SlideShare a Scribd company logo
Mihir K.Rana
301-Pushpa Vihar, Vasant Residency,
Adarsh Nagar, Near Maruti Sai Service
Mahim Road,Palghar (W),Dist- Palghar,
M.S.(INDIA) 401404.
Email-Id: mihir27rana@gmail.com
Contact: 8766722854, 9158696867.
Profile:
An Electrical Engineer with 2+ years of experience working with “Ansons Electro Mechanical Works,
Palghar” Electrical Motor and Pump Set Manufacturing Company. Looking into all aspects of Production and
quality as well as Testing as per BIS guiding and maintaining 5’s on shop floor.
Work Experience:
Presently working with “ANSONS ELECTRO MECHANICAL WORKS” as all aspects of Production Engineer.
Company Profile: One of the leading manufacturers and exporters of 3 Phase / 1 Phase Energy Efficient
Induction motor for ABB India Limited (Frame 71/80/90/132/160 & 180) & Pump Set for Crompton greaves
India Limited. Ansons is ISO 9001:2015 DNV Certify Company.
Designation: Engineer (Production).
Period: April 2016 to Present.
Field of Interests
Planning, Production, Maintenance & Breakdown, Manufacturing, Overhaling, Process & Research, Design &
Development, Electrical Hardware and Software Troubleshooting.
Core profile Senior Engineer Electrical
 Meeting production targets as per the daily and monthly plan.
 Line balancing and man power management.
 Coordinating with various depts. like planning, purchase and quality.
 Responsible for process improvement for reducing rejections and process time.
 Reporting and analyzing daily hourly loss data of different workstations.
 Regularly monitoring the KANBAN process for sustainability.
 Kaizen for process improvement.
 Effectively contribute to the overall team / company targets.
 Monitor housekeeping, maintain clean & tidy work place.
 Supervise, motivate technicians to build a high-performance culture
 Constantly monitor existing processes and continually drive Improvement Projects.
 To take appropriate corrective and preventive actions to improve the production process.
 Group Leader for implementation of 5S.
Supporting Profile Test Floor Engineer
 Testing of motors as per IEC 60034-2-1.
 Currently looking into “Energy Efficient Induction motor” Type Test testing according to IS 12615 as
per BIS & IEC-60034-2-1, IEEE-112-B Method.
 Worked jointly on the new project for ABB Global Motors (Energy Efficient Motors) with Senior ABB
Staff for Setting-up complete Setup of Type Test Lab at “Ansons Electro Mechanical Works” for
Electric Motor Type Testing Lab As per IS 12615 & Standard According to European testing model
IEC 60034-2-1/IEEE-112 Method B.
 Experience of TESTING AND COMMISSIONING OF ABB Drives like ACS800-11-0060-5, ACS800-
11-0020-3, ACS880-104-0018A-3 VFD.
 Experience of Troubleshooting AC & DC VFD (ABB).
 Quality Control and Quality Assurance of overall product in process as well as Final product Inspection.
 Responsible for maintaining calibration of all measuring & monitoring instruments & devices.
 Responsible for preparation of Testing Scheme Process Flow Chart, Inspection Formats, Standard
Operating Procedures (SOP’s) & work Instructions and ensuring sustainability of the same.
 Led the project for making new prototypes of IE2/IE3 71/80/90/160 motors for ABB India Limited.
 Inspection of Winding before and after pressing into stator.
 Routine Test and Pump Testing.
 Inspection of wire gauges, slot paper quality, sleeves etc.
 Planning shop floor activities according to layout.
 All IS related to Electric motor and Pump sets.
 Design & Development related Inspection & Testing.
 ISO/BIS Audit quality related documentation. To schedule production activity.
 To conduct maintenance activity according to maintenance schedule plan.
 To prepare documentations for ISO/BIS/ATEX Certification.
 Maintained strong vendor relationships; working with vendors to communicate quality and delivery
issues.
Education:
Bachelors of Technology (B.Tech Electrical Engg) from RIT,sakharale, Sangli (2016). (SPI 6.59)
10+2 from S.D.S.M College, Palghar. (57.65)
10th from Twinkle Star English High School, Palghar. (64.97%)
Technical / Computer Skills:
MS-CIT, Hardware Repairing, Operating System: Window-98, 2000, XP, & 2007, 2010. Corel Draw,
Photoshop, Knowledge of MATLAB, Good Command on Computer, Auto-CAD, PLC-Automation.
Academic Projects:
Final Year Project Duration: 2015- 2016
Title: Design and Implementation of “MPPT for Solar System”
Status: Completed
Team Size : 3
Summary : We can achieve these goals by using various technique and algorithms like perturb and
observe, PSO, ABC, Fuzzy logic control etc. Here we are using temperature control to design our MPPT
tracking solar system. The main objective of our project is to implement for residential as an alternative source
of energy.
Training:
1. Summer Internship Training at Reliance Infrastructure Ltd., 2 x 250 MW Dahanu Thermal Power
Station (DTPS).
2. Summer Internship Training at Distribution Transformer manufacture and repair/maintains company at
Palghar. (Two months).
Hobbies:
Travelling, Playing Computer Games, Cooking.
Personal Memoranda:
Date of Birth : 27th March 1991
Marital Status : Single
Gender : Male
Languages Know : English, Gujarati, Hindi, Marathi
Nationality : Indian
Religion : Hindu
Declaration:
I hereby declare that the information furnished above is correct and true to the best of my knowledge and belief.
Date: Mr. Mihir Khimjibhai Rana
Place: Palghar (Electrical Engineer)

More Related Content

What's hot (20)

ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
 
KAMLESH KUMAR YADAV
KAMLESH KUMAR YADAVKAMLESH KUMAR YADAV
KAMLESH KUMAR YADAV
 
ankitbarot(cgpa) - Copy
ankitbarot(cgpa) - Copyankitbarot(cgpa) - Copy
ankitbarot(cgpa) - Copy
 
harish kumar soni - Copy (2)
harish kumar soni - Copy (2)harish kumar soni - Copy (2)
harish kumar soni - Copy (2)
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
Waheed Bhutto Resume
Waheed Bhutto ResumeWaheed Bhutto Resume
Waheed Bhutto Resume
 
Process Engineer and Production Engineer
Process Engineer and Production EngineerProcess Engineer and Production Engineer
Process Engineer and Production Engineer
 
AK CV
AK CVAK CV
AK CV
 
5.12.15
5.12.155.12.15
5.12.15
 
Pramesak Poonthong
Pramesak PoonthongPramesak Poonthong
Pramesak Poonthong
 
Javaid
JavaidJavaid
Javaid
 
Avnish Pandey Resume
Avnish Pandey ResumeAvnish Pandey Resume
Avnish Pandey Resume
 
Resume
ResumeResume
Resume
 
RAJEEV_KUMAR_SHUKLA
RAJEEV_KUMAR_SHUKLARAJEEV_KUMAR_SHUKLA
RAJEEV_KUMAR_SHUKLA
 
0.RESUME
0.RESUME0.RESUME
0.RESUME
 
Resume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHIDResume-AREFIN A. TAUHID
Resume-AREFIN A. TAUHID
 
Sunil_CV-A
Sunil_CV-ASunil_CV-A
Sunil_CV-A
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 

Similar to Cv (20)

ashi new
ashi newashi new
ashi new
 
CV Pratik Rumde(BE Electrical) new
CV Pratik Rumde(BE Electrical) newCV Pratik Rumde(BE Electrical) new
CV Pratik Rumde(BE Electrical) new
 
cpk
cpkcpk
cpk
 
Manager Masud Khan CV New
Manager Masud Khan CV NewManager Masud Khan CV New
Manager Masud Khan CV New
 
Ajay's Resume
Ajay's ResumeAjay's Resume
Ajay's Resume
 
dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016
 
HARISH1 (1)
HARISH1 (1)HARISH1 (1)
HARISH1 (1)
 
vishal maurya(1)(1)
vishal maurya(1)(1)vishal maurya(1)(1)
vishal maurya(1)(1)
 
ROOP(1)
ROOP(1)ROOP(1)
ROOP(1)
 
Manager masud khan cv new
Manager masud khan cv newManager masud khan cv new
Manager masud khan cv new
 
Amit cv
Amit cvAmit cv
Amit cv
 
aravinth res-1
aravinth res-1aravinth res-1
aravinth res-1
 
Upender CV
Upender CVUpender CV
Upender CV
 
Upender CV
Upender CVUpender CV
Upender CV
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
Resume_Shakti Patra
Resume_Shakti PatraResume_Shakti Patra
Resume_Shakti Patra
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Karthik Updated (1)
Karthik Updated (1)Karthik Updated (1)
Karthik Updated (1)
 
kambha resume
kambha resumekambha resume
kambha resume
 
Resume_Laxmikant
Resume_LaxmikantResume_Laxmikant
Resume_Laxmikant
 

Recently uploaded

Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 

Recently uploaded (20)

Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 

Cv

  • 1. Mihir K.Rana 301-Pushpa Vihar, Vasant Residency, Adarsh Nagar, Near Maruti Sai Service Mahim Road,Palghar (W),Dist- Palghar, M.S.(INDIA) 401404. Email-Id: mihir27rana@gmail.com Contact: 8766722854, 9158696867. Profile: An Electrical Engineer with 2+ years of experience working with “Ansons Electro Mechanical Works, Palghar” Electrical Motor and Pump Set Manufacturing Company. Looking into all aspects of Production and quality as well as Testing as per BIS guiding and maintaining 5’s on shop floor. Work Experience: Presently working with “ANSONS ELECTRO MECHANICAL WORKS” as all aspects of Production Engineer. Company Profile: One of the leading manufacturers and exporters of 3 Phase / 1 Phase Energy Efficient Induction motor for ABB India Limited (Frame 71/80/90/132/160 & 180) & Pump Set for Crompton greaves India Limited. Ansons is ISO 9001:2015 DNV Certify Company. Designation: Engineer (Production). Period: April 2016 to Present. Field of Interests Planning, Production, Maintenance & Breakdown, Manufacturing, Overhaling, Process & Research, Design & Development, Electrical Hardware and Software Troubleshooting. Core profile Senior Engineer Electrical  Meeting production targets as per the daily and monthly plan.  Line balancing and man power management.  Coordinating with various depts. like planning, purchase and quality.  Responsible for process improvement for reducing rejections and process time.  Reporting and analyzing daily hourly loss data of different workstations.  Regularly monitoring the KANBAN process for sustainability.  Kaizen for process improvement.  Effectively contribute to the overall team / company targets.  Monitor housekeeping, maintain clean & tidy work place.  Supervise, motivate technicians to build a high-performance culture  Constantly monitor existing processes and continually drive Improvement Projects.  To take appropriate corrective and preventive actions to improve the production process.  Group Leader for implementation of 5S.
  • 2. Supporting Profile Test Floor Engineer  Testing of motors as per IEC 60034-2-1.  Currently looking into “Energy Efficient Induction motor” Type Test testing according to IS 12615 as per BIS & IEC-60034-2-1, IEEE-112-B Method.  Worked jointly on the new project for ABB Global Motors (Energy Efficient Motors) with Senior ABB Staff for Setting-up complete Setup of Type Test Lab at “Ansons Electro Mechanical Works” for Electric Motor Type Testing Lab As per IS 12615 & Standard According to European testing model IEC 60034-2-1/IEEE-112 Method B.  Experience of TESTING AND COMMISSIONING OF ABB Drives like ACS800-11-0060-5, ACS800- 11-0020-3, ACS880-104-0018A-3 VFD.  Experience of Troubleshooting AC & DC VFD (ABB).  Quality Control and Quality Assurance of overall product in process as well as Final product Inspection.  Responsible for maintaining calibration of all measuring & monitoring instruments & devices.  Responsible for preparation of Testing Scheme Process Flow Chart, Inspection Formats, Standard Operating Procedures (SOP’s) & work Instructions and ensuring sustainability of the same.  Led the project for making new prototypes of IE2/IE3 71/80/90/160 motors for ABB India Limited.  Inspection of Winding before and after pressing into stator.  Routine Test and Pump Testing.  Inspection of wire gauges, slot paper quality, sleeves etc.  Planning shop floor activities according to layout.  All IS related to Electric motor and Pump sets.  Design & Development related Inspection & Testing.  ISO/BIS Audit quality related documentation. To schedule production activity.  To conduct maintenance activity according to maintenance schedule plan.  To prepare documentations for ISO/BIS/ATEX Certification.  Maintained strong vendor relationships; working with vendors to communicate quality and delivery issues. Education: Bachelors of Technology (B.Tech Electrical Engg) from RIT,sakharale, Sangli (2016). (SPI 6.59) 10+2 from S.D.S.M College, Palghar. (57.65) 10th from Twinkle Star English High School, Palghar. (64.97%) Technical / Computer Skills: MS-CIT, Hardware Repairing, Operating System: Window-98, 2000, XP, & 2007, 2010. Corel Draw, Photoshop, Knowledge of MATLAB, Good Command on Computer, Auto-CAD, PLC-Automation.
  • 3. Academic Projects: Final Year Project Duration: 2015- 2016 Title: Design and Implementation of “MPPT for Solar System” Status: Completed Team Size : 3 Summary : We can achieve these goals by using various technique and algorithms like perturb and observe, PSO, ABC, Fuzzy logic control etc. Here we are using temperature control to design our MPPT tracking solar system. The main objective of our project is to implement for residential as an alternative source of energy. Training: 1. Summer Internship Training at Reliance Infrastructure Ltd., 2 x 250 MW Dahanu Thermal Power Station (DTPS). 2. Summer Internship Training at Distribution Transformer manufacture and repair/maintains company at Palghar. (Two months). Hobbies: Travelling, Playing Computer Games, Cooking. Personal Memoranda: Date of Birth : 27th March 1991 Marital Status : Single Gender : Male Languages Know : English, Gujarati, Hindi, Marathi Nationality : Indian Religion : Hindu Declaration: I hereby declare that the information furnished above is correct and true to the best of my knowledge and belief. Date: Mr. Mihir Khimjibhai Rana Place: Palghar (Electrical Engineer)