Abid Rasool has over 15 years of experience in health, safety, and environment roles. He holds qualifications in mechanical engineering, health and safety management, and safety auditing. His experience includes roles as an HSE engineer for power and desalination plants in Oman and Jordan. He is proficient in implementing HSE programs and procedures, conducting audits and inspections, investigating incidents, and arranging trainings. He seeks to enhance his skills and knowledge in the field of occupational health, safety, and environment.
I am looking for the vacancy of HSE Officer or any vacant position related to HSE hence find enclosed my CV for the post. I am professional HSE Officer with 9 years of working experience, Nebosh IGC, Iosh Managing Safely, Fire fighting & preventing, First aid Certified, Graduate (bachelor of Arts) Through which I have had the opportunity to enhance my skills on several different levels I am currently in UAE on visit visa.
I look forward to discuss further in personal if there is any opportunity & I am available for an interview at your convenience and can join immediately.
Thank you for your time and consideration.
Sincerely,
M Ilyas
I am looking for the vacancy of HSE Officer or any vacant position related to HSE hence find enclosed my CV for the post. I am professional HSE Officer with 9 years of working experience, Nebosh IGC, Iosh Managing Safely, Fire fighting & preventing, First aid Certified, Graduate (bachelor of Arts) Through which I have had the opportunity to enhance my skills on several different levels I am currently in UAE on visit visa.
I look forward to discuss further in personal if there is any opportunity & I am available for an interview at your convenience and can join immediately.
Thank you for your time and consideration.
Sincerely,
M Ilyas
HSE professional with twelve years plus experience in the construction/manufacturing industry – buildings, infrastructure, pre-cast concrete and fabrication of heavy steel structures/equipment in oil/gas sector with basic qualifications in Electrical engineering and additional qualifications in health safety and environment. Highly pro-active and articulate in communication and possessing excellent leadership, management and persuasive skills to bring about changes in the work culture particularly on health, safety and environmental issues.
HSE professional with twelve years plus experience in the construction/manufacturing industry – buildings, infrastructure, pre-cast concrete and fabrication of heavy steel structures/equipment in oil/gas sector with basic qualifications in Electrical engineering and additional qualifications in health safety and environment. Highly pro-active and articulate in communication and possessing excellent leadership, management and persuasive skills to bring about changes in the work culture particularly on health, safety and environmental issues.
More than 17 years of professional experience in the implementation & monitoring of Health, Safety and Environment management system and procedures as per OHSAS18001 and ISO 14001requirements. J3.Project Reliance Refinery Jamnagar (Gujarat) Pipe rack, LIN & LOX Tank. S.S Spool , U.G Pipe line. DIL 2X300 MW Power Project Chandrapur (Chimeney 275 m height , cooling tower, T.G, Boiler etc). AL Munnera, AL Raha project Abudhabi , UAE (Construction of Multistoried buildings, Circular Residential Towers, Town houses & Villas). DUBAL, DX. Technology Development Project (Bus bar, Pot line) Dubai (UAE). Emirates Aluminum smelter complex Project, (Cast House) Abudhabi. DUBAI FESTIVAL CITY (High rise Building, Shopping Mall, tunnel, Culvert etc.). BPCL Refinery India CRUDE DISTILLATION & VACUUM DISTILLATION UNIT HEAT EXCHANGER, SRU, LPG & FIRE WATER VALVE SYST.Lafarge cement Plant. Fabrication, Erection & Maintenance of all TATA STEEL PLANTS, i.e. G.C.P, Gas holder, Hot strip mill, Cold rolling Mill wire and Rod mill & Power Plant. Power plant Maintenance work.
More than 11 years of professional experience in the implementation & monitoring of Health, Safety and Environment management system and procedures as per OHSAS18001 and ISO 14001 requirements.
1. Page 1 of 7
AABBIIDD RRAASSOOOOLL
Cellular +92 335 7941281, +966 501628847
E-mail rabid795@gmail.com
abid.rasool@nomac.com
OOBBJJEECCTTIIVVEESS
To enhance my capabilities knowledge and professional skills in the field of OHSE under the
supervision of your esteemed organization
AACCAADDEEMMIICC // TTEECCHHNNIICCAALL QQUUAALLIIFFIICCAATTIIOONN
DAE Mechanical (Diploma of Associate Engineer in Mechanical) 1999
Diploma in HSWM (Health, Safety & Welfare Management) 2008
OHSAS-18001-2007 and ISO 14001-2004 Awareness course 2010
Certified Lead Auditor OHSAS-18001-2007 2011
Certified Lead Auditor ISO-14001-2004 2011
NEBOSH IGC-1 2012
Advanced Exterior Industrial Fire Brigade Member 2014
EEXXPPEERRIIEENNCCEE
1. From Sep,11-2013 to now
ORGANIZATION: NOMAC (First National Operation &Maintenance Co. Ltd)
Project: Qurreyah Independent Power Plant 4000 MW
Owner: Hajr
Position: HSE Engineer
2. Page 2 of 7
Roles and Responsibilities:
Leading plant HSE Team (HSE Engineer, Officer, Fire Fighter and Male nurse)
Implementation of Organization IMS (Integrated Management System)
Prepared Plant specific HSE Procedures like Plant Emergency response plan, Plant
chemicals handling, use and storage procedure, Environmental compliance and
monitoring procedure and Fire Fighting system Impairment procedure etc.
Prepare the Budget of HSE Material for next 5years and raised the PRs in SAP for
procurement purpose.
Arranging HSE Training and awareness session within team to prepare the plant
handling like PTW, HIRE, EAI etc.
Prepared the operation stage detailed design regarding HSE as per requirement HCIS
(Ministry of Interior)
Preparation of HSE weekly, Monthly, Quarterly reports for project company and
Corporate.
Preparation of HSE Statistics, Man-hours, incidents/Accident reports, Conduct and
prepare Incident/accident investigation reports, HSE Walk downs, follow up of NM
Reports for corrective action,
Arranging HSE Monthly meetings, HSE Committee Meetings,
Identifying the requirement of trainings for employees, preparing the training plan and
arranging internal/external trainings.
Conducting review of HSE Policies, plans and procedures, Legal and other requirements
(local laws and regulations), Risk assessments, Aspects/impacts, Evaluation of
compliance, HSE Objectives and targets, audits review and managements review report.
Conducting safety induction of visitors, suppliers and contractors, safety tool box talks
with outage contractors,
2. From 01Jan-2013 to 24Jul-2013:
ORGANIZATION: Abeinsa Teyma Barka (EPC Company)
Project: 10MIGD RO Water plant Barka-1
Owner: ACWA Power International
Position: HSE Engineer
3. Page 3 of 7
Roles and Responsibilities:
Monitoring contractor’s daily activities, like Fabrications, erection, heavy lifting, Fire
fighting arrangements, emergency arrangement and response, housekeeping situation of
project and conducting emergency moke drills to check the response.
Safety induction of all contractors, visitors and suppliers.
Reviewing lifting equipments inspections, test certificates, risk assessments of critical
activities,
Arranging weekly and monthly meetings with all contractors management and
participating in tool box talks with all contractors workers
Conducting jointly plant visits with all contractors’ management on weekly basis.
Preparation of HSE Statistics, NM, s, incident/investigation reports, and reporting to Site
Manager.
Reporting HSE Statistics to Abeinsa Online reporting system.
3. From 07Nov, 2009 to 31Dec-2012:
ORGANIZATION: NOMAC Oman (First National Company for Operation & Maintenance Services)
At ACWA Power and Desalination plant Barka-I Oman.
Project: 456MW Power and 20MIGD Water Desalination plant.
Owner: ACWA Power International
Position: Plant HSE Engineer
Roles and Responsibilities:
Implementation of Organization Occupational Health, Safety and Environment
management system procedures, on day by day activities as per OHSAS-18001-2007 and
ISO-14001-2004 requirements,
Preparation of HSE weekly, Monthly, Quarterly reports for (MECA) Ministry of
Environment and Climate Affairs, Ministry of Manpower, ACWA Power Barka and NOMAC
Oman, Preparation of HSE Statistics, Man-hours, incidents/Accident reports, Conduct
and prepare Incident/accident investigation reports, HSE Walk downs, follow up of NM
Reports for corrective action,
Arranging HSE Monthly meetings, HSE Committee Meetings, preparing outage plans,
arranging annual Safety and Environment day celebration,
Conducting routine inspection of lifting equipments, Fire fighting equipments, Emergency
equipments (ELSA, SCBA, AED, AMBULANCE, Communication system, First aid and
chlorine leakage kit etc)
4. Page 4 of 7
Identifying the requirement of trainings for employees, preparing the training plan and
arranging internal/external trainings.
Preparing the HSE Audit plan for the year, conducting audit, preparing audit report for
management and also arranging annual audit from SGS for surveillance/reissuance of
OHSAS/ISO Certification,
Conducting review of HSE Policies, plans and procedures, Legal and other requirements
(local laws and regulations), Risk assessments, Aspects/impacts, Evaluation of
compliance, HSE Objectives and targets, audits review and managements review report.
Conducting safety induction of visitors, suppliers and contractors, safety tool box talks
with outage contractors,
As an auditee completed successfully two detail Recertification and two surveillance
audits of OHSAS-18001-2007 and ISO-14001-2004 by SGS.
Participated in International IOSH Middle east conference On 25 April-2012 in Oman.
In 02 May, 2012 we completed 10years without LTA.
Training completed:
Awareness training of OHSAS-18001-2007 and ISO-14001-2004.
Occupation Health safety and loss prevention training.
Fire Fighting and First aid training completed.
Risk assessment training completed.
Scaffolding inspection training completed.
Safe use of Fork lift, Bob cat and cranes.
Confined space and rescue procedure in case of emergency.
Behavior based safety training completed.
Hazardous Material First responder awareness training.
4. From 21 Sep, 2008 to 03 Oct, 2009:
ORGANIZATION: AES Corporation.
Amman East Power Plant Jordan
Project: 370 MW Combined Cycle Power Project Jordan.
Owner: AES
Position: EHS Engineer
Roles and responsibilities:
Joined the AES at Amman East Power Plant (AEPP) Jordan during construction phase
and my role was as a EHS Engineer implementation of HSE Manual/procedures agreed
5. Page 5 of 7
between AES (owner), Doosan (EPC), Astraco (Mechanical and Electrical contractor
company) and Atcco (civil contracting company)
Monitoring contractor’s daily activities, like Fabrications, erection, heavy lifting, Fire
fighting arrangements, emergency arrangement and response, housekeeping situation of
project and conducting emergency moke drills to check the response.
Reviewing lifting equipments inspections, test certificates, risk assessments of critical
activities,
Arranging weekly and monthly meetings with all contractors management and
participating in tool box talks with all contractors workers
Conducting jointly plant visits with all contractors’ management on weekly basis.
Preparation of HSE Statistics, NM, s, incident/investigation reports, and reporting to Site
Manager.
Reporting HSE Statistics to AES Online reporting system.
AES Completed that critical project more than 4 Million man-hours without any LTA and
won the Golden helmat award from AES Corp.
5. From “29 Jun, 2006” to 15, Sep, 2008:
ORGANIZATION: Albario Engineering (Pvt.) Limited.
Rasool Building Shahra-e-Quaid-e-Azam, Lahore Pakistan 54000
Project: 225 MW Combined Cycle Power Project, Balloki, PAKISTAN.
Client: Orient Power
Technical Advisers: GE Energy Europe (Product Supplier)
Duration: 26 April 2007 to 15 September 16, 2008.
Position: HSE Engineer
Project: 150 MW GE Rental Power Project Sheikhupura, PAKISTAN.
Client: WAPDA
Consultant: General Electrics Energy Europe.
Technical Advisers: GE Energy Europe (Product Supplier)
Duration: 29 October 2006 to 10 April 2007.
Position: HSE Engineer
Project: Uch Power Plant 586MW Major Outage Balochistan, PAKISTAN.
Client: ESBI (Electric Supply Board International)
Consultant: General Electrics Energy Europe.
Technical Advisers: GE Energy Europe (Product Supplier)
6. Page 6 of 7
Duration: 29 June 2006 to 20 September 2006.
Position: HSE Coordinator
6. From “08 Apr-1999” to “25 Jun-2006”
ORGANIZATION: Engineering Kinetics (Pvt.) Limited.
73/GII Model Town, Lahore. PAKISTAN.
Project: DG Cement Khairpur Chakwal, PAKISTAN.
Duration: 17 January 2006 to 25 June 2006.
Position: Assistant HSE Engineer.
Project: Uch Power Plant 586MW Dera Murad Jamali, PAKISTAN.
Duration: 15 July 2005 to 26 December 2005.
Position: Assistant HSE Engineer.
Project: Rafhan Maize Products Jaranwallah, PAKISTAN.
Duration: 01 December 2004 to 15 July 2005.
Position: Assistant HSES Engineer.
Project: Fauji & Askari Cement Projects, PAKISTAN.
Duration: 03 March 2004 to 11 October 2004.
Position: HSE Supervisor.
Project: 1450MW Ghazi Brotha Hydro Power Project
PAKISTAN.
Duration: 05 August 2002 to 02 March 2004.
Position: HSE Supervisor.
Project: Ibrahim Fiber Phase-II Faisalabad, PAKISTAN.
Duration: 19 May 2001 to 02 July 2002.
Position: HSE Supervisor.
Project: 184MW Chashma Hydro Power Project PAKISTAN.
Duration: 08 April 1999 to 26 March 2001.
Position: Assistant HSE Supervisor.
7. Page 7 of 7
AApppprreecciiaattiioonn::
Received appreciation letter from GE in Uch power major outage 2006
Received appreciation letter from AES in Amman east power plant Jordan
CCOOMMPPUUTTEERR SSKKIILLLLSS
Internet (Browsing, Searching, Surfing & E-mailing)
MMSS OOFFFFIICCEE
MS Word.
MS Excel.
MS Outlook
Personal information:
Father Name Ghulam Rasool
Date of Birth January 01, 1979
NIC # 36401-0878512-9
Passport # AD9805122 valid till 2017
Nationality Pakistani
Religion Islam
Marital Status Married
Address Chack No. 22 / EB, Tehsil: Arifwalla, District: Pakpatan.