This document discusses a planned reconfiguration of the University Parkway I-75 interchange in Manatee and Sarasota counties by the Florida Department of Transportation. Specifically, it notes that FDOT is considering a Diverging Diamond Interchange (DDI) design, which was presented to local committees. However, alternatives like roundabouts were not studied as required. The document raises questions about the DDI design related to costs, safety, evacuation capability, and the lack of experience with this design compared to roundabouts. It encourages considering these questions if the interchange comes up at an upcoming MPO meeting.