D.1.4 Project web site and intranet                                                                                    FP7 no. 226740




                       Building Capacity for a Black Sea Catchment
             Observation and Assessment supporting Sustainable Development

                                  WP 1: Management
                                   Task 1.3: Web site
              Deliverable D1.4 : Project web site and intranet – Month 1+

                                              Authors:
                             Anthony Lehmann, Nicolas Ray, Gregory Giuliani
                                        UNIGE & UNEP/GRID

                            Submitted: July 1. 2009; Validated: July 15. 2009
                                        Authorized: A. Lehmann

                                               Dissemination level: public


    This deliverable is part of work package 1 Project management. It is covering the
    following points:

    WWW.ENVIROGRIDS.NET ............................................................................................ 2
    ABOUT US ......................................................................................................................... 3
    PROJECT DESCRIPTION AND WORK PACKAGES .................................................... 4
    ENVIROGRIDS PARTNERS ............................................................................................ 5
    ENVIROGRIDS PEOPLE .................................................................................................. 6
    ENVIROGRIDS MEETINGS ............................................................................................ 7
    PRESS ROOM .................................................................................................................... 8
    RESTRICTED AREA ........................................................................................................ 9
    ENVIROGRIDS CONTENT MANAGEMENT SYSTEM ............................................. 10
    ENVIROGRIDS MAILING LISTS ................................................................................. 11
    SHARING LARGE DATA SETS BY FTP...................................................................... 13




                                                            www.envirogrids.net
1
D.1.4 Project web site and intranet                                          FP7 no. 226740



    WWW.ENVIROGRIDS.NET
    The enviroGRIDS web site was launched in July 2008 is order to serve as the front page
    to communicate information about the project internally (intranet) and externally
    (internet). It was prepared by the UNIGE partner under the supervision of Anthony
    Lehmann (project coordinator). It will be updated regularly by Nicolas Ray (project
    manager) and Gregory Giuliani (leader of WP2) with information provided by all
    partners. For the moment it is divided in 9 main sections:

        •   About us
        •   Project
        •   Factsheets
        •   Partners
        •   People
        •   Press room
        •   Black Sea catchment
        •   Restricted area




                                          www.envirogrids.net
2
D.1.4 Project web site and intranet                                                 FP7 no. 226740


    ABOUT US
    This first section gives a brief project description, its objectives and of the main building
    blocks from which it was built up.




                                       Project description




                                           www.envirogrids.net
3
D.1.4 Project web site and intranet                                               FP7 no. 226740



    PROJECT DESCRIPTION AND WORK PACKAGES
    A short description of each work package objectives and structure is given in this section
    of the web site.




                                Description of work packages




                                          www.envirogrids.net
4
D.1.4 Project web site and intranet                                                FP7 no. 226740



    ENVIROGRIDS PARTNERS
    A short description of each partners with contact persons and internet links are given in
    this section of the web site.




                                    Description of partners


                                          www.envirogrids.net
5
D.1.4 Project web site and intranet                                               FP7 no. 226740



    ENVIROGRIDS PEOPLE
    A short description of each person involved in the project can be added in this section
    with a short personal profile .




    enviroGRIDS people



                                          www.envirogrids.net
6
D.1.4 Project web site and intranet                                              FP7 no. 226740



    ENVIROGRIDS MEETINGS
    This section will give all details on enviroGRIDS official meetings, conferences and
    courses: General Assemblies and Work Package Leader meetings,…




                                    enviroGRIDS meetings




                                          www.envirogrids.net
7
D.1.4 Project web site and intranet                                                FP7 no. 226740



    PRESS ROOM
    This section will give access to all official press releases made by the consortium as well
    as press clippings.




                                   enviroGRIDS press room

                                           www.envirogrids.net
8
D.1.4 Project web site and intranet                                              FP7 no. 226740



    RESTRICTED AREA
    The restricted area is provides important information to all project partners:




                                          Restricted area

                                           www.envirogrids.net
9
D.1.4 Project web site and intranet                                          FP7 no. 226740



     ENVIROGRIDS CONTENT MANAGEMENT SYSTEM
     The website is created from a Content Management System (SPIP) allowing its edition
     by multiple editors from any place connected to the Internet.




                Content Management System behind www.envirogrids.net




                                           www.envirogrids.net
10
D.1.4 Project web site and intranet                                           FP7 no. 226740


     ENVIROGRIDS MAILING LISTS
     Several mailing lists were created to help the communication between the various
     partners and work packages. Only the members of the mailing lists can send emails to
     these lists. Partners can become members of a WP lists through a simple Intranet
     interface.




                                Tool for managing mailing lists




                                           www.envirogrids.net
11
D.1.4 Project web site and intranet                                    FP7 no. 226740




     Interface within enviroGRIDS Intranet for mailing lists inscription by partners




                                           www.envirogrids.net
12
D.1.4 Project web site and intranet                                          FP7 no. 226740



     SHARING LARGE DATA SETS BY FTP
     A 1 Tb FTP disk has been setup to allow the enviroGRIDS partners to share their
     relevant data sets (upload and download).
     A direct access to the data sets with the help of this URL:
     https://netstorage.unige.ch/netstorage/

     To connect to this disk, you have to request a Username and a Password to Gregory
     Giuliani (gregory.giuliani@grid.unep.ch).

     Once you are connected, you can access the data through the DriveM@enviroGRIDS.
     Then, we organized the data according to the structure of the project WP.




                                    The netstorage interface


     On this netstorage space, you can download but also create directories, upload data,
     etc… We hope you will find it useful and we encourage the partners to share their data
     through this tool. If you have questions, do not hesitate to contact Gregory Giuliani
     (gregory.giuliani@grid.unep.ch).



                                           www.envirogrids.net
13

D1.4 Project web site and intranet

  • 1.
    D.1.4 Project website and intranet FP7 no. 226740 Building Capacity for a Black Sea Catchment Observation and Assessment supporting Sustainable Development WP 1: Management Task 1.3: Web site Deliverable D1.4 : Project web site and intranet – Month 1+ Authors: Anthony Lehmann, Nicolas Ray, Gregory Giuliani UNIGE & UNEP/GRID Submitted: July 1. 2009; Validated: July 15. 2009 Authorized: A. Lehmann Dissemination level: public This deliverable is part of work package 1 Project management. It is covering the following points: WWW.ENVIROGRIDS.NET ............................................................................................ 2 ABOUT US ......................................................................................................................... 3 PROJECT DESCRIPTION AND WORK PACKAGES .................................................... 4 ENVIROGRIDS PARTNERS ............................................................................................ 5 ENVIROGRIDS PEOPLE .................................................................................................. 6 ENVIROGRIDS MEETINGS ............................................................................................ 7 PRESS ROOM .................................................................................................................... 8 RESTRICTED AREA ........................................................................................................ 9 ENVIROGRIDS CONTENT MANAGEMENT SYSTEM ............................................. 10 ENVIROGRIDS MAILING LISTS ................................................................................. 11 SHARING LARGE DATA SETS BY FTP...................................................................... 13 www.envirogrids.net 1
  • 2.
    D.1.4 Project website and intranet FP7 no. 226740 WWW.ENVIROGRIDS.NET The enviroGRIDS web site was launched in July 2008 is order to serve as the front page to communicate information about the project internally (intranet) and externally (internet). It was prepared by the UNIGE partner under the supervision of Anthony Lehmann (project coordinator). It will be updated regularly by Nicolas Ray (project manager) and Gregory Giuliani (leader of WP2) with information provided by all partners. For the moment it is divided in 9 main sections: • About us • Project • Factsheets • Partners • People • Press room • Black Sea catchment • Restricted area www.envirogrids.net 2
  • 3.
    D.1.4 Project website and intranet FP7 no. 226740 ABOUT US This first section gives a brief project description, its objectives and of the main building blocks from which it was built up. Project description www.envirogrids.net 3
  • 4.
    D.1.4 Project website and intranet FP7 no. 226740 PROJECT DESCRIPTION AND WORK PACKAGES A short description of each work package objectives and structure is given in this section of the web site. Description of work packages www.envirogrids.net 4
  • 5.
    D.1.4 Project website and intranet FP7 no. 226740 ENVIROGRIDS PARTNERS A short description of each partners with contact persons and internet links are given in this section of the web site. Description of partners www.envirogrids.net 5
  • 6.
    D.1.4 Project website and intranet FP7 no. 226740 ENVIROGRIDS PEOPLE A short description of each person involved in the project can be added in this section with a short personal profile . enviroGRIDS people www.envirogrids.net 6
  • 7.
    D.1.4 Project website and intranet FP7 no. 226740 ENVIROGRIDS MEETINGS This section will give all details on enviroGRIDS official meetings, conferences and courses: General Assemblies and Work Package Leader meetings,… enviroGRIDS meetings www.envirogrids.net 7
  • 8.
    D.1.4 Project website and intranet FP7 no. 226740 PRESS ROOM This section will give access to all official press releases made by the consortium as well as press clippings. enviroGRIDS press room www.envirogrids.net 8
  • 9.
    D.1.4 Project website and intranet FP7 no. 226740 RESTRICTED AREA The restricted area is provides important information to all project partners: Restricted area www.envirogrids.net 9
  • 10.
    D.1.4 Project website and intranet FP7 no. 226740 ENVIROGRIDS CONTENT MANAGEMENT SYSTEM The website is created from a Content Management System (SPIP) allowing its edition by multiple editors from any place connected to the Internet. Content Management System behind www.envirogrids.net www.envirogrids.net 10
  • 11.
    D.1.4 Project website and intranet FP7 no. 226740 ENVIROGRIDS MAILING LISTS Several mailing lists were created to help the communication between the various partners and work packages. Only the members of the mailing lists can send emails to these lists. Partners can become members of a WP lists through a simple Intranet interface. Tool for managing mailing lists www.envirogrids.net 11
  • 12.
    D.1.4 Project website and intranet FP7 no. 226740 Interface within enviroGRIDS Intranet for mailing lists inscription by partners www.envirogrids.net 12
  • 13.
    D.1.4 Project website and intranet FP7 no. 226740 SHARING LARGE DATA SETS BY FTP A 1 Tb FTP disk has been setup to allow the enviroGRIDS partners to share their relevant data sets (upload and download). A direct access to the data sets with the help of this URL: https://netstorage.unige.ch/netstorage/ To connect to this disk, you have to request a Username and a Password to Gregory Giuliani (gregory.giuliani@grid.unep.ch). Once you are connected, you can access the data through the DriveM@enviroGRIDS. Then, we organized the data according to the structure of the project WP. The netstorage interface On this netstorage space, you can download but also create directories, upload data, etc… We hope you will find it useful and we encourage the partners to share their data through this tool. If you have questions, do not hesitate to contact Gregory Giuliani (gregory.giuliani@grid.unep.ch). www.envirogrids.net 13