SlideShare a Scribd company logo
Edo Irikefe Abraham
BIO DATA
Date of Birth: 8th
September, 1980
Marital Status: Married
Sex: Male
State of Origin: Delta State
Local Govt. Area: Ethiope East L.G.A
Nationality: Nigerian
Religion: Christian
Contact Address: 5 Bakpa street, off Waico road, behind De lords Motel, Effurun,
Delta State.
E-mail Address: abedo4real2000@yahoo.com, abedo4real2000@gmail.com
Telephone No: (+234)805 3195663, (+234)803 4736517
Skype ID: abedo4real2000@yahoo.com
PROFESSIONAL QUALIFICATION
 German Institute of Welding (GSI-SLV) Ankara, Turkey
Diploma in Int’l Welding Inspection- Comprehensive - 2011
Diploma No: D-SLV-80636-1178-110702-1108180-IIW
 DVS-IIW/EWF International Welding Inspector( Personnel Comprehensive )–
2011
Diploma No: D-S-80636-1178-110702-110702-1108180
 Competency Training in Overhauling of Pumps, Valves and Compressors
MECH.ENGR.DEPT.PTI – 2007
 ASNT-NDT CERTIFICATES IN :
RADIOGRAPHIC FILM INTERPRETATION
MAGNETIC PARTICLE INSPECTION
ULTRASONIC TESTING
ADDITIONAL QUALIFICATION
 IIW/NIW Certificate on Welding Producibility Analysis.
Cert No: NIW/CPD/038 – 2009
 Certificate in Quality Management in Fabrication and Construction Engineering
Cert No. NIW/CPD/0212 – 2011
 NBTE/INTERLINK SERVICES, UK- LEVEL 3-A1 QUALITY ASSURANCE
ASSESSOR (QAA) TRAINING (WELDING AND FABRICATION )A1 IN NATIONAL
VOCATIONAL QUALIFICATION FRAMEWORK(NVQ) FEB.-MARCH 2014
 CLASSIFICATION OF NATIONAL OCCUPATIONAL STANDARDS IN WELDING
(AUG.-SEPT.2015)
Edo Irikefe Abraham
 NBTE/INTERLINK SERVICES, UK- INTERNAL QUALITY MANAGERS TRAINING
(IV) 15TH
-25TH
Nov.2015
 FUTMinna Welding Training Centre; Certificate of Attendance for Fire and
Safety Induction Course ( 30th
Nov.2015- April 19th
2016)
EDUCATION DATA
FED.UNIV.OF PETR.RES. (FUPRE)- (2016/2017 POST HND DIRECT ENTRY) IN
MECHANICAL ENGR.
 Advance NABTEB In Mechanical Engineering Craft Practice, NOV./DEC. 2015
 Post Graduate Diploma (PGD) in Mechanical Engineering, Anambra State
University Uli. Anambra State. (Awaiting Result) MARCH 2013- NOV.2015
 Masters (MSC) in Energy and Petroleum Economics, Delta State University,
Abraka 2010- 2012
 Post Graduate Diploma (PGD) in Petroleum Economics, Delta State University,
Abraka (Pass) 2009 – 2010
 NYSC Letter of Exclusion (2007)
 NYSC Discharge (March 2010 – Feb. 2011)
 Higher National Diploma (HND) in Welding and offshore Engineering
Technology Petroleum Training Institute, Effurun, Delta State. (lower credit) -
2006
 National Diploma (ND) in Welding and Fabrication EngineeringTechnology,
Petroleum Training Institute, Effurun, Delta State. (Lower Credit) - 2003
 Senior School Leaving Certificate (WAEC). Nana College, Warri. - 1998
WORKING EXPERIENCE
ESTABLISHMENT: NIGERIAN INSTITUTE OF WELDING
- POSITION: Welding Inspector (QA/QC)/Technical Officer 2
RESPONSIBILITY: - Training Supervision of welding personnel for certification
- Conducting welders qualification test and report Preparation
- Monitoring of welding parameters and process
- Prepare and follow-up RFI for clients verification and response.
- Preparation of welding and fabrication report as necessary in line
with specification
- Calibration of test equipments
- Review of NDE reports
- reading and interpreting drawings and blue prints during specific
welding fabrication including cutting material to size and setting
Edo Irikefe Abraham
up joints process: Submerged arc SAW, SMAW, GMAW, FCAW
and Oxy-fuel cutting
- Witnessing of WPS and WPQ
- QA/QC Supervisor
- Welders certification and Inspection under the SGC,PTDF NDDC
shell/ NCD training and certification programme.
- Inspection of fabrication yards/sites of companies to ascertain
their compliance with NIW/IIW/SON standards for onward
accreditation according to the relevant standards
- Review of conference paper and presentations
- Public relations/correspondence of the institute with other
professional bodies/agencies
- In charge of membership both institutional student and
individual
- In charge of conducting Resource and Accreditation Inspection
of schools offering Welding and Fabrication Engineering in
Nigeria with NBTE Kaduna, August 2008 till date.
- Conduction of Certification/Welders Qualification test at SHI-
MCI FZE ( JULY 2017)
DURATION: Dec. 2006 till Date
ESTABLISHMENT: IZISCO INSTITUTE OF MARINE STUDIES AND TECHNOLOGY
POSITION: Consultant/Member of Governing Board
RESPONSIBILITY: - setting up of the welding school and polytechnic
- Liaising with client and contractors
- Interpretation of drawing and blue prints
- Control and monitoring of materials distribution
DURATION Feb 2009 – Till date
ESTABLISHMENT: SNEPCO-SAIPEM NIG LTD AND SAIPEM UNIV.
CORTMAGGIORRE, ITALY (ITALY AND NIGERIA) SECONDED
BY NIGERIAN INSTITUTE OF WELDING
POSITION: Welding inspector (third Party)
RESPONSIBILITY: - witnessing of WPS, PQR and WPQ
- Review of NDE reports
- Monitoring of calibration process
- Control and monitoring of material distribution under the Bonga
project
- Verification of weld parameters, preheat and inter pass temperatures,
weld repair and weld repair rate register
- Quality monitoring/witnessing of fabrication and welding of piping (CRA,
DSS, SS, CS), mezzanine and cellar decks, Riser, Riser guard and
clamps, subsea, water injector, production line and topside spools as per
approved and applicable specification, codes including API 1104-
Edo Irikefe Abraham
Performing visual inspection of edge preparations, fit-up, welds, electrode
handling and storage
- Conducting surveillance assessment & verification, materials storage and
preservation
- -Quality monitoring/witnessing of destructive/mechanical testing (tensile,
bend, nick break, impact, hardness tests etc), PWHT, hardness test,
blasting, weather and environmental check/verification.
DURATION March 2012 – May. 2013
ESTABLISHMENT: ADVANCE INSPECTION AND TESTING
POSITION: Welding inspector
RESPONSIBILITY: - witnessing of WPS, PQR and WPQ
- Review of NDE reports
DURATION Oct 2011 – Dec. 2011
ESTABLISHMENT: IZISCO-OBOS NIG.LTD
POSSITION: MACHINING SUPERVISOR/MATERIALS INSPECTOR
RESPONSIBILITY: -Supervision of fitters and machinery process for barges and tug
boats fabrication
-testing, training and retraining of machinists, fitters and welders
according to International standards and codes
-ensures that all machined parts are to customers specification and
company standard
-ensure that all materials/metals/parts been supplied are inspected
and are up to clients job specification
- ensure that material store and consumables are regularly stocked
and updated
-ensure proper use of tools, machines and PPEs thus ensuring
smooth workings at all times
-ensures proper documentation both quality and technical in
accordance to company QMS
-Ensure that jobs are completed according to company’s standard
and in clients desired and expected time
DURATION: JAN.2013-APRIL 2014
ESTABLISHMENT: DELTEC ENGR.LTD. WARRI
POSITION: QA/QC WELDING / MATERIALS INSPECTOR
RESPONSIBILITY: -Supervision of the welding, fabrication and construction of a tank
farm by SYKES ENERGI PROJEKTS LTD. For FYN-FIELD PET. FZE
Plot C26-C27, Calabar free trade zone, Cross Rivers State.
- Conduction of welders qualification test
- Drawings interpretation
Edo Irikefe Abraham
- NDT witnessing, etc
-
DURATION: May 2014- till date
ESTABLISHMENT: KENERO NIG. LTD. WARRI
POSITION: Store Keeper/ safety officer ( 1 Year)
RESPONSIBILITY: - Recommendation and issuing of welding accessories
- Day to day record keeping of welding activities
- Minor welding maintenance works
- Take records of materials and consumables
- Ensuring that all safety rules are adhere to
DURATION: Aug 2003- Sept 2004
ESTABLISHMENT: KENERO NIG. LTD. WARRI.
POSITION: Industrial Trainee (3 months)
RESPONSIBILITY: - Minor welding/fabrication works
- Basic structural fittings
- Tacking of welded joints
- Specimen preparation
DURATION Sept – Nov. 2002 (Industrial Training)
MEMBERSHIP OF PROFESSIONAL BODIES:
 Nigerian Institute of Welding (NIW)
 National Association of Petroleum Explorationist (NAPE PTI, Associate
Member)
 American Society for Non-Destructive Testing (Membership No.243556)
 Institute of Non-Destructive Testing, Nigeria
PUBLICATIONS
 Optimization of Palm Kernel cracking machine (ND project 2003)
 The Effect of failure of a Petroleum Production facility (HND Project 2006)
 Importance of welding Engineering and Education ( Paper presentation at the
Inauguration of NIW Student chapters in PTI and Delta State Polytechnic, Ogwashi-Uku
2010)
 Graduate Unemployment, an assessment of the role of the National Directorate of
Employment (NDE) as an agency for Employment creation (PGD Project June 2010)
Edo Irikefe Abraham
 The Socio-Economic impact of the Nigerian Oil Industry, A case study of the Shell Pet.
Dev. Company (SPDC) Nig.Ltd. in Ughelli South local government area of Delta State. (
Masters Project)
 The Effect of strength and thickness on Solidification stress cracking of mild steel
welds (PGD MECH.PROD. PROJECT, FEB.2015)
Hobbies:
Traveling, Reading, Trekking, Playing of Chess, monopoly and Scrabble
REFEREES:
Engr. Okiy Stanley (Lecturer)
Department of Welding and Offshore Technology,
Petroleum Training Institute,
P. M. B. 20 Effurun, Delta State.
0803 5755673, 0802 7136467
Mr. Nyore Akpobi
Office of the Vice Chancellor
Delta State University
Abraka, Delta State
08033775214, 08054665901
Mr. Clement Eribo
Technical Director
Advanced Inspection and Testing
145 Abuloma Road
Port Harcourt. Rivers State
08033418041
Edo Irikefe Abraham
 The Socio-Economic impact of the Nigerian Oil Industry, A case study of the Shell Pet.
Dev. Company (SPDC) Nig.Ltd. in Ughelli South local government area of Delta State. (
Masters Project)
 The Effect of strength and thickness on Solidification stress cracking of mild steel
welds (PGD MECH.PROD. PROJECT, FEB.2015)
Hobbies:
Traveling, Reading, Trekking, Playing of Chess, monopoly and Scrabble
REFEREES:
Engr. Okiy Stanley (Lecturer)
Department of Welding and Offshore Technology,
Petroleum Training Institute,
P. M. B. 20 Effurun, Delta State.
0803 5755673, 0802 7136467
Mr. Nyore Akpobi
Office of the Vice Chancellor
Delta State University
Abraka, Delta State
08033775214, 08054665901
Mr. Clement Eribo
Technical Director
Advanced Inspection and Testing
145 Abuloma Road
Port Harcourt. Rivers State
08033418041

More Related Content

What's hot

Hidayat- Welder and Formen CV
Hidayat- Welder and Formen CVHidayat- Welder and Formen CV
Hidayat- Welder and Formen CV
Hidayatullah Ansari
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
petroEDGE
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
jaison varkey
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
Srini vasan
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
Sivakumar krishnamurthi
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
Muhammad Aamir Shahzad
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1
Samuel Ekom
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
karuppa samy
 
Resume welder
Resume welderResume welder
Resume welder
ericson austria
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
Aries N. Aguila new resume
Aries N. Aguila new resumeAries N. Aguila new resume
Aries N. Aguila new resume
Aries Aguila
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
zafar210113
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
Ak Tiwari
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
jameen rahman
 
CV
CVCV
Brian_Resume_revise 3
Brian_Resume_revise 3Brian_Resume_revise 3
Brian_Resume_revise 3
brian fahrenthold
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15
Mazen Charrouf
 
RESUME- TOLEDO-VIVEK-QAQC ENGINEER
RESUME- TOLEDO-VIVEK-QAQC ENGINEERRESUME- TOLEDO-VIVEK-QAQC ENGINEER
RESUME- TOLEDO-VIVEK-QAQC ENGINEER
Vivek V Pillai
 
02Resume updated
02Resume updated02Resume updated
02Resume updated
Jonathan Thode
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
Babbu Jakir Hussain
 

What's hot (20)

Hidayat- Welder and Formen CV
Hidayat- Welder and Formen CVHidayat- Welder and Formen CV
Hidayat- Welder and Formen CV
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Resume welder
Resume welderResume welder
Resume welder
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Aries N. Aguila new resume
Aries N. Aguila new resumeAries N. Aguila new resume
Aries N. Aguila new resume
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
CV
CVCV
CV
 
Brian_Resume_revise 3
Brian_Resume_revise 3Brian_Resume_revise 3
Brian_Resume_revise 3
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15
 
RESUME- TOLEDO-VIVEK-QAQC ENGINEER
RESUME- TOLEDO-VIVEK-QAQC ENGINEERRESUME- TOLEDO-VIVEK-QAQC ENGINEER
RESUME- TOLEDO-VIVEK-QAQC ENGINEER
 
02Resume updated
02Resume updated02Resume updated
02Resume updated
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 

Similar to Edo cv 2 word

HOSS. C.V.
HOSS.  C.V.HOSS.  C.V.
HOSS. C.V.
Hossam Khalil
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
Samuel Alabi
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
idris lawal
 
Mech. eng. I.Veljkovic
Mech. eng. I.VeljkovicMech. eng. I.Veljkovic
Mech. eng. I.Veljkovic
Ivan Veljkovic
 
TIMOTHY ADIKAH CV CV
TIMOTHY ADIKAH CV CVTIMOTHY ADIKAH CV CV
TIMOTHY ADIKAH CV CV
Timothy Adikah
 
Mohamed Saleh Arafat
Mohamed Saleh ArafatMohamed Saleh Arafat
Mohamed Saleh Arafat
Mohamed Saleh Abdallah Arafat
 
AYENI AKEEM cv
AYENI AKEEM cvAYENI AKEEM cv
AYENI AKEEM cv
Ayeni Akeem
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
Didi sudiprayitna
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
omijie ehinomen prince
 
AZMY CV 2016
AZMY CV 2016AZMY CV 2016
AZMY CV 2016
Azmy Ashoush
 
PATRICK BAYO-PHILIP CV
PATRICK BAYO-PHILIP CVPATRICK BAYO-PHILIP CV
PATRICK BAYO-PHILIP CV
BAYO-PHILIP PATRICK
 
ADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CVADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CV
Reuben Adewuyi
 
ADEWUYI REUBEN ADEBARE CV1
ADEWUYI REUBEN ADEBARE CV1ADEWUYI REUBEN ADEBARE CV1
ADEWUYI REUBEN ADEBARE CV1
Reuben Adewuyi
 
ADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CVADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CV
Reuben Adewuyi
 
MOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUMEMOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUME
mohd faiz abdullah
 
LINGAM
LINGAMLINGAM
CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)
Eng.Elia emad
 
K BHASKARA ELECTRICAL LEAD RESUME
K BHASKARA ELECTRICAL LEAD RESUMEK BHASKARA ELECTRICAL LEAD RESUME
K BHASKARA ELECTRICAL LEAD RESUME
Kanniyappan Bhaskara
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
Santosh Gurajada
 
DOC005
DOC005DOC005

Similar to Edo cv 2 word (20)

HOSS. C.V.
HOSS.  C.V.HOSS.  C.V.
HOSS. C.V.
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
 
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CVCertified Welding Inspector - LAWAL IDRIS DARAMOLA CV
Certified Welding Inspector - LAWAL IDRIS DARAMOLA CV
 
Mech. eng. I.Veljkovic
Mech. eng. I.VeljkovicMech. eng. I.Veljkovic
Mech. eng. I.Veljkovic
 
TIMOTHY ADIKAH CV CV
TIMOTHY ADIKAH CV CVTIMOTHY ADIKAH CV CV
TIMOTHY ADIKAH CV CV
 
Mohamed Saleh Arafat
Mohamed Saleh ArafatMohamed Saleh Arafat
Mohamed Saleh Arafat
 
AYENI AKEEM cv
AYENI AKEEM cvAYENI AKEEM cv
AYENI AKEEM cv
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
AZMY CV 2016
AZMY CV 2016AZMY CV 2016
AZMY CV 2016
 
PATRICK BAYO-PHILIP CV
PATRICK BAYO-PHILIP CVPATRICK BAYO-PHILIP CV
PATRICK BAYO-PHILIP CV
 
ADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CVADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CV
 
ADEWUYI REUBEN ADEBARE CV1
ADEWUYI REUBEN ADEBARE CV1ADEWUYI REUBEN ADEBARE CV1
ADEWUYI REUBEN ADEBARE CV1
 
ADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CVADEWUYI REUBEN ADEBARE CV
ADEWUYI REUBEN ADEBARE CV
 
MOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUMEMOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUME
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)CV - Emad Ghanm Elia (1)
CV - Emad Ghanm Elia (1)
 
K BHASKARA ELECTRICAL LEAD RESUME
K BHASKARA ELECTRICAL LEAD RESUMEK BHASKARA ELECTRICAL LEAD RESUME
K BHASKARA ELECTRICAL LEAD RESUME
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
DOC005
DOC005DOC005
DOC005
 

Recently uploaded

Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
shubhamsaraswat8740
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
VanTuDuong1
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 

Recently uploaded (20)

Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 

Edo cv 2 word

  • 1. Edo Irikefe Abraham BIO DATA Date of Birth: 8th September, 1980 Marital Status: Married Sex: Male State of Origin: Delta State Local Govt. Area: Ethiope East L.G.A Nationality: Nigerian Religion: Christian Contact Address: 5 Bakpa street, off Waico road, behind De lords Motel, Effurun, Delta State. E-mail Address: abedo4real2000@yahoo.com, abedo4real2000@gmail.com Telephone No: (+234)805 3195663, (+234)803 4736517 Skype ID: abedo4real2000@yahoo.com PROFESSIONAL QUALIFICATION  German Institute of Welding (GSI-SLV) Ankara, Turkey Diploma in Int’l Welding Inspection- Comprehensive - 2011 Diploma No: D-SLV-80636-1178-110702-1108180-IIW  DVS-IIW/EWF International Welding Inspector( Personnel Comprehensive )– 2011 Diploma No: D-S-80636-1178-110702-110702-1108180  Competency Training in Overhauling of Pumps, Valves and Compressors MECH.ENGR.DEPT.PTI – 2007  ASNT-NDT CERTIFICATES IN : RADIOGRAPHIC FILM INTERPRETATION MAGNETIC PARTICLE INSPECTION ULTRASONIC TESTING ADDITIONAL QUALIFICATION  IIW/NIW Certificate on Welding Producibility Analysis. Cert No: NIW/CPD/038 – 2009  Certificate in Quality Management in Fabrication and Construction Engineering Cert No. NIW/CPD/0212 – 2011  NBTE/INTERLINK SERVICES, UK- LEVEL 3-A1 QUALITY ASSURANCE ASSESSOR (QAA) TRAINING (WELDING AND FABRICATION )A1 IN NATIONAL VOCATIONAL QUALIFICATION FRAMEWORK(NVQ) FEB.-MARCH 2014  CLASSIFICATION OF NATIONAL OCCUPATIONAL STANDARDS IN WELDING (AUG.-SEPT.2015)
  • 2. Edo Irikefe Abraham  NBTE/INTERLINK SERVICES, UK- INTERNAL QUALITY MANAGERS TRAINING (IV) 15TH -25TH Nov.2015  FUTMinna Welding Training Centre; Certificate of Attendance for Fire and Safety Induction Course ( 30th Nov.2015- April 19th 2016) EDUCATION DATA FED.UNIV.OF PETR.RES. (FUPRE)- (2016/2017 POST HND DIRECT ENTRY) IN MECHANICAL ENGR.  Advance NABTEB In Mechanical Engineering Craft Practice, NOV./DEC. 2015  Post Graduate Diploma (PGD) in Mechanical Engineering, Anambra State University Uli. Anambra State. (Awaiting Result) MARCH 2013- NOV.2015  Masters (MSC) in Energy and Petroleum Economics, Delta State University, Abraka 2010- 2012  Post Graduate Diploma (PGD) in Petroleum Economics, Delta State University, Abraka (Pass) 2009 – 2010  NYSC Letter of Exclusion (2007)  NYSC Discharge (March 2010 – Feb. 2011)  Higher National Diploma (HND) in Welding and offshore Engineering Technology Petroleum Training Institute, Effurun, Delta State. (lower credit) - 2006  National Diploma (ND) in Welding and Fabrication EngineeringTechnology, Petroleum Training Institute, Effurun, Delta State. (Lower Credit) - 2003  Senior School Leaving Certificate (WAEC). Nana College, Warri. - 1998 WORKING EXPERIENCE ESTABLISHMENT: NIGERIAN INSTITUTE OF WELDING - POSITION: Welding Inspector (QA/QC)/Technical Officer 2 RESPONSIBILITY: - Training Supervision of welding personnel for certification - Conducting welders qualification test and report Preparation - Monitoring of welding parameters and process - Prepare and follow-up RFI for clients verification and response. - Preparation of welding and fabrication report as necessary in line with specification - Calibration of test equipments - Review of NDE reports - reading and interpreting drawings and blue prints during specific welding fabrication including cutting material to size and setting
  • 3. Edo Irikefe Abraham up joints process: Submerged arc SAW, SMAW, GMAW, FCAW and Oxy-fuel cutting - Witnessing of WPS and WPQ - QA/QC Supervisor - Welders certification and Inspection under the SGC,PTDF NDDC shell/ NCD training and certification programme. - Inspection of fabrication yards/sites of companies to ascertain their compliance with NIW/IIW/SON standards for onward accreditation according to the relevant standards - Review of conference paper and presentations - Public relations/correspondence of the institute with other professional bodies/agencies - In charge of membership both institutional student and individual - In charge of conducting Resource and Accreditation Inspection of schools offering Welding and Fabrication Engineering in Nigeria with NBTE Kaduna, August 2008 till date. - Conduction of Certification/Welders Qualification test at SHI- MCI FZE ( JULY 2017) DURATION: Dec. 2006 till Date ESTABLISHMENT: IZISCO INSTITUTE OF MARINE STUDIES AND TECHNOLOGY POSITION: Consultant/Member of Governing Board RESPONSIBILITY: - setting up of the welding school and polytechnic - Liaising with client and contractors - Interpretation of drawing and blue prints - Control and monitoring of materials distribution DURATION Feb 2009 – Till date ESTABLISHMENT: SNEPCO-SAIPEM NIG LTD AND SAIPEM UNIV. CORTMAGGIORRE, ITALY (ITALY AND NIGERIA) SECONDED BY NIGERIAN INSTITUTE OF WELDING POSITION: Welding inspector (third Party) RESPONSIBILITY: - witnessing of WPS, PQR and WPQ - Review of NDE reports - Monitoring of calibration process - Control and monitoring of material distribution under the Bonga project - Verification of weld parameters, preheat and inter pass temperatures, weld repair and weld repair rate register - Quality monitoring/witnessing of fabrication and welding of piping (CRA, DSS, SS, CS), mezzanine and cellar decks, Riser, Riser guard and clamps, subsea, water injector, production line and topside spools as per approved and applicable specification, codes including API 1104-
  • 4. Edo Irikefe Abraham Performing visual inspection of edge preparations, fit-up, welds, electrode handling and storage - Conducting surveillance assessment & verification, materials storage and preservation - -Quality monitoring/witnessing of destructive/mechanical testing (tensile, bend, nick break, impact, hardness tests etc), PWHT, hardness test, blasting, weather and environmental check/verification. DURATION March 2012 – May. 2013 ESTABLISHMENT: ADVANCE INSPECTION AND TESTING POSITION: Welding inspector RESPONSIBILITY: - witnessing of WPS, PQR and WPQ - Review of NDE reports DURATION Oct 2011 – Dec. 2011 ESTABLISHMENT: IZISCO-OBOS NIG.LTD POSSITION: MACHINING SUPERVISOR/MATERIALS INSPECTOR RESPONSIBILITY: -Supervision of fitters and machinery process for barges and tug boats fabrication -testing, training and retraining of machinists, fitters and welders according to International standards and codes -ensures that all machined parts are to customers specification and company standard -ensure that all materials/metals/parts been supplied are inspected and are up to clients job specification - ensure that material store and consumables are regularly stocked and updated -ensure proper use of tools, machines and PPEs thus ensuring smooth workings at all times -ensures proper documentation both quality and technical in accordance to company QMS -Ensure that jobs are completed according to company’s standard and in clients desired and expected time DURATION: JAN.2013-APRIL 2014 ESTABLISHMENT: DELTEC ENGR.LTD. WARRI POSITION: QA/QC WELDING / MATERIALS INSPECTOR RESPONSIBILITY: -Supervision of the welding, fabrication and construction of a tank farm by SYKES ENERGI PROJEKTS LTD. For FYN-FIELD PET. FZE Plot C26-C27, Calabar free trade zone, Cross Rivers State. - Conduction of welders qualification test - Drawings interpretation
  • 5. Edo Irikefe Abraham - NDT witnessing, etc - DURATION: May 2014- till date ESTABLISHMENT: KENERO NIG. LTD. WARRI POSITION: Store Keeper/ safety officer ( 1 Year) RESPONSIBILITY: - Recommendation and issuing of welding accessories - Day to day record keeping of welding activities - Minor welding maintenance works - Take records of materials and consumables - Ensuring that all safety rules are adhere to DURATION: Aug 2003- Sept 2004 ESTABLISHMENT: KENERO NIG. LTD. WARRI. POSITION: Industrial Trainee (3 months) RESPONSIBILITY: - Minor welding/fabrication works - Basic structural fittings - Tacking of welded joints - Specimen preparation DURATION Sept – Nov. 2002 (Industrial Training) MEMBERSHIP OF PROFESSIONAL BODIES:  Nigerian Institute of Welding (NIW)  National Association of Petroleum Explorationist (NAPE PTI, Associate Member)  American Society for Non-Destructive Testing (Membership No.243556)  Institute of Non-Destructive Testing, Nigeria PUBLICATIONS  Optimization of Palm Kernel cracking machine (ND project 2003)  The Effect of failure of a Petroleum Production facility (HND Project 2006)  Importance of welding Engineering and Education ( Paper presentation at the Inauguration of NIW Student chapters in PTI and Delta State Polytechnic, Ogwashi-Uku 2010)  Graduate Unemployment, an assessment of the role of the National Directorate of Employment (NDE) as an agency for Employment creation (PGD Project June 2010)
  • 6. Edo Irikefe Abraham  The Socio-Economic impact of the Nigerian Oil Industry, A case study of the Shell Pet. Dev. Company (SPDC) Nig.Ltd. in Ughelli South local government area of Delta State. ( Masters Project)  The Effect of strength and thickness on Solidification stress cracking of mild steel welds (PGD MECH.PROD. PROJECT, FEB.2015) Hobbies: Traveling, Reading, Trekking, Playing of Chess, monopoly and Scrabble REFEREES: Engr. Okiy Stanley (Lecturer) Department of Welding and Offshore Technology, Petroleum Training Institute, P. M. B. 20 Effurun, Delta State. 0803 5755673, 0802 7136467 Mr. Nyore Akpobi Office of the Vice Chancellor Delta State University Abraka, Delta State 08033775214, 08054665901 Mr. Clement Eribo Technical Director Advanced Inspection and Testing 145 Abuloma Road Port Harcourt. Rivers State 08033418041
  • 7. Edo Irikefe Abraham  The Socio-Economic impact of the Nigerian Oil Industry, A case study of the Shell Pet. Dev. Company (SPDC) Nig.Ltd. in Ughelli South local government area of Delta State. ( Masters Project)  The Effect of strength and thickness on Solidification stress cracking of mild steel welds (PGD MECH.PROD. PROJECT, FEB.2015) Hobbies: Traveling, Reading, Trekking, Playing of Chess, monopoly and Scrabble REFEREES: Engr. Okiy Stanley (Lecturer) Department of Welding and Offshore Technology, Petroleum Training Institute, P. M. B. 20 Effurun, Delta State. 0803 5755673, 0802 7136467 Mr. Nyore Akpobi Office of the Vice Chancellor Delta State University Abraka, Delta State 08033775214, 08054665901 Mr. Clement Eribo Technical Director Advanced Inspection and Testing 145 Abuloma Road Port Harcourt. Rivers State 08033418041