Island School Redevelopment

Contingency Planning - Parent Meeting
Thursday 6th March 2014
Aims

● To share the issues around decant with regard to how we
might split the school;
● To discuss the consequences for curriculum, staff movement
and resourcing of the same;
● To inform parents about current position with regard to
finding suitable decant premises;
● Invite questions and comments from parents;
● Discuss timeline for the decant planning;
● To invite parents to enlist for parent working group.
Some context
● We are limited in the ways in which we can split the school basically it needs to be split in two equally sized ‘parts’;
● Significant commitment from ESFC to do what it takes to
secure continuity of excellence in teaching and learning;
● Meeting with ESFC Senior Management Team on Tuesday
18th March;
● Photos of KJS decant site
● Partial decant not an option;
● Decant period estimated to be from January or July 2017
until August 2021 (could possibly be 2016).
● It is more than likely that we will be decanting into two very
similar sized schools;
Some context
● Mount Parker - decision to withdraw from trying to secure this
site due to local lobby and the support this had from LegCo
members;
● Tseung Kwan O site not an Island School site.
● Around 12 sites have been ‘offered’ by EDB for consideration in
locations like Sham Shui Po, Tai Po, Sha Tin, Kowloon, Tuen
Mun.
● Issues such as lack of space, availability for use at the right time,
state of the buildings, location, feasibility of drop off and pick
up etc have all led to us dismissing these
● Only one small 17 classroom school on the island at Aberdeen
available.
● Currently the only two sites that are viable are two in Tai Wai
(One a very short walking distance from ShaTin Wai MTR and
the other very close to Tai Wai MTR)
Timetable Issues
What are the issues?
Main Criteria Headings
● Curriculum – What are the implications for the curriculum?

How will each

model promote / inhibit our curriculum aims?
●

Resourcing / buildings– How will each model optimise or stretch
deployment of resources (in the widest sense)?

●

Guidance – what are the issues and implications for guidance and progression
in each model?

● Timetabling - how does the timetable itself limit the options open to us. Will
the way the curriculum is organized have to change during decant?
●

Ethos / School Identity – opportunities for growth and development /
obstacles to the same for each model? Particularly relevant to the House System

●

Stakeholder interests

- what are the needs and wants of different
stakeholder groups – particularly parents?

● Location and Travel - are there any issues to do with location, access,
travel logistics that we need to be aware of?

● Student transferring between schools over time
● Other issues
PMI
● What is PMI

○ Pluses - the benefits of an issue
○ Minuses - the drawbacks of an issue
○ Interesting - that which is neither a plus or a minus that
needs to be considered. May suggest an alternative
solution.
Model 1 - Phase Split

School 1:

School 2:

Years 7 and 8 (360 students)
Years 12 and 13 (300
students)
● Total – 660 students

Years 9,10 and 11
● (540 students)
● Total – 540 students
Model 1 - Phase Split
● No student movement between sites at all
● Would staff teach on one site or move between the two? .
● Would all Elements on one site constrain the offer?
Curriculum
● + Fits emerging model for 9-11 curriculum/ would enable new ‘supergroup’ to bond and form
identity;
● I – may lead to staff focussing on years / arbitrary? Would staff teach yrs 7 / 8 and just 6th
form in school 1?
● I – what are the pluses and minuses of separating Island Futures students from other years?
Resourcing
● - High level of capital resourcing needed in each school due to years 11 and 13 in both;
● - HE guidance needed in both sites;
● - departmental / subject leadership spread over both sites if staff didn’t move.
● + high level of commitment from ESFC to investment.
● - at least two new teacher needed to meet needs of TT
● - need 1 DT, 2 Food, 1 Music, 5 Science rooms on top of existing (early calculation)
Model 1 - Phase Split
Guidance
● - split of house staff (SHOH in School 1 / HOH in school 2?)
● + vertical tutoring in school 2?
● I - Increase in profile of the tutor as a result of houses being split. New tutor model
would need to be developed because of staff moving from site to site during the
week.
● - progression issue. Students would move from school to school over time;
Ethos / School Identity
● I - compromise the old / herald and build the new?
● - houses fragmented across two sites
Other
● I - Elements teachers teach 9,10 and 11 on Wed, Thurs to limit their movement
between schools
● + faculties and phases stay together
● I - Faculty move site day by day - rather than split across sites.
● I - could whole faculties be timetabled to be on one site or the other for whole
days?
● - No teacher has a home base if they teach across the year range.
Model 2 - House Split

School 1: DEF

School 2: NRW

Years 7 -13
600 Students

Years 7-13
600 Students
Model 2 - House Split
● Two complete schools (+s and - s)
● If staff / students did not move then curriculum choice limited
● Houses intact but separate from each other. Supports guidance.
Guidance
● - / + House system remains the same (vertical continuity) – but split ( 3 houses in each school?);
● + No student movement over time;
● + mentorship opportunities conserved.
● + smaller schools (Human Scale Education USA)
Ethos / School Identity
● - danger that we become two distinct schools?
● - House system split
● - consistency issue between schools / external comparisons? Other?
Other
● + no student movement from school to school
● - communications
Model 2 - House Split
Curriculum
● + continuity and progression assured in both schools;
● - Elements and minority subjects would be under threat unless offered across both schools
therefore necessitating movement;
● I - Offer Elements across both schools and so students in 9,10,11 move on Wed and Thurs?
● I - and for Escape
● - BTEC would have to be on one site because of viability of courses / group sizes. Students have
to change house.
● subjects split between two sites.
Resourcing
● - Duplication = expensive. Running IB diploma curriculum in both schools would put pressure
on small classes and increase need for staffing. IN / EAL / HE etc on both sites.
● - leadership structure duplicated across both schools – expensive;
● + lower schools benefit from more dedicated resourcing in both schools;
● + - staff benefit from teaching full range of years;
● - High level of capital resourcing needed in each school dues to years 11 and 13 in both;
● - HE guidance needed in both sites;
● + high level of commitment from ESFC to investment.
● - 4 extra teachers required (spread across all subjects)
● - need 4 Science, 1 textiles and 2 food rooms extra
Model 3 - Faculty Split

School 1:

School 2:

4 Faculties accommodation

4 Faculties accommodation
Model 3 - Faculty Split
● High degrees of student movement for all students.
● Detrimental effect of pastoral care
Curriculum
● + - continuity and progression assured;
● + - faculty teams kept together in one place;
● + - all subject resources and support available to full range of students.
Resourcing
● - seems inexpensive, but we would need to decommission labs and DT rooms in one of the
schools so added refurb cost.
● - 7 Science labs needed, 1 Music, 1 Art, 3 D&T workshops
Guidance
● - where would houses reside / where would the structure fit? tracking and supporting
students across two sites would affect current quality of guidance and support.
Ethos / School Identity
● House system split
● In theory would be one whole school (rather than two smaller ones) - but might not feel like
one?
Decant Parent Working Group
To ....
● Represent parent voice on issues to do with the decant of the
school;
● Advise ESF and school of parental issues pertinent to decant
planning
Parent Focus Group Mondays 5:00pm
● 17th and 31st March;
● 5th and 26th May.
Decant second thoughts (2)

More Related Content

What's hot

Designing a thematic curriculum, George Faux, Shireland, October 2013
Designing a thematic curriculum, George Faux, Shireland, October 2013Designing a thematic curriculum, George Faux, Shireland, October 2013
Designing a thematic curriculum, George Faux, Shireland, October 2013
Wholeeducation
 
Group Daisy Proje
Group Daisy ProjeGroup Daisy Proje
Group Daisy Proje
senaccl
 
NPQSL - 26.01 (1)
NPQSL - 26.01 (1)NPQSL - 26.01 (1)
NPQSL - 26.01 (1)
Sean Day
 
Remembering ePortfolios: moving personal learning into professional practice
Remembering ePortfolios: moving personal learning into professional practiceRemembering ePortfolios: moving personal learning into professional practice
Remembering ePortfolios: moving personal learning into professional practice
ePortfolios Australia
 
Instructional models and practices
Instructional models and practicesInstructional models and practices
Instructional models and practices
Deslate Maguate
 
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
Stephanie Werhane
 
6 stuart middleton friday 4 oct - 11 am
6 stuart middleton   friday 4 oct - 11 am6 stuart middleton   friday 4 oct - 11 am
6 stuart middleton friday 4 oct - 11 am
NTLT Conference
 
N bowden vita
N bowden vitaN bowden vita
N bowden vita
Nicole Bowden
 
Presentation sarah redfern hs v3
Presentation sarah redfern hs v3Presentation sarah redfern hs v3
Presentation sarah redfern hs v3
katherinehannaford
 
172157
172157172157
172157
Elli Klajn
 
Sem to go with rls 2
Sem to go with rls 2Sem to go with rls 2
Sem to go with rls 2
carolinecohen
 
McFadden_Resume_Jan2017.docx (1)
McFadden_Resume_Jan2017.docx (1)McFadden_Resume_Jan2017.docx (1)
McFadden_Resume_Jan2017.docx (1)
Sean McFadden
 
Action learning
Action learning Action learning
Neha Sinha
Neha SinhaNeha Sinha
Neha Sinha
Neha Sinha
 
Schoolwide Enrichment Model
Schoolwide Enrichment ModelSchoolwide Enrichment Model
Schoolwide Enrichment Model
barbserianni
 
resume 2016
resume 2016resume 2016
resume 2016
Jean Brady
 
Designing an impact curriculum | Designing a thematic curriculum | George Fau...
Designing an impact curriculum | Designing a thematic curriculum | George Fau...Designing an impact curriculum | Designing a thematic curriculum | George Fau...
Designing an impact curriculum | Designing a thematic curriculum | George Fau...
Wholeeducation
 
6th enrollment pdf
6th enrollment pdf6th enrollment pdf
6th enrollment pdf
Darrin Carnahan
 

What's hot (18)

Designing a thematic curriculum, George Faux, Shireland, October 2013
Designing a thematic curriculum, George Faux, Shireland, October 2013Designing a thematic curriculum, George Faux, Shireland, October 2013
Designing a thematic curriculum, George Faux, Shireland, October 2013
 
Group Daisy Proje
Group Daisy ProjeGroup Daisy Proje
Group Daisy Proje
 
NPQSL - 26.01 (1)
NPQSL - 26.01 (1)NPQSL - 26.01 (1)
NPQSL - 26.01 (1)
 
Remembering ePortfolios: moving personal learning into professional practice
Remembering ePortfolios: moving personal learning into professional practiceRemembering ePortfolios: moving personal learning into professional practice
Remembering ePortfolios: moving personal learning into professional practice
 
Instructional models and practices
Instructional models and practicesInstructional models and practices
Instructional models and practices
 
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
Advanced Studies in Teaching and Learning (ASTL) Program Information, College...
 
6 stuart middleton friday 4 oct - 11 am
6 stuart middleton   friday 4 oct - 11 am6 stuart middleton   friday 4 oct - 11 am
6 stuart middleton friday 4 oct - 11 am
 
N bowden vita
N bowden vitaN bowden vita
N bowden vita
 
Presentation sarah redfern hs v3
Presentation sarah redfern hs v3Presentation sarah redfern hs v3
Presentation sarah redfern hs v3
 
172157
172157172157
172157
 
Sem to go with rls 2
Sem to go with rls 2Sem to go with rls 2
Sem to go with rls 2
 
McFadden_Resume_Jan2017.docx (1)
McFadden_Resume_Jan2017.docx (1)McFadden_Resume_Jan2017.docx (1)
McFadden_Resume_Jan2017.docx (1)
 
Action learning
Action learning Action learning
Action learning
 
Neha Sinha
Neha SinhaNeha Sinha
Neha Sinha
 
Schoolwide Enrichment Model
Schoolwide Enrichment ModelSchoolwide Enrichment Model
Schoolwide Enrichment Model
 
resume 2016
resume 2016resume 2016
resume 2016
 
Designing an impact curriculum | Designing a thematic curriculum | George Fau...
Designing an impact curriculum | Designing a thematic curriculum | George Fau...Designing an impact curriculum | Designing a thematic curriculum | George Fau...
Designing an impact curriculum | Designing a thematic curriculum | George Fau...
 
6th enrollment pdf
6th enrollment pdf6th enrollment pdf
6th enrollment pdf
 

Similar to Decant second thoughts (2)

April 23, 2007 Board Meeting
April 23, 2007 Board MeetingApril 23, 2007 Board Meeting
April 23, 2007 Board Meeting
Todd Neibauer
 
FPS Re-opening Schools Presentation
FPS Re-opening Schools PresentationFPS Re-opening Schools Presentation
FPS Re-opening Schools Presentation
Franklin Matters
 
Collaborative time @ ghes final
Collaborative time @ ghes finalCollaborative time @ ghes final
Collaborative time @ ghes final
Giant's Head Elementary - Sd#67
 
Schedule change proposal_update_a
Schedule change proposal_update_aSchedule change proposal_update_a
Schedule change proposal_update_a
jetnyre
 
DBE Education Lekgotla 2019 - Excellent Schools
DBE Education Lekgotla 2019 - Excellent SchoolsDBE Education Lekgotla 2019 - Excellent Schools
DBE Education Lekgotla 2019 - Excellent Schools
Education Moving Up Cc.
 
Administration day ppt
Administration day pptAdministration day ppt
Administration day ppt
jiwase
 
Ppt on diffrentiation 1st aug'14
Ppt on diffrentiation 1st aug'14Ppt on diffrentiation 1st aug'14
Ppt on diffrentiation 1st aug'14
Harjyot Malhotra
 
Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012
Martin Brown
 
Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012
Martin Brown
 
Teaching and Learning Launch Twilight
Teaching and Learning Launch TwilightTeaching and Learning Launch Twilight
Teaching and Learning Launch Twilight
rvhstl
 
Master Mathematics Teachers in Chinese primary schools
Master Mathematics Teachers in Chinese primary schoolsMaster Mathematics Teachers in Chinese primary schools
Master Mathematics Teachers in Chinese primary schools
Christian Bokhove
 
P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018
Madeleine44
 
Timetabling sessions 1 and 2 february
Timetabling sessions 1 and 2 february Timetabling sessions 1 and 2 february
Timetabling sessions 1 and 2 february
Martin Brown
 
Double shifts
Double shiftsDouble shifts
Group 6.2. global_issues_in_curriculum_development
Group 6.2. global_issues_in_curriculum_developmentGroup 6.2. global_issues_in_curriculum_development
Group 6.2. global_issues_in_curriculum_development
John Ervin
 
TCDSB Board Back to School July 16th Presentation
TCDSB Board Back to School July 16th PresentationTCDSB Board Back to School July 16th Presentation
TCDSB Board Back to School July 16th Presentation
Norman Di Pasquale
 
CPD and Recruitment Liam Collins and Tim Matthews
CPD and Recruitment Liam Collins and Tim MatthewsCPD and Recruitment Liam Collins and Tim Matthews
CPD and Recruitment Liam Collins and Tim Matthews
Uplands Community College
 
Graduation project report faculty of foreign languages Dai Nam University.docx
Graduation project report faculty of foreign languages Dai Nam University.docxGraduation project report faculty of foreign languages Dai Nam University.docx
Graduation project report faculty of foreign languages Dai Nam University.docx
Dịch vụ viết thuê đề tài trọn gói 📢📢📢 Liên hệ ZALO/TELE: 0973.287.149
 
Storyline In Tartu Hiie School
Storyline In Tartu Hiie SchoolStoryline In Tartu Hiie School
Storyline In Tartu Hiie School
tartuhiiekool
 
Coteaching by basudeba das
Coteaching by basudeba dasCoteaching by basudeba das
Coteaching by basudeba das
Priya Das
 

Similar to Decant second thoughts (2) (20)

April 23, 2007 Board Meeting
April 23, 2007 Board MeetingApril 23, 2007 Board Meeting
April 23, 2007 Board Meeting
 
FPS Re-opening Schools Presentation
FPS Re-opening Schools PresentationFPS Re-opening Schools Presentation
FPS Re-opening Schools Presentation
 
Collaborative time @ ghes final
Collaborative time @ ghes finalCollaborative time @ ghes final
Collaborative time @ ghes final
 
Schedule change proposal_update_a
Schedule change proposal_update_aSchedule change proposal_update_a
Schedule change proposal_update_a
 
DBE Education Lekgotla 2019 - Excellent Schools
DBE Education Lekgotla 2019 - Excellent SchoolsDBE Education Lekgotla 2019 - Excellent Schools
DBE Education Lekgotla 2019 - Excellent Schools
 
Administration day ppt
Administration day pptAdministration day ppt
Administration day ppt
 
Ppt on diffrentiation 1st aug'14
Ppt on diffrentiation 1st aug'14Ppt on diffrentiation 1st aug'14
Ppt on diffrentiation 1st aug'14
 
Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012
 
Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012Timetabling sessions 1 and 2 february neartu2012
Timetabling sessions 1 and 2 february neartu2012
 
Teaching and Learning Launch Twilight
Teaching and Learning Launch TwilightTeaching and Learning Launch Twilight
Teaching and Learning Launch Twilight
 
Master Mathematics Teachers in Chinese primary schools
Master Mathematics Teachers in Chinese primary schoolsMaster Mathematics Teachers in Chinese primary schools
Master Mathematics Teachers in Chinese primary schools
 
P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018P3E Townhall 19 Jan 2018
P3E Townhall 19 Jan 2018
 
Timetabling sessions 1 and 2 february
Timetabling sessions 1 and 2 february Timetabling sessions 1 and 2 february
Timetabling sessions 1 and 2 february
 
Double shifts
Double shiftsDouble shifts
Double shifts
 
Group 6.2. global_issues_in_curriculum_development
Group 6.2. global_issues_in_curriculum_developmentGroup 6.2. global_issues_in_curriculum_development
Group 6.2. global_issues_in_curriculum_development
 
TCDSB Board Back to School July 16th Presentation
TCDSB Board Back to School July 16th PresentationTCDSB Board Back to School July 16th Presentation
TCDSB Board Back to School July 16th Presentation
 
CPD and Recruitment Liam Collins and Tim Matthews
CPD and Recruitment Liam Collins and Tim MatthewsCPD and Recruitment Liam Collins and Tim Matthews
CPD and Recruitment Liam Collins and Tim Matthews
 
Graduation project report faculty of foreign languages Dai Nam University.docx
Graduation project report faculty of foreign languages Dai Nam University.docxGraduation project report faculty of foreign languages Dai Nam University.docx
Graduation project report faculty of foreign languages Dai Nam University.docx
 
Storyline In Tartu Hiie School
Storyline In Tartu Hiie SchoolStoryline In Tartu Hiie School
Storyline In Tartu Hiie School
 
Coteaching by basudeba das
Coteaching by basudeba dasCoteaching by basudeba das
Coteaching by basudeba das
 

More from Gareth Stevens

Tok maps
Tok mapsTok maps
Tok maps
Gareth Stevens
 
Christmas TOK
Christmas TOKChristmas TOK
Christmas TOK
Gareth Stevens
 
It celebration
It celebrationIt celebration
It celebration
Gareth Stevens
 
Is redevelopment parent update 16th june 2014
Is redevelopment parent update 16th june 2014Is redevelopment parent update 16th june 2014
Is redevelopment parent update 16th june 2014
Gareth Stevens
 
Decant third thoughts
Decant third thoughtsDecant third thoughts
Decant third thoughts
Gareth Stevens
 
20140122 design workshop compressed
20140122 design workshop compressed20140122 design workshop compressed
20140122 design workshop compressed
Gareth Stevens
 
Aok ethics (1)
Aok   ethics (1)Aok   ethics (1)
Aok ethics (1)
Gareth Stevens
 
Emotion ll final presentation 2
Emotion ll final presentation 2Emotion ll final presentation 2
Emotion ll final presentation 2
Gareth Stevens
 
Human sciences final
Human sciences finalHuman sciences final
Human sciences final
Gareth Stevens
 
Tok 1
Tok 1Tok 1
Tok
TokTok
Subcultures za
Subcultures zaSubcultures za
Subcultures za
Gareth Stevens
 

More from Gareth Stevens (12)

Tok maps
Tok mapsTok maps
Tok maps
 
Christmas TOK
Christmas TOKChristmas TOK
Christmas TOK
 
It celebration
It celebrationIt celebration
It celebration
 
Is redevelopment parent update 16th june 2014
Is redevelopment parent update 16th june 2014Is redevelopment parent update 16th june 2014
Is redevelopment parent update 16th june 2014
 
Decant third thoughts
Decant third thoughtsDecant third thoughts
Decant third thoughts
 
20140122 design workshop compressed
20140122 design workshop compressed20140122 design workshop compressed
20140122 design workshop compressed
 
Aok ethics (1)
Aok   ethics (1)Aok   ethics (1)
Aok ethics (1)
 
Emotion ll final presentation 2
Emotion ll final presentation 2Emotion ll final presentation 2
Emotion ll final presentation 2
 
Human sciences final
Human sciences finalHuman sciences final
Human sciences final
 
Tok 1
Tok 1Tok 1
Tok 1
 
Tok
TokTok
Tok
 
Subcultures za
Subcultures zaSubcultures za
Subcultures za
 

Decant second thoughts (2)

  • 1. Island School Redevelopment Contingency Planning - Parent Meeting Thursday 6th March 2014
  • 2. Aims ● To share the issues around decant with regard to how we might split the school; ● To discuss the consequences for curriculum, staff movement and resourcing of the same; ● To inform parents about current position with regard to finding suitable decant premises; ● Invite questions and comments from parents; ● Discuss timeline for the decant planning; ● To invite parents to enlist for parent working group.
  • 3. Some context ● We are limited in the ways in which we can split the school basically it needs to be split in two equally sized ‘parts’; ● Significant commitment from ESFC to do what it takes to secure continuity of excellence in teaching and learning; ● Meeting with ESFC Senior Management Team on Tuesday 18th March; ● Photos of KJS decant site ● Partial decant not an option; ● Decant period estimated to be from January or July 2017 until August 2021 (could possibly be 2016). ● It is more than likely that we will be decanting into two very similar sized schools;
  • 4. Some context ● Mount Parker - decision to withdraw from trying to secure this site due to local lobby and the support this had from LegCo members; ● Tseung Kwan O site not an Island School site. ● Around 12 sites have been ‘offered’ by EDB for consideration in locations like Sham Shui Po, Tai Po, Sha Tin, Kowloon, Tuen Mun. ● Issues such as lack of space, availability for use at the right time, state of the buildings, location, feasibility of drop off and pick up etc have all led to us dismissing these ● Only one small 17 classroom school on the island at Aberdeen available. ● Currently the only two sites that are viable are two in Tai Wai (One a very short walking distance from ShaTin Wai MTR and the other very close to Tai Wai MTR)
  • 6. What are the issues? Main Criteria Headings ● Curriculum – What are the implications for the curriculum? How will each model promote / inhibit our curriculum aims? ● Resourcing / buildings– How will each model optimise or stretch deployment of resources (in the widest sense)? ● Guidance – what are the issues and implications for guidance and progression in each model? ● Timetabling - how does the timetable itself limit the options open to us. Will the way the curriculum is organized have to change during decant? ● Ethos / School Identity – opportunities for growth and development / obstacles to the same for each model? Particularly relevant to the House System ● Stakeholder interests - what are the needs and wants of different stakeholder groups – particularly parents? ● Location and Travel - are there any issues to do with location, access, travel logistics that we need to be aware of? ● Student transferring between schools over time ● Other issues
  • 7. PMI ● What is PMI ○ Pluses - the benefits of an issue ○ Minuses - the drawbacks of an issue ○ Interesting - that which is neither a plus or a minus that needs to be considered. May suggest an alternative solution.
  • 8. Model 1 - Phase Split School 1: School 2: Years 7 and 8 (360 students) Years 12 and 13 (300 students) ● Total – 660 students Years 9,10 and 11 ● (540 students) ● Total – 540 students
  • 9. Model 1 - Phase Split ● No student movement between sites at all ● Would staff teach on one site or move between the two? . ● Would all Elements on one site constrain the offer? Curriculum ● + Fits emerging model for 9-11 curriculum/ would enable new ‘supergroup’ to bond and form identity; ● I – may lead to staff focussing on years / arbitrary? Would staff teach yrs 7 / 8 and just 6th form in school 1? ● I – what are the pluses and minuses of separating Island Futures students from other years? Resourcing ● - High level of capital resourcing needed in each school due to years 11 and 13 in both; ● - HE guidance needed in both sites; ● - departmental / subject leadership spread over both sites if staff didn’t move. ● + high level of commitment from ESFC to investment. ● - at least two new teacher needed to meet needs of TT ● - need 1 DT, 2 Food, 1 Music, 5 Science rooms on top of existing (early calculation)
  • 10. Model 1 - Phase Split Guidance ● - split of house staff (SHOH in School 1 / HOH in school 2?) ● + vertical tutoring in school 2? ● I - Increase in profile of the tutor as a result of houses being split. New tutor model would need to be developed because of staff moving from site to site during the week. ● - progression issue. Students would move from school to school over time; Ethos / School Identity ● I - compromise the old / herald and build the new? ● - houses fragmented across two sites Other ● I - Elements teachers teach 9,10 and 11 on Wed, Thurs to limit their movement between schools ● + faculties and phases stay together ● I - Faculty move site day by day - rather than split across sites. ● I - could whole faculties be timetabled to be on one site or the other for whole days? ● - No teacher has a home base if they teach across the year range.
  • 11. Model 2 - House Split School 1: DEF School 2: NRW Years 7 -13 600 Students Years 7-13 600 Students
  • 12. Model 2 - House Split ● Two complete schools (+s and - s) ● If staff / students did not move then curriculum choice limited ● Houses intact but separate from each other. Supports guidance. Guidance ● - / + House system remains the same (vertical continuity) – but split ( 3 houses in each school?); ● + No student movement over time; ● + mentorship opportunities conserved. ● + smaller schools (Human Scale Education USA) Ethos / School Identity ● - danger that we become two distinct schools? ● - House system split ● - consistency issue between schools / external comparisons? Other? Other ● + no student movement from school to school ● - communications
  • 13. Model 2 - House Split Curriculum ● + continuity and progression assured in both schools; ● - Elements and minority subjects would be under threat unless offered across both schools therefore necessitating movement; ● I - Offer Elements across both schools and so students in 9,10,11 move on Wed and Thurs? ● I - and for Escape ● - BTEC would have to be on one site because of viability of courses / group sizes. Students have to change house. ● subjects split between two sites. Resourcing ● - Duplication = expensive. Running IB diploma curriculum in both schools would put pressure on small classes and increase need for staffing. IN / EAL / HE etc on both sites. ● - leadership structure duplicated across both schools – expensive; ● + lower schools benefit from more dedicated resourcing in both schools; ● + - staff benefit from teaching full range of years; ● - High level of capital resourcing needed in each school dues to years 11 and 13 in both; ● - HE guidance needed in both sites; ● + high level of commitment from ESFC to investment. ● - 4 extra teachers required (spread across all subjects) ● - need 4 Science, 1 textiles and 2 food rooms extra
  • 14. Model 3 - Faculty Split School 1: School 2: 4 Faculties accommodation 4 Faculties accommodation
  • 15. Model 3 - Faculty Split ● High degrees of student movement for all students. ● Detrimental effect of pastoral care Curriculum ● + - continuity and progression assured; ● + - faculty teams kept together in one place; ● + - all subject resources and support available to full range of students. Resourcing ● - seems inexpensive, but we would need to decommission labs and DT rooms in one of the schools so added refurb cost. ● - 7 Science labs needed, 1 Music, 1 Art, 3 D&T workshops Guidance ● - where would houses reside / where would the structure fit? tracking and supporting students across two sites would affect current quality of guidance and support. Ethos / School Identity ● House system split ● In theory would be one whole school (rather than two smaller ones) - but might not feel like one?
  • 16. Decant Parent Working Group To .... ● Represent parent voice on issues to do with the decant of the school; ● Advise ESF and school of parental issues pertinent to decant planning Parent Focus Group Mondays 5:00pm ● 17th and 31st March; ● 5th and 26th May.