SlideShare a Scribd company logo
1 of 6
Resume
VIPIN KUMAR
Father’s Name : Shri Radheshyam Yadav
Date of Birth : 12/09/1981
Marital Status : Married
Career Objective
To secure a position with a well established organization with a stable environment that will lead to a
lasting relationship in the area of global concern in Environment Management, Safety and Climate
Change.
Experience
About 10.0 years of Experience.
Present Job
Company : Mantras Green Resources Ltd., Nashik
Designation : EIA- Coordinator (QCI-NABET Approved)
Sectors : Thermal Power Plant (B), Coal Washries (B), Steel Industries (B) and Building
and Construction (B)
FAE : Air Pollution Monitoring and Control
Experience : From 1st
Sep. 2015 to Till Now
• Headed & co-coordinated Environment department to obtain environmental and forest clearance for
various projects from State and Central Authority, which includes applications, co-ordinated for
baseline environment monitoring, reviewing EIA and EMP reports, attending the presentations etc.
• Finalization of Site selection report for the propose project.
• Presenting the case before Client as well as statutory authority and Participating in Public hearing.
• Responsible to obtain consents (establish and operate) from SPCB and other
NOCs/clearances/licenses from AAI, Water drawl, Explosives Dept., Fire Dept., etc.
• Responsible to ensure all statutory compliance for Environmental clearance, Pollution Control Board
Consents and other NOCs and assisted for environmental monitoring as per statutory requirement.
• Responsible to ensure preparation of EMPs, Disaster Management Plans, Chemical & Environment
laboratory for power projects, which includes to prepare the list of instruments/equipments,
specifications and technical evaluation etc.
• Developing CSR plan/program and implementing certain CSR programs for the community.
• Liasoning with Govt. and Statutory authorities
Past Experience
1. Company : M/s. Vardan EnviroNet, Gurgaon
(Vardan Environet is providing consultancy in the field of Environment Management)
1
Address for Correspondence
Nashik, Maharashtra
Mob: +91-9130025140
Email: kumarvipiny1981@gmail.com
Resume
Designation : DGM
Experience : From 20th
May 2015 to 28th
August 2015
Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, etc.)
2. Company : Godawari Green Energy Ltd. (1320 MW Thermal Power Plant and 50
MW Solar Thermal Power Plant)
Designation : AGM – Environment, Health & Safety
Experience : From 20th
July, 2011 to 15th
May 2015
Job Responsibilities
• Implement and ensure compliance to Environmental Management Rules and Regulations of
MOEF/State Pollution Board and to ensure all statutory clearance and compliance such as
Environmental clearance, Pollution Control Board Consents, Hazardous waste management, Solid
waste management, Greenbelt development and other NOCs for projects.
• Assisted for site selection, site feasibility, and Parameters, Forest Protection, Water Shed
Management, Catchment Area protection etc.
• Assisted in Clean Development Mechanism (CDM) project activities for carbon credit and
approvals/registration with UNFCCC.
• Liaison with State and Central authorities for securing clearances etc.
• Implementation of ISO 14001:2004, OHSAS 18001: 2007
• Plant safety, Hazard identification and risk assessment (HIRA), Environment Aspect Analysis (EAA)
CAPA, HAZOP, JRA, HAZAN Onsite Emergency Plan, Safety Trainings.
3. Company : M/s. Anacon Labs Pvt. Ltd., Nagpur,
(Anacon is providing consultancy in the field of Environment Management)
Designation : Sr. Environment Engineer
Experience : From 06th
Feb, 2008 to 15th
July 2011 (3 Years and 5 Months)
Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, ETP, STP etc.)
4. Company: M/s. Vimta Labs Ltd., Hyderabad.
Designation: Environment Engineer
Experience: From 21st
March, 2006 to 20th
January, 2008 (1 Year and 10 Months)
Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, ETP, STP etc.)
Environmental Modeling & Computer Proficiency
2
Computer Proficiency
• Windows 98/2000/XP/Vista
• MS Office and Internet
• AutoCAD
• Air Dispersion Modeling using ISCST3 model
• Risk Modeling (Aloha)
• Wind rose using CAD base model
• Noise Modeling using Dhawani Software
Resume
Other Achievements
• Internal Audit training.
• Training on Social Impact Assessment.
• Participated in National Workshop on “Earthquake Disaster Mitigation in Tarai Regions of Uttar
Pradesh”, Organized by the Department of Civil Engineering, M. M. M. Engg. College, Gorakhpur from
17-11-2004 to 18-11-2004.
Professional Qualification
• M. Tech. (Environmental Engineering) with First division in 2006 from M. M. M. Engineering College,
Gorakhpur affiliated to Uttar Pradesh Technical University.
• M. Sc. (Environmental Science) with First Division in 2003 from Gurukula Kangri Vishwavidyalaya,
Haridwar, Uttarakhand.
Other Qualification
• Diploma in Industrial Safety, 2010
Languages Known
Hindi & English
References: On request
Declaration
I hereby declare that the informations furnished above are true to the best of my knowledge.
(Vipin Kumar)
3
Resume
List of Ongoing and Completed Projects Details
Sr. No. Project Name
Thermal Power Projects
1 540 MW Thermal Power Plant at Korba C.G. M/s Vandana Vidhyut Ltd. (EC)
2 504 MW Thermal Power Plant at Raigarh MS. M/s Patni Power Ltd. (EC)
3 70 MW Thermal Power Plant at Korba CG. M/s Vandana Energy Pvt. Ltd. (EC)
4 600 MW Thermal Power Plant at Seoni MP. M/s Jhabua Power Ltd. (EC)
5 30 MW Thermal Power Plant at Korba C.G. M/s ACB (India) Ltd. (EC)
6 600 MW Thermal Power Plant at Janjgir Champa C.G. M/s Ind Barat Energy Pvt. Ltd.(TOR)
7 350 MW Thermal Power Plant at Raigarh C.G. M/s Sarda Energy & Minerals Ltd. (EC)
8 60 MW Thermal Power Plant at Chandrapur MS. M/s ACB (India) Ltd. (EC)
9 50 MW Thermal Power Plant at Korba C.G. M/s Spectrum Coal & Power Ltd (EC)
10
10 MW Rice Husk Based Power Plant at Janjgir Champa CG. M/s Shri Shyam Warehousing Power Pvt.
Ltd (EC)
11 10 MW Rice Husk Based Power Plant at Raipur CG M/s Lotus Powergen Pvt. Ltd. (EC)
12 300 MW Thermal Power Plant at Chandrapur MS. M/s Shalivahana Construction Pvt. Ltd. (TOR)
13 420 MW Thermal Power Plant at Nagpur MS M/s Nagpur Municipal Corporation (TOR)
14 1320 MW Thermal Power Plant at Seoni MP. M/s SLS Energy Pvt Ltd. (TOR)
15 1320 MW Thermal Power Plant at Bhandara MS. M/s DB Project Power Ltd. (TOR)
16 1320 MW Thermal Power Plant at Orissa MS. M/s Sahara India Power Corporation Limited (TOR)
Industrial Projects
1 1.1 MTPA Steel Plant at Raipur CG. M/s Sarda Energy & Minerals Ltd. (EC)
2
Expansion of Steel Plant by Iron Ore Beneficiation (10,00,000 TPA), alongwith Rolling Mill (3,00,000
TPA), Arc Furnace (5000 TPA) and Biomass based Power (20 MW) at Raipur CG M/s Godawari Power
& Ispat LTD (EC)
3
Proposed Steel Plant (250000 TPA) alongwith Ferro Alloy Plant (70, 000 TPA) and Captive Power Plant
(74 MW) at Raigarh CG M/s Hira Energy Ltd (TOR)
4
Expansion of Rolling Mill (45,000 TPA to 1,00,000 TPA) at Raipur CG. RR Isspat Ltd (EC)
Proposed Hot Rolling at Dhankanal Orissa M/s Bhuvee Profile Pvt Ltd (EC)
5 Proposed Cold Rolling at Dhankanal Orissa M/s Rabiran Vinimay Pvt. Ltd. (EC)
6 Melting and Casting Unit at Haridwar Uttranchal M/s Hindustan Zinc Ltd. (EC)
7 Pelletization Plant at Vizag AP M/s Ispat Industries Ltd (TOR)
Industry II projects
1 EIA for 30 KLD molasses based distillery M/s. Kisan Shakari Chini Mills, Azamgarh Uttar Pradesh
2 EIA for 40 KLD molasses based distillery M/s. Kisan Shakari Chini Mills, Najibabad, Uttar Pradesh
3
EIA for 45 KLD molasses based distillery M/s Shubarmanyum Shiva Cooperative Sugar Mills
Dharampuri district of Tamil Nadu.
4
EIA for 45 KLD molasses based distillery M/s Kallakurchi II Cooperative Sugar Mills Vallupuram
district of Tamil Nadu.
5
EIA for 50 KLD molasses based distillery M/s KGS Sugars and Infra Structure Pvt. Ltd. Nashik district
of Maharashtra
6 EIA for 60 KLD molasses based distillery Shahabad Cooperative Mill , Kurukstera, Haryana
7 Adlley Labs Bulk Drugs Industry, DeraBassi, Punjab
8 S.K. Solvochem Bulk Drug Industry, DeraBassi, Punjab
Coal Washery Projects
1
Expansion of Coal Washery (1.08 MTPA to 2.5 MTPA) at Yavatmal MS M/s Kartikay Coal Washery Ltd.
(EC)
2 0.96 MTPA Coal Washery at Raigarh CG M/s Sarda Energy & Minerals Ltd. (EC)
4
Resume
Sr. No. Project Name
3 Coal Washery at Chhttisgarh M/s. Phil Minerals Beneficiation and Energy Pvt. Ltd (TOR)
4 Expansion of Coal Washery at Korba CG. M/s SCPL (TOR)
Mine Projects
1 Bauxite Mines at Kudag, Surguja CG M/s Hinalco
2 Bauxite Mines at Samri Surguja CG M/s Hinalco
3 Dolomite Mines at Janjgir Campa CG M/s Sri Balaji Minerals Pvt. Ltd.
4 Iron Ore Mine at West Singbhum Jharkhand M/s Ravtiraman Prasad and Anandvardhan Prasad
5 Warora Coal Block M/s Maharashtra State Mining Corporation Ltd.
Construction Projects
1 EIA for “Viva Land Mark”, Vasai, Thane, Maharashtra
2 EIA for “Mayfair Virar Garden” Virar, Thane, Maharashtra
3 EIA for “Pride Park” Thane, Maharashtra
4 EIA for “Mohan Height” Kalyan, Maharashtra
5 EIA for “Vakil City-2” Bangalore, Karnataka
6 EIA for “TCS Software Development Park” Bhubaneswar, Orissa
7 EIA for “Microsoft Building-3 (IT-Facility)” Hyderabad, Andhra Pradesh
8 EIA fro " Township Project" at Nagpur" M/s SEW Vidharbha Infrastructure Pvt. Ltd.
Other Projects
1 Comprehensive EIA for 8 MW Power Plant at Rajnandgaon CG M/s Sai Chemicals Ltd
2 Comprehensive EIA for 30 MW Power Plant at Korba CG M/s ACB (India) Ltd.
3 Comprehensive EIA for Paper Industry at Rajnandgaon CG M/s Rajnandgaon Paper Mill
5
Resume
Sr. No. Project Name
3 Coal Washery at Chhttisgarh M/s. Phil Minerals Beneficiation and Energy Pvt. Ltd (TOR)
4 Expansion of Coal Washery at Korba CG. M/s SCPL (TOR)
Mine Projects
1 Bauxite Mines at Kudag, Surguja CG M/s Hinalco
2 Bauxite Mines at Samri Surguja CG M/s Hinalco
3 Dolomite Mines at Janjgir Campa CG M/s Sri Balaji Minerals Pvt. Ltd.
4 Iron Ore Mine at West Singbhum Jharkhand M/s Ravtiraman Prasad and Anandvardhan Prasad
5 Warora Coal Block M/s Maharashtra State Mining Corporation Ltd.
Construction Projects
1 EIA for “Viva Land Mark”, Vasai, Thane, Maharashtra
2 EIA for “Mayfair Virar Garden” Virar, Thane, Maharashtra
3 EIA for “Pride Park” Thane, Maharashtra
4 EIA for “Mohan Height” Kalyan, Maharashtra
5 EIA for “Vakil City-2” Bangalore, Karnataka
6 EIA for “TCS Software Development Park” Bhubaneswar, Orissa
7 EIA for “Microsoft Building-3 (IT-Facility)” Hyderabad, Andhra Pradesh
8 EIA fro " Township Project" at Nagpur" M/s SEW Vidharbha Infrastructure Pvt. Ltd.
Other Projects
1 Comprehensive EIA for 8 MW Power Plant at Rajnandgaon CG M/s Sai Chemicals Ltd
2 Comprehensive EIA for 30 MW Power Plant at Korba CG M/s ACB (India) Ltd.
3 Comprehensive EIA for Paper Industry at Rajnandgaon CG M/s Rajnandgaon Paper Mill
5

More Related Content

Viewers also liked

Cobra phylogeny paper slides
Cobra phylogeny paper slidesCobra phylogeny paper slides
Cobra phylogeny paper slidesNate Lewis
 
Model Management in Systems Biology: Challenges – Approaches – Solutions
Model Management in Systems Biology: Challenges – Approaches – SolutionsModel Management in Systems Biology: Challenges – Approaches – Solutions
Model Management in Systems Biology: Challenges – Approaches – SolutionsMartin Scharm
 
Polusi udara di kota besar
Polusi udara di kota besarPolusi udara di kota besar
Polusi udara di kota besarmokhalfanz
 
FAIR data and model management for systems biology (and SOPs too!)
FAIR data and model management for systems biology (and SOPs too!)FAIR data and model management for systems biology (and SOPs too!)
FAIR data and model management for systems biology (and SOPs too!)FAIRDOM
 
Reproducible and citable data and models: an introduction.
Reproducible and citable data and models: an introduction.Reproducible and citable data and models: an introduction.
Reproducible and citable data and models: an introduction.FAIRDOM
 
Gerenciamento de Projetos - Redes
Gerenciamento de Projetos - RedesGerenciamento de Projetos - Redes
Gerenciamento de Projetos - RedesClaudia Costa
 
EV3#1: Blocos fundamentais
EV3#1: Blocos fundamentaisEV3#1: Blocos fundamentais
EV3#1: Blocos fundamentaisAna Carneirinho
 
4 periodo 2015 6°ciencias naturales grado
4 periodo 2015 6°ciencias naturales grado4 periodo 2015 6°ciencias naturales grado
4 periodo 2015 6°ciencias naturales gradoNancy Pulido Arcos
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Jagmohan Garg
 

Viewers also liked (12)

Cobra phylogeny paper slides
Cobra phylogeny paper slidesCobra phylogeny paper slides
Cobra phylogeny paper slides
 
NIH BD2K DataMed model, DATS
NIH BD2K DataMed model, DATSNIH BD2K DataMed model, DATS
NIH BD2K DataMed model, DATS
 
Model Management in Systems Biology: Challenges – Approaches – Solutions
Model Management in Systems Biology: Challenges – Approaches – SolutionsModel Management in Systems Biology: Challenges – Approaches – Solutions
Model Management in Systems Biology: Challenges – Approaches – Solutions
 
Apresentação lego - Aula 2
Apresentação lego - Aula 2Apresentação lego - Aula 2
Apresentação lego - Aula 2
 
Polusi udara di kota besar
Polusi udara di kota besarPolusi udara di kota besar
Polusi udara di kota besar
 
FAIR data and model management for systems biology (and SOPs too!)
FAIR data and model management for systems biology (and SOPs too!)FAIR data and model management for systems biology (and SOPs too!)
FAIR data and model management for systems biology (and SOPs too!)
 
Sistema glandular
Sistema glandularSistema glandular
Sistema glandular
 
Reproducible and citable data and models: an introduction.
Reproducible and citable data and models: an introduction.Reproducible and citable data and models: an introduction.
Reproducible and citable data and models: an introduction.
 
Gerenciamento de Projetos - Redes
Gerenciamento de Projetos - RedesGerenciamento de Projetos - Redes
Gerenciamento de Projetos - Redes
 
EV3#1: Blocos fundamentais
EV3#1: Blocos fundamentaisEV3#1: Blocos fundamentais
EV3#1: Blocos fundamentais
 
4 periodo 2015 6°ciencias naturales grado
4 periodo 2015 6°ciencias naturales grado4 periodo 2015 6°ciencias naturales grado
4 periodo 2015 6°ciencias naturales grado
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
 

Similar to CV-Vipin Kumar

CV Dr. Prithwiraj Sahu Environment Specialist
CV Dr. Prithwiraj Sahu  Environment SpecialistCV Dr. Prithwiraj Sahu  Environment Specialist
CV Dr. Prithwiraj Sahu Environment SpecialistPrithwiraj Sahu
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Ravinder Raina
 
Amit Resume Updated
Amit Resume UpdatedAmit Resume Updated
Amit Resume UpdatedAmit Singh
 
Bio data bajrangi prasad.doc new(1)
Bio data bajrangi prasad.doc new(1)Bio data bajrangi prasad.doc new(1)
Bio data bajrangi prasad.doc new(1)Bajrangi Prasad
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report FinalSOUPARNO ROY
 
Saurabh Gupta Ctran Consulting Pvt. Ltd
Saurabh Gupta Ctran Consulting Pvt. LtdSaurabh Gupta Ctran Consulting Pvt. Ltd
Saurabh Gupta Ctran Consulting Pvt. LtdIIT Kharagpur
 
Company profile new
Company profile newCompany profile new
Company profile neweelabcruddas
 
Sadre alam (C.V)
Sadre alam (C.V)Sadre alam (C.V)
Sadre alam (C.V)sadre alam
 
New Projects Tracker - sample projects
New Projects Tracker - sample projectsNew Projects Tracker - sample projects
New Projects Tracker - sample projectsKavitha Prakash
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)piyush_deks
 

Similar to CV-Vipin Kumar (20)

CV Dr. Prithwiraj Sahu Environment Specialist
CV Dr. Prithwiraj Sahu  Environment SpecialistCV Dr. Prithwiraj Sahu  Environment Specialist
CV Dr. Prithwiraj Sahu Environment Specialist
 
Ashok Kumar-CV
Ashok Kumar-CV Ashok Kumar-CV
Ashok Kumar-CV
 
CV- Anil Salokhe
CV- Anil SalokheCV- Anil Salokhe
CV- Anil Salokhe
 
RESUME
RESUMERESUME
RESUME
 
manish resume
manish resumemanish resume
manish resume
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
Amit Resume Updated
Amit Resume UpdatedAmit Resume Updated
Amit Resume Updated
 
Bio data bajrangi prasad.doc new(1)
Bio data bajrangi prasad.doc new(1)Bio data bajrangi prasad.doc new(1)
Bio data bajrangi prasad.doc new(1)
 
CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516CV of JC Saha for Power Plant 290516
CV of JC Saha for Power Plant 290516
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
 
Saurabh Gupta Ctran Consulting Pvt. Ltd
Saurabh Gupta Ctran Consulting Pvt. LtdSaurabh Gupta Ctran Consulting Pvt. Ltd
Saurabh Gupta Ctran Consulting Pvt. Ltd
 
Company profile new
Company profile newCompany profile new
Company profile new
 
CV-Dipesh
CV-DipeshCV-Dipesh
CV-Dipesh
 
CV RKG-RKHCPVTL 28-11-12
CV RKG-RKHCPVTL 28-11-12CV RKG-RKHCPVTL 28-11-12
CV RKG-RKHCPVTL 28-11-12
 
Sadre alam (C.V)
Sadre alam (C.V)Sadre alam (C.V)
Sadre alam (C.V)
 
TCExpression Sep'11
TCExpression Sep'11TCExpression Sep'11
TCExpression Sep'11
 
Tnl design
Tnl designTnl design
Tnl design
 
pugal.resume. new
pugal.resume. newpugal.resume. new
pugal.resume. new
 
New Projects Tracker - sample projects
New Projects Tracker - sample projectsNew Projects Tracker - sample projects
New Projects Tracker - sample projects
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)
 

CV-Vipin Kumar

  • 1. Resume VIPIN KUMAR Father’s Name : Shri Radheshyam Yadav Date of Birth : 12/09/1981 Marital Status : Married Career Objective To secure a position with a well established organization with a stable environment that will lead to a lasting relationship in the area of global concern in Environment Management, Safety and Climate Change. Experience About 10.0 years of Experience. Present Job Company : Mantras Green Resources Ltd., Nashik Designation : EIA- Coordinator (QCI-NABET Approved) Sectors : Thermal Power Plant (B), Coal Washries (B), Steel Industries (B) and Building and Construction (B) FAE : Air Pollution Monitoring and Control Experience : From 1st Sep. 2015 to Till Now • Headed & co-coordinated Environment department to obtain environmental and forest clearance for various projects from State and Central Authority, which includes applications, co-ordinated for baseline environment monitoring, reviewing EIA and EMP reports, attending the presentations etc. • Finalization of Site selection report for the propose project. • Presenting the case before Client as well as statutory authority and Participating in Public hearing. • Responsible to obtain consents (establish and operate) from SPCB and other NOCs/clearances/licenses from AAI, Water drawl, Explosives Dept., Fire Dept., etc. • Responsible to ensure all statutory compliance for Environmental clearance, Pollution Control Board Consents and other NOCs and assisted for environmental monitoring as per statutory requirement. • Responsible to ensure preparation of EMPs, Disaster Management Plans, Chemical & Environment laboratory for power projects, which includes to prepare the list of instruments/equipments, specifications and technical evaluation etc. • Developing CSR plan/program and implementing certain CSR programs for the community. • Liasoning with Govt. and Statutory authorities Past Experience 1. Company : M/s. Vardan EnviroNet, Gurgaon (Vardan Environet is providing consultancy in the field of Environment Management) 1 Address for Correspondence Nashik, Maharashtra Mob: +91-9130025140 Email: kumarvipiny1981@gmail.com
  • 2. Resume Designation : DGM Experience : From 20th May 2015 to 28th August 2015 Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, etc.) 2. Company : Godawari Green Energy Ltd. (1320 MW Thermal Power Plant and 50 MW Solar Thermal Power Plant) Designation : AGM – Environment, Health & Safety Experience : From 20th July, 2011 to 15th May 2015 Job Responsibilities • Implement and ensure compliance to Environmental Management Rules and Regulations of MOEF/State Pollution Board and to ensure all statutory clearance and compliance such as Environmental clearance, Pollution Control Board Consents, Hazardous waste management, Solid waste management, Greenbelt development and other NOCs for projects. • Assisted for site selection, site feasibility, and Parameters, Forest Protection, Water Shed Management, Catchment Area protection etc. • Assisted in Clean Development Mechanism (CDM) project activities for carbon credit and approvals/registration with UNFCCC. • Liaison with State and Central authorities for securing clearances etc. • Implementation of ISO 14001:2004, OHSAS 18001: 2007 • Plant safety, Hazard identification and risk assessment (HIRA), Environment Aspect Analysis (EAA) CAPA, HAZOP, JRA, HAZAN Onsite Emergency Plan, Safety Trainings. 3. Company : M/s. Anacon Labs Pvt. Ltd., Nagpur, (Anacon is providing consultancy in the field of Environment Management) Designation : Sr. Environment Engineer Experience : From 06th Feb, 2008 to 15th July 2011 (3 Years and 5 Months) Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, ETP, STP etc.) 4. Company: M/s. Vimta Labs Ltd., Hyderabad. Designation: Environment Engineer Experience: From 21st March, 2006 to 20th January, 2008 (1 Year and 10 Months) Job Responsibilities (Key areas: EIA, EMP, EC, SPCB Consents, ETP, STP etc.) Environmental Modeling & Computer Proficiency 2 Computer Proficiency • Windows 98/2000/XP/Vista • MS Office and Internet • AutoCAD • Air Dispersion Modeling using ISCST3 model • Risk Modeling (Aloha) • Wind rose using CAD base model • Noise Modeling using Dhawani Software
  • 3. Resume Other Achievements • Internal Audit training. • Training on Social Impact Assessment. • Participated in National Workshop on “Earthquake Disaster Mitigation in Tarai Regions of Uttar Pradesh”, Organized by the Department of Civil Engineering, M. M. M. Engg. College, Gorakhpur from 17-11-2004 to 18-11-2004. Professional Qualification • M. Tech. (Environmental Engineering) with First division in 2006 from M. M. M. Engineering College, Gorakhpur affiliated to Uttar Pradesh Technical University. • M. Sc. (Environmental Science) with First Division in 2003 from Gurukula Kangri Vishwavidyalaya, Haridwar, Uttarakhand. Other Qualification • Diploma in Industrial Safety, 2010 Languages Known Hindi & English References: On request Declaration I hereby declare that the informations furnished above are true to the best of my knowledge. (Vipin Kumar) 3
  • 4. Resume List of Ongoing and Completed Projects Details Sr. No. Project Name Thermal Power Projects 1 540 MW Thermal Power Plant at Korba C.G. M/s Vandana Vidhyut Ltd. (EC) 2 504 MW Thermal Power Plant at Raigarh MS. M/s Patni Power Ltd. (EC) 3 70 MW Thermal Power Plant at Korba CG. M/s Vandana Energy Pvt. Ltd. (EC) 4 600 MW Thermal Power Plant at Seoni MP. M/s Jhabua Power Ltd. (EC) 5 30 MW Thermal Power Plant at Korba C.G. M/s ACB (India) Ltd. (EC) 6 600 MW Thermal Power Plant at Janjgir Champa C.G. M/s Ind Barat Energy Pvt. Ltd.(TOR) 7 350 MW Thermal Power Plant at Raigarh C.G. M/s Sarda Energy & Minerals Ltd. (EC) 8 60 MW Thermal Power Plant at Chandrapur MS. M/s ACB (India) Ltd. (EC) 9 50 MW Thermal Power Plant at Korba C.G. M/s Spectrum Coal & Power Ltd (EC) 10 10 MW Rice Husk Based Power Plant at Janjgir Champa CG. M/s Shri Shyam Warehousing Power Pvt. Ltd (EC) 11 10 MW Rice Husk Based Power Plant at Raipur CG M/s Lotus Powergen Pvt. Ltd. (EC) 12 300 MW Thermal Power Plant at Chandrapur MS. M/s Shalivahana Construction Pvt. Ltd. (TOR) 13 420 MW Thermal Power Plant at Nagpur MS M/s Nagpur Municipal Corporation (TOR) 14 1320 MW Thermal Power Plant at Seoni MP. M/s SLS Energy Pvt Ltd. (TOR) 15 1320 MW Thermal Power Plant at Bhandara MS. M/s DB Project Power Ltd. (TOR) 16 1320 MW Thermal Power Plant at Orissa MS. M/s Sahara India Power Corporation Limited (TOR) Industrial Projects 1 1.1 MTPA Steel Plant at Raipur CG. M/s Sarda Energy & Minerals Ltd. (EC) 2 Expansion of Steel Plant by Iron Ore Beneficiation (10,00,000 TPA), alongwith Rolling Mill (3,00,000 TPA), Arc Furnace (5000 TPA) and Biomass based Power (20 MW) at Raipur CG M/s Godawari Power & Ispat LTD (EC) 3 Proposed Steel Plant (250000 TPA) alongwith Ferro Alloy Plant (70, 000 TPA) and Captive Power Plant (74 MW) at Raigarh CG M/s Hira Energy Ltd (TOR) 4 Expansion of Rolling Mill (45,000 TPA to 1,00,000 TPA) at Raipur CG. RR Isspat Ltd (EC) Proposed Hot Rolling at Dhankanal Orissa M/s Bhuvee Profile Pvt Ltd (EC) 5 Proposed Cold Rolling at Dhankanal Orissa M/s Rabiran Vinimay Pvt. Ltd. (EC) 6 Melting and Casting Unit at Haridwar Uttranchal M/s Hindustan Zinc Ltd. (EC) 7 Pelletization Plant at Vizag AP M/s Ispat Industries Ltd (TOR) Industry II projects 1 EIA for 30 KLD molasses based distillery M/s. Kisan Shakari Chini Mills, Azamgarh Uttar Pradesh 2 EIA for 40 KLD molasses based distillery M/s. Kisan Shakari Chini Mills, Najibabad, Uttar Pradesh 3 EIA for 45 KLD molasses based distillery M/s Shubarmanyum Shiva Cooperative Sugar Mills Dharampuri district of Tamil Nadu. 4 EIA for 45 KLD molasses based distillery M/s Kallakurchi II Cooperative Sugar Mills Vallupuram district of Tamil Nadu. 5 EIA for 50 KLD molasses based distillery M/s KGS Sugars and Infra Structure Pvt. Ltd. Nashik district of Maharashtra 6 EIA for 60 KLD molasses based distillery Shahabad Cooperative Mill , Kurukstera, Haryana 7 Adlley Labs Bulk Drugs Industry, DeraBassi, Punjab 8 S.K. Solvochem Bulk Drug Industry, DeraBassi, Punjab Coal Washery Projects 1 Expansion of Coal Washery (1.08 MTPA to 2.5 MTPA) at Yavatmal MS M/s Kartikay Coal Washery Ltd. (EC) 2 0.96 MTPA Coal Washery at Raigarh CG M/s Sarda Energy & Minerals Ltd. (EC) 4
  • 5. Resume Sr. No. Project Name 3 Coal Washery at Chhttisgarh M/s. Phil Minerals Beneficiation and Energy Pvt. Ltd (TOR) 4 Expansion of Coal Washery at Korba CG. M/s SCPL (TOR) Mine Projects 1 Bauxite Mines at Kudag, Surguja CG M/s Hinalco 2 Bauxite Mines at Samri Surguja CG M/s Hinalco 3 Dolomite Mines at Janjgir Campa CG M/s Sri Balaji Minerals Pvt. Ltd. 4 Iron Ore Mine at West Singbhum Jharkhand M/s Ravtiraman Prasad and Anandvardhan Prasad 5 Warora Coal Block M/s Maharashtra State Mining Corporation Ltd. Construction Projects 1 EIA for “Viva Land Mark”, Vasai, Thane, Maharashtra 2 EIA for “Mayfair Virar Garden” Virar, Thane, Maharashtra 3 EIA for “Pride Park” Thane, Maharashtra 4 EIA for “Mohan Height” Kalyan, Maharashtra 5 EIA for “Vakil City-2” Bangalore, Karnataka 6 EIA for “TCS Software Development Park” Bhubaneswar, Orissa 7 EIA for “Microsoft Building-3 (IT-Facility)” Hyderabad, Andhra Pradesh 8 EIA fro " Township Project" at Nagpur" M/s SEW Vidharbha Infrastructure Pvt. Ltd. Other Projects 1 Comprehensive EIA for 8 MW Power Plant at Rajnandgaon CG M/s Sai Chemicals Ltd 2 Comprehensive EIA for 30 MW Power Plant at Korba CG M/s ACB (India) Ltd. 3 Comprehensive EIA for Paper Industry at Rajnandgaon CG M/s Rajnandgaon Paper Mill 5
  • 6. Resume Sr. No. Project Name 3 Coal Washery at Chhttisgarh M/s. Phil Minerals Beneficiation and Energy Pvt. Ltd (TOR) 4 Expansion of Coal Washery at Korba CG. M/s SCPL (TOR) Mine Projects 1 Bauxite Mines at Kudag, Surguja CG M/s Hinalco 2 Bauxite Mines at Samri Surguja CG M/s Hinalco 3 Dolomite Mines at Janjgir Campa CG M/s Sri Balaji Minerals Pvt. Ltd. 4 Iron Ore Mine at West Singbhum Jharkhand M/s Ravtiraman Prasad and Anandvardhan Prasad 5 Warora Coal Block M/s Maharashtra State Mining Corporation Ltd. Construction Projects 1 EIA for “Viva Land Mark”, Vasai, Thane, Maharashtra 2 EIA for “Mayfair Virar Garden” Virar, Thane, Maharashtra 3 EIA for “Pride Park” Thane, Maharashtra 4 EIA for “Mohan Height” Kalyan, Maharashtra 5 EIA for “Vakil City-2” Bangalore, Karnataka 6 EIA for “TCS Software Development Park” Bhubaneswar, Orissa 7 EIA for “Microsoft Building-3 (IT-Facility)” Hyderabad, Andhra Pradesh 8 EIA fro " Township Project" at Nagpur" M/s SEW Vidharbha Infrastructure Pvt. Ltd. Other Projects 1 Comprehensive EIA for 8 MW Power Plant at Rajnandgaon CG M/s Sai Chemicals Ltd 2 Comprehensive EIA for 30 MW Power Plant at Korba CG M/s ACB (India) Ltd. 3 Comprehensive EIA for Paper Industry at Rajnandgaon CG M/s Rajnandgaon Paper Mill 5