The document discusses dragline balancing diagrams which are designed to optimize dragline utilization, minimize rehandling, utilize available void space safely for overburden storage, and achieve desired coal exposure. It provides examples of dragline excavation parameters, cut areas, dump areas, utilization rates, and estimated annual productivities for three dragline balancing scenarios.