Name: CNESyed Muhammad Ali
Age : 9 years
Date of Admission: 14-01-25
Date of Surgery : 15- 1 -25
Date of Death : 22-01-25
Surgeon : Col Dawood Kamal
Anesthetist : Lt Col kaleem
Disease : BDG (2015) Dextrocardia, DORV , L TGA,
ASD, Large VSD, No antegrade pulmonary flow, Good
size PAs
Surgery : Completion FONTON Extracardiac
CASE 1
4.
Pre Op Echo:
Situssolitus , Dextrocardia, DORV/ L-TGA, Large VSD, ASD, No antegrade
pulmonary flow, IVC to RA
Cath:
Right MAPCAs coiling
Pressures:
MPA: 13/10/11
LEDP: 10
LPA : 11
Operatives findings:
Dextrocardia, Rt BDG, Adhesions
PROCEDURE:
Extracardiac conduit PTFE 20 mm used, prox anastomosed ro LPA and distal to IVC
5mm fenestration in Graft anastomosed to RA
PER OP ECHO:
Findings not available
5.
Day 0: 15/jan
shiftedto ITC at 1600hrs
Patient kept electively intubated.
Afebrile, Multiple episodes of tonic-clonic fits, Twitching on
right side.
MAP 60-65 mmHg with 0.1 AD & Mil @ 0.1 mics , AD
tapered down to @ 0.06 mics , mil increased to @ 0.3mics
Urine output total 2450 ml
ABGs: PH:7.28- 7.44, PaCO2 29-37.5, PaO2 80-74 Lac 11-
4mmol
Drains pleural: 430 ml
Total intake: 789 ml output 2880 ml , Negative: 2 L
Labs: HB 12.9, TLC 19.9, PLT 141, CREAT 0.6, UREA 21, BIL
1.79, AlT 39 ALP 114, ALB 39
Post Op
6.
Day 1st
& 2nd
16-17/Jan
Remained intubated
Spont trials on day1 at 1130hrs and day2 2030 hrs , failed, Generalized tonic-clonic fits
Sluggish pupil response with intact reflexes GCS 6/10
Febrile in morning, on day 2, 102 F.
MAP 55-60 mmhg, with Ad @ 0.06 mics
PD passed on17/1 at 2300hr
2D Echo: 16/1 : mod LV function with hypokinetic antero septal wall, Laminar flow in
BDG and IVC to PA. No pericardial and pleural effusion
CT brain done on 17/1, Subtle effacement of sulci and gyri in temporoparietal lobe
suggestive of mild cerebral edema
Labs: HB 16.2-14.7, TLC 13.6-26, plt 160-135, creat 0.61-0.78 UREA 25-77 , Bil 2.45-4.23,
ALT 41-39, ALP 109-93, ALB 42-39 on day1 & 2 respectively
Review by Neurophysician adv inj lerace BD and ophthalmologist – no significant
findings 17/1
Blood sent for CS On 17/1
7.
Urine output:
Day 1 2650 ml
Day 2 1080 ml
Drains output:
Day 1 480 ml
Day 2 780 ml
Total intake and output
Day 1 intake 1337 output 3130 ml
Day 2 Intak 3102 outpt 4570ml
Net fluid balance
Day 1 -ve 1793ml
Day 2 -ve 1463ml
8.
DAY 3rd
and 4th:18-19 jan
Remained intubated, spont trials on day 3 at 15:30 and
day 4 at 15:45 hrs, failed due to uncontrolled fits
Hemodynamically stable
MAP 60-70 mmhg with Ad @ 0.03 mics
Neurological status unchanged
Urine output decreased to 0-15 ml/ hr and @ 0.1 And
0.4 ml/kg/hr
ABGS: PH 7.4-7.3, PCO2 31-35 , PO2 86-94 , Lac 2.1-3.2
Labs: HB 11.5-12.5, TLC11.8-14, Plt 51-39 Creat 3.1-4.13
, UREA 181-202, T-BIL 1.1-1.08, ALT 34-53, ALP 54
CS REPORT 18/Jan. Klebsiella pneumoniae sensitive to
colistin
Peritoneal Dialysis cycle started
Nephrologist review, adv continuation of PD cycles
9.
NET input &output on day 3rd
and 4th
Total intake: 6037 ml – 6145 ml
Total output:7060 ml – 6985
PD: 1740 ml – 1465 ml
Pleural Drains: 470 ml – 590 ml
Urine output: 60 ml – 205 ml
Balance: 1023 ml –ve – 840 ml -ve
10.
DAY 5th :20/jan
Kept intubated
Hemodynamically stable with Increased Inotropic
support of Ad@ 0.1 , Nor-Ad @ 0.05 mics
ABGs: PH 7.30, pCO2 39.6 , PO2 77.3 , Lac 3.4
Creat and TLC remained in upward trend, 4.2 and 17
respectively.
Though urine output improved and PD cycle continued
Multiple episodes of fits through out the day.
Labs: HB 11.8 , TLC 17 ,PLT 72, CREAT 4.2, UREA 198,
BIL 0.87 , ALT 71 , ALB 29
11.
Intake & Output
Intake : 8592 ml
output 10030 ml
Urine outpt 1070 ml @ 3.3 ml/kg/hr
Drains Pleural: 710
PD 8230 ml , PD surplus 780 ml
Net balance:
-ve 1487ml
12.
POST ofDay 6th
20/Jan
Kept intubated
Hemodynamically unstable , pressures dropped at 0915
hrs to 60/30, inotropic support escalated, Ad @ 0.15 ,
NorAd @ 0.15 and Vaso was added @ 2ml/hr pressures
remained borderline over rest of the day , 65/45 mmhg
MAP around 45
Neurological status unchanged, Fits continued
Urine output normal and PD continued
Labs: 11.9 , TLC 16.5, PLT 15, CREAT 3.3, UREA 193, BIL
0.78, ALT 62, ALB 23
URINE for C/S sent
13.
Net Intake andOutput
Intake: 5990 ml output: 7290
Urine output : 2230ml
Drains pleural: 1080 ml
PD : 4080ml surplus 680 ml
Net balance:
-ve 1300ml
14.
Post op day7th
Kept intubated
Borderline pressures, dopamine was added @ 05
mics And rest of support escalated Ad @ 0.25
and NorAd @ 0.25
Neurological status remained same
Downward trend in PaO2 72 – 29 – 6 uptrend in
PCo2 35 – last hour 110 – 143 and lactate 3.3 – 9
At 2330 hrs patient collapsed, CPR done but
didn’t revived.
Name: S/OMEM Noor ulllah
Age: 3 months
Weight: 4.2 kg
Gender: Male
Date of Admission: 29/1/25
Date of Surgery : 04-02-25
Date of Death : 06-02-25
Surgeon: Col Intisar ul Haq
Anesthetist: Lt col kaleem
Disease: Infracardiac TAPVR with severe pulmonary hypertension,
Mod size ASD , Large Size PDA
Surgery: TAPVR Repair Infracardiac, PDA Ligation
CASE 2
17.
PreOp echo:
Infra Cardiac TAPVR , Mod ASD , Large size PDA ,
Severe PHT
Per Op findings: TAPVR Infracardiac, Tensed RPA,
volume overload RV, Confluence of veins on
subdiaphragmatic region, Large PDA
PER OP ECHO : Distended RV , Mod Biventricular
functions. Confluence LA anastomosis wide open
Came Off Bypass with High ionotropic support.
Tracheal secretions blood stained
Shifted to ITC with open chest
18.
0 POD:
Shifted To ITC Open chest, at 1330hrs
Kept intubated
MAP 45-50 with inotropic support of Dobuta @ 7
mics , 0.2AD mics , 0.12mics Nor AD and Vaso 0.3
mics
ABGs: PH: 7.43, PCO2 : 34 PO2: 197, FiO2 0.8 , Lac
Decreasing trend 5.5 – 1.9
Febrile, fever spikes of 101 F at 2215 hrs
Labs: TLC 5.3, HB 6.9, PLT 114, Creat 0.6, Urea 24, Alt
33, Alp 103, Bil 0.8
19.
Intake andoutput:
Urine: 845 ml @ 10 ml/kg/hr
Pleural Drains: 150 ml
Abdominal drain: 150 ml
Total intake 497ml
Total output 1168
Net balance:
-ve 670 ml
20.
POD 1st: 05/feb
Intubated
Hemodynamically unstable, MAP 35-45
Supports escalated, Dobuta @7mics, AD @ 0.3mics,
NorAd @ 0.2 mics and Vaso @ 0.3 mics
ABGS: PH 7.28-7.43, PCO2 upward trend 32-49, PO2
120 , FiO2 0.6
Labs: TLC 13.9, HB 10.2, PLT 106, CREAT 0.34,
UREA 41, ALT 34, ALP 93 , BIL 0.8
Chest Re-explored for tamponed effect , no
collection or clots found
21.
Intak andoutput
Urine: 885 ml @ 8.7 ml/kg/hr
Abdominal drain: 545 ml
Pleural Drains: 110 ml
Total intake: 900ml
Total output: 1590 ml
Net balance:
-ve 690 ml
22.
POD 2nd
Hemodynamically stable, MAP 55-60 , with high inotropic
support, Dob @7 mics, Ad @ 0.3 mics , NorAd @ 0.2 mics
kept intubated.
Decreasing urine output
ABGs : PH 7.24 , PCO2 45, PO2 105, LAC 1.2
Labs: TLC 15.6 HB 12.2, PLT 63000, CREAT 0.32, UREA 48,
ALT 39 , ALP 42 , BIL 0.4 , ALB 27
Pleural Drains: 0ml abdominal: 5 ml : urine output 550ml
At 23:30 sudden drop in pressures , Bradycardia, Pt
collapsed, CPR started and inotrops increased but didn’t
revived
23.
Cause OfDeath
Severe PHT
Rt ventricular failure
biventricular failure
24.
Name: CNEAmin usman
Age: 40 days
Gender: Male
Date of Admission: 3-2-2025
Date of Surgery: 04-02-25
Date of Death: 4-02-25
Surgeon: Col Intesar ul Haq
Anesthetist: Lt col kaleem
Disease: TGA, Mod VSD, Small PFO , Small PDA
Surgery: ASO, VSD closure, PDA Ligation
CASE 3
25.
Pre Op echo:
TGA, mod to large size outlet Muscular VSD, Tiny closing
PDA
Introp Findings:
d – TGA, Aorta anterior, PA posterior, Large PM VSD, Large
PDA
Intraop Event:
Coming off bypass , PaO2 , Spo2 dropped , increased inotropic
support, Globally reduced function, coagulopathy, severe acidosis
Post OP echo:
Poor ventricular contractility
LVEF 20-25%
TAPSE 3mm, Mod TR, PAP 40 +CVP.
PFO shunting Right to left
IVS bowing at RV
26.
Post Op:
Shifted to ITC at 2015hrs
Day 0:
Patient kept intubated
MAP 40-50 mmhg with high Inotropic support of AD @ 0.27
mics, Dobuta @ 5 mics & NorAd @ 0.13 mics
Urine output 5 ml/kg/hr.
ABGs, PH 6.84, PCO2 58-75 upward trend, PaO2 40-18 downward
trend & Lactate 20 mmol with ongoing deterioration
Pt status gradually deteriorated with low systemic pressures and
increasing inotropic support
CPR 5 minutes done at 2110hrs , Bradycardia plus low pressures
On 5/2/25 at 6:45hrs again collapsed CPR done but didn’t
revived.
27.
Cause ofDEATH
Left ventricular failure
Cardiopulmonary arrest
28.
Name: CNEAbdullah
Age: 25 days
Gender: Male
Weight : 3.7 KG
Date of Admission: 5/2/25
Date of surgery: 06-02-25
Date of death: 10-02-24
Surgeon: Col Intisar Ul Haq
Anesthetist: Lt Col Kaleem
Disease: TGA , VSD , ASD , PDA
Surgery: ASO + PDA Ligation
CASE 4
29.
Pre Op Echo:
d –TGA , MOD PM VSD, Small PDA , Small PFO.
Per op Findings : Aorta anterior and pulmonary artery
posterior, Mod PM VSD, mod size PDA, Small PFO
Procedure:
ASO + VSD Closure
Per Op ECHO :
Poor dilated LV , mod TR , tiny patch leak, PFO
bidirectional shunt.
Shifted open chest to ITC, severe acidosis low PaO2 & SPO2
30.
Day 0:
Shifted at 2045 hrs
MAP of 45-50 with AD @ 0.2 , Nor AD @ 0.05, Dob @ 5 mics.
At 0045 hrs pressures dropped went into bradycardia CPR
done for 3-5 minutes
ABGs: PH 7.20 , PCO2 37, PO2 49 ,FiO2 1.0, sats 80%, Lac 4
Labs: TLC 5.1, HB , 7.8, PLT 394,CRT 0.4, UREA 21, ALT 19,
ALP 90, BIL 1.5, ALB 35 , CKMB 109.
INTAKE OUTPUT:
Urine: 545 @ 11.33 ml/kg/hr
Pleural+ Med Drains: 225 ml
PD : 175 ml
Total intake: 390.4 ml
Total output: 862 ml
Net : -ve 472 ml
31.
Post Op day1st
and 2nd
Intubated, with border line hemodynamics
Supports escalated, Dob @ 7.5 mics, Ad@ 0.3 - 0.29 ,
NorAd @ 0.1
ABGs : PH 7.285-7.35 , PCO2 42-50 upward trend,
PO2 58-24 downward trend, FiO2 1.0, Lac 5-3
downward trend
Labs: TLC 9.8-10.2, HB 12.7-15.4, Creat 0.51-0.54,
Urea 33-45, ALT 42-47, ALP110, BIL 2.3 – 1.7, ALB
34 -27, CKMB 101-129, DIGOX 1.36
PD cycles started on day 2.
32.
Intake and output
Urine:655-820 ml @ 7.3-9.2 ml/hr /kg
Drains pleural+mediastinal: 70-50ml
PD : 1380 PD surplus 500 ml
Net:
Intake : 841 – 1545
Output: 1389 – 2215
-ve 538 , 661 ml
33.
Day 3rdand 4th
:
Intubated, borderline hemodynamics, deteriorated
ABGs , rising lactate with inotropic support of Dob @
7.42, Ad@ 0.25 & NorAd @ 0.05
Afebrile
ABGs: PH 7.3, PCO2 42-51, PO2 42-34, SATS 60%, Lac:
3.5-4.5, FiO2 100%.
Labs: TLC 10.4-8, HB 15.3 – 14, plt 110, creat 0.48, urea
38, ALT 72, Bil 1.8.
Urine output @ 7.3 ml/kg/hr
At 1045 hrs went into bradycardia pressures dropped
CPR started but didn’t revived.
34.
Cause OfDeath
Lt ventricular failure
Cardiopulmonary arrest
35.
Name: CNE: Brishna
Age: 13 years
Gender: Female
Date of admission; 17-02-25
Date of surgery: 18-2-25
Date of death: 019-02-25
Surgeon: Col Dawood kamalq
Anesthetist: Lt Col Kaleem
Disease: Severe MR , mod TR
Surgery: MV Replacement
CASE 5
36.
Pre op Echo:EF 50%
Thickened and Non Coapting Mitral Valve with severe
MR, dilated LA/LV with fair Lvfunction, Mod to severe
TR with PG 50 mmHg.
Per op Findings :
Thickened Mitral leaflet and pericardial adhesions.
Per op echo:
Well functioning mitral prothetic valve with no
significant gradients or paravalvular leak.
Came off bypass with high inotropes' 0.2AD,
0.1NorAD
Shifted to ITC with open chest
37.
Day 0:
Shifted to ITC at 1715 hrs
Kept intubated, Hemodynamically stable with
inotropic support of Dob 10 mics tapered to 5 mics, Ad
@ 0.23 & NorAd @ 0.1
Good urine output 4570 ml,
Drains B/L pleural: 300ml
ABGs : PH 7.30, PCO2 34.7, PO2 211, Sats , 99.5%, Lac
11- 18 upward trend
Labs: TLC 11.9, HB 8 , PLT 241, CREAT 0.53, UREA 19,
ALT 14, ALP 104, BIL 1.4, ALB 39
Total intake: 2195
Total output: 4870
Net –ve 2600 ml
38.
1st
Post opday:
At 9:15 hrs , Pt rhythm became irregular,
cardioversion done but failed then went into
cardiac arrest, CPR started despite maximum
efforts didn’t revived.
39.
Cause ofDeath
Left ventricular failure
Arrhythmias
40.
Name: CNEEshmal
Age: 1 month
Date of surgery 30-01-25
Date of Death: 10-02-25
Surgeon: Col Intisar Ul Haq
Anesthetist: Lt Col Kaleem
Disease: TGA, multiple VSDs, Small PFO
Surgery: Was planned for ASO but then PA banding and
atrial septectomy done due to Adjacent coronary ostias.
CASE 6
41.
Per Op findings:Aorta towards left and PA towards Rt. Anomalous &
Adjacent coronary ostias of RCA and LCA with intramural course.PA
banding atrial septectomy Done.
Day 0 post Op:
Kept intubated overnight, MAP 60-65 mmHg with Ad @ 0.14 mics
Urine output normal, PD passed – 725 ml
ABGs acidotic with decreasing PaO2 and Spo2 and increasing lactate
levels, PH 7.29, PCo2 40, PaO2 37, Lac 14
Day 1 post op:
Intubated spont trials given failed retaining PCO2 , dropping sats and
PaO2.
MAP 50-55 mmHg , Ad @0.10, NorAd @ 0.05 mics
Urine output normal .
PD 500 ML
42.
Day 2nd
, 3rd
,4th
Post Op:
Intubated With increasing.... High airway pressures With
decreasing PaO2 and sats , PaO2 30-35 and sats 50-60
Hemodynamically stable with increasing inotropic
support Ad @ 0.15 and NorAd @ 0.1 mics
Urine output decreased, PD cycles started
On 2 D echo , good Biventricular functions
43.
POD 5th
, 6th
,7th
:
Kept intubated
Hemodynamically stable with episodes of hypotension,
with Dob @ 5 mics , Ad @ 0.1 NorAd @ 0.05
C/S report: Klebsiella pneumoniae
PO2 and sats still below normal
Urine output normal, PD cycles continued
POD 8th
, 9th
, 10th
:
Intubated, Deteriorating hemodynamics,
Septic , CRP 204, TLC 18
PaO2 30-35
Urine output Decreasing trend, PD cycles con
44.
POD 11th
and 12th
Intubatedwith increasing airway pressure, increased
pressure support
Hemodynamically stable with episodes of hypotension
ABGs acidotic, with decreasing PaO2 and Spo2 and
increasing lactate levels.
Urine output Decreasing trend, PD cycles continued
Ay 12th
POD pt suddenly went into bradycardia and
hypotension, CPR done, didn’t revived
Cause OF death:
LV faulure, Sepsis .