Here are the answers to the quiz questions:
1. The four focus areas of cost efficient construction are:
- Material management
- Wastage minimization
- Labor management
- Contract administration
2. Five aspects for cost efficient construction are:
- Optimum use of land
- Functional design of structure
- Optimum use of construction material
- Rationalization of specifications
- New construction materials and techniques
3. Cost efficient construction means construction of facilities using appropriate technologies that are energy efficient, environmentally friendly, create employment opportunities, and substitute expensive materials with locally available materials.
4. Five factors that should be considered in cost efficient construction are:
- Ecologically appropriate
- Energy efficient
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Cost Efficient Construction Techniques
1. Debre Berhan University
Institute of Technology
College of Engineering
Department of CoTM
C o st Efficient Construction (CoTM5282 )
Organized by Asemamaw D. & Habtamu G.
Sunday, January 15, 2023
C H A P T E R T H R E E
C o s t - E f f e c t i ve C o n s t r u c t i o n
2. 1.1. INTRODUCTION
Cost efficient construction is the construction of;
Cost effective facilities using appropriate technologies
Energy efficient and environmentally friendly structure
Facilities that create employment and skill improvement
opportunities
Structures that substitute expensive and scarce building
material sand its components by local available material
CHAPTER THREE
COST EFFCIENT CONSTRUCTION (CEC)
3. Strong
Durable
Functional
Aesthetic
Environmental friendly
construction
Factors considered in cost efficient construction
Ecologically appropriate
Energy efficient
Affordable and adaptable
Cost effective material
Appropriate technologies in
construction
4.
5. Simple machine – save energy in production
Raw material – derived from agro industrial and natural fiber ,
require less energy in production
Products – provide better thermal comfort that result in conservation
of operational energy
A. Energy efficient
6. Improving waste management and environmental protection
Utilize local resource
Substitute wood – preserving forest cover
B. Environmental friendly
C . Employment generating
Simple machine – with manual handling increases employment
Small enterprise – can be set up at decentralized locations
Production of component – involves local people after short training
7. Easy to manufacture
Easy affordability
Easy erection / commissioning
Faster and cheaper construction
Effective waste utilization
Energy efficient and environment friendly
Characteristics of CEC material
8. Optimum use of land
Functional design of structure
Optimum use of construction material
Rationalization of specifications
New construction materials and techniques
Aspects for cost reduction
9. Availability / suitability of raw material
Availability of skilled labour
Scale of construction
Cost variation with conventional material
Availability of adequate power for production of components
Disaster resistant requirements
Environmental aspect
Acceptability by the people
Factors affecting choice of materials
10. Low initial cost and productivity
Lower consumption of materials
Time saving in construction
Utilization of waste materials
Better utilization of space
Achieving better utilization of equipment
Technology selection criteria
11. Expensive materials
Improper Planning
Inaccurate Project Cost Estimation
Poor cost management
Poor waste management
Lack of skills and knowledge in selection of construction
packages
Design
Materials
Method
Causes of high construction cost
13. Material management is concerned with the Planning
identification, procuring, storage and use of construction
materials.
The purpose of material management is to assure that the right
materials are in the right place, in the right quantities when
needed
Materials Management
Cost of materials in construction consume around 50-60% of the
project cost.
Causes of project cost increment related to material management
poor planning and control of materials
Lack of materials when needed
Poor identification of materials
Handling and inadequate storage
15. Waste can be defined as any losses produced by activities that
generate direct or indirect costs but do not add any value to the
product from the point of view of the client.
It is generated during the construction process because of factors
such as site preparation, material use, material damage, material
non use, excess procurement and human error
Objective Minimize wastage (minimize labor and material cost
indirectly, minimize machine time) minimize expense cost
effective building.
Waste minimization is any technique that either avoids,
eliminates or reduces waste at its source
Wastage Minimization
16. The specifications need to address the following areas;
Use of waste reduction techniques during construction;
Reuse of construction waste material on site
Recovery of construction waste material from site for resale and
use elsewhere;
Return of unused construction material to vendors for credit; and
Recycling of construction waste
Waste specifications for construction sites
17.
18. Waste Avoidance
The concept of waste avoidance can be represented with three
components:
Waste prevention,
waste demand management and
Reduction (source control )
I. Waste Prevention
The biggest opportunity to impact on waste generation through
prevention principles is at:
Design
Through design for waste reduction i.e. doing more with less, and
design with consideration for reuse and recycling at the end of life
of a structure.
19. Operations
Through clear communication of designs to the project team to
avoid unnecessary waste through errors.
Procurement
Through the engagement of suppliers to encourage a reduction in
packaging waste, the use of reusable containers and through “take
back” agreements for unused materials.
II. Waste Demand management
Material delivery
Care when loading, transporting and off loading materials.
Material storage
Safe storage, covered storage where necessary and storage
away from jobsite activities.
20. III. Waste reduction
Source control is achieved through:
Separation at source: selective and separate disposal of generated
waste for reuse, recycling and garbage disposal.
On-site reuse: . closure of materials flow loop internally on site
instead of externally in the waste stream.
Waste Management Plan
A waste management plan can be described as a construction
project related plan that gives provisions for the prevention,
separation, salvage, reuse, recycling and disposal of waste.
21. Labor
Work force in construction project include
Professional skilled
Semi skilled
Labors.
Target of labor management
o To do jobs in a lesser time
o lesser construction cost
o building with a lesser cost
Labor Management
Labor Intensive Construction Technology
“labor-intensive approach” –is an approach where labor is the
dominant resource for carrying out works, and where the share of
the total project cost spent on labor is high (typically 25 –60%)
22. Advantages of Labor Intensive Construction
Creates employment for local people (women and youth)
Creation of local entrepreneurs
Promotes local economic development and livelihoods specially
in rural areas
Mitigates rural-urban migration
Skills transfer to workers
Requires fewer skilled operators
23. Techniques towards efficient man power management:
Use of readily/locally available workforce
Focusing on building modules that are lightweight, simple to
assemble, and require minimum skilled labor.
The use of unskilled and the unemployed
Manuals and guidelines
Properly training the laborers
24.
25. Contract Administration
Develop a detailed “scope of work” for everyone hired to work on
the project.
Make sure that contractors are licensed and bonded.
Consider getting estimates for materials and products from at
least three suppliers.
Hold a pre-construction workshop with all the trade contractors
so that they understand the project goals
Contract Administration, Construction and Inspections
27. Quiz 1
1. list and explain the four focus areas of cost efficient construction?
2. List five aspects for cost efficient construction?
3. What mean cost efficient construction
4. List five factors that should consider in cost efficient construction?
5. What is the benefits of material management ?