  Pre-­‐Production	
  (AAP601)	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
Pre-­‐Production	
  
Introduction	
  -­‐	
  Fredrik	
  
Industry	
  Plans	
  
The	
  CG	
  industry	
  is	
  vast	
  and	
  the	
  amount	
  of	
  different	
  industries	
  it	
  overlaps	
  grows	
  year	
  on	
  year	
  as	
  the	
  
technology	
  improves.	
  It	
  is	
  therefore	
  my	
  ambition	
  to	
  have	
  a	
  good	
  solid	
  base	
  knowledge	
  of	
  modelling,	
  
texturing,	
  rigging,	
  animating,	
  lighting	
  and	
  rendering	
  so	
  that	
  I	
  will	
  one	
  day	
  be	
  able	
  to	
  set	
  up	
  and	
  
manage	
  my	
  own	
  business	
  in	
  the	
  3D	
  Industry.	
  	
  
This	
  challenge	
  will	
  be	
  hard	
  to	
  accomplish	
  so	
  I’d	
  prefer	
  to	
  start	
  out	
  in	
  the	
  film	
  industry	
  where	
  3D	
  
artists	
  are	
  already	
  well	
  established	
  and	
  work	
  in	
  large	
  teams	
  to	
  accomplish	
  a	
  desired	
  goal.	
  Therefore,	
  
my	
  aim	
  in	
  this	
  final	
  year	
  would	
  be	
  to	
  replicate	
  what	
  the	
  film	
  industry	
  creates	
  in	
  a	
  shortened	
  version	
  
to	
  demonstrate	
  the	
  full	
  potential	
  of	
  what	
  my	
  partner	
  and	
  I	
  can	
  create.	
  
Managing	
  a	
  team	
  is	
  also	
  very	
  important	
  when	
  creating	
  your	
  own	
  business	
  so	
  I	
  will	
  continue	
  to	
  hone	
  
my	
  skills	
  in	
  this	
  area	
  by	
  working	
  with	
  a	
  partner	
  to	
  whom	
  I’ve	
  been	
  successful	
  in	
  working	
  with	
  in	
  the	
  
past.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  
Industry	
  Jobs	
  
In	
  this	
  section,	
  I	
  will	
  tackle	
  the	
  different	
  jobs	
  sectors	
  I	
  could	
  work	
  in	
  the	
  near	
  future.	
  These	
  include:	
  
1. Film	
  –	
  CG	
  Generalist	
  
2. Film	
  –	
  Modelling	
  
3. Advertising	
  –	
  CG	
  Generalist	
  
4. Advertising	
  –	
  Modelling	
  
5. Freelance	
  
6. Personal	
  Business	
  
	
  
In	
  each	
  job	
  offer,	
  I’ve	
  added	
  an	
  about	
  section	
  to	
  show	
  what	
  industries	
  these	
  companies	
  work	
  with	
  in	
  
their	
  own	
  words.	
  Text	
  highlighted	
  in	
  green	
  are	
  the	
  skills	
  I	
  already	
  possess,	
  text	
  highlighted	
  in	
  orange	
  
are	
  skills	
  I	
  will	
  be	
  improving	
  upon/exploring	
  in	
  my	
  final	
  project.	
  	
  
Example	
  Industry	
  Job:	
  CG	
  Generalist	
  in	
  Film,	
  TV,	
  Advertising,	
  Games	
  and	
  Venues	
  
CG Generalist Fuse FX
About
FuseFX provides visual effects services for film, television, and commercials, games,
and special venues
GENERALISTS PREFERRED REQUIREMENTS
Proficiency in 3ds Max and Vray Rendering System
Experience with particle systems such as PFlow and/or Thinking Particles
Smoke and fire experience with Afterburn and FumeFX
Simulation Experience with cloth, hair, RealFlow and Reactor
Node based compositing experience with Nuke, Fusion or Shake
3d tracking with Boujou or SynthEyes
SKILLS/RESPONSIBILITIES
3+ years experience in a production environment
Should effectively execute all necessary assigned tasks while under tight production schedule
deadlines
Strong creative and technical abilities
Excellent problem solving skills
Positive attitude
Work well in a team environment
In	
  this	
  job,	
  Fuse	
  FX	
  is	
  asking	
  for	
  a	
  CG	
  Generalist	
  working	
  in	
  a	
  variety	
  of	
  industries.	
  This	
  would	
  be	
  
very	
  helpful	
  for	
  me,	
  as	
  this	
  exposure	
  will	
  help	
  to	
  further	
  narrow	
  down	
  what	
  I’d	
  like	
  to	
  be	
  doing.	
  	
  
Depending	
  on	
  time	
  constraints,	
  using	
  Pflow	
  and	
  Thinking	
  Particles	
  to	
  create	
  the	
  ripple	
  effect	
  in	
  
the	
  water	
  as	
  well	
  as	
  maybe	
  leaves	
  or	
  particles	
  of	
  dust	
  blowing	
  in	
  the	
  wind	
  would	
  be	
  beneficial.	
  
 
	
  
Example	
  Industry	
  Job:	
  CG	
  Generalist	
  in	
  Advertising	
  
TANK - Senior CG Artist to join their expanding team in South East
London.
About
Though we are a small team, this only aids us in adding a personal approach to each and
every job that comes through our doors. Regularly working with award winning
photographers and advertising agencies allows us to grow not only as a company, but also as
individual artists. With no job too big or too small, we are always looking to take on new
projects and challenges. Whether you have a large on-going project or a smaller one-off
retouching job, we put the same creativity and attention to detail into all of our work.
Requirements
You will have an extensive knowledge of the CG pipeline and be comfortable with all aspects
of 3D from soft and hard surface modelling, UV mapping, texturing, lighting and rendering.
Projects will range from basic studio product renders to complete automotive campaigns and
everything else the imagination can create in between!
You will be integral to the creative team developing innovative concepts and producing high
quality renders. You will be the lead artist and will need to brief and manage other artists
working on the project. You need to be a great problem solver and always up for a challenge.
As a large percentage of our work is involved in the production of photo-realistic imagery, it
is important that you have work in your portfolio to demonstrate this. We have systems and
workflows in place but you will be able to build up your own pipeline and manage the
renderfarm so some IT experience would be beneficial.
Skills/Qualifications:
• Highly experienced in the production of CGI's and animation
• Software skills – Preferably 3DS Max, Maya or C4D, V-ray, Photoshop. After Effects
or Nuke a bonus.
• Confident handling jobs from start to finish
• A high level of attention to detail
• Ability to work under pressure and to tight deadlines
• Able to optimize scenes for productive rendering
• The ability to create new ideas both independently and within a team
• A constant desire to produce high quality work
• Excellent communication skills
• Self motivated with creativity and flare
	
  
As	
  this	
  job	
  is	
  focused	
  on	
  photo-­‐realistic	
  imagery	
  and	
  animation,	
  creating	
  a	
  short	
  film	
  for	
  my	
  
final	
  project	
  would	
  be	
  beneficial	
  as	
  the	
  quality	
  is	
  aimed	
  to	
  be	
  photorealistic	
  and	
  the	
  Dragonfly	
  
will	
  have	
  some	
  fairly	
  complex	
  animation	
  to	
  help	
  make	
  it	
  fly.	
  
In	
  addition,	
  as	
  this	
  job	
  is	
  in	
  a	
  company	
  with	
  a	
  small	
  team,	
  the	
  job	
  will	
  be	
  more	
  personal	
  and	
  it	
  
will	
  help	
  to	
  really	
  get	
  to	
  know	
  everyone	
  and	
  analyse	
  and	
  use	
  everyone’s	
  varying	
  skills	
  to	
  our	
  
advantage.	
  
 
	
  
	
  	
  
Example	
  Industry	
  Job:	
  CG	
  Generalist/Environment	
  Modeller	
  in	
  Advertising	
  and	
  
Video	
  Game	
  Trailers	
  	
  
Goldtooth Creative Recruiting CG Generalist/Environment Modeller
About
A boutique studio in the lush and beautiful Vancouver, Canada. Artists with feature film backgrounds,
specializing in bringing a cinematic quality to video game trailers, commercials, marketing media and
in-game story content. Each member of the team is a master of their craft, who bring stories to the
screen from concept to completion.
CG Generalist/Environment Modeller
About the Position
Possessing a broad knowledge base that covers the basics of modeling, texturing, animation, lighting
and rendering. Our CG Generalist/Environment Modeler is responsible for handling general 3D tasks
as required but will need to have a strong understanding of modeling. You will create 3D models with
texture, color, and lighting. It is essential you have a “can do” attitude and open-mindedness to non-
traditional solutions.
Responsibilities
· Able to model and sculpt hard-surface and organic 3D assets with or without concepts
· Participates in modeling, rigging, animation, texture, lighting and compositing needs of the project.
· Follows Goldtooth data storage/data naming and retrieval processes outlined in studio
· Makes sure that all work done is accounted for and entered into Shotgun daily
· Identifies problems with respect to timelines and delivery schedules and flags these to the senior
team
Requirements
· The CG Generalist/Environment Modeler should have 1-3 years of industry experience in games
and/or film
· A fundamental knowledge of modeling both organic and hard surface environments and props
· Demonstrating strong proficiency in usage of 3D and 2D software tools: Maya & Photoshop
· Knowledge of other software such as Nuke, Z-Brush and RealFlow
· Up-to-date knowledge of VFX tools, video game engines and emerging technologies
· Game Engine experience is an asset
· A strong creative eye and a problem-solving attitude
· Communicate with colleagues and work as part of a team
· Take direction and willingness to address comments and make changes
	
  
As	
  Goldtooth	
  creative	
  are	
  asking	
  for	
  a	
  CG	
  Generalist/Environment	
  Modeller	
  in	
  the	
  advertising	
  
industry,	
  this	
  job	
  will	
  be	
  helpful	
  to	
  me	
  because	
  small	
  projects	
  will	
  expose	
  me	
  to	
  a	
  variety	
  of	
  
different	
  tasks	
  without	
  doing	
  the	
  same	
  job	
  over	
  and	
  over	
  again.	
  Creating	
  a	
  short	
  film	
  in	
  my	
  final	
  
project	
  will	
  help	
  me	
  to	
  understand	
  the	
  challenges	
  that	
  lay	
  before	
  me.	
  
To	
  help	
  Goldtooth	
  make	
  me	
  a	
  more	
  desirable	
  candidate	
  for	
  the	
  job,	
  some	
  of	
  my	
  time	
  will	
  be	
  
spent	
  helping	
  Rhys	
  create	
  the	
  environment	
  for	
  this	
  project.	
  This	
  would	
  be	
  beneficial	
  to	
  the	
  
both	
  of	
  us	
  as	
  I’ll	
  be	
  learning	
  new	
  software	
  and	
  techniques	
  and	
  he’ll	
  be	
  saving	
  on	
  time	
  creating	
  
this	
  vast	
  landscape.	
  
 
	
  
Example	
  Industry	
  Job:	
  CG	
  Generalist	
  in	
  a	
  Major	
  Film	
  Company	
  
	
  
Double Negative Vancouver - Generalist TD
	
  
About	
  
	
  
Double	
  Negative	
  is	
  a	
  British	
  full-­‐service	
  visual	
  effects/computer	
  animation	
  company	
  located	
  
in,	
  London.	
  Multi-­‐award-­‐winning	
  Double	
  Negative	
  (Dneg)	
  is	
  one	
  of	
  the	
  world’s	
  leading	
  
providers	
  of	
  visual	
  effects	
  for	
  Film	
  with	
  facilities	
  in	
  London,	
  Singapore	
  and	
  Vancouver.	
  
	
  
Key	
  Purpose	
  of	
  the	
  Job:	
  
	
  
To	
  handle	
  any	
  general	
  3d	
  tasks	
  required.	
  We	
  would	
  expect	
  a	
  broad	
  knowledge	
  that	
  covers	
  
as	
  many	
  areas	
  of	
  3d	
  as	
  possible,	
  or	
  at	
  least	
  the	
  basics	
  (modelling,	
  texturing,	
  animation,	
  
lighting	
  and	
  rendering).	
  
	
  
Needs	
  to	
  Do:	
  
	
  
Cover	
  the	
  more	
  general	
  3d	
  tasks	
  such	
  as	
  modelling,	
  animation,	
  texturing,	
  lighting	
  and	
  
rendering.	
  At	
  times,	
  they	
  may	
  be	
  asked	
  to	
  learn	
  a	
  proprietary	
  system	
  or	
  a	
  new	
  piece	
  of	
  
software,	
  and	
  we	
  would	
  expect	
  them	
  to	
  be	
  flexible	
  enough	
  to	
  handle	
  this.	
  
	
  
Needs	
  to	
  Know:	
  
	
  
Thorough	
  knowledge	
  of	
  the	
  principles	
  of	
  3D	
  (animation,	
  FX,	
  modelling,	
  texturing,	
  lighting,	
  
scripting,	
  shading,	
  rendering,	
  rigging).	
  We	
  appreciate	
  that	
  the	
  candidate	
  may	
  have	
  varying	
  
levels	
  of	
  knowledge	
  in	
  these	
  fields.	
  
Full	
  working	
  knowledge	
  of	
  Maya	
  and/or	
  Houdini.	
  
You	
  would	
  need	
  to	
  be	
  comfortable	
  with	
  the	
  more	
  technical	
  aspects	
  of	
  CG	
  work,	
  and	
  have	
  a	
  
good	
  sense	
  of	
  the	
  artistic	
  side	
  as	
  well.	
  Programming	
  or	
  scripting	
  skills	
  (e.g.	
  mel,	
  python)	
  
would	
  be	
  beneficial,	
  but	
  not	
  essential.	
  
Familiarity	
  with	
  pipeline	
  issues	
  and	
  a	
  typical	
  post	
  production	
  environment.	
  
Minimum	
  of	
  1	
  years	
  experience	
  on	
  feature	
  films.	
  Experience	
  in	
  other	
  areas	
  of	
  visual	
  effects	
  
(TV,	
  games)	
  would	
  also	
  be	
  taken	
  into	
  account.	
  
	
  
	
  
	
  
	
  
	
  
Being	
  a	
  much	
  larger	
  and	
  well-­‐established	
  company,	
  it	
  makes	
  it	
  a	
  lot	
  harder	
  to	
  apply	
  for	
  a	
  job,	
  as	
  
their	
  standards	
  tend	
  to	
  be	
  very	
  high.	
  However,	
  if	
  successful	
  the	
  salary	
  should	
  be	
  more	
  and	
  the	
  
experience	
  gained	
  in	
  working	
  in	
  very	
  large	
  teams	
  will	
  be	
  very	
  useful.	
  
As	
  this	
  Double	
  Negative	
  application	
  is	
  so	
  broad,	
  working	
  to	
  improve	
  all	
  of	
  my	
  skills	
  in	
  the	
  final	
  
project	
  would	
  be	
  helpful	
  to	
  help	
  secure	
  a	
  place.	
  Moreover,	
  continuing	
  to	
  learn	
  and	
  work	
  in	
  
Maya	
  is	
  one	
  of	
  the	
  most	
  important	
  tasks	
  if	
  you	
  want	
  to	
  be	
  in	
  the	
  film	
  industry.	
  
 
	
  
Example	
  Industry	
  Job:	
  CG	
  Generalist	
  in	
  a	
  Major	
  Film	
  Company	
  
	
  
Rocket Science VFX - Intermediate 3D Generalist
	
  
About	
  
	
  
Rocket	
  Science	
  continues	
  to	
  push	
  the	
  boundaries	
  of	
  visual	
  effects	
  and	
  animation.	
  We	
  
believe	
  in	
  creative	
  challenge,	
  technical	
  and	
  artistic	
  investment,	
  and	
  continuous	
  growth	
  
through	
  education	
  and	
  experimentation.	
  
	
  
Rocket	
  Science	
  VFX	
  is	
  looking	
  for	
  talented	
  3D	
  artists	
  with	
  a	
  broad	
  generalist	
  skill-­‐set	
  for	
  our	
  
upcoming	
  slate	
  of	
  projects.	
  
	
  
Job	
  Duties:	
  
	
  
Proven	
  artistic	
  ability	
  across	
  multiple	
  CG	
  disciplines	
  including	
  modelling,	
  texturing,	
  
animation,	
  lighting,	
  shading,	
  look	
  development	
  and	
  FX	
  
Understand	
  shot	
  composition,	
  camera	
  layout,	
  shot	
  blocking,	
  tracking/Matchmoving	
  and	
  
animating	
  
Strong	
  communication	
  skills	
  to	
  work	
  creatively	
  and	
  efficiently	
  with	
  a	
  team	
  of	
  artists	
  
	
  
Qualifications:	
  
	
  
Experience	
  working	
  in	
  Maya	
  a	
  must	
  
Knowledge	
  of	
  Vray,	
  Mental	
  Ray,	
  Houdini,	
  Mari,	
  Zbrush	
  and	
  PF	
  Track	
  a	
  plus	
  
A	
  firm	
  understanding	
  of	
  both	
  feature	
  film	
  and	
  television	
  production	
  
MEL,	
  RSL	
  and	
  Python	
  experience	
  earns	
  huge	
  bonus	
  points	
  
Experience	
  leading	
  teams	
  
	
  
Skills	
  Requirements	
  
	
  
College	
  Certificate	
  &/or	
  degree	
  in	
  animation	
  or	
  applicable	
  industry	
  experience	
  required	
  
	
  
Terms:	
  Hiring	
  for	
  both	
  permanent	
  full	
  time	
  and	
  contract	
  work	
  
Wage:	
  $55	
  –	
  $85K	
  annually	
  
	
  
	
  
	
  
	
  
Although	
  this	
  job	
  is	
  asking	
  for	
  a	
  less	
  experienced	
  3D	
  Generalist,	
  the	
  experience	
  needed	
  is	
  still	
  
very	
  high	
  in	
  order	
  for	
  them	
  to	
  consider	
  you.	
  As	
  shot	
  composition	
  knowledge	
  is	
  needed,	
  our	
  
final	
  project	
  would	
  help	
  very	
  much	
  in	
  this	
  aspect	
  as	
  we	
  will	
  need	
  to	
  plan	
  where	
  and	
  what	
  the	
  
camera	
  is	
  filming	
  in	
  each	
  shot.	
  Moreover,	
  a	
  1st
	
  at	
  the	
  end	
  of	
  Uni	
  would	
  also	
  help	
  as	
  one	
  of	
  the	
  
requirements	
  for	
  the	
  candidate	
  to	
  have	
  a	
  degree	
  
Depending	
  on	
  time	
  constraints,	
  using	
  Pflow	
  and	
  Thinking	
  Particles	
  to	
  create	
  the	
  ripple	
  effect	
  in	
  
 
	
  
Example	
  Industry	
  Job:	
  Organic	
  Modeller	
  in	
  a	
  Major	
  Film	
  Company	
  
As	
  an	
  Organic	
  Modeller	
  is	
  a	
  working	
  in	
  a	
  variety	
  of	
  industries.	
  This	
  would	
  be	
  very	
  helpful	
  as	
  this	
  
exposure	
  will	
  help	
  to	
  further	
  narrow	
  down	
  what	
  I’d	
  like	
  to	
  be	
  doing.	
  
	
  
Atmosphere VFX Recruiting Organic Modeller
	
  
About	
  
	
  
Atmosphere	
  Visual	
  Effects	
  is	
  a	
  rapidly	
  growing,	
  artist-­‐driven	
  boutique	
  style	
  company	
  based	
  
in	
  the	
  beautiful	
  city	
  of	
  Vancouver,	
  BC	
  and	
  Toronto,	
  ON.	
  Our	
  tight-­‐knit	
  team	
  has	
  rapidly	
  built	
  
a	
  reputation	
  for	
  top-­‐flight	
  visual	
  effects.	
  We	
  are	
  committed	
  to	
  producing	
  high	
  quality	
  work	
  
and	
  pride	
  ourselves	
  on	
  not	
  overworking	
  our	
  employees.	
  
	
  
Job	
  Duties	
  
	
  
Atmosphere	
  Visual	
  Effects	
  is	
  seeking	
  an	
  experienced	
  Organic	
  Surface	
  Modeller/Texture	
  
Artist	
  to	
  join	
  our	
  CG	
  team	
  at	
  our	
  facilities	
  in	
  Toronto,	
  ON.	
  
	
  
Requirements	
  
	
  
The	
  ideal	
  candidate	
  will	
  possess	
  the	
  following	
  qualities:	
  
At	
  least	
  1	
  year’s	
  experience	
  as	
  a	
  Organic	
  Surface	
  Modeller	
  
Expertise	
  in	
  Maya,	
  Z	
  Brush,	
  MARI,	
  V-­‐Ray	
  
Ability	
  to	
  work	
  as	
  part	
  of	
  a	
  team	
  
	
  
If	
  you	
  are	
  interested	
  in	
  working	
  as	
  part	
  of	
  a	
  talented,	
  tight-­‐knit	
  visual	
  effects	
  team,	
  please	
  
send	
  your	
  cover	
  letter	
  and	
  resume.	
  
We	
  thank	
  all	
  applicants	
  for	
  applying,	
  however,	
  only	
  those	
  selected	
  for	
  an	
  interview	
  will	
  
	
  
Required	
  experience:	
  
	
  
Modeller:	
  1	
  year	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
Example	
  Industry	
  Job:	
  Freelance	
  and	
  Creating	
  Ones	
  own	
  Business	
  
	
  
Examples	
  of	
  different	
  ways	
  to	
  economically	
  benefit	
  from	
  3D	
  Printing:	
  
http://www.mytopbusinessideas.com/3d-­‐printing/	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
Brief	
  -­‐Fredrik	
  
The	
  aim	
  of	
  this	
  project	
  is	
  to	
  learn	
  how	
  to	
  encompass	
  all	
  of	
  my	
  skills	
  into	
  one	
  scene.	
  Furthermore,	
  the	
  
complexity	
  of	
  the	
  project	
  is	
  dependent	
  on	
  how	
  much	
  time	
  each	
  step	
  will	
  take	
  to	
  do.	
  	
  In	
  order	
  of	
  
importance,	
  this	
  will	
  include:	
  
● Character	
  Modelling	
  
● Visual	
  Effects	
  
● Environment	
  Modelling	
  
Depending	
  on	
  how	
  much	
  time	
  these	
  will	
  take	
  my	
  aim	
  is	
  to	
  also	
  learn	
  how	
  to	
  do	
  
● Rigging	
  
● Animating	
  
	
  
The	
  main	
  software	
  packages	
  I	
  will	
  be	
  using	
  includes	
  3DS	
  Max,	
  Maya,	
  Mudbox	
  and	
  ZBrush.	
   	
  
The	
  first	
  step	
  is	
  for	
  me	
  to	
  create	
  a	
  Dragonfly	
  in	
  ZBrush	
  and	
  then	
  my	
  partner	
  will	
  create	
  a	
  pond	
  
environment	
  to	
  complement	
  my	
  Dragonfly.	
  
The	
  second	
  step	
  would	
  be	
  for	
  the	
  both	
  of	
  us	
  to	
  work	
  on	
  creating	
  visual	
  effects	
  on	
  this	
  static	
  scene.	
  
The	
  third	
  step	
  would	
  be	
  to	
  animate	
  the	
  dragonfly	
  moving	
  through	
  my	
  partner’s	
  environment	
  while	
  
he	
  continues	
  to	
  improve	
  upon	
  the	
  quality	
  of	
  the	
  pond	
  scene.	
  
The	
  fourth	
  step	
  is	
  to	
  continue	
  modelling	
  other	
  insect	
  characters	
  like	
  a	
  grasshopper	
  and	
  a	
  ladybird	
  to	
  
further	
  enrich	
  the	
  scene.	
  	
  
Finally,	
  all	
  of	
  our	
  work	
  will	
  be	
  combined	
  to	
  a	
  working	
  standard	
  to	
  produce	
  a	
  short	
  film.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
Milestones	
  -­‐Fredrik	
  
	
  
• Complete	
  Pre-­‐Production	
  Planning	
  
• Create	
  a	
  clear	
  blockout	
  of	
  the	
  environment	
  and	
  start	
  to	
  produce	
  the	
  final.	
  Finish	
  
creating	
  the	
  Dragonfly	
  
• Successfully	
  complete	
  the	
  environment	
  and	
  start	
  to	
  rig	
  and	
  animate	
  the	
  Dragonfly.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
Visual	
  Reference	
  –	
  FS	
  and	
  RH	
  
These	
  images	
  show	
  aesthetic	
  and	
  compositional	
  elements	
  that	
  we’d	
  like	
  to	
  incorporate	
  
in	
  our	
  environment:	
  
	
  
Elements	
  to	
  NOTE:	
  
-­‐Technical	
  
execution	
  of	
  grass	
  
-­‐Thickness	
  and	
  
height	
  of	
  grass	
  
	
  
	
  
Elements	
  to	
  NOTE:	
  
-­‐Pine	
  trees	
  in	
  
foreground	
  and	
  
background	
  
-­‐The	
  locational	
  
aspect	
  of	
  an	
  	
  Alpine	
  
Environment	
  
	
  
	
  
 
	
  
Elements	
  to	
  NOTE:	
  
-­‐Foreground,	
  
midground	
  and	
  
background	
  
-­‐Lighting	
  
Depth	
  of	
  Field	
  
	
  
	
  
This	
  image	
  shows	
  
the	
  shivelight	
  in	
  the	
  
forest	
  where	
  the	
  
dragonfly	
  will	
  be	
  
flying	
  
	
  
These	
  lily	
  pads	
  
looked	
  good	
  and	
  
we	
  thought	
  it	
  might	
  
be	
  a	
  good	
  idea	
  to	
  
add	
  them	
  to	
  the	
  
pond	
  to	
  bring	
  more	
  
life	
  to	
  it	
  
	
  
 
	
  
The	
  mountains	
  in	
  
the	
  background	
  and	
  
the	
  reflection	
  in	
  the	
  
lake	
  are	
  the	
  parts	
  of	
  
the	
  image	
  we’d	
  like	
  
to	
  use	
  as	
  
inspiration	
  
	
  
Finally,	
  we	
  both	
  
liked	
  the	
  lighting	
  
and	
  the	
  
atmosphere	
  in	
  this	
  
image.	
  
	
  
	
  
Dragonfly	
  Reference	
  
	
  
See	
  Photoshop	
  document	
  attached	
  on	
  USB	
  
	
  
Video	
  Reference	
  
	
  
• https://www.youtube.com/watch?v=NIy18tAGuyY	
  (Mayfly	
  Advert)	
  
• https://www.youtube.com/watch?v=N9Y_naTHPsY	
  (Snapdragon	
  Advert)	
  
• https://www.youtube.com/watch?v=_DMB_ERknBA	
  (Dragonfly	
  Turntable)	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
Dragonfly	
  Pond	
  Full	
  Script	
  –	
  FS	
  and	
  RH	
  
Dragonfly Pond
CAMERA ZOOMED AND FOCUSED ON DRAGONFLY
The Dragonfly is resting on a blade of grass some distance away
from the pond
CAMERA PANS OUT TO REVEAL THE SCENEREY
The environment has a distinctive foreground, midground, and
background which is what this shot prioritizes
SLOW FLYTHOUGH GRASS
The camera is now focused on the dragonfly as it starts to fly.
The wings gradually build up momentum, which can be heard on the
sound effects. When the wings are working at full force, the
volume heard in the film slightly fades out. The Dragonfly then
enters the forest
FLYTHROUGH TREES
The lighting changes soften to shivelight as the Dragonfly enters
the forest. We then hear the sound of trees leaves rustling in
the wind. It then starts to manoeuvre in zigzag like motion where
it whooshes past each tree. At the beginning of the forest the
camera can see the whole dragonfly but while the dragonfly gains
speed only the head is visible.
POND REVEAL
As it leaves the forest the dragonfly slows down and as this
happens the camera pans out to reveal the pond. The camera stays
static, as the dragonfly starts moving around smelling the cool
fresh forest air. This movement is aimed to be characteristic to
how a dragonfly naturally flies around a pond. E.g.: By abruptly
changing directions.
RIPPLE
After all of this action of flying around, the dragonfly hears a
sound coming from the water. This sound was of a water droplet
from a leaf hitting the pond creating a ripple effect. As the
audience hears this sound, the camera swivels to the pond where
the ripple is shown. The Dragonfly then thought to itself that it
would like to quench its thirst.
 
	
  
DRINK
The pond has a lone lily pad in it and the dragonfly thought this
would be a good place to settle as it quenches its thirst. It
flies directly towards it and starts drinking. While its
drinking, the camera is close up.
END
As the scene finished, the camera then pans upwards revealing the
mountains as the sun slowly illuminates the screen white. This
then reveals the moral of the story, which is: Enjoy Life’s Small
Pleasures
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  
Storyboard	
  –	
  FS	
  and	
  RH	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Sound	
  Effects	
  –	
  FS	
  and	
  RH	
  
	
  
• Bird	
  song	
  at	
  the	
  beginning	
  of	
  the	
  short	
  film	
  to	
  wake	
  up	
  the	
  dragonfly	
  to	
  a	
  new	
  day	
  
when	
  it’s	
  on	
  its	
  blade	
  of	
  a	
  grass	
  with	
  dew	
  
• Dragonfly	
  wings	
  for	
  most	
  of	
  the	
  scene	
  
• The	
  sound	
  of	
  wind	
  rushing	
  through	
  the	
  trees	
  as	
  it	
  goes	
  through	
  the	
  forest	
  
• The	
  sound	
  of	
  water	
  movement	
  increases	
  as	
  it	
  nears	
  the	
  pond	
  
	
  
 
	
  
	
  
	
  
	
  
Production	
  Planning	
  –	
  FS	
  and	
  RH	
  
	
  
Objective	
   Priority	
   Risk	
  Assessment	
  
Work	
  out	
  what	
  the	
  project	
  will	
  
entail.	
  This	
  includes	
  where	
  the	
  
environment	
  is	
  located,	
  what	
  
character	
  to	
  model	
  and	
  what	
  job	
  
roles	
  should	
  be	
  assigned.	
  
A	
   	
  
Gather	
  reference	
  images	
  for	
  the	
  
Pond	
  and	
  the	
  Dragonfly	
  
A	
   	
  
Figure	
  out	
  the	
  narrative	
  behind	
  the	
  
short	
  film	
  of	
  the	
  Dragonfly	
  flying	
  
around	
  the	
  pond	
  and	
  create	
  a	
  
script	
  for	
  this	
  
A	
   	
  
Convert	
  this	
  script	
  into	
  a	
  
Storyboard	
  
A	
   	
  
Create	
  a	
  basic	
  blockout	
  of	
  the	
  
environment	
  
A	
   	
  
Use	
  a	
  camera	
  to	
  demonstrate	
  the	
  
key	
  areas	
  where	
  the	
  Dragonfly	
  will	
  
be	
  flying	
  around	
  and	
  produce	
  stills	
  
for	
  each	
  shot	
  
A	
   	
  
Animate	
  the	
  camera	
  moving	
  
between	
  each	
  shot	
  and	
  in	
  so	
  
doing,	
  also	
  work	
  out	
  a	
  rough	
  
estimate	
  of	
  the	
  number	
  of	
  frames	
  
needed	
  to	
  render	
  our	
  final	
  scene	
  
A	
   	
  
Work	
  out	
  which	
  software’s	
  are	
  
applicable	
  to	
  create	
  a	
  
photorealistic	
  environment	
  under	
  
our	
  time	
  constraints	
  and	
  then	
  start	
  
to	
  learning	
  to	
  use	
  and	
  model	
  with	
  
them.	
  
A	
   	
  
Start	
  to	
  model	
  the	
  Dragonfly	
  in	
  
ZBrush	
  
A	
   	
  
Finish	
  modelling	
  the	
  Dragonfly	
  	
   A	
   	
  
 
	
  
Finish	
  modelling	
  the	
  environment	
   A	
   	
  
Animate	
  the	
  Dragonfly	
   A	
   	
  
Add	
  visual	
  effects	
  to	
  the	
  
environment	
  
	
  
B	
   	
  
Add	
  sound	
  effects	
  to	
  the	
  
environment	
  
B	
   	
  
Match	
  the	
  blockout	
  video	
  with	
  the	
  
final	
  video	
  in	
  the	
  viewport	
  
A	
   	
  
If	
  problems	
  arise	
  over	
  time,	
  
composite	
  our	
  work	
  together.	
  
B	
   	
  
If	
  all	
  goes	
  to	
  plan,	
  render	
  out	
  our	
  
final	
  scene	
  
A	
   	
  
	
  
Thoughts	
  and	
  Ideas	
  
	
  
• We	
  will	
  start	
  to	
  create	
  a	
  drop	
  falling	
  into	
  the	
  water	
  but	
  if	
  we	
  have	
  time,	
  change	
  the	
  
drop	
  into	
  a	
  leaf	
  falling	
  down.	
  
• Ugly	
  Duckling	
  concept	
  (Accept	
  one	
  another	
  no	
  matter	
  how	
  different	
  we	
  might	
  
appear)	
  
• Live	
  the	
  most	
  of	
  every	
  day	
  (Mayfly	
  Advert)	
  
• The	
  mood	
  of	
  the	
  scene	
  will	
  be	
  colourful	
  and	
  happy	
  as	
  this	
  is	
  how	
  the	
  dragonfly	
  is	
  
feeling	
  when	
  he	
  flies	
  to	
  the	
  pond	
  to	
  get	
  some	
  water.	
  The	
  moral	
  of	
  this	
  story	
  is	
  enjoy	
  
the	
  small	
  things	
  in	
  life.	
  
• The	
  dragonfly	
  doesn’t	
  work	
  and	
  has	
  no	
  access	
  to	
  human	
  indulgement	
  like	
  unlimited	
  
food	
  and	
  entertainment	
  and	
  therefore	
  is	
  a	
  happy	
  dragonfly	
  
• The	
  time	
  of	
  year	
  would	
  be	
  autumn	
  so	
  that	
  we	
  could	
  add	
  more	
  varied	
  colours	
  to	
  the	
  
trees	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  

Dragonfly Pre-Production Document

  • 1.
        Southampton  Solent  University   Faculty  of  Creative  Industries           BA  (Hons)  Computer  Generated  Imagery   2015/16   Fredrik  Simons   CGI  Pre-­‐Production  (AAP601)                                  
  • 2.
          Pre-­‐Production   Introduction  -­‐  Fredrik   Industry  Plans   The  CG  industry  is  vast  and  the  amount  of  different  industries  it  overlaps  grows  year  on  year  as  the   technology  improves.  It  is  therefore  my  ambition  to  have  a  good  solid  base  knowledge  of  modelling,   texturing,  rigging,  animating,  lighting  and  rendering  so  that  I  will  one  day  be  able  to  set  up  and   manage  my  own  business  in  the  3D  Industry.     This  challenge  will  be  hard  to  accomplish  so  I’d  prefer  to  start  out  in  the  film  industry  where  3D   artists  are  already  well  established  and  work  in  large  teams  to  accomplish  a  desired  goal.  Therefore,   my  aim  in  this  final  year  would  be  to  replicate  what  the  film  industry  creates  in  a  shortened  version   to  demonstrate  the  full  potential  of  what  my  partner  and  I  can  create.   Managing  a  team  is  also  very  important  when  creating  your  own  business  so  I  will  continue  to  hone   my  skills  in  this  area  by  working  with  a  partner  to  whom  I’ve  been  successful  in  working  with  in  the   past.                                
  • 3.
            Industry  Jobs   In  this  section,  I  will  tackle  the  different  jobs  sectors  I  could  work  in  the  near  future.  These  include:   1. Film  –  CG  Generalist   2. Film  –  Modelling   3. Advertising  –  CG  Generalist   4. Advertising  –  Modelling   5. Freelance   6. Personal  Business     In  each  job  offer,  I’ve  added  an  about  section  to  show  what  industries  these  companies  work  with  in   their  own  words.  Text  highlighted  in  green  are  the  skills  I  already  possess,  text  highlighted  in  orange   are  skills  I  will  be  improving  upon/exploring  in  my  final  project.     Example  Industry  Job:  CG  Generalist  in  Film,  TV,  Advertising,  Games  and  Venues   CG Generalist Fuse FX About FuseFX provides visual effects services for film, television, and commercials, games, and special venues GENERALISTS PREFERRED REQUIREMENTS Proficiency in 3ds Max and Vray Rendering System Experience with particle systems such as PFlow and/or Thinking Particles Smoke and fire experience with Afterburn and FumeFX Simulation Experience with cloth, hair, RealFlow and Reactor Node based compositing experience with Nuke, Fusion or Shake 3d tracking with Boujou or SynthEyes SKILLS/RESPONSIBILITIES 3+ years experience in a production environment Should effectively execute all necessary assigned tasks while under tight production schedule deadlines Strong creative and technical abilities Excellent problem solving skills Positive attitude Work well in a team environment In  this  job,  Fuse  FX  is  asking  for  a  CG  Generalist  working  in  a  variety  of  industries.  This  would  be   very  helpful  for  me,  as  this  exposure  will  help  to  further  narrow  down  what  I’d  like  to  be  doing.     Depending  on  time  constraints,  using  Pflow  and  Thinking  Particles  to  create  the  ripple  effect  in   the  water  as  well  as  maybe  leaves  or  particles  of  dust  blowing  in  the  wind  would  be  beneficial.  
  • 4.
        Example  Industry  Job:  CG  Generalist  in  Advertising   TANK - Senior CG Artist to join their expanding team in South East London. About Though we are a small team, this only aids us in adding a personal approach to each and every job that comes through our doors. Regularly working with award winning photographers and advertising agencies allows us to grow not only as a company, but also as individual artists. With no job too big or too small, we are always looking to take on new projects and challenges. Whether you have a large on-going project or a smaller one-off retouching job, we put the same creativity and attention to detail into all of our work. Requirements You will have an extensive knowledge of the CG pipeline and be comfortable with all aspects of 3D from soft and hard surface modelling, UV mapping, texturing, lighting and rendering. Projects will range from basic studio product renders to complete automotive campaigns and everything else the imagination can create in between! You will be integral to the creative team developing innovative concepts and producing high quality renders. You will be the lead artist and will need to brief and manage other artists working on the project. You need to be a great problem solver and always up for a challenge. As a large percentage of our work is involved in the production of photo-realistic imagery, it is important that you have work in your portfolio to demonstrate this. We have systems and workflows in place but you will be able to build up your own pipeline and manage the renderfarm so some IT experience would be beneficial. Skills/Qualifications: • Highly experienced in the production of CGI's and animation • Software skills – Preferably 3DS Max, Maya or C4D, V-ray, Photoshop. After Effects or Nuke a bonus. • Confident handling jobs from start to finish • A high level of attention to detail • Ability to work under pressure and to tight deadlines • Able to optimize scenes for productive rendering • The ability to create new ideas both independently and within a team • A constant desire to produce high quality work • Excellent communication skills • Self motivated with creativity and flare   As  this  job  is  focused  on  photo-­‐realistic  imagery  and  animation,  creating  a  short  film  for  my   final  project  would  be  beneficial  as  the  quality  is  aimed  to  be  photorealistic  and  the  Dragonfly   will  have  some  fairly  complex  animation  to  help  make  it  fly.   In  addition,  as  this  job  is  in  a  company  with  a  small  team,  the  job  will  be  more  personal  and  it   will  help  to  really  get  to  know  everyone  and  analyse  and  use  everyone’s  varying  skills  to  our   advantage.  
  • 5.
            Example  Industry  Job:  CG  Generalist/Environment  Modeller  in  Advertising  and   Video  Game  Trailers     Goldtooth Creative Recruiting CG Generalist/Environment Modeller About A boutique studio in the lush and beautiful Vancouver, Canada. Artists with feature film backgrounds, specializing in bringing a cinematic quality to video game trailers, commercials, marketing media and in-game story content. Each member of the team is a master of their craft, who bring stories to the screen from concept to completion. CG Generalist/Environment Modeller About the Position Possessing a broad knowledge base that covers the basics of modeling, texturing, animation, lighting and rendering. Our CG Generalist/Environment Modeler is responsible for handling general 3D tasks as required but will need to have a strong understanding of modeling. You will create 3D models with texture, color, and lighting. It is essential you have a “can do” attitude and open-mindedness to non- traditional solutions. Responsibilities · Able to model and sculpt hard-surface and organic 3D assets with or without concepts · Participates in modeling, rigging, animation, texture, lighting and compositing needs of the project. · Follows Goldtooth data storage/data naming and retrieval processes outlined in studio · Makes sure that all work done is accounted for and entered into Shotgun daily · Identifies problems with respect to timelines and delivery schedules and flags these to the senior team Requirements · The CG Generalist/Environment Modeler should have 1-3 years of industry experience in games and/or film · A fundamental knowledge of modeling both organic and hard surface environments and props · Demonstrating strong proficiency in usage of 3D and 2D software tools: Maya & Photoshop · Knowledge of other software such as Nuke, Z-Brush and RealFlow · Up-to-date knowledge of VFX tools, video game engines and emerging technologies · Game Engine experience is an asset · A strong creative eye and a problem-solving attitude · Communicate with colleagues and work as part of a team · Take direction and willingness to address comments and make changes   As  Goldtooth  creative  are  asking  for  a  CG  Generalist/Environment  Modeller  in  the  advertising   industry,  this  job  will  be  helpful  to  me  because  small  projects  will  expose  me  to  a  variety  of   different  tasks  without  doing  the  same  job  over  and  over  again.  Creating  a  short  film  in  my  final   project  will  help  me  to  understand  the  challenges  that  lay  before  me.   To  help  Goldtooth  make  me  a  more  desirable  candidate  for  the  job,  some  of  my  time  will  be   spent  helping  Rhys  create  the  environment  for  this  project.  This  would  be  beneficial  to  the   both  of  us  as  I’ll  be  learning  new  software  and  techniques  and  he’ll  be  saving  on  time  creating   this  vast  landscape.  
  • 6.
        Example  Industry  Job:  CG  Generalist  in  a  Major  Film  Company     Double Negative Vancouver - Generalist TD   About     Double  Negative  is  a  British  full-­‐service  visual  effects/computer  animation  company  located   in,  London.  Multi-­‐award-­‐winning  Double  Negative  (Dneg)  is  one  of  the  world’s  leading   providers  of  visual  effects  for  Film  with  facilities  in  London,  Singapore  and  Vancouver.     Key  Purpose  of  the  Job:     To  handle  any  general  3d  tasks  required.  We  would  expect  a  broad  knowledge  that  covers   as  many  areas  of  3d  as  possible,  or  at  least  the  basics  (modelling,  texturing,  animation,   lighting  and  rendering).     Needs  to  Do:     Cover  the  more  general  3d  tasks  such  as  modelling,  animation,  texturing,  lighting  and   rendering.  At  times,  they  may  be  asked  to  learn  a  proprietary  system  or  a  new  piece  of   software,  and  we  would  expect  them  to  be  flexible  enough  to  handle  this.     Needs  to  Know:     Thorough  knowledge  of  the  principles  of  3D  (animation,  FX,  modelling,  texturing,  lighting,   scripting,  shading,  rendering,  rigging).  We  appreciate  that  the  candidate  may  have  varying   levels  of  knowledge  in  these  fields.   Full  working  knowledge  of  Maya  and/or  Houdini.   You  would  need  to  be  comfortable  with  the  more  technical  aspects  of  CG  work,  and  have  a   good  sense  of  the  artistic  side  as  well.  Programming  or  scripting  skills  (e.g.  mel,  python)   would  be  beneficial,  but  not  essential.   Familiarity  with  pipeline  issues  and  a  typical  post  production  environment.   Minimum  of  1  years  experience  on  feature  films.  Experience  in  other  areas  of  visual  effects   (TV,  games)  would  also  be  taken  into  account.             Being  a  much  larger  and  well-­‐established  company,  it  makes  it  a  lot  harder  to  apply  for  a  job,  as   their  standards  tend  to  be  very  high.  However,  if  successful  the  salary  should  be  more  and  the   experience  gained  in  working  in  very  large  teams  will  be  very  useful.   As  this  Double  Negative  application  is  so  broad,  working  to  improve  all  of  my  skills  in  the  final   project  would  be  helpful  to  help  secure  a  place.  Moreover,  continuing  to  learn  and  work  in   Maya  is  one  of  the  most  important  tasks  if  you  want  to  be  in  the  film  industry.  
  • 7.
        Example  Industry  Job:  CG  Generalist  in  a  Major  Film  Company     Rocket Science VFX - Intermediate 3D Generalist   About     Rocket  Science  continues  to  push  the  boundaries  of  visual  effects  and  animation.  We   believe  in  creative  challenge,  technical  and  artistic  investment,  and  continuous  growth   through  education  and  experimentation.     Rocket  Science  VFX  is  looking  for  talented  3D  artists  with  a  broad  generalist  skill-­‐set  for  our   upcoming  slate  of  projects.     Job  Duties:     Proven  artistic  ability  across  multiple  CG  disciplines  including  modelling,  texturing,   animation,  lighting,  shading,  look  development  and  FX   Understand  shot  composition,  camera  layout,  shot  blocking,  tracking/Matchmoving  and   animating   Strong  communication  skills  to  work  creatively  and  efficiently  with  a  team  of  artists     Qualifications:     Experience  working  in  Maya  a  must   Knowledge  of  Vray,  Mental  Ray,  Houdini,  Mari,  Zbrush  and  PF  Track  a  plus   A  firm  understanding  of  both  feature  film  and  television  production   MEL,  RSL  and  Python  experience  earns  huge  bonus  points   Experience  leading  teams     Skills  Requirements     College  Certificate  &/or  degree  in  animation  or  applicable  industry  experience  required     Terms:  Hiring  for  both  permanent  full  time  and  contract  work   Wage:  $55  –  $85K  annually           Although  this  job  is  asking  for  a  less  experienced  3D  Generalist,  the  experience  needed  is  still   very  high  in  order  for  them  to  consider  you.  As  shot  composition  knowledge  is  needed,  our   final  project  would  help  very  much  in  this  aspect  as  we  will  need  to  plan  where  and  what  the   camera  is  filming  in  each  shot.  Moreover,  a  1st  at  the  end  of  Uni  would  also  help  as  one  of  the   requirements  for  the  candidate  to  have  a  degree   Depending  on  time  constraints,  using  Pflow  and  Thinking  Particles  to  create  the  ripple  effect  in  
  • 8.
        Example  Industry  Job:  Organic  Modeller  in  a  Major  Film  Company   As  an  Organic  Modeller  is  a  working  in  a  variety  of  industries.  This  would  be  very  helpful  as  this   exposure  will  help  to  further  narrow  down  what  I’d  like  to  be  doing.     Atmosphere VFX Recruiting Organic Modeller   About     Atmosphere  Visual  Effects  is  a  rapidly  growing,  artist-­‐driven  boutique  style  company  based   in  the  beautiful  city  of  Vancouver,  BC  and  Toronto,  ON.  Our  tight-­‐knit  team  has  rapidly  built   a  reputation  for  top-­‐flight  visual  effects.  We  are  committed  to  producing  high  quality  work   and  pride  ourselves  on  not  overworking  our  employees.     Job  Duties     Atmosphere  Visual  Effects  is  seeking  an  experienced  Organic  Surface  Modeller/Texture   Artist  to  join  our  CG  team  at  our  facilities  in  Toronto,  ON.     Requirements     The  ideal  candidate  will  possess  the  following  qualities:   At  least  1  year’s  experience  as  a  Organic  Surface  Modeller   Expertise  in  Maya,  Z  Brush,  MARI,  V-­‐Ray   Ability  to  work  as  part  of  a  team     If  you  are  interested  in  working  as  part  of  a  talented,  tight-­‐knit  visual  effects  team,  please   send  your  cover  letter  and  resume.   We  thank  all  applicants  for  applying,  however,  only  those  selected  for  an  interview  will     Required  experience:     Modeller:  1  year              
  • 9.
        Example  Industry  Job:  Freelance  and  Creating  Ones  own  Business     Examples  of  different  ways  to  economically  benefit  from  3D  Printing:   http://www.mytopbusinessideas.com/3d-­‐printing/                                                    
  • 10.
        Brief  -­‐Fredrik   The  aim  of  this  project  is  to  learn  how  to  encompass  all  of  my  skills  into  one  scene.  Furthermore,  the   complexity  of  the  project  is  dependent  on  how  much  time  each  step  will  take  to  do.    In  order  of   importance,  this  will  include:   ● Character  Modelling   ● Visual  Effects   ● Environment  Modelling   Depending  on  how  much  time  these  will  take  my  aim  is  to  also  learn  how  to  do   ● Rigging   ● Animating     The  main  software  packages  I  will  be  using  includes  3DS  Max,  Maya,  Mudbox  and  ZBrush.     The  first  step  is  for  me  to  create  a  Dragonfly  in  ZBrush  and  then  my  partner  will  create  a  pond   environment  to  complement  my  Dragonfly.   The  second  step  would  be  for  the  both  of  us  to  work  on  creating  visual  effects  on  this  static  scene.   The  third  step  would  be  to  animate  the  dragonfly  moving  through  my  partner’s  environment  while   he  continues  to  improve  upon  the  quality  of  the  pond  scene.   The  fourth  step  is  to  continue  modelling  other  insect  characters  like  a  grasshopper  and  a  ladybird  to   further  enrich  the  scene.     Finally,  all  of  our  work  will  be  combined  to  a  working  standard  to  produce  a  short  film.                          
  • 11.
          Milestones  -­‐Fredrik     • Complete  Pre-­‐Production  Planning   • Create  a  clear  blockout  of  the  environment  and  start  to  produce  the  final.  Finish   creating  the  Dragonfly   • Successfully  complete  the  environment  and  start  to  rig  and  animate  the  Dragonfly.                                              
  • 12.
        Visual  Reference  –  FS  and  RH   These  images  show  aesthetic  and  compositional  elements  that  we’d  like  to  incorporate   in  our  environment:     Elements  to  NOTE:   -­‐Technical   execution  of  grass   -­‐Thickness  and   height  of  grass       Elements  to  NOTE:   -­‐Pine  trees  in   foreground  and   background   -­‐The  locational   aspect  of  an    Alpine   Environment      
  • 13.
        Elements  to  NOTE:   -­‐Foreground,   midground  and   background   -­‐Lighting   Depth  of  Field       This  image  shows   the  shivelight  in  the   forest  where  the   dragonfly  will  be   flying     These  lily  pads   looked  good  and   we  thought  it  might   be  a  good  idea  to   add  them  to  the   pond  to  bring  more   life  to  it    
  • 14.
        The  mountains  in   the  background  and   the  reflection  in  the   lake  are  the  parts  of   the  image  we’d  like   to  use  as   inspiration     Finally,  we  both   liked  the  lighting   and  the   atmosphere  in  this   image.       Dragonfly  Reference     See  Photoshop  document  attached  on  USB     Video  Reference     • https://www.youtube.com/watch?v=NIy18tAGuyY  (Mayfly  Advert)   • https://www.youtube.com/watch?v=N9Y_naTHPsY  (Snapdragon  Advert)   • https://www.youtube.com/watch?v=_DMB_ERknBA  (Dragonfly  Turntable)          
  • 15.
          Dragonfly  Pond  Full  Script  –  FS  and  RH   Dragonfly Pond CAMERA ZOOMED AND FOCUSED ON DRAGONFLY The Dragonfly is resting on a blade of grass some distance away from the pond CAMERA PANS OUT TO REVEAL THE SCENEREY The environment has a distinctive foreground, midground, and background which is what this shot prioritizes SLOW FLYTHOUGH GRASS The camera is now focused on the dragonfly as it starts to fly. The wings gradually build up momentum, which can be heard on the sound effects. When the wings are working at full force, the volume heard in the film slightly fades out. The Dragonfly then enters the forest FLYTHROUGH TREES The lighting changes soften to shivelight as the Dragonfly enters the forest. We then hear the sound of trees leaves rustling in the wind. It then starts to manoeuvre in zigzag like motion where it whooshes past each tree. At the beginning of the forest the camera can see the whole dragonfly but while the dragonfly gains speed only the head is visible. POND REVEAL As it leaves the forest the dragonfly slows down and as this happens the camera pans out to reveal the pond. The camera stays static, as the dragonfly starts moving around smelling the cool fresh forest air. This movement is aimed to be characteristic to how a dragonfly naturally flies around a pond. E.g.: By abruptly changing directions. RIPPLE After all of this action of flying around, the dragonfly hears a sound coming from the water. This sound was of a water droplet from a leaf hitting the pond creating a ripple effect. As the audience hears this sound, the camera swivels to the pond where the ripple is shown. The Dragonfly then thought to itself that it would like to quench its thirst.
  • 16.
        DRINK The pondhas a lone lily pad in it and the dragonfly thought this would be a good place to settle as it quenches its thirst. It flies directly towards it and starts drinking. While its drinking, the camera is close up. END As the scene finished, the camera then pans upwards revealing the mountains as the sun slowly illuminates the screen white. This then reveals the moral of the story, which is: Enjoy Life’s Small Pleasures                                      
  • 17.
            Storyboard  –  FS  and  RH                                        
  • 18.
                                                     
  • 19.
                                                   
  • 20.
                                                Sound  Effects  –  FS  and  RH     • Bird  song  at  the  beginning  of  the  short  film  to  wake  up  the  dragonfly  to  a  new  day   when  it’s  on  its  blade  of  a  grass  with  dew   • Dragonfly  wings  for  most  of  the  scene   • The  sound  of  wind  rushing  through  the  trees  as  it  goes  through  the  forest   • The  sound  of  water  movement  increases  as  it  nears  the  pond    
  • 21.
              Production  Planning  –  FS  and  RH     Objective   Priority   Risk  Assessment   Work  out  what  the  project  will   entail.  This  includes  where  the   environment  is  located,  what   character  to  model  and  what  job   roles  should  be  assigned.   A     Gather  reference  images  for  the   Pond  and  the  Dragonfly   A     Figure  out  the  narrative  behind  the   short  film  of  the  Dragonfly  flying   around  the  pond  and  create  a   script  for  this   A     Convert  this  script  into  a   Storyboard   A     Create  a  basic  blockout  of  the   environment   A     Use  a  camera  to  demonstrate  the   key  areas  where  the  Dragonfly  will   be  flying  around  and  produce  stills   for  each  shot   A     Animate  the  camera  moving   between  each  shot  and  in  so   doing,  also  work  out  a  rough   estimate  of  the  number  of  frames   needed  to  render  our  final  scene   A     Work  out  which  software’s  are   applicable  to  create  a   photorealistic  environment  under   our  time  constraints  and  then  start   to  learning  to  use  and  model  with   them.   A     Start  to  model  the  Dragonfly  in   ZBrush   A     Finish  modelling  the  Dragonfly     A    
  • 22.
        Finish  modelling  the  environment   A     Animate  the  Dragonfly   A     Add  visual  effects  to  the   environment     B     Add  sound  effects  to  the   environment   B     Match  the  blockout  video  with  the   final  video  in  the  viewport   A     If  problems  arise  over  time,   composite  our  work  together.   B     If  all  goes  to  plan,  render  out  our   final  scene   A       Thoughts  and  Ideas     • We  will  start  to  create  a  drop  falling  into  the  water  but  if  we  have  time,  change  the   drop  into  a  leaf  falling  down.   • Ugly  Duckling  concept  (Accept  one  another  no  matter  how  different  we  might   appear)   • Live  the  most  of  every  day  (Mayfly  Advert)   • The  mood  of  the  scene  will  be  colourful  and  happy  as  this  is  how  the  dragonfly  is   feeling  when  he  flies  to  the  pond  to  get  some  water.  The  moral  of  this  story  is  enjoy   the  small  things  in  life.   • The  dragonfly  doesn’t  work  and  has  no  access  to  human  indulgement  like  unlimited   food  and  entertainment  and  therefore  is  a  happy  dragonfly   • The  time  of  year  would  be  autumn  so  that  we  could  add  more  varied  colours  to  the   trees