1
Curriculum Vitae
Contact Information
Name Jabir Yasin Ahmed
Mothers Name Mahado Abdulahi Yusuf
Sex Male
Nationality Somali
Marital Status Single
Email jaabircalasow@gmail.com
Tell: +252-90-7749658/+252906799658
Personal Sammuray:
Career Objectives:
In the last 5 years, I worked with different institutions in different fields
including Civil engineer, local Organizations, international
Organizations and Construction Companies and I have an experience in
Designing, Planning, Implementation, Coordination, supervising for all
Construction civil Engineering programs. I am still involving with the
civil Engineering and currently I work with International NGO as
Consultant Water Infrastructure engineer.
I have a good background in the field work, designing, preparing BOQ
for different construction process, office administration and community
development building activities.
To contribute the planning, designing, coordination, Analysis and
Implementations of every engineering technique and to dedicated for
creativity and diversity still being utilized in my multiple fields of
experiences and by qualifications (in; - civil engineering & Construction
Management, Education, and Community Development) and devoted to
improve and excel performance and achievements. Thus, I would like to
tackle complex challenges, generate innovative ideas and maintain high
working standards and integrity within my profession.
Education Background
Higher Education: Studied Master of Transportation Engineering In Institution of civil
Engineering In London UK-Online Class of November 2017.
Higher Education: Sept2012- Sept 2016 Bachelor’s Degree
Civil Engineering. Eelo University.
High school:
May – 2008 May -2012 Imam Al-Nawawi
Secondary school Bosaso. General Certificate Secondary
Education (GCSE).
Knowledge: Construction methods: Knowledge of materials, methods, and the
2
tools involved in the construction or repair of houses, buildings, or
other structures such as highways and roads.
Design and Architectural software: Knowledge of design techniques,
tools, and principals involved in production of precision technical
plans, drawings, and models.
Engineering Mathematics: Knowledge of arithmetic, algebra,
geometry, calculus, statistics, and their applications and The
backboned civil engineering courses like:
 Highway Engineering
 Geotechnical Engineering
 Structural analysis
 Water supply and sewerage Engineering
 Contract specification and Quantity Surveying
 Project planning and managements
 Details of bridge Engineering Design
 Irrigation Engineering
 Design of concrete structures
 Design of Hydraulic structures
 And Engineering Geology
Professional
Experience:
I have worked out for most engineering software programs, such as:
1..All AutoCAD’s
2.Archi-CAD 12,13,15,16
3.Civil 3d AutoCAD
4.Chief architect (Full vision)
5.ETABS Sap2000
5. Ms Excel Especially for cost estimation.
Vocational Training: Certificate Of WASH programme In EELO-University.
6-months Vocational Training (SIBA) held in Bosaso 2007.
4-days of marine ports rehabilitations in maritime academy.
5-days of Roads and bridges at held in PHA Puntland highway
authorities.
1-month training of Soil Lab test in Roads development agency (RDA)
in Hargeisa.
1-month training of concrete lab test in Roads development agency
(RDA) in Hargeisa.
3
Skill of Training certificate:
Skills:
INTERESTS/HOBBIES:
Certificate Of WASH programme In EELO-University.
Date issue 14/05/2014
Proposal writing, report writing Logistic and procurement, Nonprofit of
comprise account, Monitoring and Evaluation, and implemented by Sea
side Training center and East Africa University compass Garowe.
4 days PICD participated Integrated Community Development by
(AAH, UNICEF) Environmental protection.
20 days 2012 -Training Leading Organizational Development (LOD)
implemented by Tadamum Social Society, held in Gardo, Puntland.
1. IT SKILLS: (MS Word, Excel, Access, publisher, PowerPoint,
Photoshop).
2.Research and projects proposals skills
3. written, Oral and interpersonal communication skills.
4.Management and administration skills
5.Risk analysing and Project management, Problems solving skills
6. Team work communication skills.
Interest in flied construction management and working with community,
newspapers, browsing the internet, watching news and live soccer,
community service and listening to smart Idea.
Diploma Architectural
drawings
01-07-2013 courses is:
September 2010- September 2011
Aljazeera Institute of engineering Diploma of architectural
Drawings.(Auto cad, Archicad, Chief, Sap, Orian, civil 3D)
Language skills: Somali: Native
English: Excellent, easy written and spoken.
Arabic: Excellent.
Employment Record
Period Dec 2016 up to November 2017
Title Consultant Water Infrastructure-Engineer.
Employer Development Alternative International co. (DAI)-PIMS-Garowe.
Responsibilities 1.design overall schemes, such as sewer improvement schemes or water
infrastructure roads, bridges to Feasibly to the implementations
projects ,Water catchments, bore holes, soil bunds, dams storage water
tanks, and associated
Structures (the scale of the design may range from an initial outline to a
full, detailed design BOQs).
2 .prepare tender documents as a basis for construction
4
3. Review technical submission, liaise with various bodies and
individuals, including local
authorities, government agencies, clients, contractors, residents,
suppliers, technical experts
And other consultants.
4. Keep up to date with environmental matters, and be aware of policy
and developments in
this area
5. Present technical data or project results to both technical and non-
technical clients and
colleagues
6. Monitor the progress of projects from beginning to end - from the
feasibility stage, to
design through to construction and handover - or supervise one section
of a large project
7. Administer contracts and ensure that work is completed to deadline
8. Supervise the operation and maintenance of water and sewerage
infrastructure
9. Used computer simulations to analyse, for example, potential dam
failure
10. Monitor flood levels at times of high risk.
Period Dec.2015 – October 2016
Title Civil Infrastructure Engineer.
Employer African Disability Association (ADA)-Garowe/Mogadishu:
Responsibilities: 1. Ensuring design specifications and safety standards on the project
site.
2. Handling direct operations and maintenance activities on project site.
3. Surveying and establish reference points and elevations to guide
construction.
4. Handling cost-of-materials and on-site project visits documents.
5. Prepare public reports, such as bid proposals, Cost estimation etc.
6. To determine strength and adequacy of foundations, concrete or steel
by testing soils and
Materials Programs.
7. Maintain knowledge on all require technologies and assist in advance
research.
8. Develop water quality permit applications.
9. Research and document the latest information on water quality and
hydrological regulation data.
10.Provide subject matter expertise to all clients for all engineering
activities and assist al
Internal groups for same.
11. Evaluate all design for subsystem components and monitor all
vendor visits. Participate in
Various.
5
12. Design review meetings with engineering department.
4. Analyse efficient implementation of all engineering procedures and
monitor its working
13. Administer all complex problems and design effective resolutions
for same and coordinate
With customer management for same.
14.Coordinate with engineering support staff and engineers and provide
assistance to all
Programs.
Period: Feb 2013-up to May. 2014
Title: WASH Engineer.
Employer: SHILCON NGO- Garowe
Responsibilities: 1.Supervision of water points construction (boreholes, storage tanks,
shallow wells and water kiosks)
2.Water purification and treatment
3.Preparation design and BOQs
4.Sewerage &drainage system for floods
5. Hydrological survey of water supply- using EPANET programme.
6. Ensure the availability of accurate, complete and up-to-date
information required for effective WASH programme design,
implementation, management, monitoring and evaluation with a
particular focus on sanitation and hygiene promotion.
7. Provide technical support to relevant Government agencies in order to
develop capacities related to their roles and responsibilities in the Rural
WASH Sector.
8. Support emergency preparedness and response activities as a focal
point for the programme.
9. Participate in inter-sect oral collaboration with other programme
colleagues, primarily Supply/ Procurement, Education, Health and Local
Governance for Child Rights officers to identify priority needs and
appropriate strategies, share information and provide advocacy on water
and environmental sanitation.
10. Organize and attend regular meetings with government counterparts,
contractors and other partners to analyze and evaluate designs,
processes, facilities and outcomes to ensure achievement of objectives
and attainment of sustainability and/or take corrective action when
necessary to meet project objectives.
11. Ensure effective communication and networking developed and
maintained through partnership and collaboration with members of the
development community, including NGOs, UN and bilateral agencies.
12. Prepare all procurement, contracting and construction management
documentation. Enhance programme efficiency and effectiveness
through evidence-base approach and implementation follow-up.
13. Contribute to the development of training and orientation materials.
Document results and lessons learned from WASH programme
6
implementation including emergency preparedness and response, to
promote knowledge sharing with counterparts and WASH stakeholders
14. Ensure successful preparation and delivery of WASH technical
outcomes during fundraising, scoping, development and implementation
phases of WASH initiatives. Establish modalities to ensure
sustainability of facilities and extended use by beneficiaries.
Reference Persons:
Mohamud ahmed Mohamed
Programme manager-Shilcon -Ngo
Tel: +252907739855/252906799858
mohamud.ahmed1989@gmail.com
Mohamed Bare Infrastructure & Market
Systems Development
Director.
Promoting Inclusive Markets
In Somalia (PIMS).
Development Alternatives
Inc. (DAI).
Cell: Ken +254 702 258 584 or Som. +252 615 120 595
Email: Mohamed_barre@dai.com
Abdinur Abdulahi jama
Project Manager
African Disability
Association (ADA).
Tell:+252906797996/0252907733030
Abdinour Jama abdinour.a.j@gmail.com

Eng jabir cv..

  • 1.
    1 Curriculum Vitae Contact Information NameJabir Yasin Ahmed Mothers Name Mahado Abdulahi Yusuf Sex Male Nationality Somali Marital Status Single Email jaabircalasow@gmail.com Tell: +252-90-7749658/+252906799658 Personal Sammuray: Career Objectives: In the last 5 years, I worked with different institutions in different fields including Civil engineer, local Organizations, international Organizations and Construction Companies and I have an experience in Designing, Planning, Implementation, Coordination, supervising for all Construction civil Engineering programs. I am still involving with the civil Engineering and currently I work with International NGO as Consultant Water Infrastructure engineer. I have a good background in the field work, designing, preparing BOQ for different construction process, office administration and community development building activities. To contribute the planning, designing, coordination, Analysis and Implementations of every engineering technique and to dedicated for creativity and diversity still being utilized in my multiple fields of experiences and by qualifications (in; - civil engineering & Construction Management, Education, and Community Development) and devoted to improve and excel performance and achievements. Thus, I would like to tackle complex challenges, generate innovative ideas and maintain high working standards and integrity within my profession. Education Background Higher Education: Studied Master of Transportation Engineering In Institution of civil Engineering In London UK-Online Class of November 2017. Higher Education: Sept2012- Sept 2016 Bachelor’s Degree Civil Engineering. Eelo University. High school: May – 2008 May -2012 Imam Al-Nawawi Secondary school Bosaso. General Certificate Secondary Education (GCSE). Knowledge: Construction methods: Knowledge of materials, methods, and the
  • 2.
    2 tools involved inthe construction or repair of houses, buildings, or other structures such as highways and roads. Design and Architectural software: Knowledge of design techniques, tools, and principals involved in production of precision technical plans, drawings, and models. Engineering Mathematics: Knowledge of arithmetic, algebra, geometry, calculus, statistics, and their applications and The backboned civil engineering courses like:  Highway Engineering  Geotechnical Engineering  Structural analysis  Water supply and sewerage Engineering  Contract specification and Quantity Surveying  Project planning and managements  Details of bridge Engineering Design  Irrigation Engineering  Design of concrete structures  Design of Hydraulic structures  And Engineering Geology Professional Experience: I have worked out for most engineering software programs, such as: 1..All AutoCAD’s 2.Archi-CAD 12,13,15,16 3.Civil 3d AutoCAD 4.Chief architect (Full vision) 5.ETABS Sap2000 5. Ms Excel Especially for cost estimation. Vocational Training: Certificate Of WASH programme In EELO-University. 6-months Vocational Training (SIBA) held in Bosaso 2007. 4-days of marine ports rehabilitations in maritime academy. 5-days of Roads and bridges at held in PHA Puntland highway authorities. 1-month training of Soil Lab test in Roads development agency (RDA) in Hargeisa. 1-month training of concrete lab test in Roads development agency (RDA) in Hargeisa.
  • 3.
    3 Skill of Trainingcertificate: Skills: INTERESTS/HOBBIES: Certificate Of WASH programme In EELO-University. Date issue 14/05/2014 Proposal writing, report writing Logistic and procurement, Nonprofit of comprise account, Monitoring and Evaluation, and implemented by Sea side Training center and East Africa University compass Garowe. 4 days PICD participated Integrated Community Development by (AAH, UNICEF) Environmental protection. 20 days 2012 -Training Leading Organizational Development (LOD) implemented by Tadamum Social Society, held in Gardo, Puntland. 1. IT SKILLS: (MS Word, Excel, Access, publisher, PowerPoint, Photoshop). 2.Research and projects proposals skills 3. written, Oral and interpersonal communication skills. 4.Management and administration skills 5.Risk analysing and Project management, Problems solving skills 6. Team work communication skills. Interest in flied construction management and working with community, newspapers, browsing the internet, watching news and live soccer, community service and listening to smart Idea. Diploma Architectural drawings 01-07-2013 courses is: September 2010- September 2011 Aljazeera Institute of engineering Diploma of architectural Drawings.(Auto cad, Archicad, Chief, Sap, Orian, civil 3D) Language skills: Somali: Native English: Excellent, easy written and spoken. Arabic: Excellent. Employment Record Period Dec 2016 up to November 2017 Title Consultant Water Infrastructure-Engineer. Employer Development Alternative International co. (DAI)-PIMS-Garowe. Responsibilities 1.design overall schemes, such as sewer improvement schemes or water infrastructure roads, bridges to Feasibly to the implementations projects ,Water catchments, bore holes, soil bunds, dams storage water tanks, and associated Structures (the scale of the design may range from an initial outline to a full, detailed design BOQs). 2 .prepare tender documents as a basis for construction
  • 4.
    4 3. Review technicalsubmission, liaise with various bodies and individuals, including local authorities, government agencies, clients, contractors, residents, suppliers, technical experts And other consultants. 4. Keep up to date with environmental matters, and be aware of policy and developments in this area 5. Present technical data or project results to both technical and non- technical clients and colleagues 6. Monitor the progress of projects from beginning to end - from the feasibility stage, to design through to construction and handover - or supervise one section of a large project 7. Administer contracts and ensure that work is completed to deadline 8. Supervise the operation and maintenance of water and sewerage infrastructure 9. Used computer simulations to analyse, for example, potential dam failure 10. Monitor flood levels at times of high risk. Period Dec.2015 – October 2016 Title Civil Infrastructure Engineer. Employer African Disability Association (ADA)-Garowe/Mogadishu: Responsibilities: 1. Ensuring design specifications and safety standards on the project site. 2. Handling direct operations and maintenance activities on project site. 3. Surveying and establish reference points and elevations to guide construction. 4. Handling cost-of-materials and on-site project visits documents. 5. Prepare public reports, such as bid proposals, Cost estimation etc. 6. To determine strength and adequacy of foundations, concrete or steel by testing soils and Materials Programs. 7. Maintain knowledge on all require technologies and assist in advance research. 8. Develop water quality permit applications. 9. Research and document the latest information on water quality and hydrological regulation data. 10.Provide subject matter expertise to all clients for all engineering activities and assist al Internal groups for same. 11. Evaluate all design for subsystem components and monitor all vendor visits. Participate in Various.
  • 5.
    5 12. Design reviewmeetings with engineering department. 4. Analyse efficient implementation of all engineering procedures and monitor its working 13. Administer all complex problems and design effective resolutions for same and coordinate With customer management for same. 14.Coordinate with engineering support staff and engineers and provide assistance to all Programs. Period: Feb 2013-up to May. 2014 Title: WASH Engineer. Employer: SHILCON NGO- Garowe Responsibilities: 1.Supervision of water points construction (boreholes, storage tanks, shallow wells and water kiosks) 2.Water purification and treatment 3.Preparation design and BOQs 4.Sewerage &drainage system for floods 5. Hydrological survey of water supply- using EPANET programme. 6. Ensure the availability of accurate, complete and up-to-date information required for effective WASH programme design, implementation, management, monitoring and evaluation with a particular focus on sanitation and hygiene promotion. 7. Provide technical support to relevant Government agencies in order to develop capacities related to their roles and responsibilities in the Rural WASH Sector. 8. Support emergency preparedness and response activities as a focal point for the programme. 9. Participate in inter-sect oral collaboration with other programme colleagues, primarily Supply/ Procurement, Education, Health and Local Governance for Child Rights officers to identify priority needs and appropriate strategies, share information and provide advocacy on water and environmental sanitation. 10. Organize and attend regular meetings with government counterparts, contractors and other partners to analyze and evaluate designs, processes, facilities and outcomes to ensure achievement of objectives and attainment of sustainability and/or take corrective action when necessary to meet project objectives. 11. Ensure effective communication and networking developed and maintained through partnership and collaboration with members of the development community, including NGOs, UN and bilateral agencies. 12. Prepare all procurement, contracting and construction management documentation. Enhance programme efficiency and effectiveness through evidence-base approach and implementation follow-up. 13. Contribute to the development of training and orientation materials. Document results and lessons learned from WASH programme
  • 6.
    6 implementation including emergencypreparedness and response, to promote knowledge sharing with counterparts and WASH stakeholders 14. Ensure successful preparation and delivery of WASH technical outcomes during fundraising, scoping, development and implementation phases of WASH initiatives. Establish modalities to ensure sustainability of facilities and extended use by beneficiaries. Reference Persons: Mohamud ahmed Mohamed Programme manager-Shilcon -Ngo Tel: +252907739855/252906799858 mohamud.ahmed1989@gmail.com Mohamed Bare Infrastructure & Market Systems Development Director. Promoting Inclusive Markets In Somalia (PIMS). Development Alternatives Inc. (DAI). Cell: Ken +254 702 258 584 or Som. +252 615 120 595 Email: Mohamed_barre@dai.com Abdinur Abdulahi jama Project Manager African Disability Association (ADA). Tell:+252906797996/0252907733030 Abdinour Jama abdinour.a.j@gmail.com