The document is a preliminary prospectus from Dalradian Resources regarding a gold development project in Europe. It notifies investors that the prospectus has not yet been filed with regulators and that no securities can be sold until it is approved. It also notes that the document does not provide full disclosure and investors should read the prospectus and any amendments for complete information, especially regarding risk factors.
This document provides a summary of a preliminary economic assessment for the Curraghinalt high-grade gold deposit located in Northern Ireland. Key highlights from the PEA include average annual production of 145,000 ounces of gold over a 15-year mine life with an initial capital expenditure of $192 million and cash costs of $532 per ounce. The PEA shows the project has an after-tax internal rate of return of 41.9% based on a 3-year trailing average gold price of $1,378 per ounce. Additional drilling is planned to expand the current mineral resource.
- The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit in Northern Ireland, which has a measured resource of 15,100 ounces of gold and an indicated resource of 989,000 ounces, with additional inferred ounces.
- A preliminary economic assessment showed strong economics for the project, with an after-tax IRR of 41.9% using a 3-year gold price average of $1,378/ounce. Initial capex was estimated at $192 million.
- Dalradian plans to advance the project towards production by continuing exploration drilling to expand resources, permitting the mine, and financing construction.
American Lithium is a leading lithium development company focused on projects in the Americas. It has two quality lithium projects, TLC in Nevada, USA and Falchani in Peru, as well as one of the world's largest undeveloped uranium deposits. American Lithium is well funded with $19M cash and has a large, diverse mineral resource base totaling 6.3MT Li2CO3 and 51.9MT U3O8. It has made strong progress in 2021 at its projects and through corporate initiatives such acquisitions and financing. American Lithium is led by an experienced management team and board with a track record of success in the battery metals industry.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland which has over 3 million ounces in measured and indicated resources.
- A preliminary economic assessment showed strong economics for the project, with average annual production of 145,000 ounces over a 15-year mine life and low capital costs.
- The company is permitting an underground bulk sample to further prove the economics and advance the project towards production. Permitting in Northern Ireland is a thorough process but can be completed in a timely manner.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production growth from past-producing mines in Brazil and California. The Company has poured first gold and is ramping up production at its Aurizona Gold Mine in Brazil and is advancing its Castle Mountain Gold Mine in California.
This corporate presentation provides an overview of Otso Gold and its Otso Gold Mine project located in Finland. It discusses Otso Gold's management team and capital structure. The presentation contains forward-looking statements regarding plans, expectations and estimates. It also notes that the mine operates sustainably and focuses on environmental protection through practices like using wind power and maintaining high environmental standards.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production growth from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of achieving Phase 1 production in the first half of 2020.
Equinox Gold held its annual general meeting on May 1, 2019 to provide an update on the company's growth. Key highlights included:
1) Producing over 25,000 ounces of gold in Q1 2019 from its Mesquite mine in California and making first gold pour at its Aurizona mine in Brazil in early May.
2) Advancing construction of its Castle Mountain mine in California, with Phase 1 production targeted for mid-2020.
3) Outlining the significant expansion potential at Aurizona through near-mine exploration targets and an underground mining scenario.
This document provides a summary of a preliminary economic assessment for the Curraghinalt high-grade gold deposit located in Northern Ireland. Key highlights from the PEA include average annual production of 145,000 ounces of gold over a 15-year mine life with an initial capital expenditure of $192 million and cash costs of $532 per ounce. The PEA shows the project has an after-tax internal rate of return of 41.9% based on a 3-year trailing average gold price of $1,378 per ounce. Additional drilling is planned to expand the current mineral resource.
- The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit in Northern Ireland, which has a measured resource of 15,100 ounces of gold and an indicated resource of 989,000 ounces, with additional inferred ounces.
- A preliminary economic assessment showed strong economics for the project, with an after-tax IRR of 41.9% using a 3-year gold price average of $1,378/ounce. Initial capex was estimated at $192 million.
- Dalradian plans to advance the project towards production by continuing exploration drilling to expand resources, permitting the mine, and financing construction.
American Lithium is a leading lithium development company focused on projects in the Americas. It has two quality lithium projects, TLC in Nevada, USA and Falchani in Peru, as well as one of the world's largest undeveloped uranium deposits. American Lithium is well funded with $19M cash and has a large, diverse mineral resource base totaling 6.3MT Li2CO3 and 51.9MT U3O8. It has made strong progress in 2021 at its projects and through corporate initiatives such acquisitions and financing. American Lithium is led by an experienced management team and board with a track record of success in the battery metals industry.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland which has over 3 million ounces in measured and indicated resources.
- A preliminary economic assessment showed strong economics for the project, with average annual production of 145,000 ounces over a 15-year mine life and low capital costs.
- The company is permitting an underground bulk sample to further prove the economics and advance the project towards production. Permitting in Northern Ireland is a thorough process but can be completed in a timely manner.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production growth from past-producing mines in Brazil and California. The Company has poured first gold and is ramping up production at its Aurizona Gold Mine in Brazil and is advancing its Castle Mountain Gold Mine in California.
This corporate presentation provides an overview of Otso Gold and its Otso Gold Mine project located in Finland. It discusses Otso Gold's management team and capital structure. The presentation contains forward-looking statements regarding plans, expectations and estimates. It also notes that the mine operates sustainably and focuses on environmental protection through practices like using wind power and maintaining high environmental standards.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production growth from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of achieving Phase 1 production in the first half of 2020.
Equinox Gold held its annual general meeting on May 1, 2019 to provide an update on the company's growth. Key highlights included:
1) Producing over 25,000 ounces of gold in Q1 2019 from its Mesquite mine in California and making first gold pour at its Aurizona mine in Brazil in early May.
2) Advancing construction of its Castle Mountain mine in California, with Phase 1 production targeted for mid-2020.
3) Outlining the significant expansion potential at Aurizona through near-mine exploration targets and an underground mining scenario.
This document provides a summary of the 2019 Annual General Meeting for a mining company. It includes cautionary statements regarding forward-looking information in the presentation, such as production estimates, economic analyses, and assumptions underlying resource estimates. It notes that mineral resource and reserve estimates have been prepared according to Canadian standards which may not be comparable to US standards. The document also discusses non-IFRS financial measures presented and identifies the qualified persons who reviewed and approved the scientific and technical information in the presentation.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base and growth potential from three wholly-owned gold mines. The Company is producing gold from its Mesquite Gold Mine in California and its Aurizona Gold Mine in Brazil, and is advancing its Castle Mountain Gold Mine in California. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base and growth potential from three wholly-owned gold mines. The Company is producing gold from its Mesquite Gold Mine in California and its Aurizona Gold Mine in Brazil, and is advancing its Castle Mountain Gold Mine in California.
Otso Corporate Presentation - June 2020DaceFiresteel
Ready for Production Gold Opportunity in Finland
Otso Gold Corp is a gold mining company with a fully permitted and constructed gold mine and processing plant in Finland. The project has a resource of over 1 million ounces of gold and has the potential for near-term production restart. Otso is conducting a 10,000m drilling program to upgrade resources and reserves while optimizing the process plant to achieve high gold recoveries. The project benefits from excellent infrastructure, low costs, and is located in a top-tier mining jurisdiction.
Equinox Gold is a Canadian mining company with seven operating gold mines, construction underway at an eighth site, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from its pipeline of growth projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Ero Copper held a technical session to discuss its 2022 exploration program and recent results. The session provided an overview of exploration activities across Ero's portfolio, including near-mine exploration and regional programs at the MCSA Mining Complex, nickel exploration, and work at the Boa Esperança and NX Gold projects. Ero aims to unlock value across all timescales through ongoing life-of-mine planning and exploration, with a focus on generating high-margin growth projects delivering high returns on investment.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, near-term and growing gold production from two past-producing mines in Brazil and California, and an acquisition underway to purchase a producing gold mine in California. Construction is well advanced at the Company’s Aurizona Gold Mine in Brazil with the objective of pouring gold by year-end 2018, and the Company is advancing its Castle Mountain Gold Mine in California with the objective of commissioning Phase 1 operations by the end of 2019. On September 19, 2018, Equinox Gold announced its intention to acquire the Mesquite Gold Mine with the expectation of completing the acquisition before year-end 2018. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Cayden Resources owns the Morelos Sur gold property in Mexico, which has potential for a multi-million ounce gold deposit. The property is located near an existing producing gold mine and has excellent infrastructure. Cayden plans to complete approximately 30,000 meters of drilling by June 2012 to test several high-priority targets, including Las Calles, La Joya, and La Magnetita, the largest untested magnetic anomaly in the region. Goldcorp is also conducting a large drilling program on the property to evaluate expansion of its nearby mine onto Cayden's claims. Cayden has a strategic land position in a highly prospective gold belt and its experienced management team aims to discover a significant new deposit.
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 finalNorthAmericanNickel
This document provides an overview of North American Nickel's Maniitsoq Ni-Cu sulphide project in Greenland. Highlights from 2016 drilling include expansion of the Mikissoq, Spotty Hill, P-053, and P-013SE zones as well as new discoveries. The 2017 drilling program will focus on delineating the top three priority lenses identified at the Imiak Hill Complex and Fossilik areas. The project offers potential for discovery of a district-scale nickel opportunity in Greenland which has a favorable mining jurisdiction and year-round shipping access.
The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit located in Northern Ireland. It provides details on the deposit's mineral resource estimate, positive preliminary economic assessment showing low capex and high margins, ongoing drill program and underground exploration plans. It also discusses the permitting process, noting Northern Ireland has a resource friendly jurisdiction and Dalradian has already received planning permission for its underground exploration program in under a year.
- American Lithium is a leading diversified lithium development company and was a top 50 company on the TSXV in May 2021.
- The presentation provides an overview of American Lithium and its subsidiaries, including their lithium projects in Nevada, USA and Peru.
- It discloses key details about the TLC, Falchani, and Macusani lithium projects, and summarizes preliminary economic assessments conducted for the projects.
The Otso Gold Mine in Finland has all necessary licenses and permits in place to begin mining and processing materials. An expedited redevelopment plan involves infill drilling and mining in phases to restart production as soon as Q3 2020. The mine has defined mineral resources and was previously in production. With a restarted process plant and optimized drilling and mining plan, the Otso Gold Mine has solid fundamentals to become a low-cost producer again.
American lithium investor presentation Jan 2022RonWidjaja
American Lithium is a leading lithium development company with projects in Nevada and Peru. It has two advanced stage lithium projects - TLC in Nevada and Falchani in Peru. American Lithium also owns the Macusani uranium project in Peru, which is the world's 5th largest undeveloped uranium deposit. The company has a strong management team and treasury of C$50 million, and is focused on becoming one of the largest lithium producers in the Americas.
The document provides information on Dalradian Resources Inc.'s Curraghinalt Gold Project in Northern Ireland, including:
- The project features a large, high-grade vein system that is open in all directions and close to surface.
- A positive feasibility study shows robust economics for the base case with an after-tax IRR of 25.5% and CAPEX of $192 million.
- Recent work has increased the amount of mineable material above a 5 g/t gold cutoff by 32% through re-wireframing of major veins.
The document provides an overview of Ero Copper's April 2022 analyst site visit to their MCSA Mining Complex and Boa Esperança project in Brazil. It includes forward-looking statements and cautions that actual results may differ materially from projections. It also notes the qualifications of the experts who prepared technical reports on the company's properties and provides context around non-IFRS financial measures discussed. Key topics to be covered include health, safety and environment; performance and growth opportunities at MCSA and NX Gold; updates on the Boa Esperança project; and the company's balance sheet and financial position.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020.
- The corporate presentation provides an overview of Otso Gold and its Otso Gold Mine project located in Finland. It discusses Otso Gold's capital structure, ownership, management team, and location.
- The presentation contains forward-looking statements regarding plans, expectations, estimates, forecasts, and objectives. It outlines risks associated with forward-looking statements and non-IFRS financial measures.
- Otso Gold is focused on sustainable and environmentally conscious mining at its Otso Gold Mine project in Finland through practices like using wind power and maintaining high environmental standards.
The sample from the T17 vein contained 188 g/t of gold and 103 g/t of silver, with 5.07% copper. Dalradian plans to extend an existing exploration adit by 45 meters to intersect the 106-16 vein and drift along several known veins to demonstrate continuity of thickness and grade. They will extract a large bulk sample for metallurgical testing and to convert additional resources to measured and indicated categories. The underground exploration program is planned to take approximately 2,000 meters of development over 16 months.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to 2.07 million ounces.
- Deposit characteristics including high grade veins amenable to underground mining.
- A 12km mineralized trend with regional discoveries highlighting district potential.
- Progress on a feasibility study including 950m of underground development and test stoping.
- Plans for the feasibility study to incorporate longhole mining, flotation processing, and paste backfill.
The document discusses Dalradian Resources Inc.'s Curraghinalt gold deposit in Northern Ireland. It summarizes that Dalradian has grown the deposit's resource over 7-fold to over 2 million ounces of gold in the measured and indicated categories. Test stoping has validated long-hole open stoping as the primary mining method. The feasibility study is on schedule for Q4 2016. The permitting process involves submitting a planning application including an environmental and social impact assessment. Dalradian has a team with experience in mine building and exploration and notes Northern Ireland's business-friendly jurisdiction.
This document provides a summary of the 2019 Annual General Meeting for a mining company. It includes cautionary statements regarding forward-looking information in the presentation, such as production estimates, economic analyses, and assumptions underlying resource estimates. It notes that mineral resource and reserve estimates have been prepared according to Canadian standards which may not be comparable to US standards. The document also discusses non-IFRS financial measures presented and identifies the qualified persons who reviewed and approved the scientific and technical information in the presentation.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base and growth potential from three wholly-owned gold mines. The Company is producing gold from its Mesquite Gold Mine in California and its Aurizona Gold Mine in Brazil, and is advancing its Castle Mountain Gold Mine in California. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base and growth potential from three wholly-owned gold mines. The Company is producing gold from its Mesquite Gold Mine in California and its Aurizona Gold Mine in Brazil, and is advancing its Castle Mountain Gold Mine in California.
Otso Corporate Presentation - June 2020DaceFiresteel
Ready for Production Gold Opportunity in Finland
Otso Gold Corp is a gold mining company with a fully permitted and constructed gold mine and processing plant in Finland. The project has a resource of over 1 million ounces of gold and has the potential for near-term production restart. Otso is conducting a 10,000m drilling program to upgrade resources and reserves while optimizing the process plant to achieve high gold recoveries. The project benefits from excellent infrastructure, low costs, and is located in a top-tier mining jurisdiction.
Equinox Gold is a Canadian mining company with seven operating gold mines, construction underway at an eighth site, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from its pipeline of growth projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Ero Copper held a technical session to discuss its 2022 exploration program and recent results. The session provided an overview of exploration activities across Ero's portfolio, including near-mine exploration and regional programs at the MCSA Mining Complex, nickel exploration, and work at the Boa Esperança and NX Gold projects. Ero aims to unlock value across all timescales through ongoing life-of-mine planning and exploration, with a focus on generating high-margin growth projects delivering high returns on investment.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, near-term and growing gold production from two past-producing mines in Brazil and California, and an acquisition underway to purchase a producing gold mine in California. Construction is well advanced at the Company’s Aurizona Gold Mine in Brazil with the objective of pouring gold by year-end 2018, and the Company is advancing its Castle Mountain Gold Mine in California with the objective of commissioning Phase 1 operations by the end of 2019. On September 19, 2018, Equinox Gold announced its intention to acquire the Mesquite Gold Mine with the expectation of completing the acquisition before year-end 2018. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Cayden Resources owns the Morelos Sur gold property in Mexico, which has potential for a multi-million ounce gold deposit. The property is located near an existing producing gold mine and has excellent infrastructure. Cayden plans to complete approximately 30,000 meters of drilling by June 2012 to test several high-priority targets, including Las Calles, La Joya, and La Magnetita, the largest untested magnetic anomaly in the region. Goldcorp is also conducting a large drilling program on the property to evaluate expansion of its nearby mine onto Cayden's claims. Cayden has a strategic land position in a highly prospective gold belt and its experienced management team aims to discover a significant new deposit.
Nan april 2017 corporate deck prospectus marketing 6 apr-2017 finalNorthAmericanNickel
This document provides an overview of North American Nickel's Maniitsoq Ni-Cu sulphide project in Greenland. Highlights from 2016 drilling include expansion of the Mikissoq, Spotty Hill, P-053, and P-013SE zones as well as new discoveries. The 2017 drilling program will focus on delineating the top three priority lenses identified at the Imiak Hill Complex and Fossilik areas. The project offers potential for discovery of a district-scale nickel opportunity in Greenland which has a favorable mining jurisdiction and year-round shipping access.
The document discusses Dalradian Resources' Curraghinalt high-grade gold deposit located in Northern Ireland. It provides details on the deposit's mineral resource estimate, positive preliminary economic assessment showing low capex and high margins, ongoing drill program and underground exploration plans. It also discusses the permitting process, noting Northern Ireland has a resource friendly jurisdiction and Dalradian has already received planning permission for its underground exploration program in under a year.
- American Lithium is a leading diversified lithium development company and was a top 50 company on the TSXV in May 2021.
- The presentation provides an overview of American Lithium and its subsidiaries, including their lithium projects in Nevada, USA and Peru.
- It discloses key details about the TLC, Falchani, and Macusani lithium projects, and summarizes preliminary economic assessments conducted for the projects.
The Otso Gold Mine in Finland has all necessary licenses and permits in place to begin mining and processing materials. An expedited redevelopment plan involves infill drilling and mining in phases to restart production as soon as Q3 2020. The mine has defined mineral resources and was previously in production. With a restarted process plant and optimized drilling and mining plan, the Otso Gold Mine has solid fundamentals to become a low-cost producer again.
American lithium investor presentation Jan 2022RonWidjaja
American Lithium is a leading lithium development company with projects in Nevada and Peru. It has two advanced stage lithium projects - TLC in Nevada and Falchani in Peru. American Lithium also owns the Macusani uranium project in Peru, which is the world's 5th largest undeveloped uranium deposit. The company has a strong management team and treasury of C$50 million, and is focused on becoming one of the largest lithium producers in the Americas.
The document provides information on Dalradian Resources Inc.'s Curraghinalt Gold Project in Northern Ireland, including:
- The project features a large, high-grade vein system that is open in all directions and close to surface.
- A positive feasibility study shows robust economics for the base case with an after-tax IRR of 25.5% and CAPEX of $192 million.
- Recent work has increased the amount of mineable material above a 5 g/t gold cutoff by 32% through re-wireframing of major veins.
The document provides an overview of Ero Copper's April 2022 analyst site visit to their MCSA Mining Complex and Boa Esperança project in Brazil. It includes forward-looking statements and cautions that actual results may differ materially from projections. It also notes the qualifications of the experts who prepared technical reports on the company's properties and provides context around non-IFRS financial measures discussed. Key topics to be covered include health, safety and environment; performance and growth opportunities at MCSA and NX Gold; updates on the Boa Esperança project; and the company's balance sheet and financial position.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with a multi-million-ounce gold reserve base, gold production from its Mesquite Gold Mine in California, and near-term production from two past-producing mines in Brazil and California. Commissioning is underway at the Company’s Aurizona Gold Mine in Brazil and the Company is advancing its Castle Mountain Gold Mine in California with the objective of ramping-up Phase 1 operations in early 2020.
- The corporate presentation provides an overview of Otso Gold and its Otso Gold Mine project located in Finland. It discusses Otso Gold's capital structure, ownership, management team, and location.
- The presentation contains forward-looking statements regarding plans, expectations, estimates, forecasts, and objectives. It outlines risks associated with forward-looking statements and non-IFRS financial measures.
- Otso Gold is focused on sustainable and environmentally conscious mining at its Otso Gold Mine project in Finland through practices like using wind power and maintaining high environmental standards.
The sample from the T17 vein contained 188 g/t of gold and 103 g/t of silver, with 5.07% copper. Dalradian plans to extend an existing exploration adit by 45 meters to intersect the 106-16 vein and drift along several known veins to demonstrate continuity of thickness and grade. They will extract a large bulk sample for metallurgical testing and to convert additional resources to measured and indicated categories. The underground exploration program is planned to take approximately 2,000 meters of development over 16 months.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to 2.07 million ounces.
- Deposit characteristics including high grade veins amenable to underground mining.
- A 12km mineralized trend with regional discoveries highlighting district potential.
- Progress on a feasibility study including 950m of underground development and test stoping.
- Plans for the feasibility study to incorporate longhole mining, flotation processing, and paste backfill.
The document discusses Dalradian Resources Inc.'s Curraghinalt gold deposit in Northern Ireland. It summarizes that Dalradian has grown the deposit's resource over 7-fold to over 2 million ounces of gold in the measured and indicated categories. Test stoping has validated long-hole open stoping as the primary mining method. The feasibility study is on schedule for Q4 2016. The permitting process involves submitting a planning application including an environmental and social impact assessment. Dalradian has a team with experience in mine building and exploration and notes Northern Ireland's business-friendly jurisdiction.
Patrick Anderson of Dalradian Resources presented on the company's Curraghinalt gold deposit in Northern Ireland. Key points included:
1) The deposit contains over 2 million ounces of gold in the measured and indicated categories according to a recent resource update. Underground development and drilling continue to expand the deposit.
2) Test stoping yielded positive results, validating the mining method and showing narrow widths can be achieved.
3) The feasibility study is on schedule for Q4 2016 and the company plans to submit its planning application by year-end for permits to construct a mine.
4) Dalradian is engaging stakeholders and moving through the permitting process, which is expected to take 1-2
The document provides an overview of Dalradian Resources Inc., a gold mining company developing the Curraghinalt high-grade gold deposit in Northern Ireland. Some key points:
- The Curraghinalt deposit has over 1 million ounces of gold in the measured, indicated and inferred categories. Underground drilling is planned in 2015 to support a pre-feasibility study.
- A preliminary economic assessment shows strong economics for the project, with an after-tax IRR of 41.9% using a 3-year gold price average.
- Dalradian is advancing permitting for the project and expects to submit an Environmental Impact Assessment for the mine in early 2015.
- Upcoming milestones
- The document discusses the Curraghinalt high-grade gold deposit in Northern Ireland owned by Dalradian Resources.
- An updated Preliminary Economic Assessment shows strong economics for the project, including a 36.2% IRR at a gold price of $1,200/oz and average annual production of 162,000 ounces over an 18-year mine life.
- The deposit currently contains over 1 million ounces in the Indicated category and 2.5 million ounces in the Inferred category and has potential for further resource growth along a 12km trend.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland and discusses the company's feasibility study and permitting process. Some key points:
- The feasibility study is progressing on schedule and will incorporate longhole mining, flotation processing recovering over 94% of gold, dry stack tailings, and 50% of waste rock returned underground.
- Underground development includes 950m of new ramps and raises with test stoping and 130,000m of drilling to support the study.
- Permit submission for mine construction is on target for the second half of 2016.
- Dalradian Resources is a gold mining company focused on developing its Curraghinalt gold deposit in Northern Ireland.
- The Curraghinalt deposit hosts a high-grade gold resource of over 1 million ounces. Dalradian is working to advance the project with ongoing exploration drilling and studies aimed at submitting permits for mine construction in 2016.
- The company is led by an experienced management team with a track record of building and operating mines. It is well funded with $24 million in cash and advancing one of the few sizable gold deposits in Europe located in a politically stable jurisdiction.
The document provides an overview of Dalradian Resources Inc.'s high-grade gold project in Northern Ireland. It summarizes the Curraghinalt deposit's May 2016 resource estimate which more than doubled measured and indicated ounces. The deposit is open in all directions and has potential for expansion along a 12km trend. Dalradian is advancing a feasibility study involving underground development and drilling as well as test stoping.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated ounces to support an ongoing feasibility study.
- High-grade gold mineralization occurring in veins that are advantageous for underground mining.
- Ongoing underground development including 950m of new development and test stoping to inform the feasibility study.
- Potential for resource expansion along a 12km trend and from recent regional discoveries.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland. It discusses Dalradian Resources' Curraghinalt gold deposit which has over 7 million ounces of gold in inferred and indicated resources. A recent feasibility study showed positive results for developing the deposit into a mine. The presentation also notes the large land package held by Dalradian that shows potential for further exploration success and resource growth around the Curraghinalt trend.
The document summarizes a feasibility study for the Curraghinalt Gold Project in Northern Ireland. Key highlights include proven and probable reserves of 5.24 million tonnes grading 8.54 g/t gold for 1.44 million ounces. The feasibility study estimates average annual gold production of 130,000 ounces over the first 10 years of the planned 14 year mine life. The study estimates an after-tax NPV of $301 million using a 5% discount rate and $1,250/ounce gold price. Exploration potential remains along a 12km trend with the deposit open for expansion.
This presentation summarizes key information about Guyana Goldfields Inc. It provides a corporate snapshot including share structure and top shareholders. It highlights aspects that distinguish the company such as simple metallurgy, a fully funded and permitted project, robust economics, and potential for growth. Details are given about the mine plan for the Aurora Gold Project including reserves, production levels, costs, and financial projections showing strong economics. The presentation also notes the mining friendly jurisdiction of Guyana.
GUY Investor Presentation January 2014jwagenaar734
The presentation provides an overview of Guyana Goldfields Inc. and its Aurora gold mining project. Key points include:
- The project is expected to produce 3.3 million ounces of gold over a 17-year mine life at average cash costs of $527 per ounce.
- At a gold price of $1,300 per ounce, the after-tax NPV is $735 million with an IRR of 31% and payback period of just over 4 years.
- The initial plan is to mine via open pit at 5,000 tons per day, with underground development and mill expansion to 10,000 tons per day funded by operating cash flows in a staged approach.
This investor presentation provides an overview of Guyana Goldfields Inc. and its Aurora Gold Project. Key highlights include:
- The Aurora Project is expected to produce an average of 194,000 ounces of gold per year over its 17-year mine life at average cash costs of $527/oz, with total production of 3.3 million ounces.
- At a gold price of $1,300/oz, the Aurora Project has an after-tax NPV of $735 million and IRR of 31%, with payback of just over 4 years.
- Guyana Goldfields plans to use a staged approach to develop the Aurora Project, with initial open pit mining and a 5,000 tpd
Q4 Quarterly Update - December 2023 final.pdfProbe Gold
1) Probe Gold achieved several 2023 milestones in Q4 including completing over 85,600m of drilling at its Novador and Croinor gold projects, graduating to the TSX exchange, filing an initial project description to advance permitting, and updating mineral resources.
2) Exploration drilling in Q4 continued to intersect thick gold zones at Monique and returned encouraging visual results. Over 73,500m was completed in 2023.
3) Development work advanced the updated PEA including open pit designs, underground infrastructure planning, and process plant design. Permitting consultation also began.
Q4 Quarterly Update - December 2023 final.pdfProbe Gold
Probe Gold achieved several milestones in Q4 2023 related to advancing the Novador and Croinor gold projects in Val-d'Or, Quebec. They completed over 73,500 meters of drilling, updated the mineral resource estimate to 3.8Moz M&I and 1.4Moz inferred, submitted an initial project description to begin the permitting process, and continued exploration drilling with encouraging visual results. In Q1 2024, Probe Gold plans to finalize an updated PEA, continue stakeholder consultation and permitting, and resume expansion and exploration drilling at Novador totaling over 30,000 meters.
The document summarizes Pretivm's 2019 Mineral Reserve update for its Brucejack Mine. Key points include:
- The Valley of Kings Reserves were updated using updated costs, stope design parameters, and net smelter return model. No changes were made to the West Zone reserves.
- Mining costs were updated based on projected costs for 3,800 tonnes per day production, and are greater than the life of mine costs. The net smelter return cut-off increased to $185/tonne from $165/tonne previously.
- Total mining costs increased to $127.20/tonne from $91.30/tonne previously due to factors like increased development and use of
This document provides a summary of sample results from a T17 vein that contained 188 g/t of gold, 103 g/t of silver, and 5.07% copper. It also contains forward-looking statements regarding future performance, estimates, plans, and assumptions for a mining project, with disclaimers that actual results may differ due to risks and uncertainties. Qualified persons are responsible for technical information, while management provides opinions and estimates.
This document summarizes exploration work on the Maniitsoq Ni-Cu Sulphide Project in Greenland. Over the past three years, the company has conducted systematic exploration including drilling and geophysics to identify and prioritize mineralized zones. Drilling in 2016 focused on continuity testing 14 priority zones identified in previous work. Assay results are pending from 27 drill holes that will help delineate zones of potential economic merit for future development. The project benefits from access to infrastructure including a deepwater port facility.
This document provides a summary of a sample from the T17 vein on a mining property that contained 188 g/t of gold, 103 g/t of silver and 5.07% copper. It also contains forward-looking statements about future plans and estimates for the mining property with required cautions about risks and uncertainties inherent in such projections. The document was prepared by the Chief Executive Officer of the mining company to disclose sample results and risks associated with forward-looking economic assessments of the mineral resource.
This document contains a forward-looking statement from the Chief Executive Officer of a mining exploration company. It discusses positive sample results from the T17 vein showing high grades of gold, silver, and copper. It also cautions that forward-looking statements involve risks and uncertainties that could cause actual results to differ from expectations. Assumptions are based on continued political stability, permitting, availability of skilled workers, commodity prices, and the accuracy of estimates in technical reports.
The document provides an overview of Dalradian Resources Inc. and its flagship Curraghinalt gold deposit in Northern Ireland. Key points include:
- A 2014 PEA showed strong economics for Curraghinalt with a 36.2% IRR at a gold price of $1,200/oz.
- Measured resources of 15,100 oz and Indicated resources of 989,000 oz were outlined in addition to Inferred resources of 2.49 million oz.
- Drilling continues to expand the deposit, which remains open in all directions, with potential to grow resources along a 12km trend.
- Dalradian Resources is exploring for high-grade gold deposits in Northern Ireland. Its flagship project is the Curraghinalt gold deposit.
- The Preliminary Economic Assessment showed strong economics for the Curraghinalt deposit, including an after-tax NPV of $504 million and IRR of 36.2% at a gold price of $1,200/ounce.
- Drilling continues to expand the deposit, which remains open in all directions, and a Feasibility Study is underway to advance the project towards obtaining permits and making a construction decision.
The document summarizes a nickel exploration project in Greenland. It discusses the project's district scale land position covering 2,985 square kilometers within a belt known to host nickel-copper sulphide mineralization. Recent drilling has identified continuity on 9 priority mineralized zones across the property. The project benefits from proximity to port infrastructure and potential hydropower resources. Assay results are pending from the 2016 drilling program which aimed to delineate zones of interest identified through previous exploration.
The document provides an overview of Plateau Energy Metals Inc., a company focused on enabling the new energy paradigm through developing lithium and uranium deposits in Peru. Some key points:
- Plateau has a large consolidated land package of 930 km2 in Peru containing the Falchani lithium and Macusani uranium projects, located in prolific mining districts.
- Falchani has indicated resources of over 60 million tonnes grading nearly 3,000 ppm lithium and inferred resources over 260 million tonnes at similar grades, amenable to open pit mining. Metallurgical testing shows the lithium can be extracted at high purity.
- The Macusani uranium project has shallow, high
- Dalradian Resources is exploring for high-grade gold deposits in Northern Ireland. Its flagship project is the Curraghinalt gold deposit.
- The Preliminary Economic Assessment showed strong economics for the Curraghinalt deposit, including an after-tax NPV of $504 million at a gold price of $1,200/ounce.
- Dalradian is advancing the Curraghinalt deposit with infill drilling, underground development and a feasibility study. It plans to submit a mine construction permit application in Q3 2016.
- Augusta Gold Corp. recently changed its name and consolidated shares as it works to rapidly grow through exploration and development.
- The company has a strong treasury of $33.2 million and is led by an experienced team with a track record of value creation.
- Augusta Gold aims to build on its over 3,157 hectare land package in the prolific Bullfrog gold district in Nevada.
Equinox Gold is a Canadian mining company with seven operating gold mines and construction underway at an eighth site, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from a pipeline of development and expansion projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Similar to Dalradian Corporate Presentation January 2014 (20)
Patrick Anderson's presentation highlights Dalradian Resources' Curraghinalt gold project in Northern Ireland, which has advanced to the permitting stage. The project features a large, high-grade vein system that has increased in size and grade through exploration. A positive feasibility study was completed previously, and opportunities exist to further improve the economics. Dalradian is undertaking additional technical work and community engagement to support an updated feasibility study and permitting process.
- Patrick F. N. Anderson, President and CEO of Dalradian Resources Inc., presented a corporate presentation in April 2018 highlighting their Curraghinalt Gold Project in Northern Ireland.
- The presentation outlined Dalradian's high-grade gold deposit which remains open for expansion, positive feasibility study results showing robust economics, and over $138 million in cash to advance permitting and further study work.
- Dalradian has defined over 4.4 million ounces of gold in the measured, indicated and inferred categories at their Curraghinalt deposit and see potential to increase resources through further exploration on their large land package.
The document discusses high-grade gold deposits in Northern Ireland, focusing on Dalradian Resources' Curraghinalt gold project. It summarizes the positive feasibility study for the project including reserves of 1.44 million ounces at 8.54 g/t gold. The project has a large high-grade resource open along strike and at depth that remains open for expansion. Dalradian has advanced the project through exploration, permitting, and engineering studies to define the resource and assess project economics.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland. It discusses Dalradian Resources' Curraghinalt gold project, which has over 5 million ounces of proven and probable reserves at an average grade of 8.54 g/t gold. A positive feasibility study showed production of 130,000 ounces per year over 10 years at an all-in sustaining cost of $653/oz and an after-tax IRR of 25.5%. The presentation notes opportunities to further improve project economics through additional drilling, ore sorting tests, and geotechnical studies.
The document provides an overview of Dalradian Resources Inc. and its Curraghinalt Gold Project in Northern Ireland. Key points include:
- Dalradian has advanced the Curraghinalt project through exploration permits, feasibility studies showing robust economics, and underground development including test stoping.
- The most recent feasibility study outlined proven and probable reserves of 5.24MT at 8.54g/t gold for 1.44M ounces, with additional measured, indicated and inferred resources totaling over 4.4M ounces.
- Revised modeling increased the amount of mineable material above a 5g/t gold cutoff by 32%, improving the potential for longhole mining methods.
The document provides an overview and update on Dalradian Resources Inc.'s Curraghinalt Gold Project in Northern Ireland. Some key points:
- Resources have expanded to over 4 million ounces of gold in the measured and indicated categories and over 2 million ounces in inferred. The deposit remains open.
- A feasibility study demonstrated the economic potential for developing a mine. Engineering studies showed a simple flowsheet and 94% gold recovery.
- The company raised $34 million through warrant exercises and has additional warrants that could provide up to $39 million more if exercised.
- Drilling continues to expand resources and test targets while permitting and community engagement move forward for mine development.
The document discusses a high-grade gold deposit in Northern Ireland. It summarizes the geology of the large, high-grade vein system which remains open in all directions. It also provides details on the engineering studies conducted, including a capital expenditure of US$192 million and an after-tax internal rate of return of 24%. Finally, it outlines the resources and reserves estimated for the deposit based on over 130,000 meters of drilling, including measured resources of 25,000 ounces grading 26.99 g/t gold and inferred resources of over 2.3 million ounces grading 10.06 g/t gold.
This document summarizes the presentation given by Patrick Anderson, President and CEO of Dalradian Resources, at the BMO 26th Global Metals & Mining Conference. Some key points include:
- Dalradian's Curraghinalt gold deposit in Northern Ireland has a high-grade resource open in multiple directions that is close to surface and accessible.
- The feasibility study showed an after-tax IRR of 24% with an AISC of $674/oz and CAPEX of $192M.
- Dalradian has raised over $200M CAD to date and sees potential to increase resources by continuing exploration along a 12km gold trend.
The document summarizes a presentation on high-grade gold deposits in Northern Ireland, focusing on the Curraghinalt deposit. It provides details on the resource estimates which have grown to over 4 million ounces of gold. Exploration is ongoing along a 12km trend and new high-grade discoveries have been made regionally. A feasibility study is underway for the Curraghinalt deposit based on underground mining and flotation processing. Test stoping has been completed and the results support the mining methods proposed for the feasibility study.
The document provides an overview of Dalradian Resources Inc., including its flagship Curraghinalt high-grade gold deposit in Northern Ireland. Key points include:
- The Curraghinalt deposit has a measured resource of 25,000 ounces grading 26.99 g/t gold, indicated resource of 2.07 million ounces grading 11.53 g/t gold, and inferred resource of 2.31 million ounces grading 10.06 g/t gold.
- Regional exploration has discovered additional high-grade veins up to 12km from the deposit along a prospective trend.
- A feasibility study is underway utilizing underground development, drilling, and test stoping to inform the mining plan.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It announces that Dalradian has grown the resource at Curraghinalt over six-fold since 2010 through four updates. The May 2016 resource update more than doubled the measured and indicated ounces to support an upcoming feasibility study, while maintaining most of the inferred ounces. The high-grade resource includes over 2 million ounces of gold in the measured and indicated categories. Dalradian plans to submit a mine construction permit and feasibility study for Curraghinalt in the second half of 2016.
The document provides an overview of Dalradian Resources' Curraghinalt gold deposit in Northern Ireland, including:
- A May 2016 resource update that more than doubled measured and indicated gold ounces to over 2 million ounces.
- High-grade gold mineralization within 16 identified veins that is amenable to underground mining.
- Ongoing feasibility study work including 950 meters of underground development and over 130,000 meters of drilling.
- Potential for resource expansion along a 12km mineralized trend that remains largely unexplored.
- Dalradian Resources is developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- The 2016 resource update more than doubled the measured and indicated gold ounces at Curraghinalt.
- A feasibility study is underway and targeted for completion in the second half of 2016 to assess developing an underground mine at Curraghinalt.
The document discusses Dalradian Resources' Curraghinalt gold deposit in Northern Ireland. It provides an overview of the deposit's growing resource, which more than doubled its measured and indicated gold ounces in a 2016 update. The deposit remains open in multiple directions and has district-scale exploration potential along a 12km trend. Dalradian is advancing a feasibility study on the project to support mine construction permitting in the second half of 2016.
The document provides an overview of Dalradian Resources Inc. and its flagship Curraghinalt gold deposit in Northern Ireland. It discusses the high-grade nature of the deposit's resource, positive preliminary economic assessment results, and ongoing work including a feasibility study and underground program to expand resources. Analyst coverage and the management team's track record in mine building are also summarized.
The document discusses a presentation given by Patrick F.N. Anderson, Chairman & CEO of Dalradian Resources Inc., at a BMO conference in March 2016 regarding Dalradian's Curraghinalt high-grade gold deposit in Northern Ireland. It provides an overview of the deposit's resource which has grown to over 3 million ounces of gold, positive preliminary economic assessment results, and the ongoing work program including a feasibility study and underground development.
- Dalradian Resources is exploring and developing the Curraghinalt high-grade gold deposit in Northern Ireland.
- Recent work at the site includes 130 blasts, 675 meters of underground development, and 46,000 meters of infill drilling.
- A feasibility study and submission of a mine construction permit are targeted for the second half of 2016.
- The Curraghinalt deposit hosts a measured resource of 15,100 ounces of gold, an indicated resource of 989,000 ounces, and an inferred resource of 2.49 million ounces.
- Dalradian Resources is a gold mining company focused on developing its Curraghinalt gold deposit in Northern Ireland.
- The Curraghinalt deposit hosts a high-grade gold resource that has grown over 5-fold since 2010 through exploration programs.
- Dalradian is currently undertaking a major work program including a feasibility study and permitting activities aimed at submitting a mine construction permit application in the second half of 2016.
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Stone Art Hub
Stone Art Hub offers the best competitive Marble Pricing in Dubai, ensuring affordability without compromising quality. With a wide range of exquisite marble options to choose from, you can enhance your spaces with elegance and sophistication. For inquiries or orders, contact us at ☎ 9928909666. Experience luxury at unbeatable prices.
Easily Verify Compliance and Security with Binance KYCAny kyc Account
Use our simple KYC verification guide to make sure your Binance account is safe and compliant. Discover the fundamentals, appreciate the significance of KYC, and trade on one of the biggest cryptocurrency exchanges with confidence.
Part 2 Deep Dive: Navigating the 2024 Slowdownjeffkluth1
Introduction
The global retail industry has weathered numerous storms, with the financial crisis of 2008 serving as a poignant reminder of the sector's resilience and adaptability. However, as we navigate the complex landscape of 2024, retailers face a unique set of challenges that demand innovative strategies and a fundamental shift in mindset. This white paper contrasts the impact of the 2008 recession on the retail sector with the current headwinds retailers are grappling with, while offering a comprehensive roadmap for success in this new paradigm.
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
How MJ Global Leads the Packaging Industry.pdfMJ Global
MJ Global's success in staying ahead of the curve in the packaging industry is a testament to its dedication to innovation, sustainability, and customer-centricity. By embracing technological advancements, leading in eco-friendly solutions, collaborating with industry leaders, and adapting to evolving consumer preferences, MJ Global continues to set new standards in the packaging sector.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Starting a business is like embarking on an unpredictable adventure. It’s a journey filled with highs and lows, victories and defeats. But what if I told you that those setbacks and failures could be the very stepping stones that lead you to fortune? Let’s explore how resilience, adaptability, and strategic thinking can transform adversity into opportunity.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
Digital Marketing with a Focus on Sustainabilitysssourabhsharma
Digital Marketing best practices including influencer marketing, content creators, and omnichannel marketing for Sustainable Brands at the Sustainable Cosmetics Summit 2024 in New York
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Tastemy Pandit
Know what your zodiac sign says about your taste in food! Explore how the 12 zodiac signs influence your culinary preferences with insights from MyPandit. Dive into astrology and flavors!
Discover timeless style with the 2022 Vintage Roman Numerals Men's Ring. Crafted from premium stainless steel, this 6mm wide ring embodies elegance and durability. Perfect as a gift, it seamlessly blends classic Roman numeral detailing with modern sophistication, making it an ideal accessory for any occasion.
https://rb.gy/usj1a2
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
1. High‐Grade Gold │ Low‐Cost │ Low‐Risk │ Development │ Europe │
January 29, 2014
A preliminary short form prospectus containing important information relating to the securities of the Company
described in this document has not yet been filed with the securities regulatory authorities in each of the
provinces of Canada, other than Québec. A copy of the short form preliminary prospectus is required to be
delivered to any investor that received this document and expressed an interest in acquiring the securities.
There will be no sale or any acceptance of an offer to buy securities of the Company until a receipt for the
final short form prospectus has been issued.
This document does not provide full disclosure of all material facts relating to the securities offered. Investors
should read the preliminary short form prospectus, final short form prospectus and any amendment, for
disclosure of those facts, especially risk factors relating to the securities offered, before making an investment
decision.
Patrick F. N. Anderson
Chief Executive Officer
2. FORWARD‐LOOKING INFORMATION AND QUALIFIED PERSON
This presentation contains “forward‐looking information” which may include, but is not limited to, statements with respect to the completion of the acquisition (the
“Acquisition”) by the Company from a group of private vendors of approximately 1.3 million hectares of mineral rights over four greenstone belts and a historic silver mining
camp in Norway, future financial or operating performance of the Company and its mineral projects, the future price of metals, the estimation of mineral resources, the
realization of mineral resource estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and
timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations,
environmental risks, reclamation expenses, title disputes or claims and limitations of insurance coverage. Often, but not always, forward‐looking statements can be identified by
the use of words and phrases such as “plans,” “expects,” “is expected,” “budget,” “scheduled,” “estimates,” “forecasts,” “intends,” “anticipates,” or “believes” or variations
(including negative variations) of such words and phrases, or state that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or
be achieved.
Forward‐looking statements are based on the opinions and estimates of management as of the date such statements are made and are based on various assumptions, such as
the continued political stability in Northern Ireland and Norway, that permits required for the Company’s operations will be obtained in a timely basis in order to permit the
Company to proceed on schedule with its planned exploration and development programs, that skilled personnel and contractors will be available as the Company’s operations
continue to grow, that the price of gold will be at levels that render the Company’s mineral projects economic, that the Company will be able to continue raising the necessary
capital to finance its operations and realize on mineral resource estimates, and that the assumptions contained in the PEA are accurate and complete.
Forward‐looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the
Company to be materially different from any future results, performance or achievements expressed or implied by the forward‐looking statements. Such factors include, among
others, general business, economic, competitive, political and social uncertainties; the actual results of current and future exploration activities; actual results of reclamation
activities; conclusions of economic evaluations; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible
variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents,
labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or
construction activities, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Annual Information Form.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward‐looking
statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward‐looking statements contained
herein are made as of the date of this presentation and the Company disclaims any obligation to update any forward‐looking statements, whether as a result of new
information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward‐looking statements will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on
forward‐looking statements.
Certain technical data in this presentation was taken from the technical report entitled “A Preliminary Economic Assessment of the Curraghinalt Gold Deposit, Tyrone Project,
Northern Ireland” dated September 6, 2012 (effective date for resource is November 30, 2011), prepared by B. Terrence Hennessey, P.Geo., Mr. Barnard Foo, P.ENG., Mr.
Bogdan Damjanovic, P.ENG, Mr. Andre Villeneuve, P.ENG., and Mr. Christopher Jacobs, CEng MIMMM of Micon International Limited (the “PEA”), and is subject to all of the
assumptions, qualifications and procedures described therein.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes inferred mineral resources that are
considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no
certainty that the results of the PEA will be realized.
Michele L. Cote, MSc., P. Geo., VP Exploration, Dalradian Resources Inc., is the Qualified Person who supervised the preparation of the exploration technical data in this
presentation. The exploration data was based on the procedures described in the Company’s Annual Information Form for the year ended December 31, 2012 dated March 28,
2013 (the “AIF”) and is subject to all of the assumptions, qualifications and procedures described therein.
2
2
6. IN FOUR YEARS WE HAVE:
2013
2012
2011
2010
2009
• Project Acquisition ‐
December
• Existing gold
resource of
250,000 oz Indicated
& 350,000 oz
Inferred1,2
• Increased resource
to 400,000 oz
Indicated & 1.16M oz
Inferred1,3
• IPO ‐ August
• 7 rigs onsite
• Increased resource
to 10,000 oz
Measured,
460,000 oz Indicated
& 2.23M oz
Inferred1,4
• Robust PEA
announced
• New discovery ‐
Alwories
• UG planning
permission
• VP Project
Development hired
• Extensive drilling
and re‐sampling
completed
1 Refer to PEA. Please see cautionary statements in Forward Looking Information (slide 3)
2 Indicated: 0.57 MT grading 13.95 g/t Au for 250,000 contained ounces
Inferred: 0.64 MT grading 17.15 g/t Au for 350,000 contained ounces
3 Indicated: 0.95 MT grading 13.24 g/t Au for 400,000 contained ounces
Inferred: 2.46 MT grading 14.64 g/t Au for 1.16 million contained ounces
4 Measured: 0.02 MT grading 21.51 g/t Au for 10,000 contained ounces
Indicated: 1.11 MT grading 12.84 g/t Au for 460,000 contained ounces
Inferred: 5.45 MT grading 12.74 g/t Au for 2.23 million contained ounces
6
10. METAL PRODUCTION IN IRELAND & THE UK
Our flagship asset: Curraghinalt high‐grade lode gold deposit
Gold
Base Metals
Salt Mine
Excellent regional infrastructure
Over 84,000 hectares under license
Scotgold
Permitted
NORTHERN
IRELAND
Curraghinalt
Curraghinalt Gold
Deposit
Cavanacaw
Croagh Patrick
Galantas
Gold
Irish Salt
Mining
Vedanta Resources
In production
Clontibret
Tara
Galmoy
Silvermines
Pallas Green
Omagh
Lisheen
Parys Mountain
Gwynfynydd
Clogau
IMC Exploration
Gold exploration
Allihies Copper
Mines
Xstrata
Feasibility
Boliden
In production
Avoca
BELFAST
Conroy
Diamonds
& Gold
Underground
Salt Mine
Galantas Gold
In production
Lonmin
Gortin
Cononish
Conroy
Gold exploration
Lundin
In production
Gold Mines of Wales
Exploration
South Crofty
10
18. PRELIMINARY ECONOMIC ASSESSMENT
KEY PEA DATA*
NPV with 8% discount rate (After‐tax)
IRR (After‐tax)
Average Annual Production
Processing Rate
3 YEAR TRAILING AVERAGE
GOLD PRICE:
$1378/ounce
5 YEAR TRAILING AVERAGE
GOLD PRICE:
$1,166/ounce
$467 million
$331 million
41.9%
33.4%
145,000 ounces/year
1,700 tonnes/day
Life of Mine
15 years
Initial Capex ($38M contingency)
Cash Costs
$192 million
$532/ounce or $125/tonne
Diluted Grade
8.1 g/t Au
Gold Recovery
92%
Payback
2 years
At $814 gold price (10‐year trailing average), after‐tax IRR of 20.2%
* Prepared by Micon International Limited. PEA results released on July 25, 2012. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The PEA is preliminary in nature. It includes
inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that
the results of the PEA will be realized. All dollars quoted in $ USD unless stated otherwise.
18
25. Patrick F. N. Anderson
Chief Executive Officer
info@dalradian.com
416.583.5622
Trading Symbol:
DNA on TSX
Corporate Office:
Dalradian Resources Inc.
155 Wellington Street West
Suite 2920
Toronto, Ontario
Canada M5V 3H1
www.dalradian.com
25