An industrial construction company needed to lower a heavy machine 50 feet below ground level but was unable to afford the average $34,000 cost quoted by excavation companies. The space was also too enclosed for large equipment to fit. A person was found who could complete the task for 40% less than the company's $20,000 budget. They filled the hole with ice and used it to support the machine as it melted, successfully lowering the machine without damaging infrastructure and on budget. The case study demonstrates that design thinking can find innovative solutions to difficult problems.