SlideShare a Scribd company logo
DALLAS AREA’S RAPID
TRANSIT
ORIENTED DEVELOPMENT:
LIGHT RAIL
By: Andrew Pagano
OUTLINE
• System overview
• What is TOD?
• Analysis Methods
• 2003 Study
• 2014 Study
• Regional Projects
• Conclusions
& Recommendations
DALLAS
&
REGION
METRO City
Pop: 6.9 Mil Pop: 1.2 Mil
Density: 634/sq. mi. Density: 3,645/sq.mi.
Area: 9,286 sq. mi Area: 385.8 sq. mi.
DALLAS AREA RAPID
TRANSIT OVERVIEW
• Opened June1996
• Largest Light Rail system in
North America by length (90
Miles of track)
• 62 Stations built
• Average weekday ridership:
29.5 million passenger trips
(2014)
• 4 lines: Red Line, Blue Line,
Green Line, Orange Line
THE DART SYSTEM
• Red Line: Opened 1996, 29 stations,
runs southwest to northeast from
Westmoreland station in Southwest
Dallas to Parker Road station in Plano
and through the Central Business
district.
• Blue Line: Opened 1997, 21 stations
running southwest to northeast from
Ledbetter station in Southwest Dallas
to downtown Rowlett.
• Green Line: Opened 2009, 24 stations,
runs northwest to southeast from
Buckner to North
Carrollton/Frankford station in
Carrolton.
• Orange Line: Opened 2010, 29
stations, runs from the northern end of
the region at Parker Road to DFW
airport in the west
WHAT IS TRANSIT-
ORIENTED
DEVELOPMENT
• TOD: commonly defined as high-
density, mixed-use development
within walking distance (a 1/2 mile)
of a transit station.
• Provides a range of benefits
including increased transit ridership,
reduced regional congestion and
pollution, and healthier, more
walkable neighborhoods.
ANALYSIS METHODS
• Addressed the impacts of light rail stations
• Analyzed effects of DART Rail stations on
development activity
• Collected data on tax rolls of each county
• Compared development in station areas to
matching “control” areas of similar size.
• Properties were assessed and DART area
property values were compared against
control group
2003 DART
TOD STUDY
• Breakdown of Market
• classes for analysis:
1. Residential
2. Office
3. Retail
4. Industrial
• Examined all market classes within
25 mile of DART Light Rail Station
• Calculated data of taxable property
values between 1997 and 2001
2003 DART
TOD STUDY
Office Properties analyzed within
.25 Mile from DART Light Rail
Station and Control Group
Residential Properties analyzed
within .25 Mile from DART Light
Rail Station and Control Group
2003 DART
TOD STUDY
Office Properties analyzed within .25
Mile from DART Light Rail Station
and Control Group
Residential Properties analyzed
within .25 Mile from DART Light Rail
Station and Control Group
2003 DART
TOD STUDY
Residential-Vacant units within
.25 Mile from DART Light Rail
Station and Control Group
Retail Units within .25 Mile
From DART Light Rail Station
and Control Group
2003 DART
TOD STUDY
Residential-Vacant units within .25
Mile from DART Light Rail Station
and Control Group
Retail Units within .25 Mile From
DART Light Rail Station and Control
Group
2003 DART
TOD STUDY
Residential-Vacant units within .25
Mile from DART Light Rail Station
and Control Group
Residential-Vacant units within .25
Mile from DART Light Rail Station
and Control Group
2003 DART
TOD STUDY
Change Analysis tools DART Properties Control Properties
Combined Property Valuations 1997 $1,021,275 $836,910
Combined Property Valuations 2001 $1,258,985 $1,002,745
Total Change $237,710 $165,835
% Change 21.84% 16.58%
• Properties located within areas .25 mile
received a larger increase rate of property
values than control group
• DART Properties in 1997 saw combined
property valuations of $1,021,275
• Control Properties saw combined
property valuations of $836,910
• DART properties in 2001 saw property
valuations $1,258,985
• Control Properties saw combined
property valuations
• Overall, DART properties experienced
21.84% of increased property values
• Control Group properties experienced
property growth values of 16.58%
2014 DART
TOD STUDY
• Breakdown of Market
• classes for analysis:
1. Residential Multifamily
2. Residential Single Family
3. Office
4. Retail
5. Industrial
• Examined all market classes within
.25 miles of DART Light Rail Station
• Calculated data of taxable property
values between 1997 and 2001
2014 DART
TOD STUDY
• Since 2003 study, DART’s light rail system doubled in length
• Since opening of the system, development near DART rail stations have totaled to
$5.3 billion
• Tax contributions from the developments
near stations have amounted to over $36 million
Property EST. Value of ALL Properties EST. Tax contributions Tax
Type DART Control DART Control Differential
Industrial $23,473,050 $19,481,050 $556,311 $461,701 $94,610
Multi-Family $751,646,900 $169,555,466 $17,814,032 $4,018,465 $13,795,567
Office $224,798,649 $45,121,010 $5,327,728 $1,069,368 $4,258,360
Retail $393,286,515 $300,039,538 $9,320,890 $7,110,937 $2,209,953
Single Family $140,960,100 $67,550,410 $3,340,754 $1,600,945 $1,739,810
Total $1,534,165,214 $601,747,474 $36,359,716 $14,261,415 $22,098,300
2014 DART
TOD STUDY
Year Average Market Rate Average TOD Premium Weighted Average Premium
2003 $15.86 $1.03 6.50%
2004 $15.76 $1.11 7.00%
2005 $16.13 $1.58 9.80%
2006 $16.44 $2.39 14.50%
2007 $16.84 $2.94 17.50%
2008 $17.58 $2.71 15.40%
2009 $17.47 $3.24 18.50%
2010 $16.98 $3.33 19.60%
2011 $16.83 $2.68 15.90%
2012 $16.66 $2.31 13.90%
2013 $16.42 $2.36 14.40%
• Analysis included determination
of office space rental rates
• Leasing rate per square foot of
office space was 13.9% higher in
Offices near DART stations
2014 DART
TOD STUDY
• Xceligent real estate market database
was used to compare properties
• . Each different color represents
different property market areas
throughout the region
• Property within a .25 from LBJ Skillman
station were compared to properties
out of the .25 mile are from that station
within the LBJ corridor
2014 DART
TOD STUDY
• Report findings were even more
conclusive in 2014 than in 2003
• Higher levels of developments were
occurring with .25 miles of DART light rail
stations than in other comparable area
• Properties within .25 miles from a light rail
station built within three years saw
development valuations of almost $1.5
billion as opposed to the development in
control areas at around $600 million.
2014 DART
TOD STUDY
• Multifamily residential dominated
development value along .25 mile
access zones around Dart light rail
stations with $751,646,900 of
development
• Over $580 million more investment
than the $169,555,466 of Control
Group
• Office developments in DART Areas
totaled over $224 million
• Office Developments in Control
Group as only $45 million in
development along properties
REGIONAL PROJECTS
• $1.2 billion of new commercial
and residential developments constructed
walking distance from DART (2004)
• All occurred without any subsidies or TOD planning
or supportive policies by the regional planning agency
• Three projects:
1. Mockingbird station
2. The Cedars station
3. Downtown Plano station
MOCKINGBIRD
STATION
• 15 minute train ride from the central
business district
• Significant growth on developments
within a .25 radii
1. 211 upscale loft residences built
2. 140,000 square feet of office space
3. 180,000 square feet of retail, theatres
and restaurants
• The total amount of construction
around the station in 2004 was $145
million of development
• Rates per unit valued over 35%
above control group market rate
THE CEDARS
STATION
• Former industrial center 7.5 min from
CBD including a provision of industrial
warehousing
• Redevelopment stages focused on
building up residential base ,transit –
friendly access ,additional parking, bus
bays, and bike racks
• 1.4 million square feet of development
was catalyzed by the construction of
the station.
• Development included 455 lofts, 20,000
sq.ft of retail space, 100,000 sq.ft of
office space, and a concert venue
DOWNTOWN PLANO
STATION
• 40 minutes from the Central Business
district
• Widespread retail turnover and
eventually abandonment in 1980s
• Through help of developers and city
officials a $17.7 million high density,
mixed-use project was brought to
fruition.
• 245,000 square feet of 234 apartment
buildings and 15,000 square feet of
ground-level retail spaces completed
in 2001.
• 25,000 square feet of ground-level
retail was constructed and increased
rates of occupancy within units in the
TOD, mostly driven by access to the
DART station.
CONCLUSIONS & RECOMMENDATIONS
• Properties of all types including multi-family residential, office and retail spaces saw
significantly increased rates of property values.
• Industrial areas saw decrease in property rates
• Since the opening of the system, areas around stations on DART light rail lines saw
development over $5.3 billion and tax contributions in excess of $36 million.
• Development patterns along these areas have seen continued new-urbanist mixed-
use developments with supple access for bike and pedestrian infrastructure.
CONCLUSIONS & RECOMMENDATIONS
• Benefits of continued transit Oriented Development in on the Dallas regional network
of light rail has benefited not only the users of the transit service, but also the
developers taking advantage of further business opportunities along this
infrastructure and local governments who continue to benefit from increased tax
contributions in these station areas compared to other areas.
• TOD is an effective tool for development in general, however it is best used as a tool
for generating increased rates of residential property values
• Industrial areas can also be pushed out with construction of light rail and TOD
THANK YOU
References:

More Related Content

Similar to Dallas DART TOD Presentation

Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017
Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
Crosstown TO
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
Samat Jain
 

Similar to Dallas DART TOD Presentation (20)

2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers2015 Information Forum - Ken Bowers
2015 Information Forum - Ken Bowers
 
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
 
South Corridor Development Summary
South Corridor Development SummarySouth Corridor Development Summary
South Corridor Development Summary
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
 
A5 Diverse Places
A5 Diverse PlacesA5 Diverse Places
A5 Diverse Places
 
SNEAPA 2013 Friday f4 10_30_what's my tod combined sneapa presentation
SNEAPA 2013 Friday f4 10_30_what's my tod combined sneapa presentationSNEAPA 2013 Friday f4 10_30_what's my tod combined sneapa presentation
SNEAPA 2013 Friday f4 10_30_what's my tod combined sneapa presentation
 
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
 
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarkingAdopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
Interconnection in Regional Markets
Interconnection in Regional MarketsInterconnection in Regional Markets
Interconnection in Regional Markets
 
The Mason Corridor & Our Housing Future: Roger Millar of Smart Growth America
The Mason Corridor & Our Housing Future: Roger Millar of Smart Growth AmericaThe Mason Corridor & Our Housing Future: Roger Millar of Smart Growth America
The Mason Corridor & Our Housing Future: Roger Millar of Smart Growth America
 
Business Analytics: A Strategic Imperative
Business Analytics: A Strategic ImperativeBusiness Analytics: A Strategic Imperative
Business Analytics: A Strategic Imperative
 
November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM worldUniclass 2015: As it lives and breathes | Empowering you in a BIM world
Uniclass 2015: As it lives and breathes | Empowering you in a BIM world
 
Real Estate Development and Reuse (part 2), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 2), TN Basic Economic Development Cou...Real Estate Development and Reuse (part 2), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 2), TN Basic Economic Development Cou...
 
Interconnection in Regional Markets
Interconnection in Regional MarketsInterconnection in Regional Markets
Interconnection in Regional Markets
 
Complete Streets Policy Development 101
Complete Streets Policy Development 101Complete Streets Policy Development 101
Complete Streets Policy Development 101
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation Projects
 

Dallas DART TOD Presentation

  • 1. DALLAS AREA’S RAPID TRANSIT ORIENTED DEVELOPMENT: LIGHT RAIL By: Andrew Pagano
  • 2. OUTLINE • System overview • What is TOD? • Analysis Methods • 2003 Study • 2014 Study • Regional Projects • Conclusions & Recommendations
  • 3. DALLAS & REGION METRO City Pop: 6.9 Mil Pop: 1.2 Mil Density: 634/sq. mi. Density: 3,645/sq.mi. Area: 9,286 sq. mi Area: 385.8 sq. mi.
  • 4. DALLAS AREA RAPID TRANSIT OVERVIEW • Opened June1996 • Largest Light Rail system in North America by length (90 Miles of track) • 62 Stations built • Average weekday ridership: 29.5 million passenger trips (2014) • 4 lines: Red Line, Blue Line, Green Line, Orange Line
  • 5. THE DART SYSTEM • Red Line: Opened 1996, 29 stations, runs southwest to northeast from Westmoreland station in Southwest Dallas to Parker Road station in Plano and through the Central Business district. • Blue Line: Opened 1997, 21 stations running southwest to northeast from Ledbetter station in Southwest Dallas to downtown Rowlett. • Green Line: Opened 2009, 24 stations, runs northwest to southeast from Buckner to North Carrollton/Frankford station in Carrolton. • Orange Line: Opened 2010, 29 stations, runs from the northern end of the region at Parker Road to DFW airport in the west
  • 6. WHAT IS TRANSIT- ORIENTED DEVELOPMENT • TOD: commonly defined as high- density, mixed-use development within walking distance (a 1/2 mile) of a transit station. • Provides a range of benefits including increased transit ridership, reduced regional congestion and pollution, and healthier, more walkable neighborhoods.
  • 7. ANALYSIS METHODS • Addressed the impacts of light rail stations • Analyzed effects of DART Rail stations on development activity • Collected data on tax rolls of each county • Compared development in station areas to matching “control” areas of similar size. • Properties were assessed and DART area property values were compared against control group
  • 8. 2003 DART TOD STUDY • Breakdown of Market • classes for analysis: 1. Residential 2. Office 3. Retail 4. Industrial • Examined all market classes within 25 mile of DART Light Rail Station • Calculated data of taxable property values between 1997 and 2001
  • 9. 2003 DART TOD STUDY Office Properties analyzed within .25 Mile from DART Light Rail Station and Control Group Residential Properties analyzed within .25 Mile from DART Light Rail Station and Control Group
  • 10. 2003 DART TOD STUDY Office Properties analyzed within .25 Mile from DART Light Rail Station and Control Group Residential Properties analyzed within .25 Mile from DART Light Rail Station and Control Group
  • 11. 2003 DART TOD STUDY Residential-Vacant units within .25 Mile from DART Light Rail Station and Control Group Retail Units within .25 Mile From DART Light Rail Station and Control Group
  • 12. 2003 DART TOD STUDY Residential-Vacant units within .25 Mile from DART Light Rail Station and Control Group Retail Units within .25 Mile From DART Light Rail Station and Control Group
  • 13. 2003 DART TOD STUDY Residential-Vacant units within .25 Mile from DART Light Rail Station and Control Group Residential-Vacant units within .25 Mile from DART Light Rail Station and Control Group
  • 14. 2003 DART TOD STUDY Change Analysis tools DART Properties Control Properties Combined Property Valuations 1997 $1,021,275 $836,910 Combined Property Valuations 2001 $1,258,985 $1,002,745 Total Change $237,710 $165,835 % Change 21.84% 16.58% • Properties located within areas .25 mile received a larger increase rate of property values than control group • DART Properties in 1997 saw combined property valuations of $1,021,275 • Control Properties saw combined property valuations of $836,910 • DART properties in 2001 saw property valuations $1,258,985 • Control Properties saw combined property valuations • Overall, DART properties experienced 21.84% of increased property values • Control Group properties experienced property growth values of 16.58%
  • 15. 2014 DART TOD STUDY • Breakdown of Market • classes for analysis: 1. Residential Multifamily 2. Residential Single Family 3. Office 4. Retail 5. Industrial • Examined all market classes within .25 miles of DART Light Rail Station • Calculated data of taxable property values between 1997 and 2001
  • 16. 2014 DART TOD STUDY • Since 2003 study, DART’s light rail system doubled in length • Since opening of the system, development near DART rail stations have totaled to $5.3 billion • Tax contributions from the developments near stations have amounted to over $36 million Property EST. Value of ALL Properties EST. Tax contributions Tax Type DART Control DART Control Differential Industrial $23,473,050 $19,481,050 $556,311 $461,701 $94,610 Multi-Family $751,646,900 $169,555,466 $17,814,032 $4,018,465 $13,795,567 Office $224,798,649 $45,121,010 $5,327,728 $1,069,368 $4,258,360 Retail $393,286,515 $300,039,538 $9,320,890 $7,110,937 $2,209,953 Single Family $140,960,100 $67,550,410 $3,340,754 $1,600,945 $1,739,810 Total $1,534,165,214 $601,747,474 $36,359,716 $14,261,415 $22,098,300
  • 17. 2014 DART TOD STUDY Year Average Market Rate Average TOD Premium Weighted Average Premium 2003 $15.86 $1.03 6.50% 2004 $15.76 $1.11 7.00% 2005 $16.13 $1.58 9.80% 2006 $16.44 $2.39 14.50% 2007 $16.84 $2.94 17.50% 2008 $17.58 $2.71 15.40% 2009 $17.47 $3.24 18.50% 2010 $16.98 $3.33 19.60% 2011 $16.83 $2.68 15.90% 2012 $16.66 $2.31 13.90% 2013 $16.42 $2.36 14.40% • Analysis included determination of office space rental rates • Leasing rate per square foot of office space was 13.9% higher in Offices near DART stations
  • 18. 2014 DART TOD STUDY • Xceligent real estate market database was used to compare properties • . Each different color represents different property market areas throughout the region • Property within a .25 from LBJ Skillman station were compared to properties out of the .25 mile are from that station within the LBJ corridor
  • 19. 2014 DART TOD STUDY • Report findings were even more conclusive in 2014 than in 2003 • Higher levels of developments were occurring with .25 miles of DART light rail stations than in other comparable area • Properties within .25 miles from a light rail station built within three years saw development valuations of almost $1.5 billion as opposed to the development in control areas at around $600 million.
  • 20. 2014 DART TOD STUDY • Multifamily residential dominated development value along .25 mile access zones around Dart light rail stations with $751,646,900 of development • Over $580 million more investment than the $169,555,466 of Control Group • Office developments in DART Areas totaled over $224 million • Office Developments in Control Group as only $45 million in development along properties
  • 21. REGIONAL PROJECTS • $1.2 billion of new commercial and residential developments constructed walking distance from DART (2004) • All occurred without any subsidies or TOD planning or supportive policies by the regional planning agency • Three projects: 1. Mockingbird station 2. The Cedars station 3. Downtown Plano station
  • 22. MOCKINGBIRD STATION • 15 minute train ride from the central business district • Significant growth on developments within a .25 radii 1. 211 upscale loft residences built 2. 140,000 square feet of office space 3. 180,000 square feet of retail, theatres and restaurants • The total amount of construction around the station in 2004 was $145 million of development • Rates per unit valued over 35% above control group market rate
  • 23.
  • 24. THE CEDARS STATION • Former industrial center 7.5 min from CBD including a provision of industrial warehousing • Redevelopment stages focused on building up residential base ,transit – friendly access ,additional parking, bus bays, and bike racks • 1.4 million square feet of development was catalyzed by the construction of the station. • Development included 455 lofts, 20,000 sq.ft of retail space, 100,000 sq.ft of office space, and a concert venue
  • 25.
  • 26. DOWNTOWN PLANO STATION • 40 minutes from the Central Business district • Widespread retail turnover and eventually abandonment in 1980s • Through help of developers and city officials a $17.7 million high density, mixed-use project was brought to fruition. • 245,000 square feet of 234 apartment buildings and 15,000 square feet of ground-level retail spaces completed in 2001. • 25,000 square feet of ground-level retail was constructed and increased rates of occupancy within units in the TOD, mostly driven by access to the DART station.
  • 27.
  • 28. CONCLUSIONS & RECOMMENDATIONS • Properties of all types including multi-family residential, office and retail spaces saw significantly increased rates of property values. • Industrial areas saw decrease in property rates • Since the opening of the system, areas around stations on DART light rail lines saw development over $5.3 billion and tax contributions in excess of $36 million. • Development patterns along these areas have seen continued new-urbanist mixed- use developments with supple access for bike and pedestrian infrastructure.
  • 29. CONCLUSIONS & RECOMMENDATIONS • Benefits of continued transit Oriented Development in on the Dallas regional network of light rail has benefited not only the users of the transit service, but also the developers taking advantage of further business opportunities along this infrastructure and local governments who continue to benefit from increased tax contributions in these station areas compared to other areas. • TOD is an effective tool for development in general, however it is best used as a tool for generating increased rates of residential property values • Industrial areas can also be pushed out with construction of light rail and TOD