B/A = 33.15/32.15 = 1.03---- OK f*m = 15 + 4 = 19 kg/cm2
ex = 0.1 B = 0.1(33.15) = 3.315 m v* = 3kg/cm2
ey= 0.1 A = 0.1(32.15) = 3.215 m FC = 1.1 (sismo) y1.4 (vertical)
C = 0.16
Areade laLosa = 1,039.25 m2
SOLUCION:
CARGAS MUERTAS
CARGA VIVA
Wm Wa
AZOTEA 350 100 70
ENTREPISO 325 170 90
Wmuro = 264 kg/m2 *2.30 m =607.20 kg/ml
CARGA LATERAL = (390 + 70)(1039.25) + 3(428 + 90)(1039.25) + 4(607.20)(553.66)=
= 3,075.08 Ton
DENSIDADDE MUROS EN X =
244.42∗0.145
1039.25
= 3.41%
DENSIDADDE MUROS EN X =
224∗0.145
1039.25
= 3.13%
a) Cargas Laterales
Vx = Vy= Cs* WTL = 3,075.08 * 0.16 = 492 Ton
Vu= FC * V = 1.1 * 492 = 541.21 Ton
ANÁLISISPARA ELEJE X
MUROS X Li h/Li FAEi FAEi*Li Ati VRi
1 16.75 0.13731343 1 16.75 2.42875 25501.875
2 5.5 0.41818182 1 5.5 0.7975 8373.75
3 3.65 0.63013699 1 3.65 0.52925 5557.125
4 3.81 0.60367454 1 3.81 0.55245 5800.725
5 2.65 0.86792453 1 2.65 0.38425 4034.625
6 6.1 0.37704918 1 6.1 0.8845 9287.25
7 2.65 0.86792453 1 2.65 0.38425 4034.625
8 6.5 0.35384615 1 6.5 0.9425 9896.25
9 2.5 0.92 1 2.5 0.3625 3806.25
10 9.78 0.23517382 1 9.78 1.4181 14890.05
11 2.5 0.92 1 2.5 0.3625 3806.25
12 5.5 0.41818182 1 5.5 0.7975 8373.75
13 2.65 0.86792453 1 2.65 0.38425 4034.625
14 5.5 0.41818182 1 5.5 0.7975 8373.75
15 6.1 0.37704918 1 6.1 0.8845 9287.25
16 3.65 0.63013699 1 3.65 0.52925 5557.125
17 2.65 0.86792453 1 2.65 0.38425 4034.625
18 3.81 0.60367454 1 3.81 0.55245 5800.725
19 3.65 0.63013699 1 3.65 0.52925 5557.125
20 4.575 0.50273224 1 4.575 0.663375 6965.4375
21 2.58 0.89147287 1 2.58 0.3741 3928.05
22 2.58 0.89147287 1 2.58 0.3741 3928.05
23 16.575 0.1387632 1 16.575 2.403375 25235.4375
1 16.75 0.13731343 1 16.75 2.42875 25501.875
2 5.5 0.41818182 1 5.5 0.7975 8373.75
3 3.65 0.63013699 1 3.65 0.52925 5557.125
4 3.81 0.60367454 1 3.81 0.55245 5800.725
5 2.65 0.86792453 1 2.65 0.38425 4034.625
6 6.1 0.37704918 1 6.1 0.8845 9287.25
7 2.65 0.86792453 1 2.65 0.38425 4034.625
8 6.5 0.35384615 1 6.5 0.9425 9896.25
9 2.5 0.92 1 2.5 0.3625 3806.25
10 9.78 0.23517382 1 9.78 1.4181 14890.05
11 2.5 0.92 1 2.5 0.3625 3806.25
12 5.5 0.41818182 1 5.5 0.7975 8373.75
13 2.65 0.86792453 1 2.65 0.38425 4034.625
14 5.5 0.41818182 1 5.5 0.7975 8373.75
15 6.1 0.37704918 1 6.1 0.8845 9287.25
16 3.65 0.63013699 1 3.65 0.52925 5557.125
17 2.65 0.86792453 1 2.65 0.38425 4034.625
18 3.81 0.60367454 1 3.81 0.55245 5800.725
19 3.65 0.63013699 1 3.65 0.52925 5557.125
20 4.575 0.50273224 1 4.575 0.663375 6965.4375
21 2.58 0.89147287 1 2.58 0.3741 3928.05
22 2.58 0.89147287 1 2.58 0.3741 3928.05
23 16.575 0.1387632 1 16.575 2.403375 25235.4375
24 3.81 0.60367454 1 3.81 0.55245 5800.725
25 5.15 0.44660194 1 5.15 0.74675 7840.875
26 5.15 0.44660194 1 5.15 0.74675 7840.875
27 3.81 0.60367454 1 3.81 0.55245 5800.725
28 3.81 0.60367454 1 3.81 0.55245 5800.725
29 5.15 0.44660194 1 5.15 0.74675 7840.875
30 5.15 0.44660194 1 5.15 0.74675 7840.875
31 3.81 0.60367454 1 3.81 0.55245 5800.725
280.26 VRx = 426695.85 kg
426.69585 TON
ANÁLISISPARA ELEJE Y
MUROS X Li h/Li FAEi FAEi*Li Ati VRi
24 32.15 0.07153966 1 32.15 4.66175 48948.375
25 2.65 0.86792453 1 2.65 0.38425 4034.625
26 3.94 0.58375635 1 3.94 0.5713 5998.65
27 1.83 1.2568306 1 1.83 0.26535 2786.175
28 2.89 0.79584775 1 2.89 0.41905 4400.025
29 5.04 0.45634921 1 5.04 0.7308 7673.4
30 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
31 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
32 5.46 0.42124542 1 5.46 0.7917 8312.85
33 5.46 0.42124542 1 5.46 0.7917 8312.85
34 3.75 0.61333333 1 3.75 0.54375 5709.375
35 7.08 0.32485876 1 7.08 1.0266 10779.3
36 3.75 0.61333333 1 3.75 0.54375 5709.375
37 2.89 0.79584775 1 2.89 0.41905 4400.025
38 1.83 1.2568306 1 1.83 0.26535 2786.175
39 3.94 0.58375635 1 3.94 0.5713 5998.65
40 2.65 0.86792453 1 2.65 0.38425 4034.625
41 5.04 0.45634921 1 5.04 0.7308 7673.4
42 5.31 0.43314501 1 5.31 0.76995 8084.475
43 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
44 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
45 5.46 0.42124542 1 5.46 0.7917 8312.85
46 5 0.46 1 5 0.725 7612.5
24 32.15 0.07153966 1 32.15 4.66175 48948.375
25 2.65 0.86792453 1 2.65 0.38425 4034.625
26 3.94 0.58375635 1 3.94 0.5713 5998.65
27 1.83 1.2568306 1 1.83 0.26535 2786.175
28 2.89 0.79584775 1 2.89 0.41905 4400.025
29 5.04 0.45634921 1 5.04 0.7308 7673.4
30 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
31 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
32 5.46 0.42124542 1 5.46 0.7917 8312.85
33 5.46 0.42124542 1 5.46 0.7917 8312.85
34 3.75 0.61333333 1 3.75 0.54375 5709.375
35 7.08 0.32485876 1 7.08 1.0266 10779.3
36 3.75 0.61333333 1 3.75 0.54375 5709.375
37 2.89 0.79584775 1 2.89 0.41905 4400.025
38 1.83 1.2568306 1 1.83 0.26535 2786.175
39 3.94 0.58375635 1 3.94 0.5713 5998.65
40 2.65 0.86792453 1 2.65 0.38425 4034.625
41 5.04 0.45634921 1 5.04 0.7308 7673.4
42 5.31 0.43314501 1 5.31 0.76995 8084.475
43 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
44 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461
45 5.46 0.42124542 1 5.46 0.7917 8312.85
46 5 0.46 1 5 0.725 7612.5
47 6 0.38333333 1 6 0.87 9135
48 6 0.38333333 1 6 0.87 9135
49 5.31 0.43314501 1 5.31 0.76995 8084.475
50 5.31 0.43314501 1 5.31 0.76995 8084.475
51 5.31 0.43314501 1 5.31 0.76995 8084.475
52 5.31 0.43314501 1 5.31 0.76995 8084.475
53 4.04 0.56930693 1 4.04 0.5858 6150.9
54 4.04 0.56930693 1 4.04 0.5858 6150.9
55 4.04 0.56930693 1 4.04 0.5858 6150.9
56 4.04 0.56930693 1 4.04 0.5858 6150.9
273.4 VRy = 411284.297 Kg
411.284297 Ton
Por loque podemosobservarque laconfiguraciónactual del edificionosoportalos4 niveles,
estudiaremospara3 de ellos.
CARGA LATERAL = (390 + 70)(1039.25) + 2(428 + 90)(1039.25) + 3(607.20)(553.66)=
= 2,307.61 Ton
a) Cargas Laterales
Vx = Vy= Cs* WTL = 2,307.61 * 0.16 = 369.21 Ton
Vu= FC * V = 1.1 * 369.21 = 406.16 Ton
VRy = 411.28 Ton > Vu = 406.16 Ton -------- OK
VRx = 426.69 Ton > Vu = 406.16 Ton -------- OK

More Related Content

What's hot

Estadistica basica I
Estadistica basica IEstadistica basica I
Estadistica basica Igmayo
 
Ejemplos de formulas
Ejemplos de formulasEjemplos de formulas
Ejemplos de formulasDiana Ramirez
 
Besavne cevi din_2448
Besavne cevi din_2448Besavne cevi din_2448
Besavne cevi din_2448
mariomocic1989
 
Z distribution
Z distribution Z distribution
Z distribution
AdilMohsunov1
 
Inches to-millimeters-conversion-chart
Inches to-millimeters-conversion-chartInches to-millimeters-conversion-chart
Inches to-millimeters-conversion-chartHomeInt
 
BASIC STATISTIC
BASIC STATISTICBASIC STATISTIC
BASIC STATISTIC
RamshaWasim1
 
Correlación de reactores
Correlación de reactoresCorrelación de reactores
Correlación de reactoresIan Santillann
 
DSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion ChartDSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion Chart
Distributor Service Incorporated
 
R tabel
R tabelR tabel
R tabel
adurahul
 
Steam tables
Steam tablesSteam tables
Steam tables
Shiva Nasiri
 
función paramétrica x=sent,y=cost
función paramétrica x=sent,y=costfunción paramétrica x=sent,y=cost
función paramétrica x=sent,y=costabelbaca
 
Power to voltage
Power to voltagePower to voltage
Power to voltage
Yatindra Trivedi
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
AmericanMillwright
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
AmericanMillwright
 
Notas Primera Parcial Quimica I 2009
Notas Primera Parcial   Quimica I 2009Notas Primera Parcial   Quimica I 2009
Notas Primera Parcial Quimica I 2009guest75b82c8c
 

What's hot (19)

Estadistica basica I
Estadistica basica IEstadistica basica I
Estadistica basica I
 
Ejemplos de formulas
Ejemplos de formulasEjemplos de formulas
Ejemplos de formulas
 
Besavne cevi din_2448
Besavne cevi din_2448Besavne cevi din_2448
Besavne cevi din_2448
 
Ejercicio 8
Ejercicio 8Ejercicio 8
Ejercicio 8
 
Z distribution
Z distribution Z distribution
Z distribution
 
GC-MC Report NAS DIV 2016
GC-MC Report NAS DIV 2016GC-MC Report NAS DIV 2016
GC-MC Report NAS DIV 2016
 
Futurevaluetables
FuturevaluetablesFuturevaluetables
Futurevaluetables
 
Inches to-millimeters-conversion-chart
Inches to-millimeters-conversion-chartInches to-millimeters-conversion-chart
Inches to-millimeters-conversion-chart
 
BASIC STATISTIC
BASIC STATISTICBASIC STATISTIC
BASIC STATISTIC
 
Correlación de reactores
Correlación de reactoresCorrelación de reactores
Correlación de reactores
 
DSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion ChartDSI Inches to Decimal - Millimeter Conversion Chart
DSI Inches to Decimal - Millimeter Conversion Chart
 
R tabel
R tabelR tabel
R tabel
 
Steam tables
Steam tablesSteam tables
Steam tables
 
función paramétrica x=sent,y=cost
función paramétrica x=sent,y=costfunción paramétrica x=sent,y=cost
función paramétrica x=sent,y=cost
 
Power to voltage
Power to voltagePower to voltage
Power to voltage
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
Tabla 2 18
Tabla 2 18Tabla 2 18
Tabla 2 18
 
Notas Primera Parcial Quimica I 2009
Notas Primera Parcial   Quimica I 2009Notas Primera Parcial   Quimica I 2009
Notas Primera Parcial Quimica I 2009
 

Similar to Ejercicio metodo simplificado de edificio de 4 niveles

Tablas de ing_econ._1
Tablas de ing_econ._1Tablas de ing_econ._1
Tablas de ing_econ._1
Lilia Estrada
 
8 fv&pv tables
8 fv&pv tables8 fv&pv tables
8 fv&pv tables
Ahmed Elgazzar
 
Futurevaluetables
FuturevaluetablesFuturevaluetables
Futurevaluetables
deepuz05
 
Present Value and Future Value Tables
Present Value and Future Value TablesPresent Value and Future Value Tables
Present Value and Future Value Tables
AdilMohsunov1
 
Decimal chart bad
Decimal chart badDecimal chart bad
Decimal chart bad
Edy San
 
Tabla chi cuadrado
Tabla chi cuadradoTabla chi cuadrado
Tabla chi cuadrado
MARIA GRANADOS
 
Tabla chi cuadrado, ESTADISTICA UPLA
Tabla chi cuadrado, ESTADISTICA UPLATabla chi cuadrado, ESTADISTICA UPLA
Tabla chi cuadrado, ESTADISTICA UPLA
Ronald Mayhuasca Salgado
 
Tabla chi cuadrado
Tabla chi cuadradoTabla chi cuadrado
Tabla chi cuadrado
Univ Peruana Los Andes
 
Tabla de chi-cuadrado
Tabla de chi-cuadradoTabla de chi-cuadrado
Tabla de chi-cuadrado
Fer´ 2012
 
Tabla chi cuadrado.
Tabla chi cuadrado.Tabla chi cuadrado.
Tabla chi cuadrado.
pablo_0502
 
Tabla Chi cuadrado PSPP
Tabla Chi cuadrado PSPPTabla Chi cuadrado PSPP
Tabla Chi cuadrado PSPP
Mauricio Medina
 
Share
ShareShare
Funcion solver
Funcion solverFuncion solver
Interest tables (Bảng tra tỷ lệ tính lãi suất)
Interest tables (Bảng tra tỷ lệ tính lãi suất)Interest tables (Bảng tra tỷ lệ tính lãi suất)
Interest tables (Bảng tra tỷ lệ tính lãi suất)
Le Nguyen Truong Giang
 
Tablas de interes compuesto
Tablas de interes compuestoTablas de interes compuesto
Tablas de interes compuesto
SAED7075419
 

Similar to Ejercicio metodo simplificado de edificio de 4 niveles (20)

F.table
F.tableF.table
F.table
 
Tablas de ing_econ._1
Tablas de ing_econ._1Tablas de ing_econ._1
Tablas de ing_econ._1
 
8 fv&pv tables
8 fv&pv tables8 fv&pv tables
8 fv&pv tables
 
Futurevaluetables
FuturevaluetablesFuturevaluetables
Futurevaluetables
 
Present Value and Future Value Tables
Present Value and Future Value TablesPresent Value and Future Value Tables
Present Value and Future Value Tables
 
Distribucion ji cuadrado
Distribucion ji cuadradoDistribucion ji cuadrado
Distribucion ji cuadrado
 
Sanhuu udirdlaga
Sanhuu udirdlagaSanhuu udirdlaga
Sanhuu udirdlaga
 
Handbook example
Handbook exampleHandbook example
Handbook example
 
Decimal chart bad
Decimal chart badDecimal chart bad
Decimal chart bad
 
Tabla chi cuadrado
Tabla chi cuadradoTabla chi cuadrado
Tabla chi cuadrado
 
Tabla chi cuadrado, ESTADISTICA UPLA
Tabla chi cuadrado, ESTADISTICA UPLATabla chi cuadrado, ESTADISTICA UPLA
Tabla chi cuadrado, ESTADISTICA UPLA
 
Tabla chi cuadrado
Tabla chi cuadradoTabla chi cuadrado
Tabla chi cuadrado
 
7tablachicuadrado
7tablachicuadrado7tablachicuadrado
7tablachicuadrado
 
Tabla de chi-cuadrado
Tabla de chi-cuadradoTabla de chi-cuadrado
Tabla de chi-cuadrado
 
Tabla chi cuadrado.
Tabla chi cuadrado.Tabla chi cuadrado.
Tabla chi cuadrado.
 
Tabla Chi cuadrado PSPP
Tabla Chi cuadrado PSPPTabla Chi cuadrado PSPP
Tabla Chi cuadrado PSPP
 
Share
ShareShare
Share
 
Funcion solver
Funcion solverFuncion solver
Funcion solver
 
Interest tables (Bảng tra tỷ lệ tính lãi suất)
Interest tables (Bảng tra tỷ lệ tính lãi suất)Interest tables (Bảng tra tỷ lệ tính lãi suất)
Interest tables (Bảng tra tỷ lệ tính lãi suất)
 
Tablas de interes compuesto
Tablas de interes compuestoTablas de interes compuesto
Tablas de interes compuesto
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

Ejercicio metodo simplificado de edificio de 4 niveles

  • 1. EJERCICIO METODO SIMPLIFICADO DE EDIFICIO DE 4 NIVELES B/A = 33.15/32.15 = 1.03---- OK f*m = 15 + 4 = 19 kg/cm2 ex = 0.1 B = 0.1(33.15) = 3.315 m v* = 3kg/cm2 ey= 0.1 A = 0.1(32.15) = 3.215 m FC = 1.1 (sismo) y1.4 (vertical) C = 0.16 Areade laLosa = 1,039.25 m2 SOLUCION: CARGAS MUERTAS CARGA VIVA Wm Wa AZOTEA 350 100 70 ENTREPISO 325 170 90 Wmuro = 264 kg/m2 *2.30 m =607.20 kg/ml
  • 2. CARGA LATERAL = (390 + 70)(1039.25) + 3(428 + 90)(1039.25) + 4(607.20)(553.66)= = 3,075.08 Ton DENSIDADDE MUROS EN X = 244.42∗0.145 1039.25 = 3.41% DENSIDADDE MUROS EN X = 224∗0.145 1039.25 = 3.13% a) Cargas Laterales Vx = Vy= Cs* WTL = 3,075.08 * 0.16 = 492 Ton Vu= FC * V = 1.1 * 492 = 541.21 Ton ANÁLISISPARA ELEJE X MUROS X Li h/Li FAEi FAEi*Li Ati VRi 1 16.75 0.13731343 1 16.75 2.42875 25501.875 2 5.5 0.41818182 1 5.5 0.7975 8373.75 3 3.65 0.63013699 1 3.65 0.52925 5557.125 4 3.81 0.60367454 1 3.81 0.55245 5800.725 5 2.65 0.86792453 1 2.65 0.38425 4034.625 6 6.1 0.37704918 1 6.1 0.8845 9287.25 7 2.65 0.86792453 1 2.65 0.38425 4034.625 8 6.5 0.35384615 1 6.5 0.9425 9896.25 9 2.5 0.92 1 2.5 0.3625 3806.25 10 9.78 0.23517382 1 9.78 1.4181 14890.05 11 2.5 0.92 1 2.5 0.3625 3806.25 12 5.5 0.41818182 1 5.5 0.7975 8373.75 13 2.65 0.86792453 1 2.65 0.38425 4034.625 14 5.5 0.41818182 1 5.5 0.7975 8373.75 15 6.1 0.37704918 1 6.1 0.8845 9287.25 16 3.65 0.63013699 1 3.65 0.52925 5557.125 17 2.65 0.86792453 1 2.65 0.38425 4034.625 18 3.81 0.60367454 1 3.81 0.55245 5800.725 19 3.65 0.63013699 1 3.65 0.52925 5557.125 20 4.575 0.50273224 1 4.575 0.663375 6965.4375 21 2.58 0.89147287 1 2.58 0.3741 3928.05 22 2.58 0.89147287 1 2.58 0.3741 3928.05 23 16.575 0.1387632 1 16.575 2.403375 25235.4375 1 16.75 0.13731343 1 16.75 2.42875 25501.875 2 5.5 0.41818182 1 5.5 0.7975 8373.75 3 3.65 0.63013699 1 3.65 0.52925 5557.125 4 3.81 0.60367454 1 3.81 0.55245 5800.725
  • 3. 5 2.65 0.86792453 1 2.65 0.38425 4034.625 6 6.1 0.37704918 1 6.1 0.8845 9287.25 7 2.65 0.86792453 1 2.65 0.38425 4034.625 8 6.5 0.35384615 1 6.5 0.9425 9896.25 9 2.5 0.92 1 2.5 0.3625 3806.25 10 9.78 0.23517382 1 9.78 1.4181 14890.05 11 2.5 0.92 1 2.5 0.3625 3806.25 12 5.5 0.41818182 1 5.5 0.7975 8373.75 13 2.65 0.86792453 1 2.65 0.38425 4034.625 14 5.5 0.41818182 1 5.5 0.7975 8373.75 15 6.1 0.37704918 1 6.1 0.8845 9287.25 16 3.65 0.63013699 1 3.65 0.52925 5557.125 17 2.65 0.86792453 1 2.65 0.38425 4034.625 18 3.81 0.60367454 1 3.81 0.55245 5800.725 19 3.65 0.63013699 1 3.65 0.52925 5557.125 20 4.575 0.50273224 1 4.575 0.663375 6965.4375 21 2.58 0.89147287 1 2.58 0.3741 3928.05 22 2.58 0.89147287 1 2.58 0.3741 3928.05 23 16.575 0.1387632 1 16.575 2.403375 25235.4375 24 3.81 0.60367454 1 3.81 0.55245 5800.725 25 5.15 0.44660194 1 5.15 0.74675 7840.875 26 5.15 0.44660194 1 5.15 0.74675 7840.875 27 3.81 0.60367454 1 3.81 0.55245 5800.725 28 3.81 0.60367454 1 3.81 0.55245 5800.725 29 5.15 0.44660194 1 5.15 0.74675 7840.875 30 5.15 0.44660194 1 5.15 0.74675 7840.875 31 3.81 0.60367454 1 3.81 0.55245 5800.725 280.26 VRx = 426695.85 kg 426.69585 TON
  • 4. ANÁLISISPARA ELEJE Y MUROS X Li h/Li FAEi FAEi*Li Ati VRi 24 32.15 0.07153966 1 32.15 4.66175 48948.375 25 2.65 0.86792453 1 2.65 0.38425 4034.625 26 3.94 0.58375635 1 3.94 0.5713 5998.65 27 1.83 1.2568306 1 1.83 0.26535 2786.175 28 2.89 0.79584775 1 2.89 0.41905 4400.025 29 5.04 0.45634921 1 5.04 0.7308 7673.4 30 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 31 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 32 5.46 0.42124542 1 5.46 0.7917 8312.85 33 5.46 0.42124542 1 5.46 0.7917 8312.85 34 3.75 0.61333333 1 3.75 0.54375 5709.375 35 7.08 0.32485876 1 7.08 1.0266 10779.3 36 3.75 0.61333333 1 3.75 0.54375 5709.375 37 2.89 0.79584775 1 2.89 0.41905 4400.025 38 1.83 1.2568306 1 1.83 0.26535 2786.175 39 3.94 0.58375635 1 3.94 0.5713 5998.65 40 2.65 0.86792453 1 2.65 0.38425 4034.625 41 5.04 0.45634921 1 5.04 0.7308 7673.4 42 5.31 0.43314501 1 5.31 0.76995 8084.475 43 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 44 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 45 5.46 0.42124542 1 5.46 0.7917 8312.85 46 5 0.46 1 5 0.725 7612.5 24 32.15 0.07153966 1 32.15 4.66175 48948.375 25 2.65 0.86792453 1 2.65 0.38425 4034.625 26 3.94 0.58375635 1 3.94 0.5713 5998.65 27 1.83 1.2568306 1 1.83 0.26535 2786.175 28 2.89 0.79584775 1 2.89 0.41905 4400.025 29 5.04 0.45634921 1 5.04 0.7308 7673.4 30 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 31 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 32 5.46 0.42124542 1 5.46 0.7917 8312.85 33 5.46 0.42124542 1 5.46 0.7917 8312.85 34 3.75 0.61333333 1 3.75 0.54375 5709.375 35 7.08 0.32485876 1 7.08 1.0266 10779.3 36 3.75 0.61333333 1 3.75 0.54375 5709.375 37 2.89 0.79584775 1 2.89 0.41905 4400.025 38 1.83 1.2568306 1 1.83 0.26535 2786.175 39 3.94 0.58375635 1 3.94 0.5713 5998.65
  • 5. 40 2.65 0.86792453 1 2.65 0.38425 4034.625 41 5.04 0.45634921 1 5.04 0.7308 7673.4 42 5.31 0.43314501 1 5.31 0.76995 8084.475 43 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 44 1.47 1.56462585 0.72257391 1.06218365 0.15401663 1617.17461 45 5.46 0.42124542 1 5.46 0.7917 8312.85 46 5 0.46 1 5 0.725 7612.5 47 6 0.38333333 1 6 0.87 9135 48 6 0.38333333 1 6 0.87 9135 49 5.31 0.43314501 1 5.31 0.76995 8084.475 50 5.31 0.43314501 1 5.31 0.76995 8084.475 51 5.31 0.43314501 1 5.31 0.76995 8084.475 52 5.31 0.43314501 1 5.31 0.76995 8084.475 53 4.04 0.56930693 1 4.04 0.5858 6150.9 54 4.04 0.56930693 1 4.04 0.5858 6150.9 55 4.04 0.56930693 1 4.04 0.5858 6150.9 56 4.04 0.56930693 1 4.04 0.5858 6150.9 273.4 VRy = 411284.297 Kg 411.284297 Ton Por loque podemosobservarque laconfiguraciónactual del edificionosoportalos4 niveles, estudiaremospara3 de ellos. CARGA LATERAL = (390 + 70)(1039.25) + 2(428 + 90)(1039.25) + 3(607.20)(553.66)= = 2,307.61 Ton a) Cargas Laterales Vx = Vy= Cs* WTL = 2,307.61 * 0.16 = 369.21 Ton Vu= FC * V = 1.1 * 369.21 = 406.16 Ton VRy = 411.28 Ton > Vu = 406.16 Ton -------- OK VRx = 426.69 Ton > Vu = 406.16 Ton -------- OK