The document reports on sample results from a gold mine in Europe, showing high grades of gold, silver, and copper. It also contains forward-looking statements about future plans and projections that are based on certain assumptions, but are subject to risks and uncertainties that could cause actual results to differ materially. All forward-looking information is made as of the date of the document and may change due to new information or events in the future.
The document reports the results of sample testing from a vein on a mining property, which found 188 g/t of gold, 103 g/t of silver, and 5.07% copper. It also contains forward-looking statements from the CEO about the company's exploration, development, and acquisition plans in Europe, and provides disclaimers regarding the risks and uncertainties inherent in forward-looking mineral estimates.
The document reports on sample results from a gold mine in Europe, including high grades of gold, silver, and copper. It also provides forward-looking statements about future plans and performance, but cautions that many factors could affect actual results.
This document provides a summary of sample results from a T17 vein that contained 188 g/t of gold, 103 g/t of silver, and 5.07% copper. It also contains forward-looking statements regarding future performance, estimates, plans, and assumptions for a mining project, with disclaimers that actual results may differ due to risks and uncertainties. Qualified persons are responsible for technical information, while management provides opinions and estimates.
This document provides a summary of a sample from the T17 vein on a mining property that contained 188 g/t of gold, 103 g/t of silver and 5.07% copper. It also contains forward-looking statements about future plans and estimates for the mining property with required cautions about risks and uncertainties inherent in such projections. The document was prepared by the Chief Executive Officer of the mining company to disclose sample results and risks associated with forward-looking economic assessments of the mineral resource.
This document contains a forward-looking statement from the Chief Executive Officer of a mining exploration company. It discusses positive sample results from the T17 vein showing high grades of gold, silver, and copper. It also cautions that forward-looking statements involve risks and uncertainties that could cause actual results to differ from expectations. Assumptions are based on continued political stability, permitting, availability of skilled workers, commodity prices, and the accuracy of estimates in technical reports.
The document summarizes a presentation on a high-grade gold project in a low-risk jurisdiction with low capex requirements. It discusses the positive preliminary economic assessment showing high margins and low capital costs, underground development plans to extract a bulk sample and further define resources, and an expected timeline of activities in 2014-2015 including tunneling, test stoping, metallurgical testing and an updated economic study.
Dalradian corporate presentation jan7 2014 final v2DalradianResource
- Dalradian Resources is developing the high-grade Curraghinalt gold deposit located in Northern Ireland.
- The deposit has a positive preliminary economic assessment showing potential for annual production of 145,000 ounces of gold over a 15-year mine life at low costs.
- Dalradian has received planning permission to advance underground exploration development including extending an existing adit and installing a ramp to access and sample known gold-bearing veins.
The document discusses a presentation given by Patrick F.N. Anderson, Chairman & CEO of Dalradian Resources Inc., at a BMO conference in March 2016 regarding Dalradian's Curraghinalt high-grade gold deposit in Northern Ireland. It provides an overview of the deposit's resource which has grown to over 3 million ounces of gold, positive preliminary economic assessment results, and the ongoing work program including a feasibility study and underground development.
The document reports the results of sample testing from a vein on a mining property, which found 188 g/t of gold, 103 g/t of silver, and 5.07% copper. It also contains forward-looking statements from the CEO about the company's exploration, development, and acquisition plans in Europe, and provides disclaimers regarding the risks and uncertainties inherent in forward-looking mineral estimates.
The document reports on sample results from a gold mine in Europe, including high grades of gold, silver, and copper. It also provides forward-looking statements about future plans and performance, but cautions that many factors could affect actual results.
This document provides a summary of sample results from a T17 vein that contained 188 g/t of gold, 103 g/t of silver, and 5.07% copper. It also contains forward-looking statements regarding future performance, estimates, plans, and assumptions for a mining project, with disclaimers that actual results may differ due to risks and uncertainties. Qualified persons are responsible for technical information, while management provides opinions and estimates.
This document provides a summary of a sample from the T17 vein on a mining property that contained 188 g/t of gold, 103 g/t of silver and 5.07% copper. It also contains forward-looking statements about future plans and estimates for the mining property with required cautions about risks and uncertainties inherent in such projections. The document was prepared by the Chief Executive Officer of the mining company to disclose sample results and risks associated with forward-looking economic assessments of the mineral resource.
This document contains a forward-looking statement from the Chief Executive Officer of a mining exploration company. It discusses positive sample results from the T17 vein showing high grades of gold, silver, and copper. It also cautions that forward-looking statements involve risks and uncertainties that could cause actual results to differ from expectations. Assumptions are based on continued political stability, permitting, availability of skilled workers, commodity prices, and the accuracy of estimates in technical reports.
The document summarizes a presentation on a high-grade gold project in a low-risk jurisdiction with low capex requirements. It discusses the positive preliminary economic assessment showing high margins and low capital costs, underground development plans to extract a bulk sample and further define resources, and an expected timeline of activities in 2014-2015 including tunneling, test stoping, metallurgical testing and an updated economic study.
Dalradian corporate presentation jan7 2014 final v2DalradianResource
- Dalradian Resources is developing the high-grade Curraghinalt gold deposit located in Northern Ireland.
- The deposit has a positive preliminary economic assessment showing potential for annual production of 145,000 ounces of gold over a 15-year mine life at low costs.
- Dalradian has received planning permission to advance underground exploration development including extending an existing adit and installing a ramp to access and sample known gold-bearing veins.
The document discusses a presentation given by Patrick F.N. Anderson, Chairman & CEO of Dalradian Resources Inc., at a BMO conference in March 2016 regarding Dalradian's Curraghinalt high-grade gold deposit in Northern Ireland. It provides an overview of the deposit's resource which has grown to over 3 million ounces of gold, positive preliminary economic assessment results, and the ongoing work program including a feasibility study and underground development.
- Dalradian Resources is exploring for high-grade gold deposits in Northern Ireland. Its flagship project is the Curraghinalt gold deposit.
- The Preliminary Economic Assessment showed strong economics for the Curraghinalt deposit, including an after-tax NPV of $504 million and IRR of 36.2% at a gold price of $1,200/ounce.
- Drilling continues to expand the deposit, which remains open in all directions, and a Feasibility Study is underway to advance the project towards obtaining permits and making a construction decision.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated gold ounces to over 2 million ounces.
- High-grade gold mineralization within 16 identified veins that is amenable to underground mining.
- Ongoing feasibility study work including 950 meters of underground development and over 130,000 meters of drilling.
- Potential for resource expansion along a 12km mineralized trend that remains largely unexplored.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- The 2016 resource update more than doubled the measured and indicated gold ounces at Curraghinalt.
- A feasibility study is underway and targeted for completion in the second half of 2016 to assess developing an underground mine at Curraghinalt.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland which has over 1 million ounces of gold in the measured and indicated categories and 2.5 million ounces in inferred.
- A 2014 preliminary economic assessment showed strong economics for the project with an after-tax NPV of $504 million and IRR of 36.2% at a gold price of $1,200/ounce.
- Dalradian is advancing the project with underground development, infill drilling, and engineering studies to support mine permitting and a feasibility study targeted for completion in 2016.
Outback Goldfields is exploring for high-grade gold at its Fosterville property in Victoria, Australia. It has entered into an agreement to acquire gold assets from Petratherm. Completing the acquisition is subject to regulatory approvals. The company has a large land package in a prolific gold district near Kirkland Lake Gold's Fosterville mine. It has an experienced management team and board. Near-term catalysts include an upcoming work program focused on high-grade, low-cost targets.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It provides an overview of the deposit's growing resource, which more than doubled its measured and indicated gold ounces in a 2016 update. The deposit remains open in multiple directions and has district-scale exploration potential along a 12km trend. Dalradian is advancing a feasibility study on the project to support mine construction permitting in the second half of 2016.
This presentation provides an overview of Probe Metals Inc., a Canadian precious metal exploration company. Some key points:
- Probe Metals was formed in 2015 following the acquisition of Probe Mines Limited by Goldcorp Inc., which remains a 19.7% shareholder.
- The company has a high-calibre management team with extensive experience in the mining industry.
- Probe Metals' main focus and asset is the Borden Gold Project, discovered in 2010. It has seen significant value creation from discovery through exploration success.
- The company also owns the Black Creek Chromite project.
- Probe Metals has $19 million in cash and no debt. Major shareholders include Goldcorp,
The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit located in Northern Ireland. It provides details on the deposit's mineral resource estimate, positive preliminary economic assessment showing low capex and high margins, ongoing drill program and underground exploration plans. It also discusses the permitting process, noting Northern Ireland has a resource friendly jurisdiction and Dalradian has already received planning permission for its underground exploration program in under a year.
The document discusses a high-grade gold deposit in Northern Ireland. It summarizes the geology of the large, high-grade vein system which remains open in all directions. It also provides details on the engineering studies conducted, including a capital expenditure of US$192 million and an after-tax internal rate of return of 24%. Finally, it outlines the resources and reserves estimated for the deposit based on over 130,000 meters of drilling, including measured resources of 25,000 ounces grading 26.99 g/t gold and inferred resources of over 2.3 million ounces grading 10.06 g/t gold.
Outback Goldfields January 2022 Corporate PresentationCarolynGraham14
Outback Goldfields is exploring for high-grade gold in Victoria, Australia near Kirkland Lake Gold's Fosterville mine. The company has four strategic properties in the prolific Fosterville gold district: Yeungroon, Ballarat West, Glenfine, and Glensands. At Yeungroon, diamond drilling at the historic Golden Jacket mine is underway to test for high-grade gold continuity, while rotary air-blast drilling is testing geophysical targets below cover rocks. Soil and rock sampling is also ongoing. The properties have seen significant historic gold production and are located in a mining-friendly jurisdiction with year-round drilling potential and clear permitting.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to support an ongoing feasibility study.
- High-grade gold mineralization occurring in veins that are advantageous for underground mining.
- Ongoing underground development including 950m of new development and test stoping to inform the feasibility study.
- Potential for resource expansion along a 12km trend and from recent regional discoveries.
Probe Metals is a well-funded Canadian gold explorer advancing its Val-d'Or East project in Quebec. A preliminary economic assessment shows the potential for the project to be a 12.5 year mine producing over 200,000 ounces of gold per year. The project currently has over 1.8 million ounces of gold in the measured and indicated categories and over 2.3 million ounces in the inferred category. The project is located in the prolific Abitibi gold belt of Quebec near existing infrastructure. Probe Metals has a strong team with a track record of discoveries and is well positioned to advance Val-d'Or East towards production.
The document provides an overview of TriStar Gold's Castelo de Sonhos gold project in Brazil, including:
- The project has an indicated resource of 40.1Mt at 1.2g/t for 1.5Moz gold and inferred resource of 22.2Mt at 1.0g/t for 0.7Moz gold.
- A preliminary economic assessment showed potential for positive economics with an after-tax IRR of 43% and NPV of $264 million at a gold price of $1,250/oz.
- The company is currently working on a prefeasibility study to further advance the project.
The document provides an overview of the Castelo de Sonhos gold project in Brazil. Key highlights from the preliminary feasibility study include estimated life of mine gold production of 1.3 million ounces over 11 years at an average annual production of 121,000 ounces. The study estimates an after-tax internal rate of return of 28% and NPV of $321 million using a gold price of $1,550 per ounce. Initial capital costs are estimated at $261 million and average operating costs are estimated at $900 per ounce. The project is expected to have a payback period of less than 3 years.
- Dalradian Gold is exploring and developing the Curraghinalt mesothermal gold deposit in Northern Ireland, which has inferred resources of 1.16 million ounces of gold and indicated resources of 400,000 ounces of gold.
- Current drilling at Curraghinalt has encountered new veins and successfully extended the high grade zone, suggesting potential to expand known resources.
- The company has 84,000 hectares of exploration licenses covering multiple gold prospects in Northern Ireland, and aims to uncover the full extent of the mineralized system at Curraghinalt and explore additional targets on its properties.
- Dalradian is well funded with $35 million cash to execute an aggressive two year drilling program
Outback Goldfields is exploring for high-grade gold at its four strategic properties located in the prolific Fosterville gold district of Victoria, Australia. The company recently acquired the properties from Petratherm Ltd. and is conducting exploration programs including diamond drilling, soil and rock sampling, and airborne geophysics. Highlights mentioned include the Golden Jacket mine at the Yeungroon property which was previously mined at 250 g/t gold and remains open, and drill results from the British Banner and Glenfine Reef prospects at the Glenfine project including intercepts of up to 23.4 g/t gold. The document provides an overview of Outback Goldfields' projects and exploration plans in the historically productive Victorian gold
1) The document presents the results of a preliminary feasibility study for the Castelo de Sonhos gold project in Brazil.
2) Key highlights of the study include proven and probable reserves of 1.4 million ounces of gold, average annual production of 121,000 ounces over an 11-year mine life, and an after-tax NPV of $321 million at a gold price of $1,550 per ounce.
3) The project is expected to have low operating costs of $900 per ounce all-in sustaining costs and a post-tax internal rate of return of 28% with payback estimated in under 3 years.
- Dalradian Resources is exploring and developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- Recent work at the site includes 130 blasts, 675 meters of underground development, and 46,000 meters of infill drilling.
- A feasibility study and submission of a mine construction permit are targeted for the second half of 2016.
- The Curraghinalt deposit hosts a measured resource of 15,100 ounces of gold, an indicated resource of 989,000 ounces, and an inferred resource of 2.49 million ounces.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It announces that Dalradian has grown the resource at Curraghinalt over six-fold since 2010 through four updates. The May 2016 resource update more than doubled the measured and indicated ounces to support an upcoming feasibility study, while maintaining most of the inferred ounces. The high-grade resource includes over 2 million ounces of gold in the measured and indicated categories. Dalradian plans to submit a mine construction permit and feasibility study for Curraghinalt in the second half of 2016.
1. The Brucejack high-grade gold project in British Columbia is fully funded and permitted, with construction underway and commercial production targeted for 2017.
2. The project has high-grade gold reserves in the Valley of the Kings zone, with proven and probable reserves of 6.9 million ounces of gold and 26 million ounces of silver.
3. Underground mining will use longhole stoping methods on 30m level spacing to extract ore grading over 15 g/t gold. Waste rock and tailings will be deposited in engineered facilities.
The document summarizes a presentation on Dalradian Resources' Curraghinalt high-grade gold project in Northern Ireland. Key points include:
- A preliminary economic assessment shows the project could produce 145,000 ounces of gold per year with an after-tax IRR of 41.9% based on a 3-year gold price average.
- Planning permission has been received to complete 2,000 meters of underground exploration development including test stoping and collection of a bulk sample.
- The goal is to expand resources, test mining methods, and gain data on underground conditions.
The sample from the T17 vein contained 188 g/t of gold and 103 g/t of silver, with 5.07% copper. Dalradian plans to extend an existing exploration adit by 45 meters to intersect the 106-16 vein and drift along several known veins to demonstrate continuity of thickness and grade. They will extract a large bulk sample for metallurgical testing and to convert additional resources to measured and indicated categories. The underground exploration program is planned to take approximately 2,000 meters of development over 16 months.
- Dalradian Resources is exploring for high-grade gold deposits in Northern Ireland. Its flagship project is the Curraghinalt gold deposit.
- The Preliminary Economic Assessment showed strong economics for the Curraghinalt deposit, including an after-tax NPV of $504 million and IRR of 36.2% at a gold price of $1,200/ounce.
- Drilling continues to expand the deposit, which remains open in all directions, and a Feasibility Study is underway to advance the project towards obtaining permits and making a construction decision.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated gold ounces to over 2 million ounces.
- High-grade gold mineralization within 16 identified veins that is amenable to underground mining.
- Ongoing feasibility study work including 950 meters of underground development and over 130,000 meters of drilling.
- Potential for resource expansion along a 12km mineralized trend that remains largely unexplored.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- The 2016 resource update more than doubled the measured and indicated gold ounces at Curraghinalt.
- A feasibility study is underway and targeted for completion in the second half of 2016 to assess developing an underground mine at Curraghinalt.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland which has over 1 million ounces of gold in the measured and indicated categories and 2.5 million ounces in inferred.
- A 2014 preliminary economic assessment showed strong economics for the project with an after-tax NPV of $504 million and IRR of 36.2% at a gold price of $1,200/ounce.
- Dalradian is advancing the project with underground development, infill drilling, and engineering studies to support mine permitting and a feasibility study targeted for completion in 2016.
Outback Goldfields is exploring for high-grade gold at its Fosterville property in Victoria, Australia. It has entered into an agreement to acquire gold assets from Petratherm. Completing the acquisition is subject to regulatory approvals. The company has a large land package in a prolific gold district near Kirkland Lake Gold's Fosterville mine. It has an experienced management team and board. Near-term catalysts include an upcoming work program focused on high-grade, low-cost targets.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It provides an overview of the deposit's growing resource, which more than doubled its measured and indicated gold ounces in a 2016 update. The deposit remains open in multiple directions and has district-scale exploration potential along a 12km trend. Dalradian is advancing a feasibility study on the project to support mine construction permitting in the second half of 2016.
This presentation provides an overview of Probe Metals Inc., a Canadian precious metal exploration company. Some key points:
- Probe Metals was formed in 2015 following the acquisition of Probe Mines Limited by Goldcorp Inc., which remains a 19.7% shareholder.
- The company has a high-calibre management team with extensive experience in the mining industry.
- Probe Metals' main focus and asset is the Borden Gold Project, discovered in 2010. It has seen significant value creation from discovery through exploration success.
- The company also owns the Black Creek Chromite project.
- Probe Metals has $19 million in cash and no debt. Major shareholders include Goldcorp,
The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit located in Northern Ireland. It provides details on the deposit's mineral resource estimate, positive preliminary economic assessment showing low capex and high margins, ongoing drill program and underground exploration plans. It also discusses the permitting process, noting Northern Ireland has a resource friendly jurisdiction and Dalradian has already received planning permission for its underground exploration program in under a year.
The document discusses a high-grade gold deposit in Northern Ireland. It summarizes the geology of the large, high-grade vein system which remains open in all directions. It also provides details on the engineering studies conducted, including a capital expenditure of US$192 million and an after-tax internal rate of return of 24%. Finally, it outlines the resources and reserves estimated for the deposit based on over 130,000 meters of drilling, including measured resources of 25,000 ounces grading 26.99 g/t gold and inferred resources of over 2.3 million ounces grading 10.06 g/t gold.
Outback Goldfields January 2022 Corporate PresentationCarolynGraham14
Outback Goldfields is exploring for high-grade gold in Victoria, Australia near Kirkland Lake Gold's Fosterville mine. The company has four strategic properties in the prolific Fosterville gold district: Yeungroon, Ballarat West, Glenfine, and Glensands. At Yeungroon, diamond drilling at the historic Golden Jacket mine is underway to test for high-grade gold continuity, while rotary air-blast drilling is testing geophysical targets below cover rocks. Soil and rock sampling is also ongoing. The properties have seen significant historic gold production and are located in a mining-friendly jurisdiction with year-round drilling potential and clear permitting.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to support an ongoing feasibility study.
- High-grade gold mineralization occurring in veins that are advantageous for underground mining.
- Ongoing underground development including 950m of new development and test stoping to inform the feasibility study.
- Potential for resource expansion along a 12km trend and from recent regional discoveries.
Probe Metals is a well-funded Canadian gold explorer advancing its Val-d'Or East project in Quebec. A preliminary economic assessment shows the potential for the project to be a 12.5 year mine producing over 200,000 ounces of gold per year. The project currently has over 1.8 million ounces of gold in the measured and indicated categories and over 2.3 million ounces in the inferred category. The project is located in the prolific Abitibi gold belt of Quebec near existing infrastructure. Probe Metals has a strong team with a track record of discoveries and is well positioned to advance Val-d'Or East towards production.
The document provides an overview of TriStar Gold's Castelo de Sonhos gold project in Brazil, including:
- The project has an indicated resource of 40.1Mt at 1.2g/t for 1.5Moz gold and inferred resource of 22.2Mt at 1.0g/t for 0.7Moz gold.
- A preliminary economic assessment showed potential for positive economics with an after-tax IRR of 43% and NPV of $264 million at a gold price of $1,250/oz.
- The company is currently working on a prefeasibility study to further advance the project.
The document provides an overview of the Castelo de Sonhos gold project in Brazil. Key highlights from the preliminary feasibility study include estimated life of mine gold production of 1.3 million ounces over 11 years at an average annual production of 121,000 ounces. The study estimates an after-tax internal rate of return of 28% and NPV of $321 million using a gold price of $1,550 per ounce. Initial capital costs are estimated at $261 million and average operating costs are estimated at $900 per ounce. The project is expected to have a payback period of less than 3 years.
- Dalradian Gold is exploring and developing the Curraghinalt mesothermal gold deposit in Northern Ireland, which has inferred resources of 1.16 million ounces of gold and indicated resources of 400,000 ounces of gold.
- Current drilling at Curraghinalt has encountered new veins and successfully extended the high grade zone, suggesting potential to expand known resources.
- The company has 84,000 hectares of exploration licenses covering multiple gold prospects in Northern Ireland, and aims to uncover the full extent of the mineralized system at Curraghinalt and explore additional targets on its properties.
- Dalradian is well funded with $35 million cash to execute an aggressive two year drilling program
Outback Goldfields is exploring for high-grade gold at its four strategic properties located in the prolific Fosterville gold district of Victoria, Australia. The company recently acquired the properties from Petratherm Ltd. and is conducting exploration programs including diamond drilling, soil and rock sampling, and airborne geophysics. Highlights mentioned include the Golden Jacket mine at the Yeungroon property which was previously mined at 250 g/t gold and remains open, and drill results from the British Banner and Glenfine Reef prospects at the Glenfine project including intercepts of up to 23.4 g/t gold. The document provides an overview of Outback Goldfields' projects and exploration plans in the historically productive Victorian gold
1) The document presents the results of a preliminary feasibility study for the Castelo de Sonhos gold project in Brazil.
2) Key highlights of the study include proven and probable reserves of 1.4 million ounces of gold, average annual production of 121,000 ounces over an 11-year mine life, and an after-tax NPV of $321 million at a gold price of $1,550 per ounce.
3) The project is expected to have low operating costs of $900 per ounce all-in sustaining costs and a post-tax internal rate of return of 28% with payback estimated in under 3 years.
- Dalradian Resources is exploring and developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- Recent work at the site includes 130 blasts, 675 meters of underground development, and 46,000 meters of infill drilling.
- A feasibility study and submission of a mine construction permit are targeted for the second half of 2016.
- The Curraghinalt deposit hosts a measured resource of 15,100 ounces of gold, an indicated resource of 989,000 ounces, and an inferred resource of 2.49 million ounces.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It announces that Dalradian has grown the resource at Curraghinalt over six-fold since 2010 through four updates. The May 2016 resource update more than doubled the measured and indicated ounces to support an upcoming feasibility study, while maintaining most of the inferred ounces. The high-grade resource includes over 2 million ounces of gold in the measured and indicated categories. Dalradian plans to submit a mine construction permit and feasibility study for Curraghinalt in the second half of 2016.
1. The Brucejack high-grade gold project in British Columbia is fully funded and permitted, with construction underway and commercial production targeted for 2017.
2. The project has high-grade gold reserves in the Valley of the Kings zone, with proven and probable reserves of 6.9 million ounces of gold and 26 million ounces of silver.
3. Underground mining will use longhole stoping methods on 30m level spacing to extract ore grading over 15 g/t gold. Waste rock and tailings will be deposited in engineered facilities.
The document summarizes a presentation on Dalradian Resources' Curraghinalt high-grade gold project in Northern Ireland. Key points include:
- A preliminary economic assessment shows the project could produce 145,000 ounces of gold per year with an after-tax IRR of 41.9% based on a 3-year gold price average.
- Planning permission has been received to complete 2,000 meters of underground exploration development including test stoping and collection of a bulk sample.
- The goal is to expand resources, test mining methods, and gain data on underground conditions.
The sample from the T17 vein contained 188 g/t of gold and 103 g/t of silver, with 5.07% copper. Dalradian plans to extend an existing exploration adit by 45 meters to intersect the 106-16 vein and drift along several known veins to demonstrate continuity of thickness and grade. They will extract a large bulk sample for metallurgical testing and to convert additional resources to measured and indicated categories. The underground exploration program is planned to take approximately 2,000 meters of development over 16 months.
The document discusses Dalradian Resources Inc.'s Curraghinalt gold deposit in Northern Ireland. It summarizes that Dalradian has grown the deposit's resource over 7-fold to over 2 million ounces of gold in the measured and indicated categories. Test stoping has validated long-hole open stoping as the primary mining method. The feasibility study is on schedule for Q4 2016. The permitting process involves submitting a planning application including an environmental and social impact assessment. Dalradian has a team with experience in mine building and exploration and notes Northern Ireland's business-friendly jurisdiction.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland which has over 3 million ounces in measured and indicated resources.
- A preliminary economic assessment showed strong economics for the project, with average annual production of 145,000 ounces over a 15-year mine life and low capital costs.
- The company is permitting an underground bulk sample to further prove the economics and advance the project towards production. Permitting in Northern Ireland is a thorough process but can be completed in a timely manner.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland and discusses the company's feasibility study and permitting process. Some key points:
- The feasibility study is progressing on schedule and will incorporate longhole mining, flotation processing recovering over 94% of gold, dry stack tailings, and 50% of waste rock returned underground.
- Underground development includes 950m of new ramps and raises with test stoping and 130,000m of drilling to support the study.
- Permit submission for mine construction is on target for the second half of 2016.
Guy february 2018 ir presentation final-v2guygold2016
The document discusses Guyana Goldfields Inc., a gold mining company. It provides an overview of the company's 2017 performance including gold production and costs which met guidance. It then provides guidance for 2018, highlighting increased gold production and lower costs per ounce. The document also summarizes an optimized life of mine plan for the company's projects, showing increased reserves, production and cash flow over 16 years compared to the previous plan. It provides details on the life of mine production, costs, capital expenditures and mill expansion phases.
This document summarizes exploration work on the Maniitsoq Ni-Cu Sulphide Project in Greenland. Over the past three years, the company has conducted systematic exploration including drilling and geophysics to identify and prioritize mineralized zones. Drilling in 2016 focused on continuity testing 14 priority zones identified in previous work. Assay results are pending from 27 drill holes that will help delineate zones of potential economic merit for future development. The project benefits from access to infrastructure including a deepwater port facility.
The document provides an overview of Dalradian Resources Inc.'s high-grade gold project in Northern Ireland. It summarizes the Curraghinalt deposit's May 2016 resource estimate which more than doubled measured and indicated ounces. The deposit is open in all directions and has potential for expansion along a 12km trend. Dalradian is advancing a feasibility study involving underground development and drilling as well as test stoping.
- Dalradian Resources is a gold mining company focused on developing its Curraghinalt gold deposit in Northern Ireland.
- The Curraghinalt deposit hosts a high-grade gold resource with measured resources of 15,100 ounces and indicated resources of 989,000 ounces.
- Dalradian is currently undertaking a major work program at Curraghinalt, including underground development, drilling, and engineering studies, with the goal of submitting a construction permit application for the project in 2016.
- Dalradian Resources is exploring for high-grade gold deposits in Northern Ireland. Its flagship project is the Curraghinalt gold deposit.
- The Preliminary Economic Assessment showed strong economics for the Curraghinalt deposit, including an after-tax NPV of $504 million at a gold price of $1,200/ounce.
- Dalradian is advancing the Curraghinalt deposit with infill drilling, underground development and a feasibility study. It plans to submit a mine construction permit application in Q3 2016.
The document provides an overview of Dalradian Resources Inc. and its Curraghinalt gold deposit located in Northern Ireland. It summarizes that since 2010, Dalradian has grown the Curraghinalt resource seven-fold to over 3 million ounces of gold through three resource updates. The deposit contains high grades of gold and remains open for expansion. Dalradian aims to advance the project towards production to become a profitable gold producer in Northern Ireland.
Guy february 2018 ir presentation finalguygold2016
- The document is a presentation from Guyana Goldfields Inc describing the company's mining operations and assets.
- It provides operational and financial results for 2017, meeting guidance. 2018 guidance is also provided forecasting increased gold production and lower costs.
- The company has a large land package in Guyana with exploration potential, an operating mine life of over 15 years, and strong cash flow generation. However, it warns that forward-looking statements are subject to risks and uncertainties.
The document summarizes a nickel exploration project in Greenland. It discusses the project's district scale land position covering 2,985 square kilometers within a belt known to host nickel-copper sulphide mineralization. Recent drilling has identified continuity on 9 priority mineralized zones across the property. The project benefits from proximity to port infrastructure and potential hydropower resources. Assay results are pending from the 2016 drilling program which aimed to delineate zones of interest identified through previous exploration.
Dalradian Resources presented information on its Curraghinalt gold deposit in Northern Ireland. The deposit contains a high-grade gold resource of over 3 million ounces, including a measured resource of 15,100 ounces grading 20.15 g/t gold, an indicated resource of 989,000 ounces grading 10.34 g/t gold, and an inferred resource of 2.49 million ounces grading 9.67 g/t gold. Dalradian has a strong board and management team with experience developing mines and has raised billions of dollars for past projects. The presentation provided an overview of the project's geology and resource along with the company's financing and shareholder structure as it advances the high-grade Curraghinal
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to 2.07 million ounces.
- Deposit characteristics including high grade veins amenable to underground mining.
- A 12km mineralized trend with regional discoveries highlighting district potential.
- Progress on a feasibility study including 950m of underground development and test stoping.
- Plans for the feasibility study to incorporate longhole mining, flotation processing, and paste backfill.
- Dalradian Resources is a gold mining company focused on developing its Curraghinalt gold deposit in Northern Ireland.
- The Curraghinalt deposit hosts a high-grade gold resource of over 1 million ounces. Dalradian is working to advance the project with ongoing exploration drilling and studies aimed at submitting permits for mine construction in 2016.
- The company is led by an experienced management team with a track record of building and operating mines. It is well funded with $24 million in cash and advancing one of the few sizable gold deposits in Europe located in a politically stable jurisdiction.
This document summarizes a presentation from Guyana Goldfields Inc. about its Aurora Gold Mine. It states that production is expected to grow from 160koz in 2017 to over 300koz by 2022. The mine has over 16 years of reserve life and simple metallurgy. An optimized life of mine plan shows increased annual production to 270koz between 2018-2022 compared to the previous plan. This would generate over $500M in expected free cash flow at a gold price of $1,300/oz. The company has a large land package with potential for open pit targets near its mill.
The document is a preliminary prospectus from Dalradian Resources regarding a gold development project in Europe. It notifies investors that the prospectus has not yet been filed with regulators and that no securities can be sold until it is approved. It also notes that the document does not provide full disclosure and investors should read the prospectus and any amendments for complete information, especially regarding risk factors.
The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit located in Northern Ireland. Key points include:
- Curraghinalt is ranked #7 worldwide in undeveloped gold deposits by grade. A PEA shows potential for a high margin, low capex producer.
- The deposit covers only a fraction of a 12km gold trend. Resources include 2.23M oz inferred at 12.74 g/t Au.
- Permitting for an underground bulk sample was granted in under a year with strong local support. Regular community engagement occurs.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland, focusing on the Curraghinalt deposit. It provides details on the resource estimates which have grown to over 4 million ounces of gold. Exploration is ongoing along a 12km trend and new high-grade discoveries have been made regionally. A feasibility study is underway for the Curraghinalt deposit based on underground mining and flotation processing. Test stoping has been completed and the results support the mining methods proposed for the feasibility study.
Similar to Dalradian corporate presentation oct 2013 (20)
Patrick Anderson's presentation highlights Dalradian Resources' Curraghinalt gold project in Northern Ireland, which has advanced to the permitting stage. The project features a large, high-grade vein system that has increased in size and grade through exploration. A positive feasibility study was completed previously, and opportunities exist to further improve the economics. Dalradian is undertaking additional technical work and community engagement to support an updated feasibility study and permitting process.
- Patrick F. N. Anderson, President and CEO of Dalradian Resources Inc., presented a corporate presentation in April 2018 highlighting their Curraghinalt Gold Project in Northern Ireland.
- The presentation outlined Dalradian's high-grade gold deposit which remains open for expansion, positive feasibility study results showing robust economics, and over $138 million in cash to advance permitting and further study work.
- Dalradian has defined over 4.4 million ounces of gold in the measured, indicated and inferred categories at their Curraghinalt deposit and see potential to increase resources through further exploration on their large land package.
The document discusses high-grade gold deposits in Northern Ireland, focusing on Dalradian Resources' Curraghinalt gold project. It summarizes the positive feasibility study for the project including reserves of 1.44 million ounces at 8.54 g/t gold. The project has a large high-grade resource open along strike and at depth that remains open for expansion. Dalradian has advanced the project through exploration, permitting, and engineering studies to define the resource and assess project economics.
The document provides information on Dalradian Resources Inc.'s Curraghinalt Gold Project in Northern Ireland, including:
- The project features a large, high-grade vein system that is open in all directions and close to surface.
- A positive feasibility study shows robust economics for the base case with an after-tax IRR of 25.5% and CAPEX of $192 million.
- Recent work has increased the amount of mineable material above a 5 g/t gold cutoff by 32% through re-wireframing of major veins.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland. It discusses Dalradian Resources' Curraghinalt gold project, which has over 5 million ounces of proven and probable reserves at an average grade of 8.54 g/t gold. A positive feasibility study showed production of 130,000 ounces per year over 10 years at an all-in sustaining cost of $653/oz and an after-tax IRR of 25.5%. The presentation notes opportunities to further improve project economics through additional drilling, ore sorting tests, and geotechnical studies.
The document provides an overview of Dalradian Resources Inc. and its Curraghinalt Gold Project in Northern Ireland. Key points include:
- Dalradian has advanced the Curraghinalt project through exploration permits, feasibility studies showing robust economics, and underground development including test stoping.
- The most recent feasibility study outlined proven and probable reserves of 5.24MT at 8.54g/t gold for 1.44M ounces, with additional measured, indicated and inferred resources totaling over 4.4M ounces.
- Revised modeling increased the amount of mineable material above a 5g/t gold cutoff by 32%, improving the potential for longhole mining methods.
The document provides an overview and update on Dalradian Resources Inc.'s Curraghinalt Gold Project in Northern Ireland. Some key points:
- Resources have expanded to over 4 million ounces of gold in the measured and indicated categories and over 2 million ounces in inferred. The deposit remains open.
- A feasibility study demonstrated the economic potential for developing a mine. Engineering studies showed a simple flowsheet and 94% gold recovery.
- The company raised $34 million through warrant exercises and has additional warrants that could provide up to $39 million more if exercised.
- Drilling continues to expand resources and test targets while permitting and community engagement move forward for mine development.
This document summarizes the presentation given by Patrick Anderson, President and CEO of Dalradian Resources, at the BMO 26th Global Metals & Mining Conference. Some key points include:
- Dalradian's Curraghinalt gold deposit in Northern Ireland has a high-grade resource open in multiple directions that is close to surface and accessible.
- The feasibility study showed an after-tax IRR of 24% with an AISC of $674/oz and CAPEX of $192M.
- Dalradian has raised over $200M CAD to date and sees potential to increase resources by continuing exploration along a 12km gold trend.
The document summarizes a feasibility study for the Curraghinalt Gold Project in Northern Ireland. Key highlights include proven and probable reserves of 5.24 million tonnes grading 8.54 g/t gold for 1.44 million ounces. The feasibility study estimates average annual gold production of 130,000 ounces over the first 10 years of the planned 14 year mine life. The study estimates an after-tax NPV of $301 million using a 5% discount rate and $1,250/ounce gold price. Exploration potential remains along a 12km trend with the deposit open for expansion.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland. It discusses Dalradian Resources' Curraghinalt gold deposit which has over 7 million ounces of gold in inferred and indicated resources. A recent feasibility study showed positive results for developing the deposit into a mine. The presentation also notes the large land package held by Dalradian that shows potential for further exploration success and resource growth around the Curraghinalt trend.
The document provides an overview of Dalradian Resources Inc., including its flagship Curraghinalt high-grade gold deposit in Northern Ireland. Key points include:
- The Curraghinalt deposit has a measured resource of 25,000 ounces grading 26.99 g/t gold, indicated resource of 2.07 million ounces grading 11.53 g/t gold, and inferred resource of 2.31 million ounces grading 10.06 g/t gold.
- Regional exploration has discovered additional high-grade veins up to 12km from the deposit along a prospective trend.
- A feasibility study is underway utilizing underground development, drilling, and test stoping to inform the mining plan.
Patrick Anderson of Dalradian Resources presented on the company's Curraghinalt gold deposit in Northern Ireland. Key points included:
1) The deposit contains over 2 million ounces of gold in the measured and indicated categories according to a recent resource update. Underground development and drilling continue to expand the deposit.
2) Test stoping yielded positive results, validating the mining method and showing narrow widths can be achieved.
3) The feasibility study is on schedule for Q4 2016 and the company plans to submit its planning application by year-end for permits to construct a mine.
4) Dalradian is engaging stakeholders and moving through the permitting process, which is expected to take 1-2
The document provides an overview of Dalradian Resources Inc. and its flagship Curraghinalt gold deposit in Northern Ireland. It discusses the high-grade nature of the deposit's resource, positive preliminary economic assessment results, and ongoing work including a feasibility study and underground program to expand resources. Analyst coverage and the management team's track record in mine building are also summarized.
- Dalradian Resources is a gold mining company focused on developing its Curraghinalt gold deposit in Northern Ireland.
- The Curraghinalt deposit hosts a high-grade gold resource that has grown over 5-fold since 2010 through exploration programs.
- Dalradian is currently undertaking a major work program including a feasibility study and permitting activities aimed at submitting a mine construction permit application in the second half of 2016.
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Stone Art Hub
Stone Art Hub offers the best competitive Marble Pricing in Dubai, ensuring affordability without compromising quality. With a wide range of exquisite marble options to choose from, you can enhance your spaces with elegance and sophistication. For inquiries or orders, contact us at ☎ 9928909666. Experience luxury at unbeatable prices.
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...my Pandit
Explore the fascinating world of the Gemini Zodiac Sign. Discover the unique personality traits, key dates, and horoscope insights of Gemini individuals. Learn how their sociable, communicative nature and boundless curiosity make them the dynamic explorers of the zodiac. Dive into the duality of the Gemini sign and understand their intellectual and adventurous spirit.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This PowerPoint compilation offers a comprehensive overview of 20 leading innovation management frameworks and methodologies, selected for their broad applicability across various industries and organizational contexts. These frameworks are valuable resources for a wide range of users, including business professionals, educators, and consultants.
Each framework is presented with visually engaging diagrams and templates, ensuring the content is both informative and appealing. While this compilation is thorough, please note that the slides are intended as supplementary resources and may not be sufficient for standalone instructional purposes.
This compilation is ideal for anyone looking to enhance their understanding of innovation management and drive meaningful change within their organization. Whether you aim to improve product development processes, enhance customer experiences, or drive digital transformation, these frameworks offer valuable insights and tools to help you achieve your goals.
INCLUDED FRAMEWORKS/MODELS:
1. Stanford’s Design Thinking
2. IDEO’s Human-Centered Design
3. Strategyzer’s Business Model Innovation
4. Lean Startup Methodology
5. Agile Innovation Framework
6. Doblin’s Ten Types of Innovation
7. McKinsey’s Three Horizons of Growth
8. Customer Journey Map
9. Christensen’s Disruptive Innovation Theory
10. Blue Ocean Strategy
11. Strategyn’s Jobs-To-Be-Done (JTBD) Framework with Job Map
12. Design Sprint Framework
13. The Double Diamond
14. Lean Six Sigma DMAIC
15. TRIZ Problem-Solving Framework
16. Edward de Bono’s Six Thinking Hats
17. Stage-Gate Model
18. Toyota’s Six Steps of Kaizen
19. Microsoft’s Digital Transformation Framework
20. Design for Six Sigma (DFSS)
To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Neil Horowitz
On episode 272 of the Digital and Social Media Sports Podcast, Neil chatted with Brian Fitzsimmons, Director of Licensing and Business Development for Barstool Sports.
What follows is a collection of snippets from the podcast. To hear the full interview and more, check out the podcast on all podcast platforms and at www.dsmsports.net
Top 10 Free Accounting and Bookkeeping Apps for Small BusinessesYourLegal Accounting
Maintaining a proper record of your money is important for any business whether it is small or large. It helps you stay one step ahead in the financial race and be aware of your earnings and any tax obligations.
However, managing finances without an entire accounting staff can be challenging for small businesses.
Accounting apps can help with that! They resemble your private money manager.
They organize all of your transactions automatically as soon as you link them to your corporate bank account. Additionally, they are compatible with your phone, allowing you to monitor your finances from anywhere. Cool, right?
Thus, we’ll be looking at several fantastic accounting apps in this blog that will help you develop your business and save time.
IMPACT Silver is a pure silver zinc producer with over $260 million in revenue since 2008 and a large 100% owned 210km Mexico land package - 2024 catalysts includes new 14% grade zinc Plomosas mine and 20,000m of fully funded exploration drilling.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
The Steadfast and Reliable Bull: Taurus Zodiac Signmy Pandit
Explore the steadfast and reliable nature of the Taurus Zodiac Sign. Discover the personality traits, key dates, and horoscope insights that define the determined and practical Taurus, and learn how their grounded nature makes them the anchor of the zodiac.
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
1. Patrick
F.
N.
Anderson
Chief
Execu8ve
Officer
Sample
from
the
T17
vein
188
g/t
of
gold
103
g/t
of
silver
5.07%
of
copper
High-‐Grade
Gold
│
Low-‐Cost
│
Low-‐Risk
│
Development
│
Europe
│
October
2013
2. Forward-‐Looking
Informa;on
and
Qualified
Person
This
presenta8on
contains
“forward‑looking
informa8on”
which
may
include,
but
is
not
limited
to,
statements
with
respect
to
the
comple8on
of
the
acquisi8on
(the
“Acquisi8on”)
by
the
Company
from
a
group
of
private
vendors
of
approximately
1.3
million
hectares
of
mineral
rights
over
four
greenstone
belts
and
a
historic
silver
mining
camp
in
Norway,
future
financial
or
opera8ng
performance
of
the
Company
and
its
mineral
projects,
the
future
price
of
metals,
the
es8ma8on
of
mineral
resources,
the
realiza8on
of
mineral
resource
es8mates,
the
8ming
and
amount
of
es8mated
future
produc8on,
costs
of
produc8on,
capital,
opera8ng
and
explora8on
expenditures,
costs
and
8ming
of
the
development
of
new
deposits,
costs
and
8ming
of
future
explora8on,
requirements
for
addi8onal
capital,
government
regula8on
of
mining
opera8ons,
environmental
risks,
reclama8on
expenses,
8tle
disputes
or
claims
and
limita8ons
of
insurance
coverage.
O]en,
but
not
always,
forward‑looking
statements
can
be
iden8fied
by
the
use
of
words
and
phrases
such
as
“plans,”
“expects,”
“is
expected,”
“budget,”
“scheduled,”
“es8mates,”
“forecasts,”
“intends,”
“an8cipates,”
or
“believes”
or
varia8ons
(including
nega8ve
varia8ons)
of
such
words
and
phrases,
or
state
that
certain
ac8ons,
events
or
results
“may,”
“could,”
“would,”
“might”
or
“will”
be
taken,
occur
or
be
achieved.
Forward-‐looking
statements
are
based
on
the
opinions
and
es8mates
of
management
as
of
the
date
such
statements
are
made
and
are
based
on
various
assump8ons,
such
as
the
con8nued
poli8cal
stability
in
Northern
Ireland
and
Norway,
that
permits
required
for
the
Company’s
opera8ons
will
be
obtained
in
a
8mely
basis
in
order
to
permit
the
Company
to
proceed
on
schedule
with
its
planned
explora8on
and
development
programs,
that
skilled
personnel
and
contractors
will
be
available
as
the
Company’s
opera8ons
con8nue
to
grow,
that
the
price
of
gold
will
be
at
levels
that
render
the
Company’s
mineral
projects
economic,
that
the
Company
will
be
able
to
con8nue
raising
the
necessary
capital
to
finance
its
opera8ons
and
realize
on
mineral
resource
es8mates,
and
that
the
assump8ons
contained
in
the
PEA
are
accurate
and
complete.
Forward‑looking
statements
involve
known
and
unknown
risks,
uncertain8es
and
other
factors
which
may
cause
the
actual
results,
performance
or
achievements
of
the
Company
to
be
materially
different
from
any
future
results,
performance
or
achievements
expressed
or
implied
by
the
forward‑looking
statements.
Such
factors
include,
among
others,
general
business,
economic,
compe88ve,
poli8cal
and
social
uncertain8es;
the
actual
results
of
current
and
future
explora8on
ac8vi8es;
actual
results
of
reclama8on
ac8vi8es;
conclusions
of
economic
evalua8ons;
changes
in
project
parameters
and/or
economic
assessments
as
plans
con8nue
to
be
refined;
future
prices
of
metals;
possible
varia8ons
of
mineral
grade
or
recovery
rates;
the
risk
that
actual
costs
may
exceed
es8mated
costs;
failure
of
plant,
equipment
or
processes
to
operate
as
an8cipated;
accidents,
labour
disputes
and
other
risks
of
the
mining
industry;
poli8cal
instability;
delays
in
obtaining
governmental
approvals
or
financing
or
in
the
comple8on
of
development
or
construc8on
ac8vi8es,
as
well
as
those
factors
discussed
in
the
sec8on
en8tled
“Risk
Factors”
in
the
Company’s
Annual
Informa8on
Form.
Although
the
Company
has
acempted
to
iden8fy
important
factors
that
could
cause
actual
ac8ons,
events
or
results
to
differ
materially
from
those
described
in
forward‑looking
statements,
there
may
be
other
factors
that
cause
ac8ons,
events
or
results
to
differ
from
those
an8cipated,
es8mated
or
intended.
Forward‑looking
statements
contained
herein
are
made
as
of
the
date
of
this
presenta8on
and
the
Company
disclaims
any
obliga8on
to
update
any
forward‑looking
statements,
whether
as
a
result
of
new
informa8on,
future
events
or
results,
except
as
may
be
required
by
applicable
securi8es
laws.
There
can
be
no
assurance
that
forward‑looking
statements
will
prove
to
be
accurate,
as
actual
results
and
future
events
could
differ
materially
from
those
an8cipated
in
such
statements.
Accordingly,
readers
should
not
place
undue
reliance
on
forward‑looking
statements.
Some
technical
data
in
this
presenta8on
was
taken
from
the
technical
report
en8tled
“A
Preliminary
Economic
Assessment
of
the
Curraghinalt
Gold
Deposit,
Tyrone
Project,
Northern
Ireland dated
September
6,
2012,
prepared
by
B.
Terrence
Hennessey,
P.Geo.,
Mr.
Barnard
Foo,
P.ENG.,
Mr.
Bogdan
Damjanovic,
P.ENG,
Mr.
Andre
Villeneuve,
P.ENG.,
and
Mr.
Christopher
Jacobs,
CEng
MIMMM
of
Micon
Interna8onal
Limited
(the
PEA ).
Michele
L.
Cote,
MSc.,
P.
Geo.,
VP
Explora8on,
Dalradian
Resources
Inc.,
is
the
Qualified
Person
who
supervised
the
prepara8on
of
the
explora8on
technical
data
in
this
presenta8on.
2
4. 2009
• Project
Acquisi8on
-‐
December
• 600
k
ounce
gold
resource1
2010
• Increased
to
1.5
M
ounce
gold
resource1
• IPO
-‐
August
2011
• 7
rigs
onsite
• Increased
to
2.7
M
ounce
gold
resource1
2012
• Robust
PEA
announced
• New
discovery
-‐
Alwories
2013
• Underground
explora8on
development
permits
submiced
In
Three
Years
We
Have:
1
Refer
to
appendix
or
press
release
dated
Nov.
30,
2011
en8tled
“Dalradian
Announces
Resource
Increase
at
Curraghinalt”
at
www.dalradian.com
4
5. Capital
Structure
STOCK
PRICE
All
dollars
quoted
in
$
CAD
TSX:
DNA
Shares
outstanding:
Fully
diluted:
(August
30,
2013)
89.5
million
97.0
million
Market
cap:
(September
25,
2013)
$71.6
million
Average
30
day
volume:
(September
25,
2013)
156,399
52
Week
Range:
$1.90
-‐
$0.48
Insider
ownership:
(approximate)
7%
Cash
balance:
(as
at
June
30,
2013)
$12.6
million
Analyst
coverage:
(targets
range
from
$1.90-‐$1.30)
5
$1,200.00
$1,300.00
$1,400.00
$1,500.00
$1,600.00
$1,700.00
$1,800.00
$1,900.00
$2,000.00
$0.00
$0.50
$1.00
$1.50
$2.00
$0.80
September 25, 2013
DNA
Gold
Price
6. The
Board:
A
Track
Record
of
Discovery,
Development
&
Produc;on
6
PATRICK
F.
N.
ANDERSON
CHIEF
EXECUTIVE
OFFICER
Founder
&
Former
CEO
of
Aurelian
Resources
‘08
–
PDAC
Interna;onal
Mineral
Discovery
‘08
–
Northern
Miner
Man
of
the
Year
JONATHAN
A.
RUBENSTEIN
Director
of
Eldorado
Gold
Corpora;on
Director
of
Detour
Gold
Chairman
&
Director
of
MAG
Silver
Corp.
Former
Director
of
Aurelian
Resources,
Suaon
Resources,
Canico
Resource
Corp
&
Cumberland
Resources
RONALD
P.
GAGEL
Former
SVP
and
CFO
of
FNX
Mining
THOMAS
J.
OBRADOVICH
CHAIRMAN
Founder
&
Former
CEO
of
Young-‐Davidson
Mines
Former
Director
of
Aurelian
Resources
SEAN
E.
O.
ROOSEN
Founder
&
CEO
OF
Osisko
Mining
Corpora;on
Also
Director
of
Astur
Gold
‘06
–
Prospector
of
the
Year
-‐
Quebec
‘08
–
Prospector
of
the
Year
-‐
Canada
‘09
–
Northern
Miner
Man
of
the
Year
Founder
&
CEO
OF
CONTINENTAL
GOLD
LIMITED
ARI
B.
SUSSMAN
GRENVILLE
THOMAS
Founder
&
Chairman
of
Strongbow
Explora;on
Inc.
Founder
&
Former
Chairman,
President
&
Director
of
Aber
Resources
(Harry
Winston
Diamond
Corp.)
now
Dominion
Diamond
‘99
–
PDAC
Prospector
of
the
Year
‘01
–
Northern
Miner
Man
of
the
Year
‘09
–
Canadian
Mining
Hall
of
Fame
7. Development
of
a
High-‐Grade
Deposit
in
a
Low
Risk
Jurisdic;on
7
§ Gold
resource
covers
a
frac8on
of
known
mineraliza8on
§ High-‐grade
2.7M
ounce
gold
resource
(all
categories)1
− Measured:
0.02
MT
grading
21.51
g/t
Au
for
10,000
contained
ounces
− Indicated:
1.11
MT
grading
12.84
g/t
Au
for
460,000
contained
ounces
− Inferred:
5.45
MT
grading
12.74
g/t
Au
for
2.23
million
contained
ounces
§ Posi8ve
PEA
shows
a
high
margin
and
low
capex
producer
NORTHERN
IRELAND
1
Refer
to
press
release
dated
Nov.
30,
2011
en8tled
“Dalradian
Announces
Resource
Increase
at
Curraghinalt”
at
www.dalradian.com
9. Metal
Produc;on
in
Ireland
&
the
UK
§ Our
flagship
asset:
Curraghinalt
high-‐grade
lode
gold
deposit
§ Excellent
regional
infrastructure
§ Over
84,000
hectares
under
license
§ Recent
surge
in
gold
sector
9
Gor8n
Omagh
Curraghinalt
BELFAST
NORTHERN
IRELAND
Galantas
Gold
Conroy
Diamonds
&
Gold
Lonmin
Irish
Salt
Mining
Underground
Salt
Mine
Clon;bret
Croagh
Patrick
Parys
Mountain
Gwynfynydd
Galmoy
Avoca
Pallas
Green
Silvermines
South
Crohy
Curraghinalt
Gold
Deposit
Gold
Base
Metals
Salt
Mine
Allihies
Copper
Mines
Galantas
Gold
In
produc8on
Scotgold
Permiced
Vedanta
Resources
In
produc8on
Boliden
In
produc8on
IMC
Explora;on
354
g/t
gold
over
1.5m
Lundin
In
produc8on
Conroy
+1M
ounce
resource
Lisheen
Cononish
Tara
Cavanacaw
Xstrata
Feasibility
Gold
Mines
of
Wales
U/G
grab
sample
-‐
263
g/t
gold
Clogau
10. DG3
Gor;n
County
Tyrone
is
Resource
Friendly
10
Curraghinalt
Alwories
Quarry
kilometres
0 1 2
Curraghinalt
Clear
Cut
Logging
at
Gor8n
Glen
Forest
Park
125
Metres
Greencastle
Quarry
Cavanacaw
Open
Pit
Approx
30
km
SW
11. Social
License
11
Dalradian
supports
the
local
MS
Society
Awarded
in
Top
30
Irish-‐
North
American
Companies
for
2012
&
2013
“Dalradian
makes
every
effort
to
maintain
good
community
rela8ons,
protect
the
environment
and
work
with
all
local
people
providing
employment
and
training.”
”The
company
communicates
with
local
land
owners
on
a
daily
basis
and
holds
public
mee8ngs
with
the
wider
community
in
a
nearby
hall
regularly.”
“The
employment
produced
from
this
venture
is
cri;cal
to
local
work
forces
at
this
;me.
I
urge
you
to
grant
approval.”
“As
someone
who
has
worked
with
DGL
and
been
on
site,
I
have
experienced
and
been
fully
impressed
with
their
environmental
mi8ga8on
measures
and
health
&
safety
procedures.”
“It
makes
economic
sense
to
allow
DGL
to
determine
whether
a
future
mining
project
is
viable.
Not
giving
planning
permission
would
be
to
send
out
a
clear
signal
that
Northern
Ireland
is
not
open
for
investment
from
outside
companies.”
“It
is
incomprehensible
that
our
local
youth
are
having
to
travel
12,000
miles
to
work
in
explora;on
and
extrac;on
of
mineral
resources
when
we
have
poten;al
similar
opportuni;es
a
mile
away.
Every
effort
should
be
made
to
expedite
this
project
safely
and
effec;vely.”
Epicdocs.planningni.gov.uk. 2011. Public Access. Available at: http://epicdocs.planningni.gov.uk/ShowCaseFile.aspx?appNumber=K/
2013/0072/F Accessed: 19 Aug 2013.
13. Intercept in hole 11-CT-99 projected up dip to 170m mSL
A
12km
Gold
Trend
GLACIATED TERRAIN WITH MINIMAL OUTCROP
12 km
1700m
Curraghinalt
Deposit
Curraghinalt
Trend
13
Curraghinalt Trend
Veins in Current Resource
Intersected Veins
Historical Findings
Geochem Anomaly
Curraghinalt Deposit
Resource as at Nov 2011 –
Measured: 0.01 Moz Au (0.02MT @ 21.51 g/t)
Indicated: 0.46 Moz Au (1.11MT @ 12.84 g/t)
Inferred: 2.23 Moz Au (5.45 MT @ 12.74 g/t)
Golan Burn
Outcropping veins including
60cm @ 61.43 g/t Au
Alwories Discovery Holes
4.72m @ 14.82 g/t Au
2.22m @ 14.10 g/t Au
1.47m @ 23.6 2g/t Au
400 m Step-out
3.2m @ 5.34 g/t Au
Attagh Burn
2.47m @ 18.99 g/t Au
A
A’
15. Curraghinalt:
A
Growing
Resource
15
2.22
m
@
14.1
g/t
Au
1.47
m
@
23.6
g/t
Au
Alwories
3.6 km
Curraghinalt
2007
Resource
2010
Resource
2011
Resource
2012
Interpreted
vein
extents
Drilling
post
2011
Resource
4.72
m
@
14.82
g/t
Au
0m
asl
-‐500m
asl
-‐1000m
asl
257500E
258000E
258500E
259000E
259500E
A A’
3.20
m
@
5.34
g/t
Au
2.47
m
@
5.19
g/t
Au
8.34
m
@
5.84
g/t
Au
17. Preliminary
Economic
Assessment
17
17
KEY
PEA
DATA*
3
YEAR
TRAILING
AVERAGE
GOLD
PRICE:
$1378/ounce
5
YEAR
TRAILING
AVERAGE
GOLD
PRICE:
$1,166/ounce
NPV
with
8%
discount
rate
(A]er-‐tax)
$467
million
$331
million
IRR
(A]er-‐tax)
41.9%
33.4%
Average
Annual
Produc8on
145,000
ounces/year
Processing
Rate
1,700
tonnes/day
Life
of
Mine
15
years
Ini8al
Capex
($38M
con8ngency)
$192
million
Cash
Costs
$532/ounce
or
$125/tonne
Diluted
Grade
8.1
g/t
Au
Gold
Recovery
92%
Payback
2
years
All
dollars
quoted
in
$
USD
unless
stated
otherwise
PEA
results
released
on
July
25,
2012.
The
PEA
is
preliminary
in
nature.
It
includes
inferred
mineral
resources
that
are
considered
too
specula8ve
geologically
to
have
the
economic
considera8ons
applied
to
them
that
would
enable
them
to
be
categorized
as
mineral
reserves.
There
is
no
certainty
that
the
results
of
the
PEA
will
be
realized.
*
Prepared
by
Micon
Interna8onal
Limited
20. Underground
Explora;on
Development
Proposed
Access
Ramp
to
Sub-‐Level
Proposed
Tunnel
Extensions
at
Sub-‐Level
Proposed
Tunnel
Extensions
at
170
M
Level
Exis;ng
Explora;on
Tunnel
T17
No.
1
106-‐16
Bend
Crow
Road
Sheep
Dip
Mullan
§ Dalradian
has
requested
planning
permission
to
complete
approximately
2,000
m
of
underground
explora8on
development
§ Extend
the
exis8ng
adit
by
approximately
260
m
to
intersect
all
known
veins;
§ Dri]
along
several
of
the
known
veins
&
demonstrate
vein
con8nuity;
§ Install
a
ramp
to
access
150
m
level,
approximately
20
m
below
exis8ng
workings;
§ Removal
of
large
bulk
sample
for
metallurgical
test
work.
20
21. 21
Conceptual
Sublevel
Development
2,000
m
Planned
with
the
Goal
to:
• Demonstrate
con8nuity
of
thickness
and
grade
of
mineralized
veins.
• Convert
addi8onal
resources
to
Measured
and
Indicated.
• Test
mining
and
backfill
methods.
• Inves8gate
geotechnical
and
hydrogeological
condi8ons.
• Produce
a
bulk
sample
for
metallurgical
test
work.
• Test
the
permiwng
process.
ROAD
SHEEPDIP
MULLAN
T17
No.
1
106_16
BEND
CROW
EXISTING
DEVELOPMENT
PLANNED
DEVELOPMENT
PLANNED
DEVELOPMENT
PLANNED
STOPING
21
24. The European Explorer
Patrick F. N. Anderson
Chief Executive Officer
Investor Relations
Shae-Lynn Mathers
Director, Investor Relations
smathers@dalradian.com
416.583.5622
Trading Symbol:
DNA on TSX
DRLDF on OTCQX
Corporate Office:
Dalradian Resources Inc.
155 Wellington Street West
Suite 2920
Toronto, Ontario
Canada M5V 3H1
www.dalradian.com
25. Oslo
Kongsberg
SOUTHERN
NORWAY
NORWAY
FINLAND
SWEDEN
RUSSIA
Land
Posi;on
Northern
Norway
§ Four
concessions
over
three
greenstone
belts
and
a
basement
window
§ 10
gold-‐in-‐+ll
anomalies
iden+fied
Southern
Norway
§ Kongsberg
concession
hos8ng
an
historic
silver
mining
district
§ Five
silver
targets
iden+fied
Rombak
NORTHERN
NORWAY
Greenstone
Belts
Volcanic
Belts
&
Metasediments
Kautokeino
Kiwlä
Sakawlampi
Bidjovagge
Pasvik
Karasjok
Pechenga
NORWAY
FINLAND
SWEDEN
RUSSIA
25
26. 43-‐101
Resource
26
§ High-‐grade
1.5M
ounce
gold
resource
(all
categories)1
− Indicated:
0.95
MT
grading
13.24
g/t
Au
for
400,000
contained
ounces
− Inferred:
2.46
MT
grading
14.64
g/t
Au
for
1.16
million
contained
ounces
2010
RESOURCE
Northern
Ireland
Norway
1
Refer
to
press
release
dated
Nov.
30,
2011
en8tled
“Dalradian
Announces
Resource
Increase
at
Curraghinalt”
at
www.dalradian.com
2011
RESOURCE
§ High-‐grade
2.7M
ounce
gold
resource
(all
categories)1
− Measured:
0.02
MT
grading
21.51
g/t
Au
for
10,000
contained
ounces
− Indicated:
1.11
MT
grading
12.84
g/t
Au
for
460,000
contained
ounces
− Inferred:
5.45
MT
grading
12.74
g/t
Au
for
2.23
million
contained
ounces
2007
RESOURCE
§ High-‐grade
600
k
ounce
gold
resource
(all
categories)1
− Indicated:
0.57
MT
grading
13.95
g/t
Au
for
250,000
contained
ounces
− Inferred:
0.64
MT
grading
17.15
g/t
Au
for
350,000
contained
ounces