This document is a curriculum vitae for Radwan Mohammad Radwan Taha, a Palestinian surveyor. It includes his personal details, education history, work experience, skills, and languages. For his work experience, it lists several companies where he has worked as a surveyor since 2000, including preparing reports, surveys, drawings, and working on infrastructure projects. It provides details on over 30 infrastructure projects he contributed to in the West Bank.
CityLYNX Gold Line Phase 2 - May 2017 Public Meeting PresentationJulie Sheldon
Couldn't make it to the recent CityLYNX Gold Line Phase 2 public meetings? Learn about recent project updates including: vehicle design and construction schedules.
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projectsÅge Langedrag
Use of Autodesk Infrastructure Modeler in early phase design of a large rail project in Norway. Use of Civil 3D, Revit and 3ds Max for design, coordination and visualization of road and rail projects in Norway
CityLYNX Gold Line Phase 2 - May 2017 Public Meeting PresentationJulie Sheldon
Couldn't make it to the recent CityLYNX Gold Line Phase 2 public meetings? Learn about recent project updates including: vehicle design and construction schedules.
2012 02-08 autodesk infrastructure event in stockholm-multiconsult projectsÅge Langedrag
Use of Autodesk Infrastructure Modeler in early phase design of a large rail project in Norway. Use of Civil 3D, Revit and 3ds Max for design, coordination and visualization of road and rail projects in Norway
1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
Preparation of a Desktop Survey and Design Report for the installation of approximately 1808km of fibre optic cable. This route comprises of coastal and inland portions along the N2 from Umhlanga to Cape Town
1. Radwan Mohammad Radwan Taha
Nationality : Palestinian Date Of Birth: 22/7/1981
Resident of : Nablus Martial Status: Married
Gender : Male Place Of Birth: Nablus
1- Secondary school. Graduation Date: Jun 1999
Nablus - Palestine
Degree: Tawjehe
2- Ramallah Training Center Graduation Date: Jun 2001
Ramalla- Palestine
Degree: Diploma –Land Surveying
3- AN-Najah National University Graduation Date: January 2005
Nablus - Palestine
Degree: B.a Teaching Methods / Vocational & Technical Tr.
1- Taha Surveying Office (July 2000— Jan 2002)
Worked as a Land Surveyor at different machine (Level, Distomat, GPS,), and different
Program (AutoCAD, Transe, Mase, Soft Disk)
2 - Al-Qaisi for Asphalt and Investment Company (Feb 2002 - Feb 2003/ Feb 2005 – Oct 2009)
Worked as main Surveyor Road in Sector and has classification grade on
Main duties
• Preparing all shop drawing for all its projects.
• Preparing all quantity surveying for all its project.
• Applying all the drawing with works progress for any project.
• Preparing all AS-Built drawing for all projects.
Projects I worked in Al-Qaisi Company:
Contact Information
…………………………
AL-Masaken-Nablus-West Bank -Palestine
Mobile #: 00972599-732460
E-mail: Radwan_sv@hotmail.com
Radwan_sv@yahoo.com
Curriculum Vitae
Personal Information ▼
Education ▼
Experience Work ▼
2. No Project name Consultant Name
01. Tubas Main Road PECDAR
02. Tulkarem Northern entrance PECDAR
03. Anabta internal roads USAID
04. Tubas internal Roads UNDP
05. Al-Garosheya roads PECDAR
06. Nablus internal roads PECDAR
07. Alrami-Sanoor-Anza roads CARE
08. Tulkarm internal roads Municipality
09. Beat Wazen Internal Road PECDAR
10. Quseen internal road s PECDAR
11. Yadeb internal Roads Municipality Arab bank
12. Al-Maskofa roads UNDP
13. Nablus internal roads Ministry republic work (MPWH)
14. Nablus internal roads Municipality
15. Tel internal roads Municipality
16. Nablus internal roads Municipality
17. Tulkarm internal roads Municipality
18. Azzoun internal roads Islamic Bank
19. Assla internal roads Islamic Bank
20. Sarra internal road Ministry republic work (MPWH)
21. Jaba sanour road Islamic Bank (MPWH)
22. Shofa internal roads Islamic Bank
23. Nablus internal road Municipality
24. Sarra internal road Ministry republic work (MPWH)
25. Jenin (Al-Jameah Parking Road) Municipality
26. Kofur Al-labad internal road Municipality (MPWH)
27. Tulkarm internal roads Municipality
28. Balaa-Dair AL-Gosson Road Ministry republic work (MPWH)
29. Nablus internal roads Municipality
30. Anabta internal road Municipality
31. Jenin (Al-Jalameh Road) Ministry republic work (MPWH)
32. Tulkarm internal roads Municipality European Commission
33. AL-Kafreyat Main Road Ministry republic work (MPWH)
3- APCO ARCON COMPANY (Oct 2009 – July 2011)
* Worked as main Surveyor on Bazzrya –Dier Sharaf Road (8.80 K.M)
* Worked as main Surveyor on Jayous –Tulkarem Main Road (12.0 K.M)
Main duties
• Preparing all reports to project it need.
• Preparing all Level and quantity surveying for its entire project.
• Preparing all AS-Built drawing for entire project.
• Preparing all Data and quantity in Project.
4- Zeyadah Engineering Office (July 2011 – July 2013)
3. * Worked as main Surveyor on RAWABI city project.
Main duties
• Preparing all reports it need.
• Preparing all Data and quantity Excavation for all city.
• Preparing all AS-Built drawing for all building in the city.
• Work on infrastructure (wet & dry utilities) in the city.
• All excavation work in the city.
• Work on industrial area in the city.
• Work on electrical substation.
5- Technical Group Company (July 2013- Oct. 2014)
* Worked as Chief Surveyor on All project.
• Preparing all reports it need.
• Preparing all Data and quantity for all Project.
• Preparing all AS-Built drawing for all Project.
• Work on infrastructure (wet & dry utilities) in all Project.
• All excavation work in the Project.
6- APCO ARCON COMPANY (Oct.2014 – until now)
* Worked as Task Order Surveyor on Dura-Hebron Road project.
• Preparing all reports it need.
• Preparing all Data and quantity Excavation for Project.
• Preparing all AS-Built drawing for Project.
• Work all infrastructure in the Project (Storm Water, Water Pipe, Sewer, etc.)
• Have Different Training Courses in computer applications (Windows, Excel, Word, Power Point, and
Internet)
• Have an experience work on engineering program (AutoCAD, Soft Disk, Land disk top, and civil3d).
• Have an experience work on Surveying Machine ( GPS, Distomate , Level , etc)
• Have Surveyor license from land Authority.
• Have driving license.
• Good ability to work in a team.
• Good ability to contact with the local councils.
• Arabic (Mother Tongue)
• English Language, good in speaking, Reading and writing.
Skills ▼
Languages▼