SlideShare a Scribd company logo
1 of 11
SECURLOG (PVT) LIMITED
SECURETRACK (PVT) LTD
Ops Flow Chart
Ops Flow Chart
• Vehicles to be hired on monthly basis against signing of contract with
vendors
Procedure To Hire Trucks On Monthly Basis
Ops Flow Chart
• The supervisor order the vehicle to reach loading point for load. On
completion of load vehicle will move for loading point to petrol pump for
fueling
Vehicle Load
Ops Flow Chart
• The designated person will be available at petrol pump for fueling and
recording, to avoid any dual practices
Vehicle Fueling
Ops Flow Chart
• The supervisor ensure that the said vehicle has left the origin after
fueling onwards destination.
• The supervisor will record the time of departure, the load commodity
Meter reading fueling, name of the pump and fueling
Departure Of Vehicle For Destination
Ops Flow Chart
• All relevant information relates to the vehicle will be forwarded to the
designated personal designated personal destination. Further supervisor
at origin will request the person deputed at destination to plan and get
backload ready
Information Of Vehicle
Ops Flow Chart
• Driver will inform the person destination before reaching time approx 8
to 10 hours
Vehicle Reached At Destination
Ops Flow Chart
• Driver will reaching destination to unload the vehicle and incase of any
delay he will call supervisor at origin to get the vehicle unload ASAP.
Unloading
Ops Flow Chart
• After unloading the vehicle will move to the loading point for backload in
coordination with supervisor designated at point of destination.
Backload
Ops Flow Chart
• Vehicle loading the backload will move before reaching back the driver
will inform supervisor about reaching time. And as policy the supervisor
at backload will inform supervisor at destination for the load vice versa.
• On completion of RT the supervisor will handover all supporting docs to
back office for recording and filing.
Vehicle Arriving Back

More Related Content

Similar to Doc2

3-11-14 Updated job duties
3-11-14 Updated job duties3-11-14 Updated job duties
3-11-14 Updated job duties
Hamp Lucas
 
Ramiz_Morina_CV_2016
Ramiz_Morina_CV_2016Ramiz_Morina_CV_2016
Ramiz_Morina_CV_2016
Ramiz Morina
 
AMCO Logistics Profile
AMCO Logistics ProfileAMCO Logistics Profile
AMCO Logistics Profile
Mustafa Hamdy
 
Steve Cox cv (1) 2013
Steve Cox cv (1) 2013Steve Cox cv (1) 2013
Steve Cox cv (1) 2013
steve cox
 
December Presentation (Non-Confidential)
December Presentation (Non-Confidential)December Presentation (Non-Confidential)
December Presentation (Non-Confidential)
Liam Radigan
 
Assignement 3 model answer
Assignement 3 model answerAssignement 3 model answer
Assignement 3 model answer
karim sal3awi
 
Vehicle inspection training
Vehicle inspection trainingVehicle inspection training
Vehicle inspection training
Kristin Franks
 

Similar to Doc2 (20)

3-11-14 Updated job duties
3-11-14 Updated job duties3-11-14 Updated job duties
3-11-14 Updated job duties
 
Ramiz_Morina_CV_2016
Ramiz_Morina_CV_2016Ramiz_Morina_CV_2016
Ramiz_Morina_CV_2016
 
ATI & McCleod Integration Virtually Syncs Tractors & Trailers
ATI & McCleod Integration Virtually Syncs Tractors & TrailersATI & McCleod Integration Virtually Syncs Tractors & Trailers
ATI & McCleod Integration Virtually Syncs Tractors & Trailers
 
GPS for Carriers
GPS for CarriersGPS for Carriers
GPS for Carriers
 
Caferaa pharma web demo
Caferaa pharma web demoCaferaa pharma web demo
Caferaa pharma web demo
 
2014 4th Quarter Online Safety Meeting
2014 4th Quarter Online Safety Meeting2014 4th Quarter Online Safety Meeting
2014 4th Quarter Online Safety Meeting
 
AMCO Logistics Profile
AMCO Logistics ProfileAMCO Logistics Profile
AMCO Logistics Profile
 
Pinakin
PinakinPinakin
Pinakin
 
Steve Cox cv (1) 2013
Steve Cox cv (1) 2013Steve Cox cv (1) 2013
Steve Cox cv (1) 2013
 
Transportation
TransportationTransportation
Transportation
 
December Presentation (Non-Confidential)
December Presentation (Non-Confidential)December Presentation (Non-Confidential)
December Presentation (Non-Confidential)
 
freight Final Review 5.15.pptx freight Final Review 5.15.pptx
freight Final Review 5.15.pptx freight Final Review 5.15.pptxfreight Final Review 5.15.pptx freight Final Review 5.15.pptx
freight Final Review 5.15.pptx freight Final Review 5.15.pptx
 
Assignement 3 model answer
Assignement 3 model answerAssignement 3 model answer
Assignement 3 model answer
 
Vehicle inspection training
Vehicle inspection trainingVehicle inspection training
Vehicle inspection training
 
Training manual'22.pptx
Training manual'22.pptxTraining manual'22.pptx
Training manual'22.pptx
 
Operations Management at Petrol retail outlet
Operations Management at Petrol retail outletOperations Management at Petrol retail outlet
Operations Management at Petrol retail outlet
 
CV_Abdulbasit
CV_AbdulbasitCV_Abdulbasit
CV_Abdulbasit
 
BAT 06209.pptx
BAT 06209.pptxBAT 06209.pptx
BAT 06209.pptx
 
Motor Vehicle Permit
Motor Vehicle PermitMotor Vehicle Permit
Motor Vehicle Permit
 
300.05 operation maintenance reporting and security of motor vehicle and auxi...
300.05 operation maintenance reporting and security of motor vehicle and auxi...300.05 operation maintenance reporting and security of motor vehicle and auxi...
300.05 operation maintenance reporting and security of motor vehicle and auxi...
 

Doc2

  • 1. SECURLOG (PVT) LIMITED SECURETRACK (PVT) LTD Ops Flow Chart
  • 2. Ops Flow Chart • Vehicles to be hired on monthly basis against signing of contract with vendors Procedure To Hire Trucks On Monthly Basis
  • 3.
  • 4. Ops Flow Chart • The supervisor order the vehicle to reach loading point for load. On completion of load vehicle will move for loading point to petrol pump for fueling Vehicle Load
  • 5. Ops Flow Chart • The designated person will be available at petrol pump for fueling and recording, to avoid any dual practices Vehicle Fueling
  • 6. Ops Flow Chart • The supervisor ensure that the said vehicle has left the origin after fueling onwards destination. • The supervisor will record the time of departure, the load commodity Meter reading fueling, name of the pump and fueling Departure Of Vehicle For Destination
  • 7. Ops Flow Chart • All relevant information relates to the vehicle will be forwarded to the designated personal designated personal destination. Further supervisor at origin will request the person deputed at destination to plan and get backload ready Information Of Vehicle
  • 8. Ops Flow Chart • Driver will inform the person destination before reaching time approx 8 to 10 hours Vehicle Reached At Destination
  • 9. Ops Flow Chart • Driver will reaching destination to unload the vehicle and incase of any delay he will call supervisor at origin to get the vehicle unload ASAP. Unloading
  • 10. Ops Flow Chart • After unloading the vehicle will move to the loading point for backload in coordination with supervisor designated at point of destination. Backload
  • 11. Ops Flow Chart • Vehicle loading the backload will move before reaching back the driver will inform supervisor about reaching time. And as policy the supervisor at backload will inform supervisor at destination for the load vice versa. • On completion of RT the supervisor will handover all supporting docs to back office for recording and filing. Vehicle Arriving Back