Your Pipeline to Success in Europe
What We Need To Accomplish.


Deliver an exceptional customer experience that:
    • Is theatrical
    • Reflects one company
    • Shows we understand “their world” and their language
Manage multiple internal divisions
Manage expectations of internal stakeholders and board members
Maintain the integrity of the design within time and budget constraints
Provide a worry-free execution:
    • Efficient planning
    • Anticipation of potential obstacles in all situations
    • Proactive problem solving
    • Wealth of smart resources




                                  ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   2
What You Need to Succeed at The Global Users Exchange.


A smart, proactive and passionate fabricator who knows...


    • Emerson...inside and out
    • How to manage diverse teams and complex projects...with second-to-none
      problem solving skills, uber efficiency and...well, grace
    • What it takes to value engineer within a limited budget
    • How to fabricate...any project...anywhere...anytime




                                 ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   3
So, Why Star?




 ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   4
Star Knows Emerson.


12 years of experience with Emerson has taught us a lot:


     • Highly-specialized structural needs
     • Unique habits and requirements
     • Complex AV systems
     • Diverse, to say the least, engineering specifications
     • Marcom roles, responsibilities and requirements
     • Customer needs, wants and desires
     • The ultimate “go to” person within the Emerson system




                                 ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   5
Really, Who Else Can Say They Know All This?


• Never refer to Emerson Process Management as EPM
• Never leave home without your helix
• If you can’t find your dongle, don’t worry we can probably find it for you
• Wireless transmitters are always “thumbs-up”
• DeltaV monitors work best with a 1680 x 1050 resolution
• Never put a space between “Delta” and “V”
• All piping must be 2” in diameter to best fit standard bracket system
• Pneumatic valves won’t open if you don’t have air
• A 1/2” valve take about 35 lbs PSI to stroke the actuator
• Wireless transmitters are DC wired
• Redundant wiring is anything but redundant


There’s more. Go ahead, test us.


                                 ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   6
Partners In Translation.


Emerson speaks the language of technical brilliance
                         +
Star speaks the language of all things Emerson on the event floor
                         +
International partner speaks the language of local perfection


                         = ulimate customer experience




                                ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   7
Star Shines.




           JCPenney Analyst Event
           Four short weeks to execute
           100,000 feet of raw space floating on the
           Hudson River
           1600 attendees




                            ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   8
Star Shines.




           JCPenney Analyst Event [cont.]
           13,000 square foot theater
           16,000 square foot cocktail space
           60 generators to supply heat and light
           5 bathroom trailers




                          ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   9
Star Shines.




           JCPenney Analyst Event [cont.]
           Thousands of board feet of materials
           Thousands of gallons of white paint
           Over 14,000 hours of union labor
           Over 8,000 hours of Star labor
           ROI - 20 percent gain in stock prices




                          ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   10
Star Shines.




   “The space is beyond phenomenal. Seeing it come together blows one’s
   mind. Delivering something this amazing in such a short time is frankly
   miraculous! It’s rare to work with a team that truly blows you away..”


                                                                                                                                          Gregory Clark
                                                                                      [ Senior VP of Creative - JCP ]




                               ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   16
Star Shines.




           Target National Sales Meeting
           Massive, double-sided pre-rigged walls
           6’, 8’ and 10’ diameter back lit bullseyes
           Full exhibition of in-house brands
           1800 seat theater




                            ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   17
Star Shines.




         “I love working with you guys,
         you always take it to the next level.”


                                                                                     Target Corporation
                                                   [ Senior Marketing Specialist ]




                            ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   20
Star Shines.




     Valspar Intermodal Europe - 2011
     10m x 9 m, 100% German Built

      • A Solution maximizing the exhibit footprint with bold messaging and
       unique integration of technology for strategic competitive product
       comparison

      • Successfully positioned the brand as a global contender in their
        industry

      • Received praise from their direct competitor at the show on the
        exhibit design




                             ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   21
Star Shines.




         “The Valspar exhibit is our favorite at the show.”
                                           Intermodal Association Director




                            ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   23
Let’s Get This Pipeline Started.


February                                                                                March/April
Thumbs up to Star - Toast                                                               Execute fabrication
Assemble pipeline team                                                                  Create logistical agenda for installation and dismatle
Introduce Emerson to International partner
Engage Emerson business units                                                           May
Conduct needs analysis                                                                  Execute installation
Conduct hotel site visit                                                                Welcome guests
Conduct project launch meeting to identify/reaffirm                                     Drink
      • Key elements
      • Design refinements
      • Success criteria
      • Budget constraints
      • Detailed timeline
Provide value engineering solutions
Present final production estimates for approval




                                         ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   24
Here’s The Bottom Line.


Professional Services                                     €           45,197.38
Fabrication and Graphic Production                        € 240,152.45
Logistical Services                                       € 206,801.46


Preliminary Project Total                                 € 492,151.29


Notable Considerations:
Please see the addendum for a detailed break out of each area

Estimated prices are preliminary based on limited knowledge and
unconfirmed details regarding the design and business unit needs

Prices are based on the currency rate on February 16th, 2012 and
will fluctuate until June 30th, 2012.




                                         ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   25
Thumbs up.




Amy Feinberg
Account Partner
Direct: 763.569.9017
Cell: 612.408.1462
afeinberg@starexhibits.com


STAR
6920 93rd Avenue North
Minneapolis, Minnesota 55445

www.starexhibits.com




                               ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission .   26
6920 93rd Avenue North | Minneapolis, MN 55445
                                                                                                               Company: 763.561.4655 | Fax: 763.561.4655
                                                                                                                                  www.starexhibits.com



Estimate is for Budgetary Purposes Only
Costs are based on Currency Rate on 2.16.12
Contact: Amy Feinberg: 763.569.9017

    Client Name:       Emerson Process Management                   Address:               Patrijsweg 140 | 2289 EZ | Rijswijk | NL T
    Contact:           Rob Van der Zwan
    Project Name:      Global Users Exchange
    Job Number:        21258                                        Phone Number:          31704136690
    Date:              2.16.12                                      Customer Code:         1900

Professional Services                                                                       Quantity        Price each                Total
    Graphic Design                                                                              1       €      9,009.00     €               9,009.00
    Project Management, R&D, Site Visit, Show attendance                                        1       €     25,884.38     €              25,884.38
    Technical Drawings for Fabrications                                                                 €      2,576.00     €               2,576.00
                                                                                                                            €            37,469.38
Fabrication and Graphics                                                                    Quantity        Price each                Total
    Entrance                                                                                    1       €     30,898.20     €              30,898.20
    Production of fabric tunnel to create tube environment. Structureto have support
    elements to receive plasma screens, reflective graphics and lighting
    Main Floor Platform                                                                         1       €     18,400.00     €              18,400.00
    10cm tall, flooring to be finished in white laminate with white aluminum plinth
    surrounding the edge
    Main Floor Furniture
    All to produce items in traditional plywood and finish with a white laminate for
    multiple usage
    See Detail Below
    Unit 1                                                                                      4       €      1,725.00     €               6,900.00
    Unit 2                                                                                      8       €      2,659.38     €              21,275.04
    Unit 3 Basic                                                                                6       €      4,216.66     €              25,299.96
    Unit 3 Extended                                                                             3       €     11,057.25     €              33,171.75
    Unit 4                                                                                      3       €        766.66     €               2,299.98
    Unit 5                                                                                      6       €      1,533.33     €               9,199.98
    BalconyType 1                                                                               8       €      1,725.00     €              13,800.00
    Balcony Type 2                                                                              8       €      1,725.00     €              13,800.00
    Vinyl Copy for Units 1,2,3, and 5                                                          30       €         46.00     €               1,380.00
    1 meter wide
    Vinyl Copy-Balcony Type 1                                                                   8       €          46.00    €                 368.00
    Acrylic Panels-Balcony Type 2                                                               8       €         327.75    €               2,622.00
    Balcony Signage on back wall                                                                1       €       4,126.20    €               4,126.20
    Tention Fabric, freestanding
     3D Lettering for Stage Left and Right                                                      1       €       1,587.00    €               1,587.00
    Stage Scaffolding Sculpture                                                                 1       €     18,975.00     €              18,975.00
    33, 7mm Galvanized pipes, key clamps
    Stage Back Drop                                                                             2       €     10,474.20     €              20,948.40
    18,8mm Fabric banner
    Stage Flooring                                                                              1       €       2,645.00    €               2,645.00
    White raised floor to be placed over existing floor
    Stage Apron Front                                                                           1       €         962.55    €                 962.55
    Front of the stage that is perpendicular to the group level deck will be covered and
    finished in white paint
    Stage Side Returns                                                                          2       €       2,530.00    €               5,060.00
    Built to the left and right of the stage and painted white
                                                                                                                            €           233,719.06
Furniture -Rental for Stage, Main Floor and Lounge       Quantity        Price each          Total
    Bar Stools                                             21        €        102.35     €       2,149.35
    Alpha Desks                                             6        €        290.95     €       1,745.70
    Hard Plastic desk with internal lighting
    Alpha Corner Desk                                       4        €        293.25     €       1,173.00
    Hard plastic corner desks with internal lighting
    Umbria White Couch                                      4        €        145.48     €           581.92
    Umbria Lounge Chairs                                    6        €         82.09     €           492.54
    Maui Chairs                                             8        €         36.36     €           290.88
                                                                                         €       6,433.39
Property Management                                      Quantity        Price each          Total
    Production Preparation                                  1        €      7,728.00     €       7,728.00
                                                                                         €       7,728.00

Logistical Services                                      Quantity        Price each          Total
    Cleaning                                                1        €      7,930.00     €       7,930.00
    Disposal of Consumables                                 1        €        971.00     €         971.00
    Installation Labor, May 27th-28th                       1        €     51,750.00     €      51,750.00
    Dismantle Labor, May 31st                               1        €     20,700.00     €      20,700.00
    Equipment Rental                                        1        €      5,750.00     €       5,750.00
    Shipping, Freight Management and temporary storage      1        €     34,500.00     €      34,500.00
    Electrical                                              1        €      8,050.00     €       8,050.00
    Lighting                                                1        €     34,092.00     €      34,092.00
    Basic lighting for product presentation
    Par and pofil spot lights for stage
    programming for lights on stage
    Truss
    Par and pofil spots on truss
    Programming of lighting for overall room
    Labor for installation, dismantle, travel expenses

    Rigging for second stage fabric banner                  1        €      2,607.00     €       2,607.00
    Insurance Contribution                                  1        €      3,761.00     €       3,761.00
    On Site Supervision (labor and expenses)                1        €     36,690.46     €      36,690.46
    (7) Members of Execution Team
    Installation-Dismantle

                                                                                         €    206,801.46
                                                                    Project Total:       €    492,151.29


Options                                                  Quantity        Price each          Total
    18"/19" LCD Monitors                                    1        €         159.00    €          159.00
    23"/25" LCD Monitors                                    1        €         212.00    €          212.00
    32" LCD Monitors                                        1        €         230.00    €          230.00
    50" Plasmas                                             1        €         714.00    €          714.00
    Computer/Laptops                                        1        €         110.00    €          110.00
    Wall Brackets                                           1        €           5.00    €            5.00
    Delivery and Labor                                      1        €       8,050.00    €        8,050.00
    Cost for Disposal of all materials                      1        €      12,344.00    €       12,344.00
    Storage for one year                                    1        €       5,750.00    €        5,750.00
    Variance in fabrication for build and burn              1        €     (11,500.00)   €      (11,500.00)

More Related Content

Viewers also liked

Art presentation
Art presentationArt presentation
Art presentationatourso
 
Kimstarpresentationchart
KimstarpresentationchartKimstarpresentationchart
Kimstarpresentationchartkim odom
 
Webquest
Webquest Webquest
Webquest LS76
 
Presentation on ntc(edited anuj)
Presentation on ntc(edited anuj)Presentation on ntc(edited anuj)
Presentation on ntc(edited anuj)Anuj STha
 
Operation management presentation
Operation management presentationOperation management presentation
Operation management presentationAnuj STha
 
Media and types of communication
Media and types of communicationMedia and types of communication
Media and types of communicationAnuj STha
 

Viewers also liked (10)

Art presentation
Art presentationArt presentation
Art presentation
 
Darry ppt
Darry pptDarry ppt
Darry ppt
 
Kimstarpresentationchart
KimstarpresentationchartKimstarpresentationchart
Kimstarpresentationchart
 
Sodapop
SodapopSodapop
Sodapop
 
Webquest
Webquest Webquest
Webquest
 
Ponyboy
PonyboyPonyboy
Ponyboy
 
Presentation on ntc(edited anuj)
Presentation on ntc(edited anuj)Presentation on ntc(edited anuj)
Presentation on ntc(edited anuj)
 
Computer
ComputerComputer
Computer
 
Operation management presentation
Operation management presentationOperation management presentation
Operation management presentation
 
Media and types of communication
Media and types of communicationMedia and types of communication
Media and types of communication
 

Similar to Your Pipeline to Europe Success

Aimir company brochure
Aimir company brochureAimir company brochure
Aimir company brochureMomo Cui
 
Powder Impression Molding - Manufacturing
Powder Impression Molding - ManufacturingPowder Impression Molding - Manufacturing
Powder Impression Molding - ManufacturingSEECtech
 
Principle Group: Sustainability - protecting the future
Principle Group: Sustainability - protecting the futurePrinciple Group: Sustainability - protecting the future
Principle Group: Sustainability - protecting the futurePrinciple Global
 
Mapping an all-weather Tour de France
Mapping an all-weather Tour de FranceMapping an all-weather Tour de France
Mapping an all-weather Tour de Francedbyhundred
 
Senior Product Design Engineer
Senior Product Design EngineerSenior Product Design Engineer
Senior Product Design EngineerIan Laity
 
Shadowplay Folio
Shadowplay FolioShadowplay Folio
Shadowplay FolioAimee Venn
 
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries Ltd
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries LtdAWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries Ltd
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries LtdAugmentedWorldExpo
 
coin operated game rc boat for sale
coin operated game rc boat for sale coin operated game rc boat for sale
coin operated game rc boat for sale CindyZhang890647
 
Magellanns Flyer
Magellanns FlyerMagellanns Flyer
Magellanns Flyersteveives
 
Soleil Building Contracting LLC
Soleil Building Contracting LLCSoleil Building Contracting LLC
Soleil Building Contracting LLCSoleilme
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Adnet Communications
 
Decision making in the oil and gas industry
Decision making in the oil and gas industryDecision making in the oil and gas industry
Decision making in the oil and gas industryPalantir_Solutions
 

Similar to Your Pipeline to Europe Success (20)

Aimir company brochure
Aimir company brochureAimir company brochure
Aimir company brochure
 
Nano Dimension Presentation
Nano Dimension PresentationNano Dimension Presentation
Nano Dimension Presentation
 
Powder Impression Molding - Manufacturing
Powder Impression Molding - ManufacturingPowder Impression Molding - Manufacturing
Powder Impression Molding - Manufacturing
 
Intro Gen
Intro GenIntro Gen
Intro Gen
 
Principle Group: Sustainability - protecting the future
Principle Group: Sustainability - protecting the futurePrinciple Group: Sustainability - protecting the future
Principle Group: Sustainability - protecting the future
 
Mapping an all-weather Tour de France
Mapping an all-weather Tour de FranceMapping an all-weather Tour de France
Mapping an all-weather Tour de France
 
Senior Product Design Engineer
Senior Product Design EngineerSenior Product Design Engineer
Senior Product Design Engineer
 
Shadowplay Folio
Shadowplay FolioShadowplay Folio
Shadowplay Folio
 
Dec2018 egd
Dec2018 egdDec2018 egd
Dec2018 egd
 
Ptcgroup Presentation
Ptcgroup PresentationPtcgroup Presentation
Ptcgroup Presentation
 
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries Ltd
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries LtdAWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries Ltd
AWE EU Startup Pitch: Kourosh Atefipour with Valkyrie Industries Ltd
 
coin operated game rc boat for sale
coin operated game rc boat for sale coin operated game rc boat for sale
coin operated game rc boat for sale
 
Reference collateral
Reference collateral  Reference collateral
Reference collateral
 
Sept2018 egd
Sept2018 egdSept2018 egd
Sept2018 egd
 
Magellanns Flyer
Magellanns FlyerMagellanns Flyer
Magellanns Flyer
 
Real Estate Credentials
Real Estate CredentialsReal Estate Credentials
Real Estate Credentials
 
Skyworth
SkyworthSkyworth
Skyworth
 
Soleil Building Contracting LLC
Soleil Building Contracting LLCSoleil Building Contracting LLC
Soleil Building Contracting LLC
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018
 
Decision making in the oil and gas industry
Decision making in the oil and gas industryDecision making in the oil and gas industry
Decision making in the oil and gas industry
 

Recently uploaded

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 

Recently uploaded (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Your Pipeline to Europe Success

  • 1. Your Pipeline to Success in Europe
  • 2. What We Need To Accomplish. Deliver an exceptional customer experience that: • Is theatrical • Reflects one company • Shows we understand “their world” and their language Manage multiple internal divisions Manage expectations of internal stakeholders and board members Maintain the integrity of the design within time and budget constraints Provide a worry-free execution: • Efficient planning • Anticipation of potential obstacles in all situations • Proactive problem solving • Wealth of smart resources ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 2
  • 3. What You Need to Succeed at The Global Users Exchange. A smart, proactive and passionate fabricator who knows... • Emerson...inside and out • How to manage diverse teams and complex projects...with second-to-none problem solving skills, uber efficiency and...well, grace • What it takes to value engineer within a limited budget • How to fabricate...any project...anywhere...anytime ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 3
  • 4. So, Why Star? ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 4
  • 5. Star Knows Emerson. 12 years of experience with Emerson has taught us a lot: • Highly-specialized structural needs • Unique habits and requirements • Complex AV systems • Diverse, to say the least, engineering specifications • Marcom roles, responsibilities and requirements • Customer needs, wants and desires • The ultimate “go to” person within the Emerson system ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 5
  • 6. Really, Who Else Can Say They Know All This? • Never refer to Emerson Process Management as EPM • Never leave home without your helix • If you can’t find your dongle, don’t worry we can probably find it for you • Wireless transmitters are always “thumbs-up” • DeltaV monitors work best with a 1680 x 1050 resolution • Never put a space between “Delta” and “V” • All piping must be 2” in diameter to best fit standard bracket system • Pneumatic valves won’t open if you don’t have air • A 1/2” valve take about 35 lbs PSI to stroke the actuator • Wireless transmitters are DC wired • Redundant wiring is anything but redundant There’s more. Go ahead, test us. ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 6
  • 7. Partners In Translation. Emerson speaks the language of technical brilliance + Star speaks the language of all things Emerson on the event floor + International partner speaks the language of local perfection = ulimate customer experience ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 7
  • 8. Star Shines. JCPenney Analyst Event Four short weeks to execute 100,000 feet of raw space floating on the Hudson River 1600 attendees ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 8
  • 9. Star Shines. JCPenney Analyst Event [cont.] 13,000 square foot theater 16,000 square foot cocktail space 60 generators to supply heat and light 5 bathroom trailers ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 9
  • 10. Star Shines. JCPenney Analyst Event [cont.] Thousands of board feet of materials Thousands of gallons of white paint Over 14,000 hours of union labor Over 8,000 hours of Star labor ROI - 20 percent gain in stock prices ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 10
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Star Shines. “The space is beyond phenomenal. Seeing it come together blows one’s mind. Delivering something this amazing in such a short time is frankly miraculous! It’s rare to work with a team that truly blows you away..” Gregory Clark [ Senior VP of Creative - JCP ] ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 16
  • 17. Star Shines. Target National Sales Meeting Massive, double-sided pre-rigged walls 6’, 8’ and 10’ diameter back lit bullseyes Full exhibition of in-house brands 1800 seat theater ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 17
  • 18.
  • 19.
  • 20. Star Shines. “I love working with you guys, you always take it to the next level.” Target Corporation [ Senior Marketing Specialist ] ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 20
  • 21. Star Shines. Valspar Intermodal Europe - 2011 10m x 9 m, 100% German Built • A Solution maximizing the exhibit footprint with bold messaging and unique integration of technology for strategic competitive product comparison • Successfully positioned the brand as a global contender in their industry • Received praise from their direct competitor at the show on the exhibit design ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 21
  • 22.
  • 23. Star Shines. “The Valspar exhibit is our favorite at the show.” Intermodal Association Director ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 23
  • 24. Let’s Get This Pipeline Started. February March/April Thumbs up to Star - Toast Execute fabrication Assemble pipeline team Create logistical agenda for installation and dismatle Introduce Emerson to International partner Engage Emerson business units May Conduct needs analysis Execute installation Conduct hotel site visit Welcome guests Conduct project launch meeting to identify/reaffirm Drink • Key elements • Design refinements • Success criteria • Budget constraints • Detailed timeline Provide value engineering solutions Present final production estimates for approval ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 24
  • 25. Here’s The Bottom Line. Professional Services € 45,197.38 Fabrication and Graphic Production € 240,152.45 Logistical Services € 206,801.46 Preliminary Project Total € 492,151.29 Notable Considerations: Please see the addendum for a detailed break out of each area Estimated prices are preliminary based on limited knowledge and unconfirmed details regarding the design and business unit needs Prices are based on the currency rate on February 16th, 2012 and will fluctuate until June 30th, 2012. ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 25
  • 26. Thumbs up. Amy Feinberg Account Partner Direct: 763.569.9017 Cell: 612.408.1462 afeinberg@starexhibits.com STAR 6920 93rd Avenue North Minneapolis, Minnesota 55445 www.starexhibits.com ©20 1 2 STA R , IN C . T h e des i gn rep resen ted by t h i s drawi n g i s t h e p rop e r t y of S tar. N on e of t h is sh al l b e u se d w it h ou t w r it te n p e r m ission . 26
  • 27. 6920 93rd Avenue North | Minneapolis, MN 55445 Company: 763.561.4655 | Fax: 763.561.4655 www.starexhibits.com Estimate is for Budgetary Purposes Only Costs are based on Currency Rate on 2.16.12 Contact: Amy Feinberg: 763.569.9017 Client Name: Emerson Process Management Address: Patrijsweg 140 | 2289 EZ | Rijswijk | NL T Contact: Rob Van der Zwan Project Name: Global Users Exchange Job Number: 21258 Phone Number: 31704136690 Date: 2.16.12 Customer Code: 1900 Professional Services Quantity Price each Total Graphic Design 1 € 9,009.00 € 9,009.00 Project Management, R&D, Site Visit, Show attendance 1 € 25,884.38 € 25,884.38 Technical Drawings for Fabrications € 2,576.00 € 2,576.00 € 37,469.38 Fabrication and Graphics Quantity Price each Total Entrance 1 € 30,898.20 € 30,898.20 Production of fabric tunnel to create tube environment. Structureto have support elements to receive plasma screens, reflective graphics and lighting Main Floor Platform 1 € 18,400.00 € 18,400.00 10cm tall, flooring to be finished in white laminate with white aluminum plinth surrounding the edge Main Floor Furniture All to produce items in traditional plywood and finish with a white laminate for multiple usage See Detail Below Unit 1 4 € 1,725.00 € 6,900.00 Unit 2 8 € 2,659.38 € 21,275.04 Unit 3 Basic 6 € 4,216.66 € 25,299.96 Unit 3 Extended 3 € 11,057.25 € 33,171.75 Unit 4 3 € 766.66 € 2,299.98 Unit 5 6 € 1,533.33 € 9,199.98 BalconyType 1 8 € 1,725.00 € 13,800.00 Balcony Type 2 8 € 1,725.00 € 13,800.00 Vinyl Copy for Units 1,2,3, and 5 30 € 46.00 € 1,380.00 1 meter wide Vinyl Copy-Balcony Type 1 8 € 46.00 € 368.00 Acrylic Panels-Balcony Type 2 8 € 327.75 € 2,622.00 Balcony Signage on back wall 1 € 4,126.20 € 4,126.20 Tention Fabric, freestanding 3D Lettering for Stage Left and Right 1 € 1,587.00 € 1,587.00 Stage Scaffolding Sculpture 1 € 18,975.00 € 18,975.00 33, 7mm Galvanized pipes, key clamps Stage Back Drop 2 € 10,474.20 € 20,948.40 18,8mm Fabric banner Stage Flooring 1 € 2,645.00 € 2,645.00 White raised floor to be placed over existing floor Stage Apron Front 1 € 962.55 € 962.55 Front of the stage that is perpendicular to the group level deck will be covered and finished in white paint Stage Side Returns 2 € 2,530.00 € 5,060.00 Built to the left and right of the stage and painted white € 233,719.06
  • 28. Furniture -Rental for Stage, Main Floor and Lounge Quantity Price each Total Bar Stools 21 € 102.35 € 2,149.35 Alpha Desks 6 € 290.95 € 1,745.70 Hard Plastic desk with internal lighting Alpha Corner Desk 4 € 293.25 € 1,173.00 Hard plastic corner desks with internal lighting Umbria White Couch 4 € 145.48 € 581.92 Umbria Lounge Chairs 6 € 82.09 € 492.54 Maui Chairs 8 € 36.36 € 290.88 € 6,433.39 Property Management Quantity Price each Total Production Preparation 1 € 7,728.00 € 7,728.00 € 7,728.00 Logistical Services Quantity Price each Total Cleaning 1 € 7,930.00 € 7,930.00 Disposal of Consumables 1 € 971.00 € 971.00 Installation Labor, May 27th-28th 1 € 51,750.00 € 51,750.00 Dismantle Labor, May 31st 1 € 20,700.00 € 20,700.00 Equipment Rental 1 € 5,750.00 € 5,750.00 Shipping, Freight Management and temporary storage 1 € 34,500.00 € 34,500.00 Electrical 1 € 8,050.00 € 8,050.00 Lighting 1 € 34,092.00 € 34,092.00 Basic lighting for product presentation Par and pofil spot lights for stage programming for lights on stage Truss Par and pofil spots on truss Programming of lighting for overall room Labor for installation, dismantle, travel expenses Rigging for second stage fabric banner 1 € 2,607.00 € 2,607.00 Insurance Contribution 1 € 3,761.00 € 3,761.00 On Site Supervision (labor and expenses) 1 € 36,690.46 € 36,690.46 (7) Members of Execution Team Installation-Dismantle € 206,801.46 Project Total: € 492,151.29 Options Quantity Price each Total 18"/19" LCD Monitors 1 € 159.00 € 159.00 23"/25" LCD Monitors 1 € 212.00 € 212.00 32" LCD Monitors 1 € 230.00 € 230.00 50" Plasmas 1 € 714.00 € 714.00 Computer/Laptops 1 € 110.00 € 110.00 Wall Brackets 1 € 5.00 € 5.00 Delivery and Labor 1 € 8,050.00 € 8,050.00 Cost for Disposal of all materials 1 € 12,344.00 € 12,344.00 Storage for one year 1 € 5,750.00 € 5,750.00 Variance in fabrication for build and burn 1 € (11,500.00) € (11,500.00)