1. BIOMETHANE PRODUCTION –
CONNECTING TO THE GAS GRID
#UKADBiogas @adbioresources
CHAIR:
STUART EASTERBROOK, NATIONAL GRID
PANEL:
JOOST LÖTTERS, BRONKHORST HIGH-TECH BV
JON HARRIS, MALMBERG
RICHARD GOODFELLOW, ADDLESHAW GODDARD
DR WILL MEZZULLO, FUTURE BIOGAS
KEVIN FERNANDES, IMSPEX DIAGNOSTICS
2. UK AD & Biogas
William Mezzullo Connecting to the Grid
3. Our Biomethane Journey
June 2012
Broke ground on
first biomethane
site
Oct 2013
First Commercial
National Grid
G2G site
Q4 2014
First ‘private’
high pressure
site
2011/2012
First DAS and
Connection Agreement
2015
First 42 bar
injection project
Q4 2014
Two further
sites online
4. Connecting to the Grid
Checklist
• ✓ Location of closest injection point
• ✓ What pressure is the pipe?
• ✓ What’s the available injection flowrate?
• ✓ Is blending achievable?
Show Stoppers
• ✗ No capacity in the network? Increasingly common
• ✗ Limited blending possibilities (higher Opex)
• ✗ High pressure pipes (>19 bar) more costly and time delays
• ✗ Distance to the pipe too far to make it feasible
Work with your GDN
5. North Norfolk – LTS connection
Collaboration with National Grid
• First ‘UIP’ style HP connection for National Grid
• Private pipeline and connection installed by ‘third party’ and
adopted
• Appoint accredited contractor to construct and connect onto LTS
• Cost and timescale reductions
7. Cost of Connection and Design Assurance
• ✓ Progress made since 2014
• ✗ Still not enough for pace of industry which leads to costs
Propane Addition – Blending
• ✗ Still a concern – we need to reduce Opex and improve
sustainable image
FWACV and burden on Operators
• ✗ An onerous process for the amount of gas injected
• ✓ Industry working with Ofgem to push this
Grid Capacity Issues
• ✗ Diminishing capacity on <7bar connections
• ✓ Costs expected to come down for LTS projects
• ✓ 42 bar plastic pipe?
Challenges 2014 vs. 2015
9. BIOMETHANE PRODUCTION –
CONNECTING TO THE GAS GRID
#UKADBiogas @adbioresources
CHAIR:
STUART EASTERBROOK, NATIONAL GRID
PANEL:
JOOST LÖTTERS, BRONKHORST HIGH-TECH BV
JON HARRIS, MALMBERG
RICHARD GOODFELLOW, ADDLESHAW GODDARD
DR WILL MEZZULLO, FUTURE BIOGAS
KEVIN FERNANDES, IMSPEX DIAGNOSTICS