DIFFERENT PURCHASING PRACTICES
FOR MANUFACTURERS
A robust and accurate planning system is critical to any manufacturer. In this
article, we are comparing different purchasing practices – ROP/ROQ Principles
vs MRP System Planning.
A robust and accurate planning system is critical to any manufacturer. However,
unlike larger producers, small and medium-sized businesses (SMB) are often
much more cash conscious as a matter of survival and or to shelter their growth
plans. If the plan is too aggressive, companies may find themselves with too
much inventory, tying up valuable cash-flow required for day to day operations.
If the plan is too timid, companies may find themselves with stockouts that
cause loss or cancellation of orders.
One long-running discussion on the value of which planning system to use has
centered on whether a manufacturer should use a Reorder Point /Reorder
Quantity planning system (ROP/ROQ) versus a Materials Requirement
System (MRP) software. To understand which is best, it helps to look at what
each system really is.
ROP/ROQ planning systems are consumption-based planning tools and formulas used to
determine when to reorder material and in what quantities. With reorder point planning,
orders for material are triggered by the depletion of stock items as orders are placed. Once
a stock level for a component reaches a predetermined minimum, an order is placed for that
component. This type of planning also uses a Reorder Quantity (ROQ) to determine how
much stock to order for replenishment. Each of the two segments of this planning method
utilizes a simple formula set.
ROP/ROQ Planning
ROP = (Lead Time in Days x Unit Sales per Day) + Safety Stock
This then yields the number of units where new components and raw materials orders
should be placed to keep the factory running with no stoppage and without holding excess
inventory.
ROQ = Square Root of ( 2 X Required Quantity X Cost per Order / Carrying Cost per
Unit)
This then yields the quantity of the component to order at the reorder point.
A helpful book – Smart Inventory Solutions: Improving the Management of Engineering
Materials By Phillip Slater.
While the formulas are simple, the two have important distinctions. ROP defines the when
of the planning system, and ROQ defines how much. Also, ROQ is simply an inventory
planning component, whereas ROP may be influenced by management due to cash-flow
and current business conditions. Effectively, ROP is a more strategic and more stable aspect
of the system, ROQ is a tactical aspect and one that may change due to many factors.
ROQ also carries with it the impact of a larger number of external factors such as freight
costs, volume discounts and other things that affect inventory cost either positively or
negatively. As such, it is an operational component that requires additional scrutiny in order
to optimize costs.
Example: If a factory requires 5000 units of a component from an overseas supplier and a
standard container holds 4,000 units, then a decision must be made to optimize the
acquisition of the balance of the remaining 1,000 units. Shipping by another method
increases cost, while deferring may risk stockouts. Or, the decision can be made to order two
containers and “go long” on the additional component to optimize costs.
While ROP/ROQ systems can be done manually or with additional software, MRP systems
are software-based inventory planning systems that help automate the planning and
purchase of raw materials and components. It is also a forecast based system that takes
sales forecast, production capacity and other forecasted aspects of production and develops
a plan for components purchases for the Bill of Materials (BOM of all parts required for final
production.
Material Requirements Planning
MRP systems also incorporate data such as quality, labor, process routing, FIFO, to create an
optimized purchasing plan for all components. This helps companies maintain lower
inventory levels while ensuring that the levels held are optimized for production resulting in
a balance where few materials are held in excess yet stockouts do not occur.
MRP systems generally work backward from a production plan and use the Bills of Material
to determine the raw materials required. The system answers not only when and how much,
but what is required. This is done by using internal and external forecasting to determine
what timeframe is required for ordering and completion. The forecasts and plan can be
used over relatively shorter or longer time periods, depending on the total lead time
required for production or for planning far ahead.
MRP is a forecast based planning system while ROP/ROQ is a non-forecasted planning
system. Many argue that ROP/ROQ systems are more dependable because they can allow
for reaction to greater levels of uncertainty involved in some production environments. For
example, it has been noted that ROP/ROW planning is useful when raw materials and
components are difficult or impossible to forecast.
ROP/ROQ is also said to be a good choice when demand is extremely stable, with only
slight variations over time. This would include commodified high-volume goods where the
unit cost is very small.
Comparisons of the Two Systems
However, these conceits may be due to legacy issues where the familiar seems a better
option, but practice proves otherwise. Academic studies have shown that when tested head
to head, MRP systems outperform ROP/ROQ planning systems on all levels in terms of
inventory efficiency. The study further indicated that while issues such as difficult
forecasting, hyper-stable demand and fractional cost of the end-use product may
significantly reduce the risk of using an ROP system, MRP’s automation and the broader
application perform at a much more reliable level by comparison.
MRP planning can also perform reliably across different modes of production including
MTO, MTS, ETO or blended modes and still provide benefits through actionable data and
reports across a broader spectrum of a manufacturer and its managers. These include
planned order schedules, order releases and changes to orders. Managers can use such
data to optimize inventory levels, track material flow and requirements, compute optimal lot
sizes matched to capacity and labor, and better control calculations for safety stock.
Perhaps the starkest difference is that today’s MRP systems are automated with deep
analytical capability built into the platform. ROP/ROQ planning may utilize a dedicated
software or it may not. In the case where it does, this system may be siloed causing
interoperability issues with other software and risking the integrity of the data and analysis.
And for those that are still done manually, the product and BOM complexity of many
finished goods can outrun a human being’s capacity to calculate it and draw useful
inferences from those calculations.
Today’s MRP systems are modular, agile, flexible and can often be purchased a la’ carte.
They also tend to be cloud-based, providing up to date delivery of advancements and
improvements to the software. ROP/ROQ systems are still a valid planning method. But
compared to an MRP system’s ability to provide real-time inventory overview, accurate
production planning and reporting, a broader view of the operation, and the ability to
control and manage inventory costs, ROP/ROQ planning is less dependable, more prone to
human error and at the risk introducing error in very complex manufacturing environments.
https://manufacturing-software-blog.mrpeasy.com/different-purchasing-
practices-for-manufacturers/
https://www.mrpeasy.com/

More Related Content

What's hot

IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & ManufacturingPantit Sirapobthada
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Supply Chain Management and MRP & ERP
Supply Chain Management and MRP & ERPSupply Chain Management and MRP & ERP
Supply Chain Management and MRP & ERPMasum Hussain
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentationAkash Maurya
 
Significance of material planning, production control in actualization of org...
Significance of material planning, production control in actualization of org...Significance of material planning, production control in actualization of org...
Significance of material planning, production control in actualization of org...Alexander Decker
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2Ari Limpo
 
Ppt Mes Aaddala 2010
Ppt Mes Aaddala 2010Ppt Mes Aaddala 2010
Ppt Mes Aaddala 2010AADDALA
 

What's hot (20)

IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & Manufacturing
 
(Mrp)
(Mrp)(Mrp)
(Mrp)
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Supply Chain Management and MRP & ERP
Supply Chain Management and MRP & ERPSupply Chain Management and MRP & ERP
Supply Chain Management and MRP & ERP
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Significance of material planning, production control in actualization of org...
Significance of material planning, production control in actualization of org...Significance of material planning, production control in actualization of org...
Significance of material planning, production control in actualization of org...
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
Pp interview questions
Pp interview questionsPp interview questions
Pp interview questions
 
Role Of ERP In Supply Chain
Role Of ERP In Supply ChainRole Of ERP In Supply Chain
Role Of ERP In Supply Chain
 
Ppt Mes Aaddala 2010
Ppt Mes Aaddala 2010Ppt Mes Aaddala 2010
Ppt Mes Aaddala 2010
 
Mis supply chain
Mis  supply chainMis  supply chain
Mis supply chain
 
Live SAP PP Training
Live SAP PP TrainingLive SAP PP Training
Live SAP PP Training
 
MRP MCD-presentation
MRP MCD-presentation MRP MCD-presentation
MRP MCD-presentation
 

Similar to Different purchasing practices for manufacturers

MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docxARIV4
 
Why food manufacturing is hard and how mrp system helps
Why food manufacturing is hard and how mrp system helpsWhy food manufacturing is hard and how mrp system helps
Why food manufacturing is hard and how mrp system helpsMRPeasy
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRPeasy
 
Mrp inventory management
Mrp inventory managementMrp inventory management
Mrp inventory managementVIBHASH SINGH
 
Closed loop mrp system
Closed loop mrp systemClosed loop mrp system
Closed loop mrp systemNisha Agarwal
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource PlanningMayank Kashyap
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainSaad Munami
 
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...BatchMaster Software Pvt. Ltd.
 
1. Whitepaper - Translating ERP into ROI in Mining
1. Whitepaper - Translating ERP into ROI in Mining1. Whitepaper - Translating ERP into ROI in Mining
1. Whitepaper - Translating ERP into ROI in MiningJarrad Liam Sonnenberg
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERPMaria AL
 
hr_om12_ism_ch14 (1).pdf
hr_om12_ism_ch14 (1).pdfhr_om12_ism_ch14 (1).pdf
hr_om12_ism_ch14 (1).pdfbx99
 
5 tips for making material planning more effective
5 tips for making material planning more effective5 tips for making material planning more effective
5 tips for making material planning more effectiveMRPeasy
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyHaider Alkaisy
 

Similar to Different purchasing practices for manufacturers (20)

MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docx
 
Why food manufacturing is hard and how mrp system helps
Why food manufacturing is hard and how mrp system helpsWhy food manufacturing is hard and how mrp system helps
Why food manufacturing is hard and how mrp system helps
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?
 
Mrp inventory management
Mrp inventory managementMrp inventory management
Mrp inventory management
 
Closed loop mrp system
Closed loop mrp systemClosed loop mrp system
Closed loop mrp system
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
Rccp report
Rccp reportRccp report
Rccp report
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
Material Requirements Planning (MRP)
Material Requirements Planning (MRP)Material Requirements Planning (MRP)
Material Requirements Planning (MRP)
 
Materials management
Materials managementMaterials management
Materials management
 
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
 
MRP- Lecture PPT.pptx
MRP- Lecture PPT.pptxMRP- Lecture PPT.pptx
MRP- Lecture PPT.pptx
 
Lect 6.ppt
Lect 6.pptLect 6.ppt
Lect 6.ppt
 
1. Whitepaper - Translating ERP into ROI in Mining
1. Whitepaper - Translating ERP into ROI in Mining1. Whitepaper - Translating ERP into ROI in Mining
1. Whitepaper - Translating ERP into ROI in Mining
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
hr_om12_ism_ch14 (1).pdf
hr_om12_ism_ch14 (1).pdfhr_om12_ism_ch14 (1).pdf
hr_om12_ism_ch14 (1).pdf
 
5 tips for making material planning more effective
5 tips for making material planning more effective5 tips for making material planning more effective
5 tips for making material planning more effective
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
 

More from MRPeasy

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingMRPeasy
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemMRPeasy
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningMRPeasy
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?MRPeasy
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseMRPeasy
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyMRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?MRPeasy
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyMRPeasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing newsMRPeasy
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?MRPeasy
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing newsMRPeasy
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing newsMRPeasy
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing newsMRPeasy
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing processMRPeasy
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing newsMRPeasy
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing newsMRPeasy
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate itMRPeasy
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing newsMRPeasy
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryMRPeasy
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing newsMRPeasy
 

More from MRPeasy (20)

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory tracking
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouse
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing news
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing news
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing news
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing news
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing news
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing news
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate it
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing news
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the Industry
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing news
 

Recently uploaded

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Recently uploaded (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Different purchasing practices for manufacturers

  • 2. A robust and accurate planning system is critical to any manufacturer. In this article, we are comparing different purchasing practices – ROP/ROQ Principles vs MRP System Planning.
  • 3. A robust and accurate planning system is critical to any manufacturer. However, unlike larger producers, small and medium-sized businesses (SMB) are often much more cash conscious as a matter of survival and or to shelter their growth plans. If the plan is too aggressive, companies may find themselves with too much inventory, tying up valuable cash-flow required for day to day operations. If the plan is too timid, companies may find themselves with stockouts that cause loss or cancellation of orders.
  • 4. One long-running discussion on the value of which planning system to use has centered on whether a manufacturer should use a Reorder Point /Reorder Quantity planning system (ROP/ROQ) versus a Materials Requirement System (MRP) software. To understand which is best, it helps to look at what each system really is.
  • 5. ROP/ROQ planning systems are consumption-based planning tools and formulas used to determine when to reorder material and in what quantities. With reorder point planning, orders for material are triggered by the depletion of stock items as orders are placed. Once a stock level for a component reaches a predetermined minimum, an order is placed for that component. This type of planning also uses a Reorder Quantity (ROQ) to determine how much stock to order for replenishment. Each of the two segments of this planning method utilizes a simple formula set. ROP/ROQ Planning
  • 6. ROP = (Lead Time in Days x Unit Sales per Day) + Safety Stock This then yields the number of units where new components and raw materials orders should be placed to keep the factory running with no stoppage and without holding excess inventory. ROQ = Square Root of ( 2 X Required Quantity X Cost per Order / Carrying Cost per Unit) This then yields the quantity of the component to order at the reorder point. A helpful book – Smart Inventory Solutions: Improving the Management of Engineering Materials By Phillip Slater.
  • 7. While the formulas are simple, the two have important distinctions. ROP defines the when of the planning system, and ROQ defines how much. Also, ROQ is simply an inventory planning component, whereas ROP may be influenced by management due to cash-flow and current business conditions. Effectively, ROP is a more strategic and more stable aspect of the system, ROQ is a tactical aspect and one that may change due to many factors. ROQ also carries with it the impact of a larger number of external factors such as freight costs, volume discounts and other things that affect inventory cost either positively or negatively. As such, it is an operational component that requires additional scrutiny in order to optimize costs.
  • 8. Example: If a factory requires 5000 units of a component from an overseas supplier and a standard container holds 4,000 units, then a decision must be made to optimize the acquisition of the balance of the remaining 1,000 units. Shipping by another method increases cost, while deferring may risk stockouts. Or, the decision can be made to order two containers and “go long” on the additional component to optimize costs.
  • 9. While ROP/ROQ systems can be done manually or with additional software, MRP systems are software-based inventory planning systems that help automate the planning and purchase of raw materials and components. It is also a forecast based system that takes sales forecast, production capacity and other forecasted aspects of production and develops a plan for components purchases for the Bill of Materials (BOM of all parts required for final production. Material Requirements Planning
  • 10. MRP systems also incorporate data such as quality, labor, process routing, FIFO, to create an optimized purchasing plan for all components. This helps companies maintain lower inventory levels while ensuring that the levels held are optimized for production resulting in a balance where few materials are held in excess yet stockouts do not occur. MRP systems generally work backward from a production plan and use the Bills of Material to determine the raw materials required. The system answers not only when and how much, but what is required. This is done by using internal and external forecasting to determine what timeframe is required for ordering and completion. The forecasts and plan can be used over relatively shorter or longer time periods, depending on the total lead time required for production or for planning far ahead.
  • 11. MRP is a forecast based planning system while ROP/ROQ is a non-forecasted planning system. Many argue that ROP/ROQ systems are more dependable because they can allow for reaction to greater levels of uncertainty involved in some production environments. For example, it has been noted that ROP/ROW planning is useful when raw materials and components are difficult or impossible to forecast. ROP/ROQ is also said to be a good choice when demand is extremely stable, with only slight variations over time. This would include commodified high-volume goods where the unit cost is very small. Comparisons of the Two Systems
  • 12. However, these conceits may be due to legacy issues where the familiar seems a better option, but practice proves otherwise. Academic studies have shown that when tested head to head, MRP systems outperform ROP/ROQ planning systems on all levels in terms of inventory efficiency. The study further indicated that while issues such as difficult forecasting, hyper-stable demand and fractional cost of the end-use product may significantly reduce the risk of using an ROP system, MRP’s automation and the broader application perform at a much more reliable level by comparison.
  • 13. MRP planning can also perform reliably across different modes of production including MTO, MTS, ETO or blended modes and still provide benefits through actionable data and reports across a broader spectrum of a manufacturer and its managers. These include planned order schedules, order releases and changes to orders. Managers can use such data to optimize inventory levels, track material flow and requirements, compute optimal lot sizes matched to capacity and labor, and better control calculations for safety stock. Perhaps the starkest difference is that today’s MRP systems are automated with deep analytical capability built into the platform. ROP/ROQ planning may utilize a dedicated software or it may not. In the case where it does, this system may be siloed causing interoperability issues with other software and risking the integrity of the data and analysis. And for those that are still done manually, the product and BOM complexity of many finished goods can outrun a human being’s capacity to calculate it and draw useful inferences from those calculations.
  • 14. Today’s MRP systems are modular, agile, flexible and can often be purchased a la’ carte. They also tend to be cloud-based, providing up to date delivery of advancements and improvements to the software. ROP/ROQ systems are still a valid planning method. But compared to an MRP system’s ability to provide real-time inventory overview, accurate production planning and reporting, a broader view of the operation, and the ability to control and manage inventory costs, ROP/ROQ planning is less dependable, more prone to human error and at the risk introducing error in very complex manufacturing environments.