CSE-Transtel PTE LTD
A Member of CSE Global Group of Companies
AGENDA
• Introduction to CSE Global Ltd
• Introduction to CSE-Transtel Pte Ltd
• Capability, Competencies & Solutions
• Customer References
• HSE Orientation for Visitors to Our Office
CSE Global – Global Technology Group
CSE Group Organisation Chart
Board of Directors
Group CEO
Alan Stubbs
CSE Global (UK)
Alan Stubbs - MD
CSE Servelec
CSE
Healthcare
Systems
CSE Controls
CSE Global (USA)
Rick Lynn - CEO
W-Industries
WI-Louisiana
CSE Global (Australia)
Roy Rowe - CEO
CSE Uniserve
CSE-WAF
New Zealand
CSE-Transtel
Australia
CSE-CX
Distribution
CSE
Comsource
CSE Global (Asia)
Lim Boon Kheng - MD
CSE-Hankin
ITS/IAP/EIS
Singapore
CSE-China
CSE-Transtel
Tan Goh Beng - MD
Middle East
Asia
A3E
(Africa,
America,
Australia &
Europe)
CSE Semaphone
William Ketelhut - MD
CSE
Semaphore
Belgium
CSE
Semaphore
Inc
CSE
Semaphore
Australia
CSE-Transtel Pte Ltd
• CSE-Transtel Pte Ltd is a wholly owned subsidiary of CSE
Global Ltd with over 200 employees.
• CSE-Transtel Pte Ltd, a leading telecommunications system
engineering and integration company, provides turnkey projects
and solutions for Oil & Gas and Mining industries.
TECHNOLOGICAL EXCELLENCE THROUGH
INNOVATION
• CSE Transtel delivers mission critical communications
systems to oil and gas, petrochemicals, energy
industries and mining customers anywhere in the
world
• For every challenge that our customer is facing, we
have the right solution to meet today's and tomorrow's
customers communications requirements. With over
14 years of experience, CSE Transtel has become a
premier telecom system integrator and provides
“Customer Satisfaction Every time”
CSE-Transtel Pte Ltd – History
1997
• Incorporation of Transtel Engineering Pte Ltd
1999
• Opening of first overseas operation in Indonesia
2001
• Acquisition by CSE Global Ltd
2002
• Opening of first operation in the Middle East
2003
• Opening of first operation in Africa
2011
• Acquisition of ASTIB group by CSE Global Ltd to be rebranded CSE-Transtel
AUSTRALIA PTY LTD.
2011
• Transtel Engineering Pte Ltd is renamed CSE-Transtel PTE LTD
Organisation Chart
Management
Office
HQ Corporate Functions
HR/Admin/IT
Finance/
Procurement/
Logistics/
Integration Centre
Project
Governance
QAQC/HSE
Contract
Management
Competency &
Productivity
Development
Business Units
Middle East
Asia
A3E
(Africa,America,Australia
& Europe)
CSE-Transtel LOCATIONS
CSE-Transtel Pte Ltd
1 Jalan Kilang #06-00
Singapore 159402
Tel : 65-6276-7600
Fax : 65-6276-7800
www.cse-transtelsg.com
PT Transtel Engineering
Menara Bidakara 2,
10th Floor, Jl.Jend. Gatot
Subroto. Kav 71-73,
Pancoran, Jakarta 12870,
Indonesia
Transtel Engineering
Nigeria Ltd 10 Rumuogba
Estate Road
Port Harcourt
Rivers State of Nigeria
Transtel Engineering PNG
Limited PO Box 981,
Waigani
National Capital District
Papua New Guinea
Transtel Engineering Arabia
Limited Co
1st Floor, Air Line Center
Building
PO.Box # 691 , Al-Khobar -31932
Kingdom of Saudi Arabia
Transtel Engineering Tianjin Co.Ltd
Room 1702 B Wing, International
Building,JIA #18 South Street,
Zhongguancun, Haidian District,
Beijing City, China
Transtel Engineering Pte Ltd
PO.BOX 43745
Office 401, Makeen Tower
Tourist Club Area, Abu Dhabi UAE
CSE-Transtel Pte Ltd - Capability
DESIGN
ENGINEERING
PROJECT
MANAGEMENT
PROCUREMENT
SYSTEM
INTEGRATION
AND TESTING
INSTALLATION
AND
COMMISSIONING
WARRANTY
AND AFTER
SALES
SUPPORT
FEED AND
CONSULTANCY
SERVICE
CSE-Transtel - Certification
ISO9001/2008 ISO14001/2004 ISO18001/2007
Competencies
A range of complete turnkey solutions to meet customers
communications requirements, today and tomorrow.
Transmission
system
•SDH/PDH
•LAN/WAN
•MPLS
•Industrial
Ethernet
•WIFI
•Wimax
•Microwave
•VSAT
Security system
•CCTV
•ACS
•Intrusion
detection
•People On
Board
•E-mustering
• Man of Board
•Fence intrusion
detection
•Security Radar
system
•LRAD system
On-plant
communication
•Public address
and General
Alarm
•Intercom and
page Party
•Telephony
system
•Hotline
•Powerless
phone
Navigation
system
•Radar system
•ECDIS
•AIS
•Navigation light
•Berthing aids
•GMDSS
•Navtex
•Weathertex
•DGPS
•Gyrocompass
•Positioning
•Pilot console
Radio system
•UHF
Conventional
radio
•VHF marine
•VHF aeronautical
•MF/HF
•NDB
Telemetry and
sensor
•Meteo system
•SCADA
•Telemetry Radio
•Oceanological
system
INTEGRATED VOICE AND DATA
COMMUNICATION
VSAT Satellite Communication Systems
FIBER OPTIC NETWORK AND
TRANSMISSION SYSTEM
FIBER OPTIC NETWORK AND
TRANSMISSION SYSTEM
FIBER OPTIC NETWORK AND
TRANSMISSION SYSTEM
ROUTER
SITE - 1
RTU
SCADA
WORKSTATION
ROUTER
MODEM
SITE - 10
RTU
ROUTER
SITE - 11
RTU
ROUTER
SITE - 9
RTU
ROUTER
SITE - 29
RTU
SCADA
WORKSTATION
ROUTER
MODEM
RTU
ROUTER
MODEM
HEAD
OFFICE
CONTROLER
SYSTEM
LAN A LAN B
MODEM
SITE - 30
RING 1 (SCADA 1 / WORKSTATION)
RING 2 (SCADA 2 / RTU)
SYNC. / ASYN. SYNC. / ASYN.
SDH / STM-1
BACKBONE
LOGICAL RING
CONVENTIONAL AND DIGITAL RADIO
SYSTEM
POINT TO POINT MICROWAVE SYSTEM
POINT TO MULTIPOINT SYSTEM
PAGA SYSTEM
INTEGRATED SECURITY SYSTEM
MARKET SECTOR
CSE –
Transtel
Oil and gas
Power plant
Petrochemical
Mining
Front End Engineering Design (FEED)
Information
gathering
• Define telecommunication
requirement
• Establish design criteria
Basic
engineering
• Telecom philosophy
• System specification
• Detailed drawings
• Initial calculation report
Estimation
• Technical Bid Evaluation format
• Manufacturer Pre-selection
• Initial budgeting
Engineering, Procurement and commissioning
service
Project Management
•Define detailed
scope of works
•Project planning
•Reporting
•Risk management
•Cost control
Detailed Engineering
•Functional design
specification
•Block diagram
•Installation drawings
•Design reports
•Calculation reports
•Bill of Materials
Procurement
•Sourcing globally
•Purchasing
•Expediting
Integration and
testing
•Integration
•Over 400 cabinets
capacity
•Fully equipped with
tools and test
equipment
•Full scale Factory
acceptance test
(FAT)
•Full scale System
integration tests (SIT)
•Inspection
•Packing and
Shipping
Field service
•Installation
•Site supervision
•Commissioning
•On site training
Maintenance
With our unique systems technical
knowledge, practical experience
and plant familiarisation on projects,
we are in a perfect position to
provide engineering maintenance
services.
Design Studies (PAGA System Sound Analysis
& Coverage Studies)
We provide sound coverage
analysis which simulates the
Signal/Noise ratio and SPL to be
expected at any location in the
plant.
Speakers are modelled using
accurate sound pressure contour
provided by the speaker
manufacturer.
Design Studies (Radio Propagation Study)
Predict the coverage boundary for hand
held radios and vehicle mounted radios
used using Path Loss 4.0. This provides
precise information on the tower
required and antenna height for the
base station.
Design Studies (CCTV Coverage Study)
Predict the viewing coverage of each
camera for each specific Lens, zoom. It
provides height of camera and angle of
installation.
Global Customer (EPC Contractor)
Global Customers (EPC Contractor)
Global Customers (EPC Contractor)
Global Customers (END USER)
Global Customers (END USER)
Global Customers (END USER)
FOR MORE INFORMATION
CSE-Transtel PTE LTD
1 JALAN KILANG #06-00
Singapore 159402
TEL: +65 62767600
FAX: +65 62767800
sales@cse-transtelsg.com
For more information please visit us at
www.cse-transtel.com
Cse trans tel corporate presentation (2013)

Cse trans tel corporate presentation (2013)

  • 1.
    CSE-Transtel PTE LTD AMember of CSE Global Group of Companies
  • 2.
    AGENDA • Introduction toCSE Global Ltd • Introduction to CSE-Transtel Pte Ltd • Capability, Competencies & Solutions • Customer References • HSE Orientation for Visitors to Our Office
  • 3.
    CSE Global –Global Technology Group
  • 4.
    CSE Group OrganisationChart Board of Directors Group CEO Alan Stubbs CSE Global (UK) Alan Stubbs - MD CSE Servelec CSE Healthcare Systems CSE Controls CSE Global (USA) Rick Lynn - CEO W-Industries WI-Louisiana CSE Global (Australia) Roy Rowe - CEO CSE Uniserve CSE-WAF New Zealand CSE-Transtel Australia CSE-CX Distribution CSE Comsource CSE Global (Asia) Lim Boon Kheng - MD CSE-Hankin ITS/IAP/EIS Singapore CSE-China CSE-Transtel Tan Goh Beng - MD Middle East Asia A3E (Africa, America, Australia & Europe) CSE Semaphone William Ketelhut - MD CSE Semaphore Belgium CSE Semaphore Inc CSE Semaphore Australia
  • 5.
    CSE-Transtel Pte Ltd •CSE-Transtel Pte Ltd is a wholly owned subsidiary of CSE Global Ltd with over 200 employees. • CSE-Transtel Pte Ltd, a leading telecommunications system engineering and integration company, provides turnkey projects and solutions for Oil & Gas and Mining industries.
  • 6.
    TECHNOLOGICAL EXCELLENCE THROUGH INNOVATION •CSE Transtel delivers mission critical communications systems to oil and gas, petrochemicals, energy industries and mining customers anywhere in the world • For every challenge that our customer is facing, we have the right solution to meet today's and tomorrow's customers communications requirements. With over 14 years of experience, CSE Transtel has become a premier telecom system integrator and provides “Customer Satisfaction Every time”
  • 7.
    CSE-Transtel Pte Ltd– History 1997 • Incorporation of Transtel Engineering Pte Ltd 1999 • Opening of first overseas operation in Indonesia 2001 • Acquisition by CSE Global Ltd 2002 • Opening of first operation in the Middle East 2003 • Opening of first operation in Africa 2011 • Acquisition of ASTIB group by CSE Global Ltd to be rebranded CSE-Transtel AUSTRALIA PTY LTD. 2011 • Transtel Engineering Pte Ltd is renamed CSE-Transtel PTE LTD
  • 8.
    Organisation Chart Management Office HQ CorporateFunctions HR/Admin/IT Finance/ Procurement/ Logistics/ Integration Centre Project Governance QAQC/HSE Contract Management Competency & Productivity Development Business Units Middle East Asia A3E (Africa,America,Australia & Europe)
  • 9.
    CSE-Transtel LOCATIONS CSE-Transtel PteLtd 1 Jalan Kilang #06-00 Singapore 159402 Tel : 65-6276-7600 Fax : 65-6276-7800 www.cse-transtelsg.com PT Transtel Engineering Menara Bidakara 2, 10th Floor, Jl.Jend. Gatot Subroto. Kav 71-73, Pancoran, Jakarta 12870, Indonesia Transtel Engineering Nigeria Ltd 10 Rumuogba Estate Road Port Harcourt Rivers State of Nigeria Transtel Engineering PNG Limited PO Box 981, Waigani National Capital District Papua New Guinea Transtel Engineering Arabia Limited Co 1st Floor, Air Line Center Building PO.Box # 691 , Al-Khobar -31932 Kingdom of Saudi Arabia Transtel Engineering Tianjin Co.Ltd Room 1702 B Wing, International Building,JIA #18 South Street, Zhongguancun, Haidian District, Beijing City, China Transtel Engineering Pte Ltd PO.BOX 43745 Office 401, Makeen Tower Tourist Club Area, Abu Dhabi UAE
  • 10.
    CSE-Transtel Pte Ltd- Capability DESIGN ENGINEERING PROJECT MANAGEMENT PROCUREMENT SYSTEM INTEGRATION AND TESTING INSTALLATION AND COMMISSIONING WARRANTY AND AFTER SALES SUPPORT FEED AND CONSULTANCY SERVICE
  • 11.
    CSE-Transtel - Certification ISO9001/2008ISO14001/2004 ISO18001/2007
  • 12.
    Competencies A range ofcomplete turnkey solutions to meet customers communications requirements, today and tomorrow. Transmission system •SDH/PDH •LAN/WAN •MPLS •Industrial Ethernet •WIFI •Wimax •Microwave •VSAT Security system •CCTV •ACS •Intrusion detection •People On Board •E-mustering • Man of Board •Fence intrusion detection •Security Radar system •LRAD system On-plant communication •Public address and General Alarm •Intercom and page Party •Telephony system •Hotline •Powerless phone Navigation system •Radar system •ECDIS •AIS •Navigation light •Berthing aids •GMDSS •Navtex •Weathertex •DGPS •Gyrocompass •Positioning •Pilot console Radio system •UHF Conventional radio •VHF marine •VHF aeronautical •MF/HF •NDB Telemetry and sensor •Meteo system •SCADA •Telemetry Radio •Oceanological system
  • 15.
    INTEGRATED VOICE ANDDATA COMMUNICATION
  • 16.
  • 17.
    FIBER OPTIC NETWORKAND TRANSMISSION SYSTEM
  • 18.
    FIBER OPTIC NETWORKAND TRANSMISSION SYSTEM
  • 19.
    FIBER OPTIC NETWORKAND TRANSMISSION SYSTEM ROUTER SITE - 1 RTU SCADA WORKSTATION ROUTER MODEM SITE - 10 RTU ROUTER SITE - 11 RTU ROUTER SITE - 9 RTU ROUTER SITE - 29 RTU SCADA WORKSTATION ROUTER MODEM RTU ROUTER MODEM HEAD OFFICE CONTROLER SYSTEM LAN A LAN B MODEM SITE - 30 RING 1 (SCADA 1 / WORKSTATION) RING 2 (SCADA 2 / RTU) SYNC. / ASYN. SYNC. / ASYN. SDH / STM-1 BACKBONE LOGICAL RING
  • 20.
  • 21.
    POINT TO POINTMICROWAVE SYSTEM
  • 22.
  • 23.
  • 24.
  • 25.
    MARKET SECTOR CSE – Transtel Oiland gas Power plant Petrochemical Mining
  • 26.
    Front End EngineeringDesign (FEED) Information gathering • Define telecommunication requirement • Establish design criteria Basic engineering • Telecom philosophy • System specification • Detailed drawings • Initial calculation report Estimation • Technical Bid Evaluation format • Manufacturer Pre-selection • Initial budgeting
  • 27.
    Engineering, Procurement andcommissioning service Project Management •Define detailed scope of works •Project planning •Reporting •Risk management •Cost control Detailed Engineering •Functional design specification •Block diagram •Installation drawings •Design reports •Calculation reports •Bill of Materials Procurement •Sourcing globally •Purchasing •Expediting Integration and testing •Integration •Over 400 cabinets capacity •Fully equipped with tools and test equipment •Full scale Factory acceptance test (FAT) •Full scale System integration tests (SIT) •Inspection •Packing and Shipping Field service •Installation •Site supervision •Commissioning •On site training
  • 28.
    Maintenance With our uniquesystems technical knowledge, practical experience and plant familiarisation on projects, we are in a perfect position to provide engineering maintenance services.
  • 29.
    Design Studies (PAGASystem Sound Analysis & Coverage Studies) We provide sound coverage analysis which simulates the Signal/Noise ratio and SPL to be expected at any location in the plant. Speakers are modelled using accurate sound pressure contour provided by the speaker manufacturer.
  • 30.
    Design Studies (RadioPropagation Study) Predict the coverage boundary for hand held radios and vehicle mounted radios used using Path Loss 4.0. This provides precise information on the tower required and antenna height for the base station.
  • 31.
    Design Studies (CCTVCoverage Study) Predict the viewing coverage of each camera for each specific Lens, zoom. It provides height of camera and angle of installation.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
    FOR MORE INFORMATION CSE-TranstelPTE LTD 1 JALAN KILANG #06-00 Singapore 159402 TEL: +65 62767600 FAX: +65 62767800 sales@cse-transtelsg.com For more information please visit us at www.cse-transtel.com

Editor's Notes

  • #13 This often involve multiple technologies from many sources such as:
  • #27 Conceptual engineering and FEED work is one of our core expertise and activities. We provide our clients with developing and defining their telecommunication requirements and establishing the criteria of achieving these requirements.
  • #28 The detailed engineering design work is the core function of our work and deliverables to the client. In addition, our integration centre is fully equipped to stage full scale factory acceptance tests (FATs) and system Integration Tests (SIT) witnessed by our client prior to the shipment of the equipment to project site.