1.1. INTRODUCTION
Cost efficient construction is the construction of;
Cost effective facilities using appropriate technologies
Energy efficient and environmentally friendly structure
Facilities that create employment and skill improvement
opportunities
Structures that substitute expensive and scarce building
material sand its components by local available material
CHAPTER THREE
COST EFFCIENT CONSTRUCTION (CEC)
 Strong
 Durable
 Functional
 Aesthetic
 Environmental friendly
 construction
Factors considered in cost efficient construction
 Ecologically appropriate
 Energy efficient
 Affordable and adaptable
 Cost effective material
 Appropriate technologies in
construction
Simple machine – save energy in production
Raw material – derived from agro industrial and natural fiber ,
require less energy in production
Products – provide better thermal comfort that result in conservation
of operational energy
A. Energy efficient
 Improving waste management and environmental protection
 Utilize local resource
 Substitute wood – preserving forest cover
B. Environmental friendly
C . Employment generating
 Simple machine – with manual handling increases employment
 Small enterprise – can be set up at decentralized locations
 Production of component – involves local people after short training
 Easy to manufacture
 Easy affordability
 Easy erection / commissioning
 Faster and cheaper construction
 Effective waste utilization
 Energy efficient and environment friendly
Characteristics of CEC material
 Optimum use of land
 Functional design of structure
 Optimum use of construction material
 Rationalization of specifications
 New construction materials and techniques
Aspects for cost reduction
 Availability / suitability of raw material
 Availability of skilled labour
 Scale of construction
 Cost variation with conventional material
 Availability of adequate power for production of components
 Disaster resistant requirements
 Environmental aspect
 Acceptability by the people
Factors affecting choice of materials
 Low initial cost and productivity
 Lower consumption of materials
 Time saving in construction
 Utilization of waste materials
 Better utilization of space
 Achieving better utilization of equipment
Technology selection criteria
 Expensive materials
 Improper Planning
 Inaccurate Project Cost Estimation
 Poor cost management
 Poor waste management
 Lack of skills and knowledge in selection of construction
packages
 Design
 Materials
 Method
Causes of high construction cost
Focus areas for cost efficient construction
 Material management is concerned with the Planning
identification, procuring, storage and use of construction
materials.
 The purpose of material management is to assure that the right
materials are in the right place, in the right quantities when
needed
Materials Management
 Cost of materials in construction consume around 50-60% of the
project cost.
Causes of project cost increment related to material management
 poor planning and control of materials
 Lack of materials when needed
 Poor identification of materials
 Handling and inadequate storage
 Improved labor productivity
 Reduced Bulk Materials Surplus
 Reduced Materials Management Manpower
 Improved Vendor Performance
Benefits of a Materials Management
 Waste can be defined as any losses produced by activities that
generate direct or indirect costs but do not add any value to the
product from the point of view of the client.
 It is generated during the construction process because of factors
such as site preparation, material use, material damage, material
non use, excess procurement and human error
 Objective Minimize wastage (minimize labor and material cost
indirectly, minimize machine time) minimize expense cost
effective building.
 Waste minimization is any technique that either avoids,
eliminates or reduces waste at its source
Wastage Minimization
The specifications need to address the following areas;
Use of waste reduction techniques during construction;
Reuse of construction waste material on site
Recovery of construction waste material from site for resale and
use elsewhere;
Return of unused construction material to vendors for credit; and
Recycling of construction waste
Waste specifications for construction sites
Waste Avoidance
The concept of waste avoidance can be represented with three
components:
Waste prevention,
waste demand management and
Reduction (source control )
I. Waste Prevention
The biggest opportunity to impact on waste generation through
prevention principles is at:
Design
Through design for waste reduction i.e. doing more with less, and
design with consideration for reuse and recycling at the end of life
of a structure.
Operations
Through clear communication of designs to the project team to
avoid unnecessary waste through errors.
Procurement
Through the engagement of suppliers to encourage a reduction in
packaging waste, the use of reusable containers and through “take
back” agreements for unused materials.
II. Waste Demand management
Material delivery
Care when loading, transporting and off loading materials.
Material storage
Safe storage, covered storage where necessary and storage
away from jobsite activities.
III. Waste reduction
Source control is achieved through:
Separation at source: selective and separate disposal of generated
waste for reuse, recycling and garbage disposal.
On-site reuse: . closure of materials flow loop internally on site
instead of externally in the waste stream.
Waste Management Plan
A waste management plan can be described as a construction
project related plan that gives provisions for the prevention,
separation, salvage, reuse, recycling and disposal of waste.
Labor
Work force in construction project include
 Professional skilled
 Semi skilled
 Labors.
Target of labor management
o To do jobs in a lesser time
o lesser construction cost
o building with a lesser cost
Labor Management
Labor Intensive Construction Technology
“labor-intensive approach” –is an approach where labor is the
dominant resource for carrying out works, and where the share of
the total project cost spent on labor is high (typically 25 –60%)
Advantages of Labor Intensive Construction
Creates employment for local people (women and youth)
Creation of local entrepreneurs
Promotes local economic development and livelihoods specially
in rural areas
Mitigates rural-urban migration
Skills transfer to workers
Requires fewer skilled operators
Techniques towards efficient man power management:
Use of readily/locally available workforce
Focusing on building modules that are lightweight, simple to
assemble, and require minimum skilled labor.
The use of unskilled and the unemployed
Manuals and guidelines
Properly training the laborers
Contract Administration
 Develop a detailed “scope of work” for everyone hired to work on
the project.
 Make sure that contractors are licensed and bonded.
 Consider getting estimates for materials and products from at
least three suppliers.
 Hold a pre-construction workshop with all the trade contractors
so that they understand the project goals
Contract Administration, Construction and Inspections
END OF CHAPTER 3
THANK YOU!
Quiz 1
1. list and explain the four focus areas of cost efficient construction?
2. List five aspects for cost efficient construction?
3. What mean cost efficient construction
4. List five factors that should consider in cost efficient construction?
5. What is the benefits of material management ?

More Related Content

Similar to Cost Efficient Construction Techniques

Appropriate material for sustainable building
Appropriate material for sustainable building Appropriate material for sustainable building
Appropriate material for sustainable building Biya Girma Hirpo
 
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...IJRESJOURNAL
 
Design for disassembly iraldo
Design for disassembly iraldoDesign for disassembly iraldo
Design for disassembly iraldoFabio Iraldo
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewIRJET Journal
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET Journal
 
Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationKerrie Noble
 
Research paper on Eco-Friendly building material and construction technique i...
Research paper on Eco-Friendly building material and construction technique i...Research paper on Eco-Friendly building material and construction technique i...
Research paper on Eco-Friendly building material and construction technique i...shivangi5796
 
070 material management
070 material management070 material management
070 material managementdrdej19
 
070 Material Management and Construction Productivity
070 Material Management and Construction Productivity 070 Material Management and Construction Productivity
070 Material Management and Construction Productivity Dr Fereidoun Dejahang
 
Circular Construction definition
Circular Construction definitionCircular Construction definition
Circular Construction definitionDina Padalkina
 
Sustainable building practices and materials in relation to.pdf
Sustainable building practices and materials in relation to.pdfSustainable building practices and materials in relation to.pdf
Sustainable building practices and materials in relation to.pdfsdfghj21
 

Similar to Cost Efficient Construction Techniques (20)

Appropriate material for sustainable building
Appropriate material for sustainable building Appropriate material for sustainable building
Appropriate material for sustainable building
 
Tony Baldwinson Waste Pecha Kucha
Tony Baldwinson Waste Pecha KuchaTony Baldwinson Waste Pecha Kucha
Tony Baldwinson Waste Pecha Kucha
 
LECTURE 3.pptx
LECTURE 3.pptxLECTURE 3.pptx
LECTURE 3.pptx
 
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...
Performance Evaluation of Cost Saving Towards Sustainability in Traditional C...
 
Ecodesign
EcodesignEcodesign
Ecodesign
 
Production mgmt
Production mgmtProduction mgmt
Production mgmt
 
Circular Economy and the Built Environment
Circular Economy and the Built EnvironmentCircular Economy and the Built Environment
Circular Economy and the Built Environment
 
Design for disassembly iraldo
Design for disassembly iraldoDesign for disassembly iraldo
Design for disassembly iraldo
 
Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A Review
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...IRJET-Improving Effective Material Management by Identifying Common Factors i...
IRJET-Improving Effective Material Management by Identifying Common Factors i...
 
Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentation
 
Research paper on Eco-Friendly building material and construction technique i...
Research paper on Eco-Friendly building material and construction technique i...Research paper on Eco-Friendly building material and construction technique i...
Research paper on Eco-Friendly building material and construction technique i...
 
070 material management
070 material management070 material management
070 material management
 
070 Material Management and Construction Productivity
070 Material Management and Construction Productivity 070 Material Management and Construction Productivity
070 Material Management and Construction Productivity
 
Circular Construction definition
Circular Construction definitionCircular Construction definition
Circular Construction definition
 
Sustainable building practices and materials in relation to.pdf
Sustainable building practices and materials in relation to.pdfSustainable building practices and materials in relation to.pdf
Sustainable building practices and materials in relation to.pdf
 

Recently uploaded

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Cost Efficient Construction Techniques

  • 1. Debre Berhan University Institute of Technology College of Engineering Department of CoTM C o st Efficient Construction (CoTM5282 ) Organized by Asemamaw D. & Habtamu G. Sunday, January 15, 2023 C H A P T E R T H R E E C o s t - E f f e c t i ve C o n s t r u c t i o n
  • 2. 1.1. INTRODUCTION Cost efficient construction is the construction of; Cost effective facilities using appropriate technologies Energy efficient and environmentally friendly structure Facilities that create employment and skill improvement opportunities Structures that substitute expensive and scarce building material sand its components by local available material CHAPTER THREE COST EFFCIENT CONSTRUCTION (CEC)
  • 3.  Strong  Durable  Functional  Aesthetic  Environmental friendly  construction Factors considered in cost efficient construction  Ecologically appropriate  Energy efficient  Affordable and adaptable  Cost effective material  Appropriate technologies in construction
  • 4.
  • 5. Simple machine – save energy in production Raw material – derived from agro industrial and natural fiber , require less energy in production Products – provide better thermal comfort that result in conservation of operational energy A. Energy efficient
  • 6.  Improving waste management and environmental protection  Utilize local resource  Substitute wood – preserving forest cover B. Environmental friendly C . Employment generating  Simple machine – with manual handling increases employment  Small enterprise – can be set up at decentralized locations  Production of component – involves local people after short training
  • 7.  Easy to manufacture  Easy affordability  Easy erection / commissioning  Faster and cheaper construction  Effective waste utilization  Energy efficient and environment friendly Characteristics of CEC material
  • 8.  Optimum use of land  Functional design of structure  Optimum use of construction material  Rationalization of specifications  New construction materials and techniques Aspects for cost reduction
  • 9.  Availability / suitability of raw material  Availability of skilled labour  Scale of construction  Cost variation with conventional material  Availability of adequate power for production of components  Disaster resistant requirements  Environmental aspect  Acceptability by the people Factors affecting choice of materials
  • 10.  Low initial cost and productivity  Lower consumption of materials  Time saving in construction  Utilization of waste materials  Better utilization of space  Achieving better utilization of equipment Technology selection criteria
  • 11.  Expensive materials  Improper Planning  Inaccurate Project Cost Estimation  Poor cost management  Poor waste management  Lack of skills and knowledge in selection of construction packages  Design  Materials  Method Causes of high construction cost
  • 12. Focus areas for cost efficient construction
  • 13.  Material management is concerned with the Planning identification, procuring, storage and use of construction materials.  The purpose of material management is to assure that the right materials are in the right place, in the right quantities when needed Materials Management  Cost of materials in construction consume around 50-60% of the project cost. Causes of project cost increment related to material management  poor planning and control of materials  Lack of materials when needed  Poor identification of materials  Handling and inadequate storage
  • 14.  Improved labor productivity  Reduced Bulk Materials Surplus  Reduced Materials Management Manpower  Improved Vendor Performance Benefits of a Materials Management
  • 15.  Waste can be defined as any losses produced by activities that generate direct or indirect costs but do not add any value to the product from the point of view of the client.  It is generated during the construction process because of factors such as site preparation, material use, material damage, material non use, excess procurement and human error  Objective Minimize wastage (minimize labor and material cost indirectly, minimize machine time) minimize expense cost effective building.  Waste minimization is any technique that either avoids, eliminates or reduces waste at its source Wastage Minimization
  • 16. The specifications need to address the following areas; Use of waste reduction techniques during construction; Reuse of construction waste material on site Recovery of construction waste material from site for resale and use elsewhere; Return of unused construction material to vendors for credit; and Recycling of construction waste Waste specifications for construction sites
  • 17.
  • 18. Waste Avoidance The concept of waste avoidance can be represented with three components: Waste prevention, waste demand management and Reduction (source control ) I. Waste Prevention The biggest opportunity to impact on waste generation through prevention principles is at: Design Through design for waste reduction i.e. doing more with less, and design with consideration for reuse and recycling at the end of life of a structure.
  • 19. Operations Through clear communication of designs to the project team to avoid unnecessary waste through errors. Procurement Through the engagement of suppliers to encourage a reduction in packaging waste, the use of reusable containers and through “take back” agreements for unused materials. II. Waste Demand management Material delivery Care when loading, transporting and off loading materials. Material storage Safe storage, covered storage where necessary and storage away from jobsite activities.
  • 20. III. Waste reduction Source control is achieved through: Separation at source: selective and separate disposal of generated waste for reuse, recycling and garbage disposal. On-site reuse: . closure of materials flow loop internally on site instead of externally in the waste stream. Waste Management Plan A waste management plan can be described as a construction project related plan that gives provisions for the prevention, separation, salvage, reuse, recycling and disposal of waste.
  • 21. Labor Work force in construction project include  Professional skilled  Semi skilled  Labors. Target of labor management o To do jobs in a lesser time o lesser construction cost o building with a lesser cost Labor Management Labor Intensive Construction Technology “labor-intensive approach” –is an approach where labor is the dominant resource for carrying out works, and where the share of the total project cost spent on labor is high (typically 25 –60%)
  • 22. Advantages of Labor Intensive Construction Creates employment for local people (women and youth) Creation of local entrepreneurs Promotes local economic development and livelihoods specially in rural areas Mitigates rural-urban migration Skills transfer to workers Requires fewer skilled operators
  • 23. Techniques towards efficient man power management: Use of readily/locally available workforce Focusing on building modules that are lightweight, simple to assemble, and require minimum skilled labor. The use of unskilled and the unemployed Manuals and guidelines Properly training the laborers
  • 24.
  • 25. Contract Administration  Develop a detailed “scope of work” for everyone hired to work on the project.  Make sure that contractors are licensed and bonded.  Consider getting estimates for materials and products from at least three suppliers.  Hold a pre-construction workshop with all the trade contractors so that they understand the project goals Contract Administration, Construction and Inspections
  • 26. END OF CHAPTER 3 THANK YOU!
  • 27. Quiz 1 1. list and explain the four focus areas of cost efficient construction? 2. List five aspects for cost efficient construction? 3. What mean cost efficient construction 4. List five factors that should consider in cost efficient construction? 5. What is the benefits of material management ?