SlideShare a Scribd company logo
DIRECTORATE OF SEISMIC STUDIES
TARBELA DAM PROJECT
WELCOME
TO
DIRECTORATE OF
SEISMIC STUDIES
A
BRIEF ABOUT
TARBELA DAM PROJECT
&
SEISMIC NETWORKS
AT
THIS PROJECT
LARGE DAMS
• According to ICOLD definition of large dams it
• is the one which has at least
• 15 meters of height or storing at least 3
million
• meter cube of water
Sr.No COUNTRY NO. OF
LARGE DAMS
1 CHINA >18000
2 USA >7000
3 INDIA >4000
4 JAPAN >3000
5 CANADA >800
6 RUSSIA >200
7 PAKISTAN ~154
TYPES OF DAMS
• EMBANKMENT DAMS
• GRAVITY DAMS
• ARCH DAMS
• BUTTRESS DAMS
EMBANKMENT DAM
EMBANKMENT DAM
• Embankment Dams are massive dams
made of Earth or Rock
• They rely on their weight to resist the
flow of water
GRAVITY DAM
GRAVITY DAM
• Gravity Dams resist the horizontal thrust of water
entirely by their own weight
• Concrete Gravity Dams are typically used to
block streams through narrow gorges
• Concrete gravity dams tend to use a large
amount concrete which make these expensive
• Generally the base of a concrete gravity dam is
equal to 0.7 times the height of the dam
ARCH DAM
ARCH DAM
• An Arched Dam is a curved Dam, dependent
upon arch action for its strength
• Arch Dams are thinner and therefore require
less material than any other type of dam
• Arch dams are good for sites that are narrow
and have strong abutments
BUTTRESS DAM
BUTTRESS DAM
• Buttress Dams are dams in which the face is
held up by a series of supports
• Buttress Dams can take many forms , the face
may be flat or curved
• Buttress Dams are made of concrete and may
be reinforced with steel bars. The buttress
may be hollow or solid
MAIN STRUCTURES
OF
TARBELA DAM PROJECT
• Main Embankment Dam
• The Reservoir
• Two Auxiliary Dams
• Two Spillways
• Five Tunnels
• Power House
IMPORTANT FUNCTIONS
OF
TARBELA DAM
• SUPPLY OF WATER FOR IRRIGATION
• Nearly four million acres of agriculture land is receiving
• GENERATION OF HYDEL POWER
• 3478 MW of electricity is being generated which is almost 30% of the
total electricity generated by WAPDA and 16 % of the country.
• TARBELA DAM IS THE BACK BONE OF THE COUNTRY
• w.r.t
• THE SUPPLY OF WATER FOR IRRIGATION
• AND
• GENERATON OF ELECTRICITY
IMPORTANT INFORMATION ABOUT TARBELA DAM PROJECT
YEAR OF BEGINNING 1968 YEAR OF COMPLETION 1976 COST ~ US$ 2 Billion
TYPE OF DAM LENGTH
(Meters)
HEIGHT (Meters)
MAIN 2743 145
AUXILLARY 1 713 105
AUXILLARY 2 293 67
CAPACITY INITIAL 2015 DECREASE
GROSS 11.62 MAF 7.44 MAF 36 %
USABLE 9.68 MAF 6.5 MAF 33%
NAME OF
SPILLWAYS
DISCHAR
GE
(Cusecs)
GATES SIZE
(Meters)
AUXILLARY 8,50,000 9 15.2 *
18.6
SERVICE 6,50,000 7 -do-
TUNNEL NO LENGTH
(Miles)
DISCHARGE
(Cusecs)
1-3 ½ Mile Turbines Installed
4 ½ Mile 92,000
5 ½ Mile 82,000
UNITS TUNNEL CAPACITY TOTAL YEAR
1-4 1 175 700 1977
5-10 2 175 1050 1982-
85
11-14 3 432 1728 1994
G.TOTAL 3478
SEISMIC NETWORKS
AT
TARBELA DAM
PROJECT
MAXIMUM EARTHQUAKE THAT CAN
BE GENERATED BY LOCAL FAULTS
• Fault Magnitude
• Darband 6.5
• Panjal 7.5
• Detachment 8.0
SEISMIC MONITORING
OF
DAMS AND RESERVOIRS
MAY SERVE SEVERAL PURPOSES
STUDIES REGARDING INDUCED SEISMICITY
STUDIES REGARDING GROUND RESPONSE TO
STRONG SHAKING BEFORE A DAM IS BUILT
STRUCTURAL STUDIES REGARDING SEISMIC
BEHAVIOUR OF THE DAM ITSELF
SEISMIC INSTRUMENTATION
AT
TARBELA DAM
• MICROSEISMIC NETWORK
• ACCELEROGRAPH NETWORK
WAPDA REAL TIME
SEISMIC MONITORING
SYSTEM AND
DATA PROCESSING
USING
ANTELOPE SOFTWARE
COMPONENT OF
WAPDA
REAL-TIME SEISMIC SYSTEM
• Site
• Sensors
• Data loggers
• Communications
• ANTELOPE Software
STATION SITE
IN SEISMOLOGY, WHICH IS A TYPICAL NON-
EXPERIMENTAL SCIENCE, EVERY SEISMIC EVENT WHICH
IS NOT RECORDED REPRESENTS LOSS OF DATA
• Seismometers
• Weak motion
• Velocity
• Very sensitive
• Seismicity monitoring
•
• Accelerometers
• Strong motion
• Acceleration
• Less sensitive
• Engineering purposes
SENSORS AT WAPDA STATIONS
• SHORT PERIOD SEISMOMETER
• TO RECORD GROUND MOTION OF VERY SMALL,
MODERATE, AND LARGE; LOCAL, REGIONAL
EARTHQUAKESFREE FIELD
•ACCELEROMETER
• TO RECORD LOCAL STRONG GROUND MOTION
AND USEFUL FOR BOTH ENGINEERING AND
SEISMOLOGICAL APPLICATIONS
LOCATION OF SEISMIC STATIONS
LOCATION OF ACCELEROGRAPH STATIONS
DIRECTORATE OF SEISMIC STUDIES
TARBELA DAM PROJECT
WAPDA VSAT COMMUNICATION SYSTEM
REAL-TIME SEISMIC SYSTEM
PROVIDES
FAST AND RELIABLE INFORMATION TO
GOVERNMENT AGENCIES IN RESPONSE TO
SEISMIC EVENT
HIGH QUALITY SEISMIC DATA RECORDING
FOR HAZARD MITIGATION STUDIES AND
SCIENTIFIC RESEARCH
HIGH AVAILABILITY
EASE OF MAINTENANCE AND UPGRADE
LOW TOTAL COST OF THE OWNERSHIP (TCO)
ANTELOPE SOFTWARE SYSTEMS
ARTS (ANTELOPE Real Time System)
Real Time Acquisition
Real Time Data Processing
Command & Control
OFF Line Processing
Relational Database
Communications & Power System
ANTELOPE Software
REAL-TIME MONITORING
OF
DATA & INFORMATION
OBJECTIVES
Calculate seismic risk factor for different
project structures to be constructed.
Calculate the maximum credible
earthquake posing great hazard to dam.
Investigate the seismicity induced by
filling of Tarbela reservoir.
Gather data for exchange with different
international organizations.
Make an attempt for the prediction of
earthquake
RESERVOIR INDUCED SEISMICITY
Reorganization in Seismicity is generally
confined up to shallow depths i.e. 20 km.
and limited to a radial distance of about
50 km.
Increased seismic activity associated with
rapid filling/depleting is a direct effect of
loading/unloading through either shear
stress or increased pore pressure. These
induced events are mostly of low
magnitude. However, after quiescence in
Seismicity, felt events may occur with
magnitudes up to 5.5.
EXAMPLES OF RESERVOIR INDUCED
SEISMICITY AT SOME DAMS
DIRECTORATE OF SEISMIC STUDIES
TARBELA DAM PROJECT
EARTHQUAKE DRILL
BLUE IV
TO V
YELLOW
VI TO VII
RED > VII
EARTHQUAKE DRILLS
TARBELA,MANGLA & DIAMER BASHA
Earthquake felt around the Dams may be potentially damaging depending
on their intensity and duration of shaking. a tremor with intensities of vi
or higher on modified Mercalli (M.M) Intensity scale will cause visible
damage. therefore, emergency drill must be called for.
OBJECTIVES:
To take immediate actions to assess the damages.
To take necessary actions to lessen or prevent the consequences of
damages around the Dams and down stream areas.
To evaluate the remedial actions for restoring of functional adequacy of
damaged project features as soon as possible.

More Related Content

Similar to DIRECTORATE OF SEISMIC STUDIES.pptx

2209100010 febrianto - plt pasang surut (tidal)
2209100010   febrianto - plt pasang surut (tidal)2209100010   febrianto - plt pasang surut (tidal)
2209100010 febrianto - plt pasang surut (tidal)Febrianto Utomo
 
Tidal Energy (Non Conventional Energy Source)
Tidal Energy (Non Conventional Energy Source)Tidal Energy (Non Conventional Energy Source)
Tidal Energy (Non Conventional Energy Source)
Aswin KP
 
Tides and Tidal Energy.pptx
Tides and Tidal Energy.pptxTides and Tidal Energy.pptx
Tides and Tidal Energy.pptx
SatishAdhikari10
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridge
elsayed ahmed
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallu
rohinibjn
 
The Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for LandownersThe Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for Landowners
Dan Arthur
 
Rishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.pptRishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.ppt
NoomanShaikh
 
tidal energy
tidal energytidal energy
tidal energy
Shivam Prajapati
 
Tailings dams
Tailings damsTailings dams
Tailings dams
MahmoudDweik1
 
Tidal energy 2
Tidal energy 2Tidal energy 2
Tidal energy 2
sainmahendra7
 
Tailings dams
Tailings damsTailings dams
Tailings dams
Vanessa Chappell
 
Methods
MethodsMethods
Methods
Shah Naseer
 
Peatland monitoring iucn conference v.4
Peatland monitoring iucn conference v.4Peatland monitoring iucn conference v.4
Peatland monitoring iucn conference v.4
Jeremy LeLean
 
Dangers from surface & Underground water
Dangers from surface & Underground water  Dangers from surface & Underground water
Dangers from surface & Underground water
Rathin Biswas
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit v
Dr.Anil Deshpande
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
RijuDasgupta
 
Global earthquake,bam
Global earthquake,bamGlobal earthquake,bam
Global earthquake,bam
ANISHALALU1
 
Storage head works
Storage head worksStorage head works
Storage head works
Anirudhan K M
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assign
ravi shankar
 
Tidal power
Tidal powerTidal power
Tidal powerMelwinda
 

Similar to DIRECTORATE OF SEISMIC STUDIES.pptx (20)

2209100010 febrianto - plt pasang surut (tidal)
2209100010   febrianto - plt pasang surut (tidal)2209100010   febrianto - plt pasang surut (tidal)
2209100010 febrianto - plt pasang surut (tidal)
 
Tidal Energy (Non Conventional Energy Source)
Tidal Energy (Non Conventional Energy Source)Tidal Energy (Non Conventional Energy Source)
Tidal Energy (Non Conventional Energy Source)
 
Tides and Tidal Energy.pptx
Tides and Tidal Energy.pptxTides and Tidal Energy.pptx
Tides and Tidal Energy.pptx
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridge
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallu
 
The Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for LandownersThe Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for Landowners
 
Rishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.pptRishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.ppt
 
tidal energy
tidal energytidal energy
tidal energy
 
Tailings dams
Tailings damsTailings dams
Tailings dams
 
Tidal energy 2
Tidal energy 2Tidal energy 2
Tidal energy 2
 
Tailings dams
Tailings damsTailings dams
Tailings dams
 
Methods
MethodsMethods
Methods
 
Peatland monitoring iucn conference v.4
Peatland monitoring iucn conference v.4Peatland monitoring iucn conference v.4
Peatland monitoring iucn conference v.4
 
Dangers from surface & Underground water
Dangers from surface & Underground water  Dangers from surface & Underground water
Dangers from surface & Underground water
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit v
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
 
Global earthquake,bam
Global earthquake,bamGlobal earthquake,bam
Global earthquake,bam
 
Storage head works
Storage head worksStorage head works
Storage head works
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assign
 
Tidal power
Tidal powerTidal power
Tidal power
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

DIRECTORATE OF SEISMIC STUDIES.pptx

  • 1. DIRECTORATE OF SEISMIC STUDIES TARBELA DAM PROJECT WELCOME TO DIRECTORATE OF SEISMIC STUDIES
  • 2. A BRIEF ABOUT TARBELA DAM PROJECT & SEISMIC NETWORKS AT THIS PROJECT
  • 3.
  • 4. LARGE DAMS • According to ICOLD definition of large dams it • is the one which has at least • 15 meters of height or storing at least 3 million • meter cube of water
  • 5. Sr.No COUNTRY NO. OF LARGE DAMS 1 CHINA >18000 2 USA >7000 3 INDIA >4000 4 JAPAN >3000 5 CANADA >800 6 RUSSIA >200 7 PAKISTAN ~154
  • 6. TYPES OF DAMS • EMBANKMENT DAMS • GRAVITY DAMS • ARCH DAMS • BUTTRESS DAMS
  • 8. EMBANKMENT DAM • Embankment Dams are massive dams made of Earth or Rock • They rely on their weight to resist the flow of water
  • 10. GRAVITY DAM • Gravity Dams resist the horizontal thrust of water entirely by their own weight • Concrete Gravity Dams are typically used to block streams through narrow gorges • Concrete gravity dams tend to use a large amount concrete which make these expensive • Generally the base of a concrete gravity dam is equal to 0.7 times the height of the dam
  • 12. ARCH DAM • An Arched Dam is a curved Dam, dependent upon arch action for its strength • Arch Dams are thinner and therefore require less material than any other type of dam • Arch dams are good for sites that are narrow and have strong abutments
  • 14. BUTTRESS DAM • Buttress Dams are dams in which the face is held up by a series of supports • Buttress Dams can take many forms , the face may be flat or curved • Buttress Dams are made of concrete and may be reinforced with steel bars. The buttress may be hollow or solid
  • 15. MAIN STRUCTURES OF TARBELA DAM PROJECT • Main Embankment Dam • The Reservoir • Two Auxiliary Dams • Two Spillways • Five Tunnels • Power House
  • 16.
  • 17. IMPORTANT FUNCTIONS OF TARBELA DAM • SUPPLY OF WATER FOR IRRIGATION • Nearly four million acres of agriculture land is receiving • GENERATION OF HYDEL POWER • 3478 MW of electricity is being generated which is almost 30% of the total electricity generated by WAPDA and 16 % of the country. • TARBELA DAM IS THE BACK BONE OF THE COUNTRY • w.r.t • THE SUPPLY OF WATER FOR IRRIGATION • AND • GENERATON OF ELECTRICITY
  • 18. IMPORTANT INFORMATION ABOUT TARBELA DAM PROJECT YEAR OF BEGINNING 1968 YEAR OF COMPLETION 1976 COST ~ US$ 2 Billion TYPE OF DAM LENGTH (Meters) HEIGHT (Meters) MAIN 2743 145 AUXILLARY 1 713 105 AUXILLARY 2 293 67 CAPACITY INITIAL 2015 DECREASE GROSS 11.62 MAF 7.44 MAF 36 % USABLE 9.68 MAF 6.5 MAF 33% NAME OF SPILLWAYS DISCHAR GE (Cusecs) GATES SIZE (Meters) AUXILLARY 8,50,000 9 15.2 * 18.6 SERVICE 6,50,000 7 -do- TUNNEL NO LENGTH (Miles) DISCHARGE (Cusecs) 1-3 ½ Mile Turbines Installed 4 ½ Mile 92,000 5 ½ Mile 82,000 UNITS TUNNEL CAPACITY TOTAL YEAR 1-4 1 175 700 1977 5-10 2 175 1050 1982- 85 11-14 3 432 1728 1994 G.TOTAL 3478
  • 20.
  • 21. MAXIMUM EARTHQUAKE THAT CAN BE GENERATED BY LOCAL FAULTS • Fault Magnitude • Darband 6.5 • Panjal 7.5 • Detachment 8.0
  • 22. SEISMIC MONITORING OF DAMS AND RESERVOIRS MAY SERVE SEVERAL PURPOSES STUDIES REGARDING INDUCED SEISMICITY STUDIES REGARDING GROUND RESPONSE TO STRONG SHAKING BEFORE A DAM IS BUILT STRUCTURAL STUDIES REGARDING SEISMIC BEHAVIOUR OF THE DAM ITSELF
  • 23. SEISMIC INSTRUMENTATION AT TARBELA DAM • MICROSEISMIC NETWORK • ACCELEROGRAPH NETWORK
  • 24. WAPDA REAL TIME SEISMIC MONITORING SYSTEM AND DATA PROCESSING USING ANTELOPE SOFTWARE
  • 25. COMPONENT OF WAPDA REAL-TIME SEISMIC SYSTEM • Site • Sensors • Data loggers • Communications • ANTELOPE Software
  • 26. STATION SITE IN SEISMOLOGY, WHICH IS A TYPICAL NON- EXPERIMENTAL SCIENCE, EVERY SEISMIC EVENT WHICH IS NOT RECORDED REPRESENTS LOSS OF DATA
  • 27.
  • 28. • Seismometers • Weak motion • Velocity • Very sensitive • Seismicity monitoring • • Accelerometers • Strong motion • Acceleration • Less sensitive • Engineering purposes
  • 29. SENSORS AT WAPDA STATIONS • SHORT PERIOD SEISMOMETER • TO RECORD GROUND MOTION OF VERY SMALL, MODERATE, AND LARGE; LOCAL, REGIONAL EARTHQUAKESFREE FIELD •ACCELEROMETER • TO RECORD LOCAL STRONG GROUND MOTION AND USEFUL FOR BOTH ENGINEERING AND SEISMOLOGICAL APPLICATIONS
  • 32. DIRECTORATE OF SEISMIC STUDIES TARBELA DAM PROJECT
  • 34. REAL-TIME SEISMIC SYSTEM PROVIDES FAST AND RELIABLE INFORMATION TO GOVERNMENT AGENCIES IN RESPONSE TO SEISMIC EVENT HIGH QUALITY SEISMIC DATA RECORDING FOR HAZARD MITIGATION STUDIES AND SCIENTIFIC RESEARCH HIGH AVAILABILITY EASE OF MAINTENANCE AND UPGRADE LOW TOTAL COST OF THE OWNERSHIP (TCO)
  • 35. ANTELOPE SOFTWARE SYSTEMS ARTS (ANTELOPE Real Time System) Real Time Acquisition Real Time Data Processing Command & Control OFF Line Processing Relational Database Communications & Power System ANTELOPE Software
  • 37. OBJECTIVES Calculate seismic risk factor for different project structures to be constructed. Calculate the maximum credible earthquake posing great hazard to dam. Investigate the seismicity induced by filling of Tarbela reservoir. Gather data for exchange with different international organizations. Make an attempt for the prediction of earthquake
  • 38. RESERVOIR INDUCED SEISMICITY Reorganization in Seismicity is generally confined up to shallow depths i.e. 20 km. and limited to a radial distance of about 50 km. Increased seismic activity associated with rapid filling/depleting is a direct effect of loading/unloading through either shear stress or increased pore pressure. These induced events are mostly of low magnitude. However, after quiescence in Seismicity, felt events may occur with magnitudes up to 5.5.
  • 39. EXAMPLES OF RESERVOIR INDUCED SEISMICITY AT SOME DAMS
  • 40. DIRECTORATE OF SEISMIC STUDIES TARBELA DAM PROJECT EARTHQUAKE DRILL BLUE IV TO V YELLOW VI TO VII RED > VII
  • 41. EARTHQUAKE DRILLS TARBELA,MANGLA & DIAMER BASHA Earthquake felt around the Dams may be potentially damaging depending on their intensity and duration of shaking. a tremor with intensities of vi or higher on modified Mercalli (M.M) Intensity scale will cause visible damage. therefore, emergency drill must be called for. OBJECTIVES: To take immediate actions to assess the damages. To take necessary actions to lessen or prevent the consequences of damages around the Dams and down stream areas. To evaluate the remedial actions for restoring of functional adequacy of damaged project features as soon as possible.