SlideShare a Scribd company logo
Change Request - Management Process Operations
Mobile Network Operations Change Request Form
Change Submitters are required to fill out section 1 of the CR completely and attach all relevant
documentation before handing it in for technical approval. Please mark fields with an ‘x’.
Section 2 will be filled out by the Change Approvers.
Note: Notification before work starts and feedback must be given by the change Implementer to the NOC
upon completion of work!
1. Change Request (CR)
CR Reference No
(To Be Assigned by
Change Manager)
Date (dd/mm/yy)
Change Submitter’s
Details
Name Edward Okoth
Department Networks
Position RAN Design& Optimization Engineer
e-Mail Edward.okoth.ext@nokia.com
Phone No +256751323077
System / Network
Element
BS
RAN
1. Hop Name SW Upgrade
Requested Outage
Date and Time
(Subject to Approval)
Start Date (dd/mm/yy)
Start Time
(hh:mm)
12:00Hrs
End Date (dd/mm/yy) End Time
(hh:mm)
23:00Hrs
2. Hop Name SW Upgrade
Requested Outage
Date and Time
(Subject to Approval)
Start Date (dd/mm/yy)
Start Time
(hh:mm)
End Date (dd/mm/yy)
End Time
(hh:mm)
3. Hop Name
Requested Outage
Date and Time
(Subject to Approval)
Start Date (dd/mm/yy)
Start Time
(hh:mm)
End Date (dd/mm/yy)
End Time
(hh:mm)
Roll-back Trigger Time Dates (dd/mm/yy)
Time
(hh:mm)
Implemented change
monitoring period
1Hrs
Detailed Description
of Change Requested
RAN 14 feature aimed at call drop reduction.
Reasons for Change
Requested / Results to
Be Obtained
To activate the call re-establishment feature in RNC AHRNC01 and BURNC02
Risk Analysis:
Impact of Change
Requested on Network
/ Service
NEs / Services Affected
AHRNC01/BURNC01 and the sites for both RNCs
NEs / Services Potentially Affected
Not sevice affecting
Performance Degradation
crforcallreestablishment-150821224140-lva1-app6892.doc
1/4
Change Request - Management Process Operations
Loss of Redundancy Protection
Design
Other
Dependencies
Has the Change
Requested Been
Tested?
If Yes, Attach Test
Documents.
Yes No
If Yes, State Results: If No, Give Reasons:
In Case the Change
Has Not Been Tested:
Has the Change
Requested Been
Implemented Before?
Yes No
If Yes, When and Where?
List
Departments/Names
That Should Be
Notified of Change
Requested or that
have dependencies
upon.
Core X Radio
TX VAS
X OSS IT
Power Fixed
IN Names added
Resource Plan (ASP)
1. Project Manager
Name Edward okoth
e-Mail Edward.okoth.ext@nokia.com
Phone No +25671323077
2. Implementation Engineer 2
Name William Mpuuga
e-Mail William.mpuuga@airtel.co.ug
Phone No +256704005066
3. Implementation Engineer 3
Name Jerome Lubega
e-Mail Jerome.lubega@airtel.co.ug
Phone No +256 704005665
Escalation Path
(ERICSSON)
1. Project Manager
Name
e-Mail
Phone No
2. Implementation Manager
Name
e-Mail
Phone No
3. On-site Supervisor
Name
e-Mail
Phone No
crforcallreestablishment-150821224140-lva1-app6892.doc
2/4
Change Request - Management Process Operations
4. Other
Name
e-Mail
Phone No
Attached
Documentation*
Other:
* Additional documentation may be required for certain types of CRs.
crforcallreestablishment-150821224140-lva1-app6892.doc
3/4
Change Request - Management Process Operations
2. Approvals
Submitters must hand in the CR to the MS technical Approver of the respective area first. If he approves it,
he will pass it on to the Airtel technical Approver. If he approves it, he will pass it on to the MS Ops Director
who will take it to the update the Airtel ND. The timeslot in case of dependencies with other planned work
may be changed.
MS technical Approver
Approver’s Name
Department Position
e-Mail Phone No
Approved Yes No
Date (dd/mm/yy)
Additional Remarks
Signature
Airtel technical Approver
Approver’s Name
Department Position
e-Mail Phone No
Approved Yes No
Date (dd/mm/yy)
Additional Remarks
Signature
Approved execution of the activity (atleast 4 days after the approval date)
Scheduled Date and Time
Start Date (dd/mm/yy) Start Time (hh:mm)
End Date (dd/mm/yy) End Time (hh:mm)
Scheduled Outage Time
(If Applicable)
Start Date (dd/mm/yy) Start Time (hh:mm)
End Date (dd/mm/yy) End Time (hh:mm)
Completion of
Implemented change
monitoring period
(recommended 48 hrs)
Date (dd/mm/yy) Time (hh:mm)
Reasons for New Timeslot
(If Applicable)
Additional Remarks
MS Operations Director Airtel Network Director
crforcallreestablishment-150821224140-lva1-app6892.doc
4/4

More Related Content

Viewers also liked

Explorando o splunk
Explorando o splunkExplorando o splunk
Explorando o splunk
Jamildo Feitosa
 
Change request form
Change request formChange request form
Change request form
sanddrap
 
Requirement Change Request Template
Requirement Change Request TemplateRequirement Change Request Template
Requirement Change Request Template
sanjeev085
 
Change request form_template
Change request form_templateChange request form_template
Change request form_templaterac2
 
SharePoint Configuration Management – Effective Techniques for Regulated Shar...
SharePoint Configuration Management – Effective Techniques for Regulated Shar...SharePoint Configuration Management – Effective Techniques for Regulated Shar...
SharePoint Configuration Management – Effective Techniques for Regulated Shar...
Montrium
 
Software Development : Change Request Template
Software Development : Change Request TemplateSoftware Development : Change Request Template
Software Development : Change Request Template
OpenThink Labs
 
Change Control Form
Change Control FormChange Control Form
Exemplo de Requisição de Mudança ITIL
Exemplo de Requisição de Mudança ITILExemplo de Requisição de Mudança ITIL
Exemplo de Requisição de Mudança ITIL
Fernando Palma
 
ITIL - Gestão de Mudanças
ITIL - Gestão de MudançasITIL - Gestão de Mudanças
ITIL - Gestão de Mudanças
Jamildo Feitosa
 
Motivação de Equipes
Motivação de EquipesMotivação de Equipes
Motivação de Equipes
Jamildo Feitosa
 
Aula 3 - Gestão da Mudança
Aula 3 - Gestão da MudançaAula 3 - Gestão da Mudança
Aula 3 - Gestão da Mudança
Prof. Leonardo Rocha
 
Project Management Plan Template
Project Management Plan TemplateProject Management Plan Template
Project Management Plan Template
Simplilearn
 
Apresentacao Suse
Apresentacao SuseApresentacao Suse
Apresentacao Suse
Jamildo Feitosa
 

Viewers also liked (14)

Explorando o splunk
Explorando o splunkExplorando o splunk
Explorando o splunk
 
Tutorial sobre itil
Tutorial sobre itilTutorial sobre itil
Tutorial sobre itil
 
Change request form
Change request formChange request form
Change request form
 
Requirement Change Request Template
Requirement Change Request TemplateRequirement Change Request Template
Requirement Change Request Template
 
Change request form_template
Change request form_templateChange request form_template
Change request form_template
 
SharePoint Configuration Management – Effective Techniques for Regulated Shar...
SharePoint Configuration Management – Effective Techniques for Regulated Shar...SharePoint Configuration Management – Effective Techniques for Regulated Shar...
SharePoint Configuration Management – Effective Techniques for Regulated Shar...
 
Software Development : Change Request Template
Software Development : Change Request TemplateSoftware Development : Change Request Template
Software Development : Change Request Template
 
Change Control Form
Change Control FormChange Control Form
Change Control Form
 
Exemplo de Requisição de Mudança ITIL
Exemplo de Requisição de Mudança ITILExemplo de Requisição de Mudança ITIL
Exemplo de Requisição de Mudança ITIL
 
ITIL - Gestão de Mudanças
ITIL - Gestão de MudançasITIL - Gestão de Mudanças
ITIL - Gestão de Mudanças
 
Motivação de Equipes
Motivação de EquipesMotivação de Equipes
Motivação de Equipes
 
Aula 3 - Gestão da Mudança
Aula 3 - Gestão da MudançaAula 3 - Gestão da Mudança
Aula 3 - Gestão da Mudança
 
Project Management Plan Template
Project Management Plan TemplateProject Management Plan Template
Project Management Plan Template
 
Apresentacao Suse
Apresentacao SuseApresentacao Suse
Apresentacao Suse
 

Similar to Cr for call re establishment

Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...
Luis Cabrera
 
Michael Dean A+ resume #1
Michael Dean A+ resume #1Michael Dean A+ resume #1
Michael Dean A+ resume #1Michael Dean
 
Robert A Frink 11 2016 (1)
Robert A Frink  11 2016 (1)Robert A Frink  11 2016 (1)
Robert A Frink 11 2016 (1)Robert Frink
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanJames Zhang (Chi, Zhang)
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
Nicholas Naing
 
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and ProcessesDATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
clashngpinoy
 
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012Kobus Oosthuizen
 
Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015Timothy Knell
 
CV_Vinit_Kumar_Charging_Exp_6.7 yrs
CV_Vinit_Kumar_Charging_Exp_6.7 yrsCV_Vinit_Kumar_Charging_Exp_6.7 yrs
CV_Vinit_Kumar_Charging_Exp_6.7 yrsVinit Kumar
 
FRW website copy plan
FRW website copy planFRW website copy plan
FRW website copy plan
Charlesmcn2
 
Narf blank 4
Narf blank 4Narf blank 4
Narf blank 4
thomasdwang
 

Similar to Cr for call re establishment (20)

leon
leonleon
leon
 
Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...
 
Michael Dean A+ resume #1
Michael Dean A+ resume #1Michael Dean A+ resume #1
Michael Dean A+ resume #1
 
Gautam V_Resume
Gautam V_ResumeGautam V_Resume
Gautam V_Resume
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
Robert A Frink 11 2016 (1)
Robert A Frink  11 2016 (1)Robert A Frink  11 2016 (1)
Robert A Frink 11 2016 (1)
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 
OCS ENGINEER_PRAKASH S
OCS ENGINEER_PRAKASH SOCS ENGINEER_PRAKASH S
OCS ENGINEER_PRAKASH S
 
OCS ENGINEER_PRAKASH S
OCS ENGINEER_PRAKASH SOCS ENGINEER_PRAKASH S
OCS ENGINEER_PRAKASH S
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and ProcessesDATA CENTER MANAGEMENT - Business as usual tasks and Processes
DATA CENTER MANAGEMENT - Business as usual tasks and Processes
 
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012
CURRICULUM VITAE - Kobus Oosthuizen - 24-05-2012
 
David Ferguson Resume
David Ferguson ResumeDavid Ferguson Resume
David Ferguson Resume
 
Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015
 
CV_Vinit_Kumar_Charging_Exp_6.7 yrs
CV_Vinit_Kumar_Charging_Exp_6.7 yrsCV_Vinit_Kumar_Charging_Exp_6.7 yrs
CV_Vinit_Kumar_Charging_Exp_6.7 yrs
 
CV-Farhan Mushtaq
CV-Farhan MushtaqCV-Farhan Mushtaq
CV-Farhan Mushtaq
 
FRW website copy plan
FRW website copy planFRW website copy plan
FRW website copy plan
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Narf blank 4
Narf blank 4Narf blank 4
Narf blank 4
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 

Cr for call re establishment

  • 1. Change Request - Management Process Operations Mobile Network Operations Change Request Form Change Submitters are required to fill out section 1 of the CR completely and attach all relevant documentation before handing it in for technical approval. Please mark fields with an ‘x’. Section 2 will be filled out by the Change Approvers. Note: Notification before work starts and feedback must be given by the change Implementer to the NOC upon completion of work! 1. Change Request (CR) CR Reference No (To Be Assigned by Change Manager) Date (dd/mm/yy) Change Submitter’s Details Name Edward Okoth Department Networks Position RAN Design& Optimization Engineer e-Mail Edward.okoth.ext@nokia.com Phone No +256751323077 System / Network Element BS RAN 1. Hop Name SW Upgrade Requested Outage Date and Time (Subject to Approval) Start Date (dd/mm/yy) Start Time (hh:mm) 12:00Hrs End Date (dd/mm/yy) End Time (hh:mm) 23:00Hrs 2. Hop Name SW Upgrade Requested Outage Date and Time (Subject to Approval) Start Date (dd/mm/yy) Start Time (hh:mm) End Date (dd/mm/yy) End Time (hh:mm) 3. Hop Name Requested Outage Date and Time (Subject to Approval) Start Date (dd/mm/yy) Start Time (hh:mm) End Date (dd/mm/yy) End Time (hh:mm) Roll-back Trigger Time Dates (dd/mm/yy) Time (hh:mm) Implemented change monitoring period 1Hrs Detailed Description of Change Requested RAN 14 feature aimed at call drop reduction. Reasons for Change Requested / Results to Be Obtained To activate the call re-establishment feature in RNC AHRNC01 and BURNC02 Risk Analysis: Impact of Change Requested on Network / Service NEs / Services Affected AHRNC01/BURNC01 and the sites for both RNCs NEs / Services Potentially Affected Not sevice affecting Performance Degradation crforcallreestablishment-150821224140-lva1-app6892.doc 1/4
  • 2. Change Request - Management Process Operations Loss of Redundancy Protection Design Other Dependencies Has the Change Requested Been Tested? If Yes, Attach Test Documents. Yes No If Yes, State Results: If No, Give Reasons: In Case the Change Has Not Been Tested: Has the Change Requested Been Implemented Before? Yes No If Yes, When and Where? List Departments/Names That Should Be Notified of Change Requested or that have dependencies upon. Core X Radio TX VAS X OSS IT Power Fixed IN Names added Resource Plan (ASP) 1. Project Manager Name Edward okoth e-Mail Edward.okoth.ext@nokia.com Phone No +25671323077 2. Implementation Engineer 2 Name William Mpuuga e-Mail William.mpuuga@airtel.co.ug Phone No +256704005066 3. Implementation Engineer 3 Name Jerome Lubega e-Mail Jerome.lubega@airtel.co.ug Phone No +256 704005665 Escalation Path (ERICSSON) 1. Project Manager Name e-Mail Phone No 2. Implementation Manager Name e-Mail Phone No 3. On-site Supervisor Name e-Mail Phone No crforcallreestablishment-150821224140-lva1-app6892.doc 2/4
  • 3. Change Request - Management Process Operations 4. Other Name e-Mail Phone No Attached Documentation* Other: * Additional documentation may be required for certain types of CRs. crforcallreestablishment-150821224140-lva1-app6892.doc 3/4
  • 4. Change Request - Management Process Operations 2. Approvals Submitters must hand in the CR to the MS technical Approver of the respective area first. If he approves it, he will pass it on to the Airtel technical Approver. If he approves it, he will pass it on to the MS Ops Director who will take it to the update the Airtel ND. The timeslot in case of dependencies with other planned work may be changed. MS technical Approver Approver’s Name Department Position e-Mail Phone No Approved Yes No Date (dd/mm/yy) Additional Remarks Signature Airtel technical Approver Approver’s Name Department Position e-Mail Phone No Approved Yes No Date (dd/mm/yy) Additional Remarks Signature Approved execution of the activity (atleast 4 days after the approval date) Scheduled Date and Time Start Date (dd/mm/yy) Start Time (hh:mm) End Date (dd/mm/yy) End Time (hh:mm) Scheduled Outage Time (If Applicable) Start Date (dd/mm/yy) Start Time (hh:mm) End Date (dd/mm/yy) End Time (hh:mm) Completion of Implemented change monitoring period (recommended 48 hrs) Date (dd/mm/yy) Time (hh:mm) Reasons for New Timeslot (If Applicable) Additional Remarks MS Operations Director Airtel Network Director crforcallreestablishment-150821224140-lva1-app6892.doc 4/4