S H U TTL E
    P R O C E S S IN G
 ( B e f o r e F lig h t A c t iv it ie s
R a r e ly S e e n             B y Th e
     D G S n e rO lV E b l i c - - -
         I e C a Pu R )
      D IS C O V E R Y
External Tank Arrives by Barge from MS
External Tank



Vertical Assembly Building
Removing
External Tank
From Carrier
External Tank Enters VAB
External Tank in VAB
Preparing to Lift the Tank to Vertical
Lifting Tank
Solid Rockets
Are Attached
Engines Are
Attached To
  Solids
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
Shuttle In Sling Ready For Lift In VAB
Shuttle Has Been
Moved To VAB And
And Will Be Attached
  To External Tank
Shuttle is Attached
Payload
Preparation Room
      (PPR)
Cargo Package For ISS
New Module For ISS
Payload Ready To
Be Moved to The
  Launch Pad
Payload Carrier
 Leaves PPR
Payload Being Moved To Launch
             Pad
Lifting Payload
Into Position For
   Insertion Into
Discovery When
 It Arrives At The
         Pad
Shuttle Discovery Leaves VAB
Shuttle & Crawler




                    TRIP:
                    Length--- 3 ½ mi
                    Time--- 6-8 hours
   Launch Pad
Crawler Control
DISCOVERY
ARRIVES
  AT PAD
READY FOR
  LAUNCH
We Have Lift Off
Discover the discovery

Discover the discovery