CURRICULUM VITAE FOR
SUBANDHU DUTTA
Role: Signalling Engineer
Age: 30
Education: B. Tech. (Electronics & communication)
Specialization: Railway Signalling Design
Phone no: +91 9599780622.
+91 9451548046.
Email ID: rsdutta86@gmail.com
Trainings:
Introduction to Basic Concepts & Principles of Railway signaling & designing from April to
May 2012:
 Preparation of Signalling Plan
 Preparation of Bonding Plan
 Preparation of Cable Route Plan
 Principle of Interlocking
 Preparation of Location Case Design
Route Relay Interlocking, Table of Control, Wiring Circuits from July to Sep 2012:
 Preparation of Control Table
 Route Relay Circuit Design
 HR Circuit
 UCR Circuit
 ALSR Circuit
 Point Control and Detection Circuit
 Miscellaneous Circuits
Training Provider: Signet Solutions Ltd, UK
SSI Control Tables – Network Rail, UK Practice (1 week: 22nd July – 26th July 2013),
secured 76%
 Signal Route & Aspect Control Table
 Point Control Table
 Sub-route Control Table
 Sub-route Diagram
 Approach Locking Map Search
Design Processes - Schematics – Network Rail, UK Practice (2 week: 29th July – 09th
August 2013)
 Location Area Plan
 TFM Schematics
 Data Diversity Plan & Schematics
 Axle Counter Schematics
 Axle Counter Head Siting Forms
 Stage Scheme Plan
 Track Circuit Bonding Plan
Balcombe Tunnel Project Specific Training (1 week: 24th march – 29th march 2014)
 Location Case Design
 Cable Core plan
 Cable Schematics
 Aspect Sequence Chart
 CP9 Control table
Candidate Profile Summary:
A keen learner, hardworking, always ready to adapt new technologies. Being an extrovert, I believe in relational
networking and set my timescales to finish my tasks on time. Love to explore different arenas of work, with a
proven track record. Working towards successful career, looking to be an expert in modern railways in the coming
years.
Knowledge of Tools & Simulators:
 C Language
 Auto Cad 2010
 Micro station V8i
 GCSS TOOL Revision 7.1.3 and 9.1.0
CURRICULUM VITAE FOR
SUBANDHU DUTTA
Application Specific:
 Design of Cable Schematics
 Design of Axle Counter Schematic
 Design of Cable Core Plan
 Design of TFM Schematic
 Design of MAP Search Plan
 Design of SUB ROUTE Plan
 Design of Data Diversity Plan
 Design of Data Link Schematics
 Design of Control Table
 Design of Axle Counter Siting Form etc
System Specific (Westrace):
 Vital bit chart preparation
 Non-Vital bit chart preparation
 Vital Application logic using GCSS Revision 7.1.3, 9.1.0
 Non-Vital Application logic using GCSS 7.1.3, 9.1.0
 Interface Design
Career Summary:
Previous-
Five Core Electronics Limited, Bhiwadi (Rajasthan) India – Testing Engineer AUG 2010 to NOV 2011.
Radharani Rail Engineering Systems Pvt Ltd – Design Engineer April 2012- August 2015
Current-
Kalpataru Power Transmission Ltd – Design Engineer September 2015- Till Date
Career History:
Graduate Engineer Trainee – August 2012 – December 2012
RRI Projects:
 Northern Railway (Adhinpur station)
Accountable for: Production of Cable Termination Rack, Location Cable Termination and Contact Analysis.
Key Achievements: Successfully Delivered.
 South Eastern Railway (TISCO Phase-2)
Accountable for: Production of Wiring Diagram.
Key Achievements: Successfully Delivered.
Assistant Design Engineer – January 2013 – December 2013
UK Railway Projects:
 Swindon Area Signaling Renewals GRIP 4B
Accountable for: Production of Axle Counter Schematic, Axle Counter Multicore Plan, Data Diversity Plan, Data
Link Schematic.
Key Achievements: Successfully Delivered.
 Oxford Area Renewal Signalling GRIP 4B
Accountable for: Production of Axle Counter Schematic, Data Diversity Plan, Data Link Schematic.
Key Achievements: Successfully Delivered.
CURRICULUM VITAE FOR
SUBANDHU DUTTA
 Oxford Area Renewal Signalling GRIP 5-8
Accountable for: Production of Cable Core Plan, Cable Schematic, Map Search Plan, Sub Route plan, TFM,
Schematic and Axle Counter Siting Forms.
Key Achievements: Successfully Delivered.
Design Engineer Grade III – January 2014 – August 2015
 Oxford Area Renewal Signalling GRIP 5-8
Accountable for: Verification of Cable Core Plan, Cable Schematic, TFM Schematic, and Axle Counter Siting
Forms.
Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client / SSL.
 Balcombe to Copyhold Bi-Directional Signalling Upgrade:
Accountable for: Verification of Location Case Design & Cable Core Plan.
Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client / KIER
Construction.
RRI Projects:
 MBPL Siding implant yard project:
Accountable for: Production Design checking of control Table, Wiring Diagram of Indoor and Outdoor Circuits.
Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client.
 Northern Railway UTR-RBL Project(Mohanlalganj station)
Accountable for: Production of Wiring Diagram of Indoor and outdoor Circuit.
Key Achievements: Successfully completed at production level.
EI Projects:
 Demo project for Northern Railway (Kankaha station)
Accountable for: Production of Vital/Non-vital bit chart with relay rack, Vital/Non-Vital logic application module
and interface design.
Key Achievements: Successfully produced.
 Logic design for vital and non vital, SIEMENS, BANGALOUR, As a Design Engineer(on
deputation)
Accountable for: Production ofVital/Non-vitalbit chart,Logic design,PCGtools for south eastern railway stations
HATIA, MAHLIMARUP. BIMALGARH and PATASAHI
Key Achievements: Successfully completed.
Design Engineer – Kalpataru Power Transmission ltd. (September 2015 – Till Date)
RRI Projects:
 North Eastern Railway Allahabad-Chappra Project (Doubling and RE Modification Work)
Accountable for: Production of Wiring Diagram of PI Stations (Indoor & outdoor circuit) and EI Stations (outdoor
circuit). RE Modification works for RE Suit Stations.
Key Achievements: Project is going on.
 West Central Railway Budni-Itarsi Project (Introducing of New Third Line in Auto Section)
Accountable for: Production of Wiring Diagram of Indoor and outdoor Circuit.
Key Achievements: Project is going on.
CURRICULUM VITAE FOR
SUBANDHU DUTTA
Others:
Successfully completed Work Place Assessment and Competence Assessment for Signalling Designer
Licensing Scheme 1.1.510v1.
CPD & Career Look Ahead Plan:
 To accept any challenging role in the field of railway signalling and diversify myself into various arenas of
railway signalling design. I would also love to explore other areas like installation, testing and
commissioning work and deliver quality service according to the client requirement within specified time
frame.

CV_subandhu dutta

  • 1.
    CURRICULUM VITAE FOR SUBANDHUDUTTA Role: Signalling Engineer Age: 30 Education: B. Tech. (Electronics & communication) Specialization: Railway Signalling Design Phone no: +91 9599780622. +91 9451548046. Email ID: rsdutta86@gmail.com Trainings: Introduction to Basic Concepts & Principles of Railway signaling & designing from April to May 2012:  Preparation of Signalling Plan  Preparation of Bonding Plan  Preparation of Cable Route Plan  Principle of Interlocking  Preparation of Location Case Design Route Relay Interlocking, Table of Control, Wiring Circuits from July to Sep 2012:  Preparation of Control Table  Route Relay Circuit Design  HR Circuit  UCR Circuit  ALSR Circuit  Point Control and Detection Circuit  Miscellaneous Circuits Training Provider: Signet Solutions Ltd, UK SSI Control Tables – Network Rail, UK Practice (1 week: 22nd July – 26th July 2013), secured 76%  Signal Route & Aspect Control Table  Point Control Table  Sub-route Control Table  Sub-route Diagram  Approach Locking Map Search Design Processes - Schematics – Network Rail, UK Practice (2 week: 29th July – 09th August 2013)  Location Area Plan  TFM Schematics  Data Diversity Plan & Schematics  Axle Counter Schematics  Axle Counter Head Siting Forms  Stage Scheme Plan  Track Circuit Bonding Plan Balcombe Tunnel Project Specific Training (1 week: 24th march – 29th march 2014)  Location Case Design  Cable Core plan  Cable Schematics  Aspect Sequence Chart  CP9 Control table Candidate Profile Summary: A keen learner, hardworking, always ready to adapt new technologies. Being an extrovert, I believe in relational networking and set my timescales to finish my tasks on time. Love to explore different arenas of work, with a proven track record. Working towards successful career, looking to be an expert in modern railways in the coming years. Knowledge of Tools & Simulators:  C Language  Auto Cad 2010  Micro station V8i  GCSS TOOL Revision 7.1.3 and 9.1.0
  • 2.
    CURRICULUM VITAE FOR SUBANDHUDUTTA Application Specific:  Design of Cable Schematics  Design of Axle Counter Schematic  Design of Cable Core Plan  Design of TFM Schematic  Design of MAP Search Plan  Design of SUB ROUTE Plan  Design of Data Diversity Plan  Design of Data Link Schematics  Design of Control Table  Design of Axle Counter Siting Form etc System Specific (Westrace):  Vital bit chart preparation  Non-Vital bit chart preparation  Vital Application logic using GCSS Revision 7.1.3, 9.1.0  Non-Vital Application logic using GCSS 7.1.3, 9.1.0  Interface Design Career Summary: Previous- Five Core Electronics Limited, Bhiwadi (Rajasthan) India – Testing Engineer AUG 2010 to NOV 2011. Radharani Rail Engineering Systems Pvt Ltd – Design Engineer April 2012- August 2015 Current- Kalpataru Power Transmission Ltd – Design Engineer September 2015- Till Date Career History: Graduate Engineer Trainee – August 2012 – December 2012 RRI Projects:  Northern Railway (Adhinpur station) Accountable for: Production of Cable Termination Rack, Location Cable Termination and Contact Analysis. Key Achievements: Successfully Delivered.  South Eastern Railway (TISCO Phase-2) Accountable for: Production of Wiring Diagram. Key Achievements: Successfully Delivered. Assistant Design Engineer – January 2013 – December 2013 UK Railway Projects:  Swindon Area Signaling Renewals GRIP 4B Accountable for: Production of Axle Counter Schematic, Axle Counter Multicore Plan, Data Diversity Plan, Data Link Schematic. Key Achievements: Successfully Delivered.  Oxford Area Renewal Signalling GRIP 4B Accountable for: Production of Axle Counter Schematic, Data Diversity Plan, Data Link Schematic. Key Achievements: Successfully Delivered.
  • 3.
    CURRICULUM VITAE FOR SUBANDHUDUTTA  Oxford Area Renewal Signalling GRIP 5-8 Accountable for: Production of Cable Core Plan, Cable Schematic, Map Search Plan, Sub Route plan, TFM, Schematic and Axle Counter Siting Forms. Key Achievements: Successfully Delivered. Design Engineer Grade III – January 2014 – August 2015  Oxford Area Renewal Signalling GRIP 5-8 Accountable for: Verification of Cable Core Plan, Cable Schematic, TFM Schematic, and Axle Counter Siting Forms. Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client / SSL.  Balcombe to Copyhold Bi-Directional Signalling Upgrade: Accountable for: Verification of Location Case Design & Cable Core Plan. Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client / KIER Construction. RRI Projects:  MBPL Siding implant yard project: Accountable for: Production Design checking of control Table, Wiring Diagram of Indoor and Outdoor Circuits. Key Achievements: Successfully Delivered and most of the parts of the designs are accepted by client.  Northern Railway UTR-RBL Project(Mohanlalganj station) Accountable for: Production of Wiring Diagram of Indoor and outdoor Circuit. Key Achievements: Successfully completed at production level. EI Projects:  Demo project for Northern Railway (Kankaha station) Accountable for: Production of Vital/Non-vital bit chart with relay rack, Vital/Non-Vital logic application module and interface design. Key Achievements: Successfully produced.  Logic design for vital and non vital, SIEMENS, BANGALOUR, As a Design Engineer(on deputation) Accountable for: Production ofVital/Non-vitalbit chart,Logic design,PCGtools for south eastern railway stations HATIA, MAHLIMARUP. BIMALGARH and PATASAHI Key Achievements: Successfully completed. Design Engineer – Kalpataru Power Transmission ltd. (September 2015 – Till Date) RRI Projects:  North Eastern Railway Allahabad-Chappra Project (Doubling and RE Modification Work) Accountable for: Production of Wiring Diagram of PI Stations (Indoor & outdoor circuit) and EI Stations (outdoor circuit). RE Modification works for RE Suit Stations. Key Achievements: Project is going on.  West Central Railway Budni-Itarsi Project (Introducing of New Third Line in Auto Section) Accountable for: Production of Wiring Diagram of Indoor and outdoor Circuit. Key Achievements: Project is going on.
  • 4.
    CURRICULUM VITAE FOR SUBANDHUDUTTA Others: Successfully completed Work Place Assessment and Competence Assessment for Signalling Designer Licensing Scheme 1.1.510v1. CPD & Career Look Ahead Plan:  To accept any challenging role in the field of railway signalling and diversify myself into various arenas of railway signalling design. I would also love to explore other areas like installation, testing and commissioning work and deliver quality service according to the client requirement within specified time frame.