The minutes summarize a DDWP meeting held on October 27, 2014 that discussed two development projects. For the first project to establish playgrounds across Khyber Pakhtunkhwa, the engineering wing presented a standardized PC-I based on criteria in the umbrella PC-I. The engineering wing's PC-I was approved subject to area factors and topography considerations, and they were instructed to submit district-wise PC-Is within 7 days. For the second project to establish picnic spots in Swat, it was decided to select 3 sites instead of 5, acquire 2 kanal of land at each site, construct according to local traditions, and submit the design and PC-I for the 3 sites within