LLC
design builders




                  PROFESSIONAL
                  QUALIFICATIONS
Firm Overview
                                                                                          dbRight LLC
                                                                                       SBLM Architects




About dbRight
dbRight was founded by the Principals of SBLM Architects to offer a wider range of services to our
clients, including competitive design-build project delivery options. The design-build process offers
a lower-risk alternative to the traditional design-bid-build delivery method and assures a fixed cost
and expedited project-delivery schedule as design and construction phases are overlapped. The
significant advantages of this method are epitomized by the following: architects are professionally
responsible for a facility during its entire life span, versus an industry standard of one year for
contractors; and with architects at the helm, the integrity of a building’s design is supported by the
architect’s passion for an elegant solution.


Staff
The firm is comprised of 13 Project Managers and Site Superintendents. In addition, SBLM is
comprised of 90 architects, technicians, CAD specialists, administrative and support personnel who
utilize the most current technology in designing and drafting.


Firm Capabilities
•• Program Management
•• Program Analysis and Test Fits
•• Preliminary Construction Cost Analysis
•• Zoning and Building Code Review and Analysis
•• Local Community Board Representation
•• Architecture and Engineering through SBLM Architects
•• Agency Filing and Permitting
•• Building Construction and Construction Management
•• Post-Construction Documents




dbRight Qualifications | Firm Overview
Firm Overview
                 dbRight LLC
                 SBLM Architects




                Retail Design
                Through our affiliation with SBLM Architects, dbRight is able to offer complete design services
                supported by an integrated architectural and contractor approach. SBLM’s designers work with you
                to develop your brand language into a three-dimensional environment. At the same time, dbRight’s
                builders inform the design process by bringing to light potential site challenges, hidden conditions,
                and local approvals processes. Through integrating the contractor perspective early in the design
                process, dbRight is able to avoid potential project delays and change orders which translates into
                cost savings and speed-to-market delivery.


                Cost Estimating & Budgeting
                Each project begins with a well-researched and reliable cost estimate. This estimate is closely
                monitored and evaluated by our in-house cost estimator throughout the project process. This
                eliminates any potential for surprises and cost overruns in the final budget. Another cost saving
                measure is dbRight’s ability to value-engineer at every stage of the design process prior to
                construction.


                Construction Services
                dbRight is a licensed and insured General Contractor (GC) and Construction Manager (CM)
                with construction managers and superintendents on staff. dbRight offers a variety of choices for
                contracting to best suit the specific project needs. These include GC or CM with a guaranteed
                maximum price, CM with a cost-plus-percentage fee, or CM with a cost-plus-fixed fee. The “cost
                plus” options are especially appealing to clients who need to establish and record multiple bids for
                each work trade. All bids are open and reviewed with the client prior to final sub-contractor selection.
                dbRight maintains a solid relationship with a network of qualified sub-contractors in various states.
                Each job is supervised by both a Project Manager and an on-site Superintendent.


                Post–Construction Services
                dbRight provides a thorough close-out package, including operating manuals, as-built drawings, and
                lien waivers from sub-contractors upon final payment. Our staff conducts a punch list for each trade
                as well as an overall list for substantial completion. The design-build structure allows us immediate
                access to on-staff licensed design professionals to handle any inspection concerns or local agency
                issues. dbRight has the capability to remove, relocate, or install new merchandise fixtures, displays,
                signage, and graphics if required. As an optional service, dbRight provides post-occupancy visits.




                                                                                      dbRight Qualifications | Firm Overview
Firm Overview
                                                                                        dbRight LLC
                                                                                     SBLM Architects




Sustainability
dbRight understands that the sustainable design of high performance, energy efficient buildings is
the future of responsible construction, and that investing up front in sustainable building methods
leads to long term energy-related cost savings. dbRight’s commitment to sustainable design and
project management is demonstrated by our conscientious, integrated design-build approach,
and we are committed to achieving USGBC LEED certification whenever possible. Working with
SBLM Architects, dbRight employs a wide range of sustainable design and analysis techniques,
from extensive studies to responsible material sourcing, to help ensure each building component
contributes to the overall exemplary performance and efficiency of the project.


In 2010, Office Depot opened it’s first state of the art distribution center in Newville, PA, to be
registered under the USGBC LEED rating system. Certified LEED-Silver, the project includes
various energy and water reduction systems, recycled material construction, and a comprehensive
recycling program for operational waste. SBLM Architects and dbRight LLC delivered the project
via an expedited design-build project delivery system. The design-build team worked with the local
municipality to establish a phased occupancy of the facility. SBLM Architects/dbRight worked closely
with the subcontractors and Office Depot’s supply chain vendors on the roll-out of the Kiva robotic
fulfillment system, which services up to 30 trucks on both the unloading and receiving sides.


dbright LEED Registered Construction Projects
CERTIFIED
Office Depot Call Center – Austin, TX
Office Depot – Panama City, FL
Office Depot – Sarasota, FL
Office Depot – Glen Burnie, MD
Office Depot – Burnsville, MN
Office Depot – Newville, PA
Office Depot – Memphis, TN
Office Depot – Houston, TX
Office Depot – Manassas, VA




dbRight Qualifications | Firm Overview
Firm Overview
                 dbRight LLC
                 SBLM Architects




                dbRight Firm Licenses

                This map demonstrates where dbRight is licensed and/or registered.




                                                                                 dbRight Qualifications | Firm Overview
References
                                                        SBLM Architects
                                                           dbRight LLC




Office Depot

Mr. Edward Costa
Vice President of Construction and Global Procurement
660 North Military Trail
Boca Raton, FL 33496
561.438.7782
edward.costa@officedepot.com

Bridgestone Retail Operations, LLC

Mr. Michael Donofrio
Construction Project Manager
333 E. Lake Street
Bloomingdale, IL 60108
610.968.2077
mdonofrio@bfrc.com

Weingarten Realty

Mr. John L. Greenman
Construction Manager
891 E Commercial Blvd
Ft. Lauderdale, FL 33334
954.495.5239
jgreenman@weingarten.com

Petco Animal Supplies Inc.

Mr. Keith Moreau
Sr. Project Manager
9125 Rehco Road
San Diego, CA 92121
Office 860.370.9203
Cell 858.525.2916
Keith.Moreau@petco.com


Southeast Centers, LLC

Mr. Jeff Scott
Vice President of Construction
1541 Sunset Drive #300
Coral Gables, FL 33143
305. 666.2140




dbRight Qualifications | References
5HODWHG ([SHULHQFH
                                                                                     GE5LJKW //




                                2IILFH 'HSRW
                                0XOWLSOH /RFDWLRQV 1DWLRQZLGH




                                UXH
                                1RUWK $WWOHERUR 0$




                                %HG %DWK           %HRQG
                                0XOWLSOH /RFDWLRQV 86 (DVW RDVW




                                'XDQH 5HDGH
                                +RZDUG %HDFK 1




                                86 HOOXODU
                                0XOWLSOH /RFDWLRQV 1DWLRQZLGH




                                %ULGJHVWRQH  )LUHVWRQH
                                0XOWLSOH /RFDWLRQV 1DWLRQZLGH




                                :HLQJDUWHQ 5HDOW
                                0LDPL )/




GE5LJKW 5HODWHG ([SHULHQFH
:VOK]O
]OO
^RO
PYVVYaSXQ
ZKQO]
PY
NO]MSZ^SYX]
YP
]SQXSPSMKX^
NLSQR^
MVSOX^]
KXN
ZYTOM^]

SXMV_NSXQ
^RO
PYVVYaSXQ$
9PPSMO
.OZY^
_O
,ON
,K^R

,OcYXN
._KXO
OKNO
?=
-OVV_VK
KXN

,SNQO]^YXO

0SO]^YXO

NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


2IILFH 'HSRW
0XOWLSOH /RFDWLRQV



=,67
ROVZON
9PPSMO
.OZY^
NO`OVYZ
S^]
M_OX^
ZY^Y^cZO
KXN
]WKVV
PYWK^
]^YO

NO]SQX
=,67
RK]
MYWZVO^ON
KMRS^OM^_KV
]O`SMO]
YX
Y`O

]^YO]
PY
9PPSMO

.OZY^
 XK^SYXaSNO
 KXN
 SX
 :_O^Y
 SMY
 =,67
 ZY`SNO]
 6//.
 +NWSXS]^K^SYX

]O`SMO]
 PY
 9PPSMO
 .OZY^
 KXN
 RK]
 KMRSO`ON
 6//.
 =SV`O
 MO^SPSMK^SYX
 PY

X_WOY_]
]^YO]
^RY_QR^Y_^
^RO
?XS^ON
=^K^O]
3X

9PPSMO
.OZY^
YZOXON
S^]
PS]^
]^K^OYP^ROK^
NS]^SL_^SYX
MOX^O
^Y
LO

OQS]^OON
_XNO
^RO
?=1,-
6//.
K^SXQ
]c]^OW
RO
ZYTOM^
SXMV_NO]
`KSY_]

OXOQc
 KXN
 aK^O
 ON_M^SYX
 ]c]^OW]
 OMcMVON
 WK^OSKV]
 KXN
 RSQRVc
 OPPSMSOX^

ROK^SXQ
 KXN
 MYYVSXQ
 O[_SZWOX^
 =,67
 +MRS^OM^]
 KXN
 ZK^XO
 NLSQR^
 66-

NOVS`OON
 ^RO
 ZYTOM^
 `SK
 KX
 ObZONS^ON
 NO]SQXL_SVN
 ZYTOM^
 NOVS`Oc
 ]c]^OW

RO
NO]SQXL_SVN
^OKW
aYUON
aS^R
^RO
VYMKV
W_XSMSZKVS^c
^Y
O]^KLVS]R
K
ZRK]ON

YMM_ZKXMc
YP
^RO
PKMSVS^c
=,67
+MRS^OM^]
KXN
NLSQR^
aYUON
MVY]OVc
aS^R
^RO

]_LMYX^KM^Y]
KXN
9PPSMO
.OZY^v]
]_ZZVc
MRKSX
`OXNY]
YX
^RO
YVVY_^
YP
^RO

5S`K
YLY^SM
P_VPSVVWOX^
]c]^OW




                                                                                         NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


2IILFH 'HSRW DOO HQWHU
$XVWLQ 7;



=,67
ZK^XOSXQ
aS^R
NLSQR^
66-
^RO
PSWv]
NO]SQXL_SVN
MYX]^_M^SYX

KPPSVSK^O
ZY`SNON
ZYQKWWSXQ
^O]^
PS^
]^_NSO]
+MRS^OM^_KV
KXN
3X^OSY

.O]SQX
]O`SMO]
PY
^RS]
XOa
][_KOPYY^
]KVO]
MOX^O
KXN
MYZYK^O

YPPSMO
MYWZVOb
RS]
ZYTOM^
aK]
K
PS^Y_^
YP
^RO
]OMYXN
PVYY
YP
KX
YPPSMO

L_SVNSXQ
aS^RSX
^RO
+WLOQVOX
9PPSMO
:KU
SX
+_]^SX
B

9PPSMO
.OZY^
O[_SON

K
PVObSLVO
ZYQKW
YP
YZOX
QK^ROSXQ
]ZKMO]
WOO^SXQ
KOK]
YPPSMO]
KXN
MKVV

MOX^O
]^K^SYX]

=,67v]
NO]SQX
^OKW
]OVOM^ON
WK^OSKV]
KXN
PSXS]RO]
^RK^

aY_VN
MOK^O
KX
OX`SYXWOX^
KMY_]^SMKVVc
]_S^KLVO
^Y
^RO
MKVV
MOX^O
P_XM^SYX]


aY
UOc
MVSOX^
O[_SOWOX^]
aOO
^Y
WKSX^KSX
K
^ROWO
^RK^
ZYWY^ON
^RO

9PPSMO
.OZY^
LKXN
KXN
^Y
SXMYZYK^O
QOOX
]_]^KSXKLVO
NO]SQX
RO
NO]SQX

^OKW
aYUON
RKXN
SX
RKXN
aS^R
^RO
MYX]^_M^SYX
WKXKQO
KXN
MY]^
O]^SWK^Y

SX
]OVOM^SXQ
]_]^KSXKLVO
WK^OSKV]
KXN
]c]^OW]
aS^R
^RO
QOK^O]^
`KV_O
KXN

N_KLSVS^c
=,67
KXN
NLSQR^
aYUON
MVY]OVc
aS^R
9PPSMO
.OZY^v]
QVYLKV

KMMY_X^
`OXNY]
^Y
KMRSO`O
KVV
^RO
O[_SOWOX^]
YP
K
?=1,-
6//.-3
K^SXQ

aRSVO
]^KcSXQ
LOVYa
^RO
YSQSXKV
MVSOX^
L_NQO^
RO
NO]SQXL_SVN
ZYTOM^
NOVS`Oc

PKMSVS^K^ON
K
]RY^OXSXQ
YP
^RO
Y`OKVV
ZYTOM^
]MRON_VO




                                                                                     NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


UXH
1RUWK $WWOHERUR 0$

+]
K
ZOPOON
MYX^KM^Y
PY
_O
^RY_QRY_^
^RO
?=
ZY`SNSXQ
[_KVS^c

MYX]^_M^SYX
MYX^KM^SXQ
KXN
NO]SQXL_SVN
]O`SMO]
NLSQR^
S]
ZY_N
^Y

KXXY_XMO
^RO
QKXN
YZOXSXQ
YP
_Ov]
 ^R
]^YO

_O
ZY`SNO]
K
`SLKX^

OX`SYXWOX^
PY
S^]
cY_^RP_V
M_]^YWO
LK]O
KXN
MYX^SX_O]
^Y
LO
K
VOKNSXQ

]ZOMSKV^c
O^KSVO

RO
WKTYS^SO]
YP
^ROS
]^YO]
KO
VYMK^ON
aS^RSX
OQSYXKV

]RYZZSXQ
WKVV]
KXN
KXQO
SX
]SdO
PYW
][_KOPOO^
^Y
][_KO
POO^
+]
^RO
1OXOKV
-YX^KM^Y
PY
^RS]
ZYTOM^
NLSQR^
MYX]^_M^ON
^RO

SX^OSYPS^Y_^
PYW
]^K^
^Y
PSXS]R
SX
K
ZOSYN
YP
PS`O
aOOU]
NLSQR^
ZY`SNON

NOWYVS^SYX
XOa
]^YOPYX^
]c]^OW]
]ZOMSKV^c
VSQR^SXQ
]VK^
aKVV
]^_M^_O]
KXN

MOKWSM
^SVO
PVYYSXQ





                                                                                      NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


%HG %DWK                %HRQG
0XOWLSOH /RFDWLRQV 86 (DVW RDVW


NLSQR^
MYX^SX_O]
^Y
ZK^XO
aS^R
,ON
,K^R

,OcYXN
K]
^RO
XK^SYXKV
O^KSVO

QYa]
S^]
L_]SXO]]
SX
ObZKXNSXQ
WKUO^]
KMY]]
^RO
MY_X^c
NLSQR^v]

]_S^O
YP
NO]SQXL_SVN
KXN
ZYTOM^
WKXKQOWOX^
]O`SMO]
KO
KNKZ^KLVO
^Y

LY^R
VKQO
KXN
]WKVV
]MKVO]
KX
K]]O^
OPVOM^ON
SX
^RO
PSWv]
aYU
aS^R
,ON

,K^R

,OcYXN
3X
YXO
OMOX^
ZYTOM^
NLSQR^
Y`O]Ka
^RO
]OVOM^S`O
SX^OSY

OWYNOVVSXQ
YP
K
][_KOPYY^
,ON
,K^R

,OcYXN
]^YO
SX
KWZK
06

+XY^RO
OMOX^Vc
MYWZVO^ON
ZYTOM^
MYX]S]^ON
YP
K
P_VV
SX^OSY
PS^Y_^
KXN
PSb^_O

SX]^KVVK^SYX
K^
K
,ON
,K^R

,OcYXN
VYMK^SYX
SX
AO]^
:KVW
,OKMR
0VYSNK

8Oa
YXQYSXQ
ZYTOM^]
SXMV_NO
^RO
KNWSXS]^K^SYX
KXN
ZYTOM^
WKXKQOWOX^
YP

Ob^OX]S`O
Ob^OSY
]S^O
OXY`K^SYX
aYU
K^
K
,ON
,K^R

,OcYXN
VYMK^SYX
SX
0^

6K_NONKVO
06




                                                                                       NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


'XDQH 5HDGH
+RZDUG %HDFK 1

NLSQR^
NO]SQXON
K
XOa
#][_KOPYY^
QY_XN_Z
L_SVNSXQ
PY
._KXO

OKNO
^RO
ZYZ_VK
N_Q]^YO
MRKSX
aS^R
VYMK^SYX]
^RY_QRY_^
WO^YZYVS^KX

8Oa
CYU
RS]
L_SVNSXQ
OZO]OX^]
^RO
PS]^
YVVY_^
VYMK^SYX
YP
^RO
XOa
._KXO

OKNO
LKXN
ZY^Y^cZO
^RY_QRY_^
8Oa
CYU
-S^c
KXN
aK]
MYWZVO^ON
SX

]_WWO
#

RS]
]SXQVO]^Yc
L_SVNSXQ
S]
MYX]^_M^ON
YP
]^OOV
KXN
WK]YXc
AYU
ZY`SNON

SXMV_NON
]S^O
SWZY`OWOX^]
PY

KMO]
SXMV_NSXQ
M_L]
ZK`OWOX^]

NKSXKQO
]^_M^_O]
KXN
]S^O
VSQR^SXQ
RO
L_SVNSXQ
POK^_O]
LY^R
]^YOPYX^
KXN

MVOO]^Yc
aSXNYa]
KXN
K
ZRKWKMc
aS^R
]OM_O
NS`O^R_
aSXNYa]





                                                                                     NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


86 HOOXODU
0XOWLSOH /RFDWLRQV 1DWLRQZLGH

+]
K
ZOPOON
MYX^KM^Y
PY
?=
-OVV_VK
^RY_QRY_^
^RO
?=
ZY`SNSXQ

[_KVS^c
MYX]^_M^SYX
MYX^KM^SXQ
KXN
NO]SQXL_SVN
]O`SMO]
NLSQR^
OMOX^Vc

MYWZVO^ON
^RO
+_L_X
7/
VYMK^SYX
RO
+_L_X
7/
VYMK^SYX
S]
ZK^
YP
?=
-OVV_VKv]
XOa
YVVY_^
ZYQKW
YP

K
XOa
]^YO
NO]SQX
1OXOK^SYX
@
?XNO
^RO
1OXOK^SYX
@
ZYQKW


MYZYK^O
VYMK^SYX]
KXN
 
KQOX^
VYMK^SYX]
aSVV
LO
L_SV^
Y
OWYNOVON




NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


%ULGJHVWRQH  )LUHVWRQH
0XOWLSOH /RFDWLRQV 1DWLRQZLGH

NLSQR^
KXN
=,67
RK`O
LOOX
O^KSXON
^Y
ZY`SNO
^RSN
ZK^c
MYX]^_M^SYX

YL]O`K^SYX
]O`SMO]
PY
XOa
,SNQO]^YXO
O^KSV
9ZOK^SYX
]S^O]
Y
OX]_O
^RK^

^RO
aYU
S]
ZOPYWON
^Y
^RO
]^KXNKN]
KXN
[_KVS^c
NO]MSLON
SX
^RO
MYX^KM^_KV

NYM_WOX^]
Y_
^OKW
aYU]
MVY]OVc
aS^R
^RO
9aXO
KXN
-YX^KM^Y
^Y
O`SOa

^RO
ZYQO]]
YP
MYX]^_M^SYX
K^
OQ_VK
SX^O`KV]
=S^O
`S]S^]
aSVV
SXMV_NO
^RO

YL]O`K^SYX
YP
^RO
PYVVYaSXQ
S^OW]$

•
 0YY^SXQ
ZOZKK^SYX
OSXPYMOWOX^
KXN
ZVKMOWOX^
?XNOQY_XN
_^SVS^SO]
•
 3X^OSY
aKVV
PKWSXQ
KXN
7/:
SXPK]^_M^_O
Y_QR
SX
•
 9`OROKN
7/:
KXN
0SO
:Y^OM^SYX
]c]^OW
Y_QR
SX
KXN
MOSVSXQ
ZVKMOWOX^
•
 :K`OWOX^
]_LQKNO
ZOZKK^SYX
KXN
ZY_SXQ
YP
K]ZRKV^MYXMO^O

   ZK`OWOX^
+^
^RO
MYXMV_]SYX
YP
OKMR
]S^O
`S]S^
^RO
^OKW
ZOZKO]
K
MYX]^_M^SYX
]^K^_]

OZY^
NYM_WOX^SXQ
]S^O
MYXNS^SYX]
KXN
ZRY^YQKZR]
YP
^RO
MYX]^_M^SYX

ZYQO]]
Y
`OSPc

MYWZVO^SYX
YP
^RO
ZYTOM^]
KXN
KZZY`SXQ
PSXKV

ZKcWOX^]
^Y
^RO
-YX^KM^Y
^RO
9L]O`K^SYX
^OKW
aSVV
MYYNSXK^O
KXN
K]]S]^
SX

^RO
MYVVOM^SYX
KXN
K]]OWLVc
YP
KVV
MVY]OY_^
SXPYWK^SYX
KXN
NYM_WOX^K^SYX




                                                                                   NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
GE5LJKW //


:HLQJDUWHQ 5HDOW
0LDPL )/

NLSQR^
ZOPYW]
NO]SQX
KXN
MYX]^_M^SYX
PY
AOSXQK^OX
ZYTOM^]
KXQSXQ

PYW
ObZKX]SYX]
NYaX]SdO]
SX^OSY
^OXKX^
PS^Y_^]
]_`Oc]
O]^SWK^O]
KXN

]ROVV]
-_OX^Vc
NLSQR^
S]
aYUSXQ
YX
KX
ObZKX]SYX
SX
^RO
KWSKWS
KSV

=RYZZSXQ
:VKdK
KXN
S]
SX`YV`ON
SX
WKXc
ZYTOM^]
YX
^RO
0VYSNK
WKUO^




                                                                             TAMIAMI TRAIL (S.W. 8th. STREET)                                                                             NORTH
                                                                                                                                                                                                              TRAFFIC LIGHT




                                                                                                                                                                 AUTO HARBOR

                                                                                                                                                OWNED                          OWNED
                      C0V   C0T    C0S
                                                                                                                                               BY OTHERS                                   OWNED
                                                                                                                                                                              BY OTHERS
 S.W. 139th. AVENUE




                                                                                                                                                                                          BY OTHERS




                                                                                                                                                                                                                               ENUE
                             C0R




                                                                                                                                                                                                                 S.W. 137th. AV


                                                                                                                                                                                                   OWNED
                                               C0E                                                                                                                                                BY OTHERS
                                                     C0D

                                         C0P

                                                                 B0S
                                                                       B0R         B0N     B0L         B J
                                                                                                       B0J     B0G         B D
                                                                                                                           B0D   B B
                                                                                                                                 B0B                                   A H
                                                                                                                                                                       A0H
                                                                             B0P     B M
                                                                                     B0M         B0K     B H
                                                                                                         B0H         B0E     B C
                                                                                                                             B0C   B A
                                                                                                                                   B0A   A0R         A0M   A0K   A0J         A0G    A0A
                                                           C0A




NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
Team Overview
                                                                                          dbRight LLC
                                                                                       SBLM Architects




Roles and Responsibilities
James Cornwell PA-AIA is the primary client contact. Jim oversees the entire team and
delivers information to the client at all project intervals. He establishes and manages project teams
to accommodate the needs of the client and leads the process review effort. Having held many
positions of responsibility with the retail giant, Office Depot, Jim has implemented numerous initiatives
to improve processes and programs. As a Director of Construction and Design, Jim selected,
developed, and implemented a real estate development and a web-enabled management system,
adopted by several departments company-wide. As an active member of their Real Estate Pipeline
Committee, Jim was responsible for reviewing every aspect related to new retail strategies prior to
Real Estate Committee submittals, including legal and negotiation aspects. In addition, Jim developed
and implemented their departmental process manual.

Mike LeFande AIA, LEED AP, MBA serves as a primary back-up person for Jim Cornwell. Mike
is responsible for all office-based functions, including managing and tracking progress. He will bring
his unique perspective, having worked closely with a wide range of retailers across the country, to the
process review effort.

David Nicholson AIA, LEED AP brings over 30 years’ experience managing staff and programs
for numerous retail clients. A manager with a reputation for innovative solutions to challenging
problems, he has a sophisticated understanding of the design and construction of retail facilities
including small and large scale stores. Dave oversees project progress, quality, and client satisfaction.
In addition, Dave directs our team of in-house entitlement managers, and brings an invaluable
perspective gained from his track record of moving projects expeditiously through the entitlement
process at minimal cost, and from his experience directing retail roll-out programs.




dbRight Qualifications | Team Overview
Team Overview
                       dbRight LLC
                       SBLM Architects

                      James Cornwell PA-AIA
                      Partner of dbRight, LLC

                      James Cornwell has extensive experience in retail real estate development. A creative developer and
                      manager of the design and construction process, Jim has developed procedures and techniques
                      to ensure schedules are met on time, budgets are not exceeded, and construction documents
                      are of the highest quality. He acts as a liaison between all parties involved in a project, including
                      construction, legal, real estate, and consultant operations. Jim has strong client relationships,
                      including retail giant, Office Depot. As a former Director of Construction, Jim understands the process
                      of building and construction from early stages of project site selection through actual construction
                      and project completion.


                      Licenses/Registrations
                      xx Architecture – Brazil

                      Affiliations
                      xx American Institute of Architects (AIA)

                      Education
                      xx Bachelor of Science, Architecture and Urban Planning – St. Ursula University

  Select Experience   Office Depot — Multiple Locations, Nationwide
                      Jim has worked on numerous Office Depot projects ranging from remodels, renovations, and
                      expansions to new construction for retail stores as well as warehouses. While Senior Director of
                      Construction at Office Depot, Jim controlled and managed all aspects of design and construction
                      for all new facilities. He was responsible for the due diligence, lease exhibits, permitting, budgeting,
                      bidding, contracting, and construction. While working for dbRight, LLC and working along side
                      SBLM, Jim was involved with the Office Depot in Austin, TX, which achieved LEED Silver certification.
                      He was also involved with the distribution center in Newville, PA. Jim continues to work with Office
                      Depot and is currently providing services for several Office Depot projects, including multiple projects
                      pursuing LEED certification.


                      US Cellular — Multiple Locations, Nationwide
                      dbRight is a preferred contractor for US Cellular stores throughout the U.S., providing quality
                      construction, contracting, and design-build services under their new roll-out program, Generation
                      V. This new program consists of 40 corporate locations and 60 agent locations that will be built or
                      remodeled. In addition, dbRight reviewed the existing processes of the US Cellular management
                      group. Jim established benchmarking systems and aggressive national retail development plans.


                      RUE 21 — Multiple Locations, Nationwide
                      dbRight was the general contractor for a RUE 21 project, which consisted of constructing an interior
                      fit-out from start to finish in a period of five weeks. Following that project, dbRight became a preferred
                      contractor for RUE 21 throughout the U.S., providing quality construction, contracting, and design-
                      build services.


                      Bridgestone/Firestone — Multiple Locations, Nationwide
                      dbRight and SBLM have been retained to provide third party construction observation services
                      for new Bridgestone Retail Operation sites. dbRight and SBLM work closely with the owner and
                      contractor to review the progress of construction at regular intervals.


                      Bed Bath  Beyond — Multiple Locations, FL




                                                                                                 dbRight Qualifications | Resumes
Team Overview
                                                                                          dbRight LLC
                                                                                       SBLM Architects

dbRight oversaw the selective interior remodelling of a 40,000-square-foot Bed Bath  Beyond store
in Tampa, FL. Jim was also involved with the administration and project management for extensive
exterior site renovation work at a location in Ft. Lauderdale, FL.


Transload America — Miami, FL
Transload America (TLA) is a construction debris transfer and recycling facility. In conjunction with
SBLM, dbRight was selected to design a new waste transfer facility on TLA’s six-acre site, as well
as coordinate integral building systems. The project consists of a 30,000-square-foot waste transfer
building, a 1,500-square-foot office building, and an 800-square-foot gate house.


*Office Depot — Delray Beach, FL
While Senior Director of Construction at Office Depot, Jim controlled and managed all aspects of
design and construction for all new facilities. He was responsible for the due diligence, lease exhibits,
permitting, budgeting, bidding, contracting, and construction.


*Tynes Construction, Bahia, Brazil
Jim focused his efforts on managing estimating, bidding, and design. His responsibilities included
supervising residential and retail designs as well as construction endeavors.


*Lojas Americanas — Rio de Janeiro, Brazil
Jim managed design and construction of new stores and remodels for this 80-year-old Brazilian
retail chain. As part of this expansion program, Jim implemented a design-related Loss Prevention
Program that added $30M to the bottom line.


*Areas Engineering International, Rio de Janeiro, Brazil
Jim directed the development and permitting of construction documents and managed a complex
team of Project Managers and Estimators. He also managed consulting services for high-rise
residential buildings for all design and construction phases.


*Previous Affiliation




dbRight Qualifications | Resumes
Team Overview
                       dbRight LLC
                       SBLM Architects

                      Michael LeFande AIA, LEED AP, MBA
                      Principal at SBLM Architects/Partner of dbRight, LLC

                      For more than 25 years, Michael LeFande has directed numerous building programs, developing
                      design and building standards for developers and retailers throughout the US. His projects have
                      included site development, ground-up buildings, adaptive re-use, tenant fit-outs, and renovations. As
                      a Principal at SBLM, Mike has developed procedures and techniques to ensure schedules are met
                      on time, budgets are not exceeded, and construction documents are of the highest quality. As the
                      leader of SBLM’s retail design practice, Mike has designed store prototypes and managed rollout
                      programs for many of today’s largest and most successful retailers.
                      Mike is also the chairman of the SOS (Stewards of Sustainability) Committee at SBLM. This
                      committee conducts research and applies current sustainable technologies and ideas to projects
                      throughout the firm.


                      Licenses/Registrations
                      xx Architecture – NY, NJ, CO

                      Affiliations
                      xx American Institute of Architects (AIA)
                      xx Leadership in Energy and Environmental Design Accredited Professional (LEED AP)
                      xx United States Green Building Council (USGBC)
                      xx International Council of Shopping Centers (ICSC)
                      xx National Retail Federation (NRF)
                      xx Long Island Association (LIA)

                      Education
                      xx Master of Business Administration – University of Phoenix
                      xx Bachelor of Science, Architectural Technology – New York Institute of Technology



  Select Experience   Office Depot — Multiple Locations, U.S. and Puerto Rico
                      Mike is the Principal-in-Charge of the Office Depot expansion program including nationwide
                      renovations, upgrades, and ground-up projects. Services provided included: site development,
                      comprehensive architecture and engineering, and sustainable design. SBLM continues to provide
                      services for Office Depot, in conjunction with dbRight.


                      PETCO — Multiple Locations, U.S and Puerto Rico
                      As Principal-in-Charge, Mike manages the expansion of PETCO’s national rollout program for
                      facilities ranging from 10,000-square-feet to 25,000-square-feet. SBLM maintains the PETCO
                      prototype design and modifies it to adapt to the parameters of each location. More than 350 stores
                      have been designed and outfitted for the retail chain, focusing on pet adoptions, sales, grooming, day
                      care, supplies, and other related products.


                      Aldo Groupe — Multiple Locations, Nationwide
                      Since 2008, SBLM has provided architectural services for ALDO brand stores featuring high fashion
                      footwear and accessories, including ‘Call it Spring’ stores. In January 2011, SBLM was awarded
                      participation in ALDO’s rollout program. Under this contract, SBLM provides services for new
                      and remodel stores, which include feasibility studies (as requested), construction documents, and
                      construction administration. Stores range from 2,000-square-feet to 4,000-square-feet. Mike is
                      Principal-in-Charge for all ALDO projects.




                                                                                              dbRight Qualifications | Resumes
Team Overview
                                                                                       dbRight LLC
                                                                                    SBLM Architects

JC Penney — Multiple Locations, Nationwide
SBLM acts as a Store Planning Consultant for JC Penney’s Store Planning Support Program in the
Northeast Region (ME to VA); an extension of JC Penney’s store planning team. Services include
area and fixture planning for 220,00-square-foot stores ranging from 2-3 stories to one story
84,000-square-foot stores. Mike is the Principal-in-Charge for this program.


Dunkin’ Brands — Multiple Locations, TX
SBLM is the preferred Architect for Dunkin’ Brands in the Dallas-Austin-San Antonio, TX corridor.
SBLM Architects provides complete due diligence, design, construction documentation, and
construction administration services. Mike is the Principal-in-Charge.


SkyView Parc — Queens, NY
This $1 billion mixed-use development features six residential towers and 800,000 square feet
of retail and commercial space. SBLM provided tenant fit-out services for several retailers that
have leased space in the center, including Target; Bed, Bath and Beyond; BJ’s Wholesale Club;
Marshall’s, Famous Footwear; Bob’s Discount Furniture; and Sky Foods. The SBLM team was also
responsible for preparing lease exhibits and mall leasing plans. Mike was the Principal-in-Charge.


Bergen Town Center — Paramus, NJ
Mike was Principal-in-Charge for renovations and additions to this large and complex project, which
included obtaining municipal approvals, providing schematic designs and making presentations to
potential clients. In addition to providing schematic through design development and construction
documents for this project, Mike’s team worked directly with the developer and also provided code
reviews and studies for various tenants throughout the mall such as Target, Century 21, and Whole
Foods Market.




dbRight Qualifications | Resumes
Team Overview
                       dbRight LLC
                       SBLM Architects

                      David Nicholson AIA, LEED AP
                      Principal at SBLM Architects/Partner of dbRight, LLC

                      David Nicholson has spent over 30 years dedicated to the development, design, and construction
                      industries. He has brought his expertise to SBLM’s ongoing collaborations with the nation’s largest
                      retail chains, real estate developers, and government clients providing feasibility studies, site analyses
                      and selection, demographic research, zoning and regulatory considerations, prototype adaptation,
                      project management, budget control, and financing coordination. Dave has a deep understanding of
                      design and management, and is well known for his innovative solutions to challenging problems.


                      Licenses/Registrations
                      xx Architecture – NY, NJ, HI

                      Affiliations
                      xx American Institute of Architects (AIA)
                      xx Leadership in Energy and Environmental Design Accredited Professional (LEED AP)
                      xx National Council of Architectural Registration Boards (NCARB)

                      Education
                      xx Bachelor of Architecture – Syracuse University
                      xx Bachelor of Arts, Economics – Syracuse University



  Select Experience   Toys “R” Us  Kids “R” Us — Multiple Locations, Nationwide
                      As head of the in-house architectural staff, Dave directed the development of 112 Kids “R” Us retail
                      locations and 98 Toys “R” Us stores and distribution centers, totaling 9.5 million square feet and
                      $525 million in construction costs. In addition, he implemented a computerized process of collecting
                      and distributing information.


                      Barnes  Noble — Multiple Locations, Nationwide
                      As Director of Construction for a national rollout program, Dave supervised the prototype
                      development; design, development, and construction; and fixturing of 256 store locations totaling 6.7
                      million square feet and $450 million in capital costs.


                      The Home Depot — Multiple Locations, East Coast
                      SBLM has been providing consultant services to Home Depot, assisting the retailer on their national
                      rollout program. As the site development manager, Dave’s team performed site selection, due
                      diligence, and entitlements on locations in New York, Pennsylvania, Delaware, Maryland, and West
                      Virginia. Dave was also the Principal-in-Charge of three projects in New York, one in New Jersey,
                      and one in Pennsylvania where SBLM provided comprehensive architectural, archeological, and
                      ecological services.


                      Duane Reade — Multiple Locations, NY
                      SBLM designed several locations in the five boroughs to reflect the new Duane Reed design and
                      graphics standards in conjunction with an updated brand image rollout. After successfully designing
                      several locations, SBLM was recently awarded participation in their regional rollout program. Dave
                      is managing the SBLM design team in these efforts. The first location to feature the new prototype
                      design was designed by SBLM and built by dbRight.




                                                                                                 dbRight Qualifications | Resumes
Team Overview
                                                                                        dbRight LLC
                                                                                     SBLM Architects

24 Hour Fitness — Multiple Locations, East Coast
As the Principal-in-Charge for 24 Hour Fitness’ metropolitan projects, Dave has managed the
entitlements, design, construction documents, and construction administration phases for numerous
clubs across the East Coast. SBLM has provided feasibility studies, as well as architectural and
design services for nearly 35 locations. Each fitness club includes amenities such as an NBA-sized
basketball court, 3-lane lap pool, steam room, sauna, spa, aerobics studio, spin room, and children’s
play area. Facilities are typically 50,000-square-feet and average $3 million in construction costs.


The Olivia — New York, NY
SBLM was commissioned to design this new 600,000 -square-foot mixed-use development located
on 34th Street in Manhattan. As Principal-in-Charge, Dave managed the conceptual design and
oversaw construction documents for the 34-story mixed-use tower, which includes 333 apartments,
85,000 square-feet of retail space, a 14-screen movie complex, and a 200-space below grade
parking garage. Each building section - residential, theater, retail, and office - were treated as
separate units. Multiple entrances and egresses were designed to avoid congestion and create
smooth pedestrian flow for business tenants, residential unit customers, and building workers.


The Eventi Hotel — New York, NY
SBLM is the coordinating architect on the ground-up execution of this 54-story high-rise building in
Manhattan’s Flatiron district. Dave managed SBLM’s design and construction efforts on the project.
One notable feature of the hotel is its entrance, which consists of a public, block-through plaza
featuring an art-glass wall and fully configurable JumboTron screen. The full project occupies roughly
500,000-square-feet, and was constructed at a cost of $600 million.




dbRight Qualifications | Resumes
dbRight LLC Design Builders


New York, NY
151 W. 26th Street
New York, NY 10001
T 212 995 5600
F 212 675 4228

Long Island
33 Walt Whitman Road, Suite 204
Huntington Station, NY 11746
T 631 683 5588
F 631 683 5589

Miami, FL
11430 N. Kendall Drive, Suite 310
Miami, FL 33176
T 305 412 9187
F 305 412 6731

Dallas, TX
16910 Dallas Parkway
Dallas, TX 75248
T 469 554 7770
F 469 554 7775

Db Right Qualifications

  • 1.
    LLC design builders PROFESSIONAL QUALIFICATIONS
  • 3.
    Firm Overview dbRight LLC SBLM Architects About dbRight dbRight was founded by the Principals of SBLM Architects to offer a wider range of services to our clients, including competitive design-build project delivery options. The design-build process offers a lower-risk alternative to the traditional design-bid-build delivery method and assures a fixed cost and expedited project-delivery schedule as design and construction phases are overlapped. The significant advantages of this method are epitomized by the following: architects are professionally responsible for a facility during its entire life span, versus an industry standard of one year for contractors; and with architects at the helm, the integrity of a building’s design is supported by the architect’s passion for an elegant solution. Staff The firm is comprised of 13 Project Managers and Site Superintendents. In addition, SBLM is comprised of 90 architects, technicians, CAD specialists, administrative and support personnel who utilize the most current technology in designing and drafting. Firm Capabilities •• Program Management •• Program Analysis and Test Fits •• Preliminary Construction Cost Analysis •• Zoning and Building Code Review and Analysis •• Local Community Board Representation •• Architecture and Engineering through SBLM Architects •• Agency Filing and Permitting •• Building Construction and Construction Management •• Post-Construction Documents dbRight Qualifications | Firm Overview
  • 4.
    Firm Overview dbRight LLC SBLM Architects Retail Design Through our affiliation with SBLM Architects, dbRight is able to offer complete design services supported by an integrated architectural and contractor approach. SBLM’s designers work with you to develop your brand language into a three-dimensional environment. At the same time, dbRight’s builders inform the design process by bringing to light potential site challenges, hidden conditions, and local approvals processes. Through integrating the contractor perspective early in the design process, dbRight is able to avoid potential project delays and change orders which translates into cost savings and speed-to-market delivery. Cost Estimating & Budgeting Each project begins with a well-researched and reliable cost estimate. This estimate is closely monitored and evaluated by our in-house cost estimator throughout the project process. This eliminates any potential for surprises and cost overruns in the final budget. Another cost saving measure is dbRight’s ability to value-engineer at every stage of the design process prior to construction. Construction Services dbRight is a licensed and insured General Contractor (GC) and Construction Manager (CM) with construction managers and superintendents on staff. dbRight offers a variety of choices for contracting to best suit the specific project needs. These include GC or CM with a guaranteed maximum price, CM with a cost-plus-percentage fee, or CM with a cost-plus-fixed fee. The “cost plus” options are especially appealing to clients who need to establish and record multiple bids for each work trade. All bids are open and reviewed with the client prior to final sub-contractor selection. dbRight maintains a solid relationship with a network of qualified sub-contractors in various states. Each job is supervised by both a Project Manager and an on-site Superintendent. Post–Construction Services dbRight provides a thorough close-out package, including operating manuals, as-built drawings, and lien waivers from sub-contractors upon final payment. Our staff conducts a punch list for each trade as well as an overall list for substantial completion. The design-build structure allows us immediate access to on-staff licensed design professionals to handle any inspection concerns or local agency issues. dbRight has the capability to remove, relocate, or install new merchandise fixtures, displays, signage, and graphics if required. As an optional service, dbRight provides post-occupancy visits. dbRight Qualifications | Firm Overview
  • 5.
    Firm Overview dbRight LLC SBLM Architects Sustainability dbRight understands that the sustainable design of high performance, energy efficient buildings is the future of responsible construction, and that investing up front in sustainable building methods leads to long term energy-related cost savings. dbRight’s commitment to sustainable design and project management is demonstrated by our conscientious, integrated design-build approach, and we are committed to achieving USGBC LEED certification whenever possible. Working with SBLM Architects, dbRight employs a wide range of sustainable design and analysis techniques, from extensive studies to responsible material sourcing, to help ensure each building component contributes to the overall exemplary performance and efficiency of the project. In 2010, Office Depot opened it’s first state of the art distribution center in Newville, PA, to be registered under the USGBC LEED rating system. Certified LEED-Silver, the project includes various energy and water reduction systems, recycled material construction, and a comprehensive recycling program for operational waste. SBLM Architects and dbRight LLC delivered the project via an expedited design-build project delivery system. The design-build team worked with the local municipality to establish a phased occupancy of the facility. SBLM Architects/dbRight worked closely with the subcontractors and Office Depot’s supply chain vendors on the roll-out of the Kiva robotic fulfillment system, which services up to 30 trucks on both the unloading and receiving sides. dbright LEED Registered Construction Projects CERTIFIED Office Depot Call Center – Austin, TX Office Depot – Panama City, FL Office Depot – Sarasota, FL Office Depot – Glen Burnie, MD Office Depot – Burnsville, MN Office Depot – Newville, PA Office Depot – Memphis, TN Office Depot – Houston, TX Office Depot – Manassas, VA dbRight Qualifications | Firm Overview
  • 6.
    Firm Overview dbRight LLC SBLM Architects dbRight Firm Licenses This map demonstrates where dbRight is licensed and/or registered. dbRight Qualifications | Firm Overview
  • 7.
    References SBLM Architects dbRight LLC Office Depot Mr. Edward Costa Vice President of Construction and Global Procurement 660 North Military Trail Boca Raton, FL 33496 561.438.7782 edward.costa@officedepot.com Bridgestone Retail Operations, LLC Mr. Michael Donofrio Construction Project Manager 333 E. Lake Street Bloomingdale, IL 60108 610.968.2077 mdonofrio@bfrc.com Weingarten Realty Mr. John L. Greenman Construction Manager 891 E Commercial Blvd Ft. Lauderdale, FL 33334 954.495.5239 jgreenman@weingarten.com Petco Animal Supplies Inc. Mr. Keith Moreau Sr. Project Manager 9125 Rehco Road San Diego, CA 92121 Office 860.370.9203 Cell 858.525.2916 Keith.Moreau@petco.com Southeast Centers, LLC Mr. Jeff Scott Vice President of Construction 1541 Sunset Drive #300 Coral Gables, FL 33143 305. 666.2140 dbRight Qualifications | References
  • 9.
    5HODWHG ([SHULHQFH GE5LJKW // 2IILFH 'HSRW 0XOWLSOH /RFDWLRQV 1DWLRQZLGH UXH 1RUWK $WWOHERUR 0$ %HG %DWK %HRQG 0XOWLSOH /RFDWLRQV 86 (DVW RDVW 'XDQH 5HDGH +RZDUG %HDFK 1 86 HOOXODU 0XOWLSOH /RFDWLRQV 1DWLRQZLGH %ULGJHVWRQH )LUHVWRQH 0XOWLSOH /RFDWLRQV 1DWLRQZLGH :HLQJDUWHQ 5HDOW 0LDPL )/ GE5LJKW 5HODWHG ([SHULHQFH :VOK]O ]OO ^RO PYVVYaSXQ ZKQO] PY NO]MSZ^SYX] YP ]SQXSPSMKX^ NLSQR^ MVSOX^] KXN ZYTOM^] SXMV_NSXQ ^RO PYVVYaSXQ$ 9PPSMO .OZY^ _O ,ON ,K^R ,OcYXN ._KXO OKNO ?= -OVV_VK KXN ,SNQO]^YXO 0SO]^YXO NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 10.
    GE5LJKW // 2IILFH 'HSRW 0XOWLSOH/RFDWLRQV =,67 ROVZON 9PPSMO .OZY^ NO`OVYZ S^] M_OX^ ZY^Y^cZO KXN ]WKVV PYWK^ ]^YO NO]SQX =,67 RK] MYWZVO^ON KMRS^OM^_KV ]O`SMO] YX Y`O ]^YO] PY 9PPSMO .OZY^ XK^SYXaSNO KXN SX :_O^Y SMY =,67 ZY`SNO] 6//. +NWSXS]^K^SYX ]O`SMO] PY 9PPSMO .OZY^ KXN RK] KMRSO`ON 6//. =SV`O MO^SPSMK^SYX PY X_WOY_] ]^YO] ^RY_QR^Y_^ ^RO ?XS^ON =^K^O] 3X 9PPSMO .OZY^ YZOXON S^] PS]^ ]^K^OYP^ROK^ NS]^SL_^SYX MOX^O ^Y LO OQS]^OON _XNO ^RO ?=1,- 6//. K^SXQ ]c]^OW RO ZYTOM^ SXMV_NO] `KSY_] OXOQc KXN aK^O ON_M^SYX ]c]^OW] OMcMVON WK^OSKV] KXN RSQRVc OPPSMSOX^ ROK^SXQ KXN MYYVSXQ O[_SZWOX^ =,67 +MRS^OM^] KXN ZK^XO NLSQR^ 66- NOVS`OON ^RO ZYTOM^ `SK KX ObZONS^ON NO]SQXL_SVN ZYTOM^ NOVS`Oc ]c]^OW RO NO]SQXL_SVN ^OKW aYUON aS^R ^RO VYMKV W_XSMSZKVS^c ^Y O]^KLVS]R K ZRK]ON YMM_ZKXMc YP ^RO PKMSVS^c =,67 +MRS^OM^] KXN NLSQR^ aYUON MVY]OVc aS^R ^RO ]_LMYX^KM^Y] KXN 9PPSMO .OZY^v] ]_ZZVc MRKSX `OXNY] YX ^RO YVVY_^ YP ^RO 5S`K YLY^SM P_VPSVVWOX^ ]c]^OW NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 11.
    NLSQR^ ;_KVSPSMK^SYX] fOVK^ON /bZOSOXMO
  • 12.
    GE5LJKW // 2IILFH 'HSRWDOO HQWHU $XVWLQ 7; =,67 ZK^XOSXQ aS^R NLSQR^ 66- ^RO PSWv] NO]SQXL_SVN MYX]^_M^SYX KPPSVSK^O ZY`SNON ZYQKWWSXQ ^O]^ PS^ ]^_NSO] +MRS^OM^_KV KXN 3X^OSY .O]SQX ]O`SMO] PY ^RS] XOa ][_KOPYY^ ]KVO] MOX^O KXN MYZYK^O YPPSMO MYWZVOb RS] ZYTOM^ aK] K PS^Y_^ YP ^RO ]OMYXN PVYY YP KX YPPSMO L_SVNSXQ aS^RSX ^RO +WLOQVOX 9PPSMO :KU SX +_]^SX B 9PPSMO .OZY^ O[_SON K PVObSLVO ZYQKW YP YZOX QK^ROSXQ ]ZKMO] WOO^SXQ KOK] YPPSMO] KXN MKVV MOX^O ]^K^SYX] =,67v] NO]SQX ^OKW ]OVOM^ON WK^OSKV] KXN PSXS]RO] ^RK^ aY_VN MOK^O KX OX`SYXWOX^ KMY_]^SMKVVc ]_S^KLVO ^Y ^RO MKVV MOX^O P_XM^SYX] aY UOc MVSOX^ O[_SOWOX^] aOO ^Y WKSX^KSX K ^ROWO ^RK^ ZYWY^ON ^RO 9PPSMO .OZY^ LKXN KXN ^Y SXMYZYK^O QOOX ]_]^KSXKLVO NO]SQX RO NO]SQX ^OKW aYUON RKXN SX RKXN aS^R ^RO MYX]^_M^SYX WKXKQO KXN MY]^ O]^SWK^Y SX ]OVOM^SXQ ]_]^KSXKLVO WK^OSKV] KXN ]c]^OW] aS^R ^RO QOK^O]^ `KV_O KXN N_KLSVS^c =,67 KXN NLSQR^ aYUON MVY]OVc aS^R 9PPSMO .OZY^v] QVYLKV KMMY_X^ `OXNY] ^Y KMRSO`O KVV ^RO O[_SOWOX^] YP K ?=1,- 6//.-3 K^SXQ aRSVO ]^KcSXQ LOVYa ^RO YSQSXKV MVSOX^ L_NQO^ RO NO]SQXL_SVN ZYTOM^ NOVS`Oc PKMSVS^K^ON K ]RY^OXSXQ YP ^RO Y`OKVV ZYTOM^ ]MRON_VO NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 13.
    NLSQR^ ;_KVSPSMK^SYX] fOVK^ON /bZOSOXMO
  • 14.
    GE5LJKW // UXH 1RUWK $WWOHERUR0$ +] K ZOPOON MYX^KM^Y PY _O ^RY_QRY_^ ^RO ?= ZY`SNSXQ [_KVS^c MYX]^_M^SYX MYX^KM^SXQ KXN NO]SQXL_SVN ]O`SMO] NLSQR^ S] ZY_N ^Y KXXY_XMO ^RO QKXN YZOXSXQ YP _Ov] ^R ]^YO _O ZY`SNO] K `SLKX^ OX`SYXWOX^ PY S^] cY_^RP_V M_]^YWO LK]O KXN MYX^SX_O] ^Y LO K VOKNSXQ ]ZOMSKV^c O^KSVO RO WKTYS^SO] YP ^ROS ]^YO] KO VYMK^ON aS^RSX OQSYXKV ]RYZZSXQ WKVV] KXN KXQO SX ]SdO PYW ][_KOPOO^ ^Y ][_KO POO^ +] ^RO 1OXOKV -YX^KM^Y PY ^RS] ZYTOM^ NLSQR^ MYX]^_M^ON ^RO SX^OSYPS^Y_^ PYW ]^K^ ^Y PSXS]R SX K ZOSYN YP PS`O aOOU] NLSQR^ ZY`SNON NOWYVS^SYX XOa ]^YOPYX^ ]c]^OW] ]ZOMSKV^c VSQR^SXQ ]VK^ aKVV ]^_M^_O] KXN MOKWSM ^SVO PVYYSXQ NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 15.
    NLSQR^ ;_KVSPSMK^SYX] fOVK^ON /bZOSOXMO
  • 16.
    GE5LJKW // %HG %DWK %HRQG 0XOWLSOH /RFDWLRQV 86 (DVW RDVW NLSQR^ MYX^SX_O] ^Y ZK^XO aS^R ,ON ,K^R ,OcYXN K] ^RO XK^SYXKV O^KSVO QYa] S^] L_]SXO]] SX ObZKXNSXQ WKUO^] KMY]] ^RO MY_X^c NLSQR^v] ]_S^O YP NO]SQXL_SVN KXN ZYTOM^ WKXKQOWOX^ ]O`SMO] KO KNKZ^KLVO ^Y LY^R VKQO KXN ]WKVV ]MKVO] KX K]]O^ OPVOM^ON SX ^RO PSWv] aYU aS^R ,ON ,K^R ,OcYXN 3X YXO OMOX^ ZYTOM^ NLSQR^ Y`O]Ka ^RO ]OVOM^S`O SX^OSY OWYNOVVSXQ YP K ][_KOPYY^ ,ON ,K^R ,OcYXN ]^YO SX KWZK 06 +XY^RO OMOX^Vc MYWZVO^ON ZYTOM^ MYX]S]^ON YP K P_VV SX^OSY PS^Y_^ KXN PSb^_O SX]^KVVK^SYX K^ K ,ON ,K^R ,OcYXN VYMK^SYX SX AO]^ :KVW ,OKMR 0VYSNK 8Oa YXQYSXQ ZYTOM^] SXMV_NO ^RO KNWSXS]^K^SYX KXN ZYTOM^ WKXKQOWOX^ YP Ob^OX]S`O Ob^OSY ]S^O OXY`K^SYX aYU K^ K ,ON ,K^R ,OcYXN VYMK^SYX SX 0^ 6K_NONKVO 06 NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 17.
    NLSQR^ ;_KVSPSMK^SYX] fOVK^ON /bZOSOXMO
  • 18.
    GE5LJKW // 'XDQH 5HDGH +RZDUG%HDFK 1 NLSQR^ NO]SQXON K XOa #][_KOPYY^ QY_XN_Z L_SVNSXQ PY ._KXO OKNO ^RO ZYZ_VK N_Q]^YO MRKSX aS^R VYMK^SYX] ^RY_QRY_^ WO^YZYVS^KX 8Oa CYU RS] L_SVNSXQ OZO]OX^] ^RO PS]^ YVVY_^ VYMK^SYX YP ^RO XOa ._KXO OKNO LKXN ZY^Y^cZO ^RY_QRY_^ 8Oa CYU -S^c KXN aK] MYWZVO^ON SX ]_WWO # RS] ]SXQVO]^Yc L_SVNSXQ S] MYX]^_M^ON YP ]^OOV KXN WK]YXc AYU ZY`SNON SXMV_NON ]S^O SWZY`OWOX^] PY KMO] SXMV_NSXQ M_L] ZK`OWOX^] NKSXKQO ]^_M^_O] KXN ]S^O VSQR^SXQ RO L_SVNSXQ POK^_O] LY^R ]^YOPYX^ KXN MVOO]^Yc aSXNYa] KXN K ZRKWKMc aS^R ]OM_O NS`O^R_ aSXNYa] NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 19.
    GE5LJKW // 86 HOOXODU 0XOWLSOH/RFDWLRQV 1DWLRQZLGH +] K ZOPOON MYX^KM^Y PY ?= -OVV_VK ^RY_QRY_^ ^RO ?= ZY`SNSXQ [_KVS^c MYX]^_M^SYX MYX^KM^SXQ KXN NO]SQXL_SVN ]O`SMO] NLSQR^ OMOX^Vc MYWZVO^ON ^RO +_L_X 7/ VYMK^SYX RO +_L_X 7/ VYMK^SYX S] ZK^ YP ?= -OVV_VKv] XOa YVVY_^ ZYQKW YP K XOa ]^YO NO]SQX 1OXOK^SYX @ ?XNO ^RO 1OXOK^SYX @ ZYQKW MYZYK^O VYMK^SYX] KXN KQOX^ VYMK^SYX] aSVV LO L_SV^ Y OWYNOVON NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 20.
    GE5LJKW // %ULGJHVWRQH )LUHVWRQH 0XOWLSOH /RFDWLRQV 1DWLRQZLGH NLSQR^ KXN =,67 RK`O LOOX O^KSXON ^Y ZY`SNO ^RSN ZK^c MYX]^_M^SYX YL]O`K^SYX ]O`SMO] PY XOa ,SNQO]^YXO O^KSV 9ZOK^SYX ]S^O] Y OX]_O ^RK^ ^RO aYU S] ZOPYWON ^Y ^RO ]^KXNKN] KXN [_KVS^c NO]MSLON SX ^RO MYX^KM^_KV NYM_WOX^] Y_ ^OKW aYU] MVY]OVc aS^R ^RO 9aXO KXN -YX^KM^Y ^Y O`SOa ^RO ZYQO]] YP MYX]^_M^SYX K^ OQ_VK SX^O`KV] =S^O `S]S^] aSVV SXMV_NO ^RO YL]O`K^SYX YP ^RO PYVVYaSXQ S^OW]$ • 0YY^SXQ ZOZKK^SYX OSXPYMOWOX^ KXN ZVKMOWOX^ ?XNOQY_XN _^SVS^SO] • 3X^OSY aKVV PKWSXQ KXN 7/: SXPK]^_M^_O Y_QR SX • 9`OROKN 7/: KXN 0SO :Y^OM^SYX ]c]^OW Y_QR SX KXN MOSVSXQ ZVKMOWOX^ • :K`OWOX^ ]_LQKNO ZOZKK^SYX KXN ZY_SXQ YP K]ZRKV^MYXMO^O ZK`OWOX^ +^ ^RO MYXMV_]SYX YP OKMR ]S^O `S]S^ ^RO ^OKW ZOZKO] K MYX]^_M^SYX ]^K^_] OZY^ NYM_WOX^SXQ ]S^O MYXNS^SYX] KXN ZRY^YQKZR] YP ^RO MYX]^_M^SYX ZYQO]] Y `OSPc MYWZVO^SYX YP ^RO ZYTOM^] KXN KZZY`SXQ PSXKV ZKcWOX^] ^Y ^RO -YX^KM^Y ^RO 9L]O`K^SYX ^OKW aSVV MYYNSXK^O KXN K]]S]^ SX ^RO MYVVOM^SYX KXN K]]OWLVc YP KVV MVY]OY_^ SXPYWK^SYX KXN NYM_WOX^K^SYX NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 21.
    GE5LJKW // :HLQJDUWHQ 5HDOW 0LDPL)/ NLSQR^ ZOPYW] NO]SQX KXN MYX]^_M^SYX PY AOSXQK^OX ZYTOM^] KXQSXQ PYW ObZKX]SYX] NYaX]SdO] SX^OSY ^OXKX^ PS^Y_^] ]_`Oc] O]^SWK^O] KXN ]ROVV] -_OX^Vc NLSQR^ S] aYUSXQ YX KX ObZKX]SYX SX ^RO KWSKWS KSV =RYZZSXQ :VKdK KXN S] SX`YV`ON SX WKXc ZYTOM^] YX ^RO 0VYSNK WKUO^ TAMIAMI TRAIL (S.W. 8th. STREET) NORTH TRAFFIC LIGHT AUTO HARBOR OWNED OWNED C0V C0T C0S BY OTHERS OWNED BY OTHERS S.W. 139th. AVENUE BY OTHERS ENUE C0R S.W. 137th. AV OWNED C0E BY OTHERS C0D C0P B0S B0R B0N B0L B J B0J B0G B D B0D B B B0B A H A0H B0P B M B0M B0K B H B0H B0E B C B0C B A B0A A0R A0M A0K A0J A0G A0A C0A NLSQR^ ;_KVSPSMK^SYX] f OVK^ON /bZOSOXMO
  • 23.
    Team Overview dbRight LLC SBLM Architects Roles and Responsibilities James Cornwell PA-AIA is the primary client contact. Jim oversees the entire team and delivers information to the client at all project intervals. He establishes and manages project teams to accommodate the needs of the client and leads the process review effort. Having held many positions of responsibility with the retail giant, Office Depot, Jim has implemented numerous initiatives to improve processes and programs. As a Director of Construction and Design, Jim selected, developed, and implemented a real estate development and a web-enabled management system, adopted by several departments company-wide. As an active member of their Real Estate Pipeline Committee, Jim was responsible for reviewing every aspect related to new retail strategies prior to Real Estate Committee submittals, including legal and negotiation aspects. In addition, Jim developed and implemented their departmental process manual. Mike LeFande AIA, LEED AP, MBA serves as a primary back-up person for Jim Cornwell. Mike is responsible for all office-based functions, including managing and tracking progress. He will bring his unique perspective, having worked closely with a wide range of retailers across the country, to the process review effort. David Nicholson AIA, LEED AP brings over 30 years’ experience managing staff and programs for numerous retail clients. A manager with a reputation for innovative solutions to challenging problems, he has a sophisticated understanding of the design and construction of retail facilities including small and large scale stores. Dave oversees project progress, quality, and client satisfaction. In addition, Dave directs our team of in-house entitlement managers, and brings an invaluable perspective gained from his track record of moving projects expeditiously through the entitlement process at minimal cost, and from his experience directing retail roll-out programs. dbRight Qualifications | Team Overview
  • 24.
    Team Overview dbRight LLC SBLM Architects James Cornwell PA-AIA Partner of dbRight, LLC James Cornwell has extensive experience in retail real estate development. A creative developer and manager of the design and construction process, Jim has developed procedures and techniques to ensure schedules are met on time, budgets are not exceeded, and construction documents are of the highest quality. He acts as a liaison between all parties involved in a project, including construction, legal, real estate, and consultant operations. Jim has strong client relationships, including retail giant, Office Depot. As a former Director of Construction, Jim understands the process of building and construction from early stages of project site selection through actual construction and project completion. Licenses/Registrations xx Architecture – Brazil Affiliations xx American Institute of Architects (AIA) Education xx Bachelor of Science, Architecture and Urban Planning – St. Ursula University Select Experience Office Depot — Multiple Locations, Nationwide Jim has worked on numerous Office Depot projects ranging from remodels, renovations, and expansions to new construction for retail stores as well as warehouses. While Senior Director of Construction at Office Depot, Jim controlled and managed all aspects of design and construction for all new facilities. He was responsible for the due diligence, lease exhibits, permitting, budgeting, bidding, contracting, and construction. While working for dbRight, LLC and working along side SBLM, Jim was involved with the Office Depot in Austin, TX, which achieved LEED Silver certification. He was also involved with the distribution center in Newville, PA. Jim continues to work with Office Depot and is currently providing services for several Office Depot projects, including multiple projects pursuing LEED certification. US Cellular — Multiple Locations, Nationwide dbRight is a preferred contractor for US Cellular stores throughout the U.S., providing quality construction, contracting, and design-build services under their new roll-out program, Generation V. This new program consists of 40 corporate locations and 60 agent locations that will be built or remodeled. In addition, dbRight reviewed the existing processes of the US Cellular management group. Jim established benchmarking systems and aggressive national retail development plans. RUE 21 — Multiple Locations, Nationwide dbRight was the general contractor for a RUE 21 project, which consisted of constructing an interior fit-out from start to finish in a period of five weeks. Following that project, dbRight became a preferred contractor for RUE 21 throughout the U.S., providing quality construction, contracting, and design- build services. Bridgestone/Firestone — Multiple Locations, Nationwide dbRight and SBLM have been retained to provide third party construction observation services for new Bridgestone Retail Operation sites. dbRight and SBLM work closely with the owner and contractor to review the progress of construction at regular intervals. Bed Bath Beyond — Multiple Locations, FL dbRight Qualifications | Resumes
  • 25.
    Team Overview dbRight LLC SBLM Architects dbRight oversaw the selective interior remodelling of a 40,000-square-foot Bed Bath Beyond store in Tampa, FL. Jim was also involved with the administration and project management for extensive exterior site renovation work at a location in Ft. Lauderdale, FL. Transload America — Miami, FL Transload America (TLA) is a construction debris transfer and recycling facility. In conjunction with SBLM, dbRight was selected to design a new waste transfer facility on TLA’s six-acre site, as well as coordinate integral building systems. The project consists of a 30,000-square-foot waste transfer building, a 1,500-square-foot office building, and an 800-square-foot gate house. *Office Depot — Delray Beach, FL While Senior Director of Construction at Office Depot, Jim controlled and managed all aspects of design and construction for all new facilities. He was responsible for the due diligence, lease exhibits, permitting, budgeting, bidding, contracting, and construction. *Tynes Construction, Bahia, Brazil Jim focused his efforts on managing estimating, bidding, and design. His responsibilities included supervising residential and retail designs as well as construction endeavors. *Lojas Americanas — Rio de Janeiro, Brazil Jim managed design and construction of new stores and remodels for this 80-year-old Brazilian retail chain. As part of this expansion program, Jim implemented a design-related Loss Prevention Program that added $30M to the bottom line. *Areas Engineering International, Rio de Janeiro, Brazil Jim directed the development and permitting of construction documents and managed a complex team of Project Managers and Estimators. He also managed consulting services for high-rise residential buildings for all design and construction phases. *Previous Affiliation dbRight Qualifications | Resumes
  • 26.
    Team Overview dbRight LLC SBLM Architects Michael LeFande AIA, LEED AP, MBA Principal at SBLM Architects/Partner of dbRight, LLC For more than 25 years, Michael LeFande has directed numerous building programs, developing design and building standards for developers and retailers throughout the US. His projects have included site development, ground-up buildings, adaptive re-use, tenant fit-outs, and renovations. As a Principal at SBLM, Mike has developed procedures and techniques to ensure schedules are met on time, budgets are not exceeded, and construction documents are of the highest quality. As the leader of SBLM’s retail design practice, Mike has designed store prototypes and managed rollout programs for many of today’s largest and most successful retailers. Mike is also the chairman of the SOS (Stewards of Sustainability) Committee at SBLM. This committee conducts research and applies current sustainable technologies and ideas to projects throughout the firm. Licenses/Registrations xx Architecture – NY, NJ, CO Affiliations xx American Institute of Architects (AIA) xx Leadership in Energy and Environmental Design Accredited Professional (LEED AP) xx United States Green Building Council (USGBC) xx International Council of Shopping Centers (ICSC) xx National Retail Federation (NRF) xx Long Island Association (LIA) Education xx Master of Business Administration – University of Phoenix xx Bachelor of Science, Architectural Technology – New York Institute of Technology Select Experience Office Depot — Multiple Locations, U.S. and Puerto Rico Mike is the Principal-in-Charge of the Office Depot expansion program including nationwide renovations, upgrades, and ground-up projects. Services provided included: site development, comprehensive architecture and engineering, and sustainable design. SBLM continues to provide services for Office Depot, in conjunction with dbRight. PETCO — Multiple Locations, U.S and Puerto Rico As Principal-in-Charge, Mike manages the expansion of PETCO’s national rollout program for facilities ranging from 10,000-square-feet to 25,000-square-feet. SBLM maintains the PETCO prototype design and modifies it to adapt to the parameters of each location. More than 350 stores have been designed and outfitted for the retail chain, focusing on pet adoptions, sales, grooming, day care, supplies, and other related products. Aldo Groupe — Multiple Locations, Nationwide Since 2008, SBLM has provided architectural services for ALDO brand stores featuring high fashion footwear and accessories, including ‘Call it Spring’ stores. In January 2011, SBLM was awarded participation in ALDO’s rollout program. Under this contract, SBLM provides services for new and remodel stores, which include feasibility studies (as requested), construction documents, and construction administration. Stores range from 2,000-square-feet to 4,000-square-feet. Mike is Principal-in-Charge for all ALDO projects. dbRight Qualifications | Resumes
  • 27.
    Team Overview dbRight LLC SBLM Architects JC Penney — Multiple Locations, Nationwide SBLM acts as a Store Planning Consultant for JC Penney’s Store Planning Support Program in the Northeast Region (ME to VA); an extension of JC Penney’s store planning team. Services include area and fixture planning for 220,00-square-foot stores ranging from 2-3 stories to one story 84,000-square-foot stores. Mike is the Principal-in-Charge for this program. Dunkin’ Brands — Multiple Locations, TX SBLM is the preferred Architect for Dunkin’ Brands in the Dallas-Austin-San Antonio, TX corridor. SBLM Architects provides complete due diligence, design, construction documentation, and construction administration services. Mike is the Principal-in-Charge. SkyView Parc — Queens, NY This $1 billion mixed-use development features six residential towers and 800,000 square feet of retail and commercial space. SBLM provided tenant fit-out services for several retailers that have leased space in the center, including Target; Bed, Bath and Beyond; BJ’s Wholesale Club; Marshall’s, Famous Footwear; Bob’s Discount Furniture; and Sky Foods. The SBLM team was also responsible for preparing lease exhibits and mall leasing plans. Mike was the Principal-in-Charge. Bergen Town Center — Paramus, NJ Mike was Principal-in-Charge for renovations and additions to this large and complex project, which included obtaining municipal approvals, providing schematic designs and making presentations to potential clients. In addition to providing schematic through design development and construction documents for this project, Mike’s team worked directly with the developer and also provided code reviews and studies for various tenants throughout the mall such as Target, Century 21, and Whole Foods Market. dbRight Qualifications | Resumes
  • 28.
    Team Overview dbRight LLC SBLM Architects David Nicholson AIA, LEED AP Principal at SBLM Architects/Partner of dbRight, LLC David Nicholson has spent over 30 years dedicated to the development, design, and construction industries. He has brought his expertise to SBLM’s ongoing collaborations with the nation’s largest retail chains, real estate developers, and government clients providing feasibility studies, site analyses and selection, demographic research, zoning and regulatory considerations, prototype adaptation, project management, budget control, and financing coordination. Dave has a deep understanding of design and management, and is well known for his innovative solutions to challenging problems. Licenses/Registrations xx Architecture – NY, NJ, HI Affiliations xx American Institute of Architects (AIA) xx Leadership in Energy and Environmental Design Accredited Professional (LEED AP) xx National Council of Architectural Registration Boards (NCARB) Education xx Bachelor of Architecture – Syracuse University xx Bachelor of Arts, Economics – Syracuse University Select Experience Toys “R” Us Kids “R” Us — Multiple Locations, Nationwide As head of the in-house architectural staff, Dave directed the development of 112 Kids “R” Us retail locations and 98 Toys “R” Us stores and distribution centers, totaling 9.5 million square feet and $525 million in construction costs. In addition, he implemented a computerized process of collecting and distributing information. Barnes Noble — Multiple Locations, Nationwide As Director of Construction for a national rollout program, Dave supervised the prototype development; design, development, and construction; and fixturing of 256 store locations totaling 6.7 million square feet and $450 million in capital costs. The Home Depot — Multiple Locations, East Coast SBLM has been providing consultant services to Home Depot, assisting the retailer on their national rollout program. As the site development manager, Dave’s team performed site selection, due diligence, and entitlements on locations in New York, Pennsylvania, Delaware, Maryland, and West Virginia. Dave was also the Principal-in-Charge of three projects in New York, one in New Jersey, and one in Pennsylvania where SBLM provided comprehensive architectural, archeological, and ecological services. Duane Reade — Multiple Locations, NY SBLM designed several locations in the five boroughs to reflect the new Duane Reed design and graphics standards in conjunction with an updated brand image rollout. After successfully designing several locations, SBLM was recently awarded participation in their regional rollout program. Dave is managing the SBLM design team in these efforts. The first location to feature the new prototype design was designed by SBLM and built by dbRight. dbRight Qualifications | Resumes
  • 29.
    Team Overview dbRight LLC SBLM Architects 24 Hour Fitness — Multiple Locations, East Coast As the Principal-in-Charge for 24 Hour Fitness’ metropolitan projects, Dave has managed the entitlements, design, construction documents, and construction administration phases for numerous clubs across the East Coast. SBLM has provided feasibility studies, as well as architectural and design services for nearly 35 locations. Each fitness club includes amenities such as an NBA-sized basketball court, 3-lane lap pool, steam room, sauna, spa, aerobics studio, spin room, and children’s play area. Facilities are typically 50,000-square-feet and average $3 million in construction costs. The Olivia — New York, NY SBLM was commissioned to design this new 600,000 -square-foot mixed-use development located on 34th Street in Manhattan. As Principal-in-Charge, Dave managed the conceptual design and oversaw construction documents for the 34-story mixed-use tower, which includes 333 apartments, 85,000 square-feet of retail space, a 14-screen movie complex, and a 200-space below grade parking garage. Each building section - residential, theater, retail, and office - were treated as separate units. Multiple entrances and egresses were designed to avoid congestion and create smooth pedestrian flow for business tenants, residential unit customers, and building workers. The Eventi Hotel — New York, NY SBLM is the coordinating architect on the ground-up execution of this 54-story high-rise building in Manhattan’s Flatiron district. Dave managed SBLM’s design and construction efforts on the project. One notable feature of the hotel is its entrance, which consists of a public, block-through plaza featuring an art-glass wall and fully configurable JumboTron screen. The full project occupies roughly 500,000-square-feet, and was constructed at a cost of $600 million. dbRight Qualifications | Resumes
  • 31.
    dbRight LLC DesignBuilders New York, NY 151 W. 26th Street New York, NY 10001 T 212 995 5600 F 212 675 4228 Long Island 33 Walt Whitman Road, Suite 204 Huntington Station, NY 11746 T 631 683 5588 F 631 683 5589 Miami, FL 11430 N. Kendall Drive, Suite 310 Miami, FL 33176 T 305 412 9187 F 305 412 6731 Dallas, TX 16910 Dallas Parkway Dallas, TX 75248 T 469 554 7770 F 469 554 7775