaniam 9698 • Ahmad Ariff Bin Jamaludin 9722 • Siti Nadiah Binti Jamaludin 10202 • Muhammad Syafiq Bin Mohd Ariffin 10228 • Aliya Binti Mhd Zahir 11657 Supervisor: Dr Mokhtar B Awang 2Engineering Team Project Group 61
  • 3.
    Contents 1. Background 2. Problemstatement 3. Objectives 4. Literature Review 5. Materials 6. Methods 7. Results 8. Drawing 9. Discussion 10. Project Planning 11. Conclusion & Recommendations 3Engineering Team Project Group 61
  • 4.
    Background The main functionof the “Notibox” is to notify the user when there is/are letter(s) inside the letter box. The notification is only given when the user open the house main door. 4Engineering Team Project Group 61
  • 5.
    Problem Statement These problemsoccur when the user is not in the house when the letter is delivered:  Important letters are uncollected  Delay in responding urgent letters  Stealing and destruction of the letters 5Engineering Team Project Group 61
  • 6.
    Objectives Objectives of thissystem are:  To notify user about urgent letters  To preserve the condition of the letters  To modify the existing letter box 6Engineering Team Project Group 61
  • 7.
    Literature Review • Asensor according to www.wikepedia.com is a device that measures a physical quantity and converts it into a signal. • A buzzer referring to www.wikepedia.com is a signaling device. • A light-emitting diode (LED) is an electronic light source. The description is from www.wikepedia.com. • The micro switch is an electrical switch. The description is from www.wikepedia.com. Engineering Team Project Group 61 7
  • 8.
    Material Function Adaptor Providepower Zinc plate Act as the sensor Micro switch Trigger the buzzer Buzzer Generate sound Light –emitting diode (LED) Give signal Materials Materials used: 8Engineering Team Project Group 61
  • 9.
  • 10.
    Switch 1 (Door) Switch2 (sensor) Close Open Close (letter) circuit on LED& BuzzerCircuit off Results • Working principles: 10Engineering Team Project Group 61
  • 11.
  • 12.
    Front view ofthe prototype Sensor LED Micro switch Buzzer 12Engineering Team Project Group 61
  • 13.
  • 14.
  • 15.
    Material Advantages Disadvantages ZincLow malleable Low creep strength Aluminum Lightweight Highly Malleable Discussion Justification for chosen materials:  Sensor 15Engineering Team Project Group 61 Material Advantages Disadvantages Zinc Low malleable Low creep strength Aluminum Lightweight Highly Malleable
  • 16.
    Material Advantages Disadvantages Microswitch Cheap Low sensitivity Reed Switch Sensitive Fragile Material Advantages Disadvantages Adaptor Longer life time High cost Battery Cheap Low life time  Switch & Power Supply 16Engineering Team Project Group 61 Material Advantages Disadvantages Micro switch Cheap Low sensitivity Reed switch Sensitive Fragile Material Advantages Disadvantages Adaptor Longer life time Costly Battery Cheap Low life time
  • 17.
    Problem Solution Foreign objectsSet a minimum load Sensor exposed to heat Use plywood at the edge Glue will melt Replace with small screws Potential problems and solutions: • In real life: a. LED and buzzer will be inside the house b. Micro switch will be replaces by reed switch • The minimum weight sensor can detect is 70g. 17Engineering Team Project Group 61 Problem Solution Foreign objects Set a minimum load Sensor exposed to heat Use plywood as support Melting of glue Replace with small screws
  • 18.
    Overall cost ofthe prototype is only RM 23.00 Engineering Team Project Group 61 18 Materials Cost LED (40units*RM0.10) RM4.00 Wire RM 0.30 Zinc plate RM 0.40 Resistor (5 units*RM 0.30) RM 1.50 Micro switch RM 0.50 Adaptor RM 10.00 Buzzer RM 3.00 Electrical board RM 3.00 Total RM 23.00
  • 19.
    Project Planning Name Tasks TaufiqSensor assembly Shalini Fixing of speaker and LED Nadiah Circuit assembly Aliya Engineering Drawing Afiq Lighting(LED) Syafiq Design of the house Engineering Team Project Group 61 19
  • 20.
    Conclusion & Recommendations We successfullydesigned a better letter box than the existing letter box. We would like to recommend “Notibox” because it is cheap with simple mechanism and very helpful in making our life more organized. 20Engineering Team Project Group 61